Total # Projects: 11
Total # Contracts: 7
Total $ Projects: $4,174,128
Total $ Contracts: $3,449,358

Other Counties

Project $
Beaverhead $0
Big Horn $2,287,646
Blaine $2,402,036
Broadwater $0
Carbon $1,343,448
Carter $10,954,503
Cascade $5,577,474
Chouteau $0
Custer $0
Daniels $518,694
Dawson $2,306,303
Deer Lodge $517,000
Fallon $7,939,811
Fergus $0
Flathead $19,563,781
Gallatin $9,733,185
Garfield $0
Glacier $9,884,850
Golden Valley $0
Granite $111,165
Hill $0
Jefferson $0
Judith Basin $0
Lake $612,860
Lewis and Clark $14,266,134
Liberty $0
Lincoln $186,403
McCone $0
Madison $323,887
Meagher $0
Mineral $0
Musselshell $0
Park $572,267
Petroleum $0
Phillips $8,000,000
Pondera $0
Powder River $0
Powell $0
Prairie $0
Ravalli $5,493,307
Richland $0
Roosevelt $334,320
Rosebud $1,905,486
Sanders $0
Sheridan $3,022,926
Silver Bow $1,380,530
Stillwater $3,795,714
Sweet Grass $3,205,584
Teton $2,728,753
Toole $0
Treasure $0
Valley $0
Wheatland $0
Wibaux $1,319,731
Yellowstone $20,687,546
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for Missoula. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
2.6 MILE SEAL AND COVER ON A STATE HIGHWAY WEST OF MISSOULA. (Federal ID: 3275813) LS JENSEN CONSTRUCTION & READY MIX Missoula Pavement Improvement $210,134
0.8 MILE MILL AND FILL IN MISSOULA (Federal ID: 8105014) KNIFE RIVER - BELGRADE Missoula Pavement Improvement $134,635
0.17 MILE MILL AND FILL IN MISSOULA (Federal ID: 8107019) KNIFE RIVER - BELGRADE Missoula Pavement Improvement $68,776
ON THE SCOTT STREET OVERPASS IN MISSOULA, BRIDGE DECK REPAIR AND REPLACING THE SURFACE WITH A HIGH STRENGTH EPOXY CONCRETE. (Federal ID: 8109002) SLETTEN CONSTRUCTION COMPANY Missoula Bridge Improvement $1,777,546
0.3 MILE MILL AND FILL IN MISSOULA (Federal ID: 8113006) KNIFE RIVER - BELGRADE Missoula Pavement Improvement $107,746
INTERSECTION & SIGNAL IMPROVEMENT IN MISSOULA (Federal ID: 8117006) KNIFE RIVER - BELGRADE Missoula Pavement Improvement $600,125
2 MILE MILL AND FILL IN MISSOULA (Federal ID: 8120005) KNIFE RIVER - BELGRADE Missoula Pavement Improvement $550,396
DESIGN AND CONSTRUCTION OF SIDEWALKS, BIKE LANES, AND PERIOD LIGHTING. THE PROEJCT IS IN MISSOULA ALONG BOTH SIDES IF HIGGINS AVENUE BETWEEN BROADWAY AND RAILROAD STREETS. (Federal ID: 8119001) No Contractor Missoula Other $125,000
DESIGN AND CONSTRUCT A BICYCLE AND PEDSTRIAN PATH IN THE MISSOULA URBANIZED AREA ALONG THE SOUTH SIDE OF MULLAN ROAD BETWEEN FLYN LANE AND COTE LANE. (Federal ID: 8123001) No Contractor Missoula Other $72,000
INSTALLATION OF ACCESSIBLE CURB RAMPS ON EXISTING SIDEWALKS AT MULTIPLE LOCATIONS WITHIN THE CITY OF MISSOULA. (Federal ID: 8199088) No Contractor Missoula Other $20,000
DESIGN AND CONSTRUCT SIDEWALKS AND BIKE PATHS IN MISSOULA - ON BOTH SIDES OF GREENOUGH DRVIE BETWEEN MADISON ST AND WATEWORKS HILL TRAILHEAD. (Federal ID: 8199089) No Contractor Missoula Other $30,000