New Hampshire • Merrimack County
Top 10 Largest Contracts
EXIT 14 NORTH TO EXIT 17, 1.5" TW INLAY WI... | NH / Merrimack |
$5,121,186
|
EXIT 11 NORTH TO EXIT 12A, 1.5" FULL WIDTH... | NH / Merrimack |
$4,940,917
|
NORTH MAIN STREET EAST TO NH9, MICROSURFAC... | NH / Merrimack |
$792,740
|
Total # Projects: | 4 |
Total # Contracts: | 3 |
Total $ Projects: | $11,911,274 |
Total $ Contracts: | $10,854,843 |
Other Counties
Project $ | |
---|---|
Belknap | $539,233 |
Carroll | $0 |
Cheshire | $0 |
Coos | $0 |
Grafton | $28,822,301 |
Hillsborough | $16,998,999 |
Rockingham | $38,422,403 |
Strafford | $758,258 |
Sullivan | $0 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for Merrimack. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
NORTH MAIN STREET EAST TO NH9, MICROSURFACING OF TW ONLY (4.9 MILES) [PARENT = IPPP*3927] [ARRA] (Federal ID: A000838) | NEW YORK BITUMINOUS PRODUCTS CORP | Merrimack | Pavement Improvement | $792,740 |
EXIT 14 NORTH TO EXIT 17, 1.5" TW INLAY WITH 1.5" FULL WIDTH OVERLAY (6.1 MILES) [PARENTS = IPPP*3927, BRPPI 6601 AND GRR 785] [ARRA] (Federal ID: A000839) | CONTINENTAL PAVING INC. | Merrimack | Pavement Improvement | $5,121,186 |
EXIT 11 NORTH TO EXIT 12A, 1.5" FULL WIDTH INLAY (4.9 MILES) (Federal ID: A000846) | PIKE INDUSTRIES, INC. | Merrimack | Pavement Improvement | $4,940,917 |
KING ST SIDEWALK CONNECTOR: CONSTRUCT SIDEWALKS ALONG NORTH MAIN ST FORM EXISTING SIDEWALK TO INTERSECTION OF US 3/4 & FROM US 3/4 INTERSECTION TO RIVER RD CONNECTING WITH EXISTING SIDEWALK ON KING ST (Federal ID: A000342) | No Contractor | Merrimack | Transportation Enhancements | $421,431 |