New Mexico • NM-03 Congressional District

Get Adobe Flash player

Total # Projects: 17
Total # Contracts: 6
Total $ Projects: $125,058,579
Total $ Contracts: $108,993,728

Congressmembers

Other Congressional Districts

Project $
NM-01 $17,721,176
NM-02 $48,655,273

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for NM-03. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
US 84, POJOAQUE TO ESPANOLA, NORTHERN HALF OF CORRIDOR, ARROYO SECO / LA PUEBLA, MP 185.5-188.4 (Federal ID: 0511097) MOUNTAIN STATES CONSTUCTORS, INC. Santa Fe Pavement Widening $14,000,000
US 84/285 MM 187.0 TO 189.0 (Federal ID: 0511098) STAR PAVING COMPANY Santa Fe Pavement Improvement $9,500,000
US 64, RATON TO CLAYTON RECONSTRUCTION (Federal ID: 0649036) Unknown Company 3730 Colfax New Construction $28,993,728
CONSTRUCT NEW 2 LANE ROADWAY (Federal ID: 4007003) Unknown Company 51863 Sandoval Pavement Widening $14,000,000
US 491, TOHATCHI TO SHIPROCK (Federal ID: 4911011) SKANSKA USA CIVIL WEST ROCKY MOUNTAIN DISTRICT INC San Juan New Construction $31,500,000
US 491, REHAB EXISTING LANES ON SOUTHERN SEGMENT OF CORRIDOR, PHASE II, MP 15.6-29.5 (Federal ID: 4911031) FNF CONSTRUCTION, INC. McKinley Pavement Improvement $11,000,000
RIO GRANDE CROSSING COORS TO E SIDE (Federal ID: 0403104) No Contractor Bernalillo Transportation Enhancements $5,358,782
FL5119, RECONSTRUCT 2 LANES AND ADD/IMPROVE SIDEWALKS. ADD CENTER DOUBLE LEFT TURN LANES AND ADD DECELERATION LANE. (Federal ID: 5119001) No Contractor Sandoval Pavement Improvement $2,914,579
INDUSTRIAL PARK ROAD IMPROVEMENTS, DRAINAGE, TRAFFIC & PEDESTRIAN SAFETY, LEFT TURN LANES & SIDEWALKS (Federal ID: 5348002) No Contractor Rio Arriba Pavement Improvement $1,250,000
REPLACEMENT OF HULL STREET OVERPASS SPANNING OVER BNSF RAILROAD (Federal ID: ES21280) No Contractor Curry Bridge Replacement $831,489
SIGNING, STRIPING, SIDEWALKS, CURB & GUTTER, DRAINAGE STRUCTURES & PAVEMENT REPLACEMENT (Federal ID: ES41190) No Contractor Colfax Pavement Improvement $762,000
REPLACE BRIDGE (Federal ID: ES61170) No Contractor Sandoval Bridge Improvement $198,000
WIDEN SHOULDERS, INTERSECTION, REPLACE BRIDGE, EXPAND BRIDGE, DRAINAGE STRUCTURES, SIDEWALKS, CURB & GUTTER & UTILITIES. (Federal ID: ES61190) No Contractor McKinley Pavement Widening $2,100,000
DESIGN, ENGINEERING, ENVIRONMENTAL ASSESSMENT AND INITIAL CONSTRUCITON OF EAST AZTEC ARTERIAL ROUTE, NM. DEMO ID# NM083 (Federal ID: ESF1050) No Contractor San Juan Pavement Improvement $1,700,000
VISUAL & AESTHETIC ENHANCEMENTS TO ROADWAY, WHICH IS SUTUATED IN A MOSTLY RESIDENTIAL AREA. (Federal ID: ESS1010) No Contractor Santa Fe Transportation Enhancements $150,000
COMPLETE CONSTRUCTION OF THE PAVED MULTIMODAL SANTA FE RAIL TRAIL FROM WHERE IT CURRENTLY ENDS AT THE I-25 OVERPASS AT US 84/285 (ST. FRANCIS DR). TO RABBIT RD. (Federal ID: ESS1020) No Contractor Santa Fe Transportation Enhancements $100,000
CONTRACT MODIFICATION TO EXISTING PROJECT (ORIGINAL PROJECT INCLUDED GRADING, DRAINAGE, SURFACING AND A NEW BRIDGE STRUCTURE) TO ADD ROADWAY DRAINAGE IMPROVEMENTS TO PROTECT THE ROADWAY AND INSTREAM D (Federal ID: 1516350121006) No Contractor Sandoval Other $700,000