Ohio • OH-09 Congressional District
Top 10 Largest Contracts
HYDRODEMO THE EXISTING WEARING COURSE AND ... | OH / Wood |
$5,539,590
|
PRIORITY SYSTEM PREVENTIVE MAINTENANCE PRO... | OH / Lucas |
$1,166,670
|
A SAFETY FUNDED PROJECT TO REVISE THE TRAF... | OH / Lucas |
$136,301
|
HYDRODEMO THE EXISTING WEARING COURSE AND ... | OH / Wood |
$45,516
|
Congressmembers
- Sen. Sherrod Brown (D) See Campaign Finances
- Rep. Marcy Kaptur (D) See Campaign Finances
- Sen. George V. Voinovich (R) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
OH-01 | $8,609,432 |
OH-02 | $14,356,785 |
OH-03 | $5,014,210 |
OH-04 | $19,554,685 |
OH-05 | $6,138,883 |
OH-06 | $161,641,400 |
OH-07 | $29,249,196 |
OH-08 | $13,113,618 |
OH-10 | $25,948,408 |
OH-11 | $11,968,729 |
OH-12 | $9,095,504 |
OH-13 | $7,119,147 |
OH-14 | $15,740,618 |
OH-15 | $5,759,725 |
OH-16 | $22,469,912 |
OH-17 | $19,283,328 |
OH-18 | $39,227,662 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for OH-09. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
PRIORITY SYSTEM PREVENTIVE MAINTENANCE PROJECT ON LUC-75 FROM NORTH COVE BRIDGE TO CECILIA, PERFORM NECESSARY RELATED WORK. (NO WARRANTY) (Federal ID: E031995) | GERKEN PAVING INC | Lucas | Pavement Improvement | $1,166,670 |
A SAFETY FUNDED PROJECT TO REVISE THE TRAFFIC CONTROL PLAN ON EASTBOUND SR-2 (AIRPORT HWY) FROM SPRING MEADOWS EAST DR TO SB I-475 SIGNALIZED INTERSECTION TO IMPROVE LANE UTILIZATION. CREATE A DEDICA (Federal ID: E080757) | GEDDIS PAVING & EXCAVATING INC | Lucas | Safety/Traffic Management | $136,301 |
HYDRODEMO THE EXISTING WEARING COURSE AND OVERLAY WITH MICRO-SILICA. (SEE PID 25492 FOR PAVEMENT MAJOR REHAB) OF 4 BRIDGES. PERFORM NECESSARY RELATED WORK. ORIGINAL PROJECT SCOPE OF THE DISALLE BRIDGE (Federal ID: E090752) | CSX TRANSPORTATION INC | Wood | Bridge Improvement | $45,516 |
HYDRODEMO THE EXISTING WEARING COURSE AND OVERLAY WITH MICRO-SILICA. (SEE PID 25492 FOR PAVEMENT MAJOR REHAB) OF 4 BRIDGES. PERFORM NECESSARY RELATED WORK. ORIGINAL PROJECT SCOPE OF THE DISALLE BRIDGE (Federal ID: E090752) | POSEN CONSTRUCTION, INC. | Wood | Bridge Improvement | $5,539,590 |
AN ARRA FUNDED PROJECT TO UPGARDE SIGNALIZATION AT 13 INTERSECTIONS IN LUCAS COUNTY; PERFORM NECESSARY RELATED WORK. (Federal ID: E090560) | No Contractor | Lucas | Safety/Traffic Management | $420,000 |
AN ARRA FUNDED PROJECT TO RESURFACE HILL AVE, IN THE CITY OF TOLEDO, FROM WESTWOOD AVE TO DETROIT AVE; PERFORM NECESSARY RELATED WORK. (Federal ID: E090636) | No Contractor | Lucas | Pavement Improvement | $1,175,000 |
AN ARRA FUNDED PROJECT TO RESURFACE SOUTH AVE, IN THE CITY OF TOLEDO, FROM AIRPORT HWY (SR-2) TO DETROIT AVE (US-24); PERFORM NECESSARY RELATED WORK. (Federal ID: E090637) | No Contractor | Lucas | Pavement Improvement | $242,522 |
A PARTIALLY ARRA FUNDED AND PARTIALLY URBAN PAVING PROGRAM FUNDED RESURFACING OF TELEGRAPH RD (US-24) FROM ALEXIS RD (SR-184) TO JUST SOUTH OF THE MICHIGAN STATE LINE IN THE CITY OF TOLEDO. PERFORM N (Federal ID: E090789) | No Contractor | Lucas | Pavement Improvement | $315,000 |
THE PARTIALLY (TMACOG) ARRA FUNDED AND PARTIALLY URBAN PAVING PROGRAM FUNDED RESURFACING OF DETROIT AVE (US-24) IN THE CITY OF TOLEDO FROM I-75 NEAR MONROE ST TO CENTRAL AVE (SR-120). PERFORM NECESSA (Federal ID: E090790) | No Contractor | Lucas | Pavement Improvement | $570,000 |