Pennsylvania • PA-05 Congressional District

Get Adobe Flash player

Total # Projects: 35
Total # Contracts: 28
Total $ Projects: $64,689,313
Total $ Contracts: $52,273,440

Congressmembers

Other Congressional Districts

Project $
PA-01 $77,377,214
PA-02 $0
PA-03 $50,716,370
PA-04 $37,189,039
PA-06 $7,448,341
PA-07 $14,576,740
PA-08 $2,762,897
PA-09 $49,935,502
PA-10 $54,516,079
PA-11 $68,776,621
PA-12 $26,453,493
PA-13 $273,000
PA-14 $71,792,939
PA-15 $36,196,943
PA-16 $23,231,295
PA-17 $37,435,455
PA-18 $22,046,043
PA-19 $30,878,384
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for PA-05. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
HIGHWAY RESTORATION OF STATE ROUTE 66 IN JENKS TOWNSHIP (Federal ID: Z013119) IA CONSTRUCTION CORPORATION Forest Pavement Improvement $875,679
RESURFACING OF US ROUTE 62 FROM MERCER ROAD TO BELL AVENUE AND STATE ROUTE 8 FROM POLK CUT-OFF TO MERCER ROAD IN THE CITY OF FRANKLIN, FRENCH CREEK AND SANDY CREEK TOWNSHIPS (Federal ID: Z015189) SHARON PAVING AND CONSTRUCTION CO.,INC. Venango Pavement Improvement $1,220,335
REPLACEMENT ON STATE ROUTE 428 OVER SUGAR CREEK IN OAKLAND TOWNSHIP (Federal ID: Z015190) SHINGLEDECKER'S WELDING, INC Venango Bridge Replacement $1,534,220
REPAIR RETAINING WALL ON STATE ROUTE 8 BYPASS IN THE CITY OF OIL CITY (Federal ID: Z015193) BRAYMAN CONSTRUCTION CORPORATION Venango Other $2,587,320
RESURFACING OF STATE ROUTE 3005, PLEASANT ROAD IN PLEASANT TOWNSHIP (Federal ID: Z016177) IA CONSTRUCTION CORPORATION Warren Pavement Improvement $547,395
BRIDGE REPLACEMENT ON US ROUTE 6 (GRAND ARMY HWY) OVER SIX MILE CREEK IN MEAD TOWNSHIP (Federal ID: Z016178) THE L.C. WHITFORD COMPANY, INC. Warren Bridge Replacement $1,488,996
RESURFACING, SHOULDER REHABILITATION AND DRAINAGE AND GUIDERAIL UPGRADES TO STATE ROUTE 26 FROM STATE ROUTE 144 TO STATE ROUTE 64 AND STATE ROUTE 64 FROM STATE ROUTE 26 TO STATE ROUTE 550 IN PLEASANT (Federal ID: Z021241) GLENN O. HAWBAKER, INC. Centre Pavement Improvement $2,784,026
REPLACEMENT OF THE STATE ROUTE 1001 BRIDGE OVER MARSH CREEK IN CURTIN TOWNSHIP (Federal ID: Z021253) QUALITY ENGINEERING SOLUTIONS, INC. Centre Bridge Replacement $948,536
REPLACEMENT OF THE STATE ROUTE 1001 BRIDGE OVER MARSH CREEK IN CURTIN TOWNSHIP (Federal ID: Z021253) GLENN O. HAWBAKER, INC. Centre Bridge Replacement $948,536
BRIDGE PERSEVERATION AT THREE LOCATIONS IN COLLEGE AND HARRIS TOWNSHIPS (Federal ID: Z021254) SPARTAN CONTRACTING LLC Centre Bridge Improvement $829,000
REPLACEMENT OF THE STATE ROUTE 2014 BRIDGE OVER TRIBUTARY TO PENNS CREEK IN GREGG TOWNSHIP (Federal ID: Z021255) LTT TRUCKING LLC Centre Bridge Replacement $395,011
RESURFACING AND SAFETY AND DRAINAGE IMPROVEMENTS ON STATE ROUTE 219 FROM CHESTNUT GROVE TO ANDERSON CREEK IN BRADY AND BLOOM TOWNSHIPS (Federal ID: Z022246) NEW ENTERPRISE STONE & LIME CO., INC. Clearfield Pavement Improvement $3,039,235
RESURFACING, DRAINAGE IMPROVEMENTS, GUIDERAIL, SLOPE STABILIZATION, AND SAFETY IMPROVEMENTS ON STATE ROUTE 970 FROM WOODLAND TO SHAWVILLE AREA IN BRADFORD AND GOSHEN TOWNSHIPS (Federal ID: Z022249) NEW ENTERPRISE STONE & LIME CO., INC. Clearfield Pavement Improvement $3,724,266
BRIDGE PRESERVATION OF 7 BRIDGES IN VARIOUS LOCATIONS IN CAMERON, CLEARFIELD, MCKEAN AND POTTER COUNTIES (Federal ID: Z022252) THE L.C. WHITFORD COMPANY, INC. Clearfield Bridge Improvement $3,938,887
RESURFACING OF LOCK HAVEN BYPASS FROM SALONA TO AVIS IN PINE CREEK, WAYNE, CASTENEA, BALD EAGLE AND LAMAR TOWNSHIPS (Federal ID: Z023177) GLENN O. HAWBAKER, INC. Clinton Pavement Improvement $6,717,022
REHABILITATION OF US ROUTE 219 INCLUDING ROADWAY, DRAINAGE, AND GUIDERAIL IMPROVEMENTS FROM LEWIS RUN TO CUSTER CITY IN BRADFORD TOWNSHIP (Federal ID: Z025185) GLENN O. HAWBAKER, INC. McKean Pavement Improvement $2,871,346
RESTORATION OF US ROUTE 6 FROM COUDERSPORT TOWARD SWEDEN VALLEY IN COUDERSPORT BOROUGH AND EULALIA TOWNSHIP (Federal ID: Z026154) GLENN O. HAWBAKER, INC. Potter Pavement Improvement $1,744,319
RESURFACING OF STATE ROUTE 2014 FROM MONTOUR STREET TO FAIRFIELD ROAD IN MONTOURSVILLE BOROUGH (Federal ID: Z032288) GLENN O. HAWBAKER, INC. Lycoming Pavement Improvement $550,000
REHABILITATION OF US ROUTE 220 OVER PINE RUN IN WOODWARD TOWNSHIP (Federal ID: Z032290) HRI, INC. Lycoming Pavement Improvement $584,844
PRESERVATION OF US ROUTE 15 NORTHBOUND BRIDGE OVER MILL CREEK/ HAMMOND DAM IN TIOGA TOWNSHIP (Federal ID: Z037222) THE L.C. WHITFORD COMPANY, INC. Tioga Bridge Improvement $289,192
RESURFACING OF STATE ROUTE 287 FROM WILSON CREEK TO SHUMWAY HILL ROAD IN DELMAR TOWNSHIP (Federal ID: Z037223) GLENN O. HAWBAKER, INC. Tioga Pavement Improvement $1,567,890
PRESERVATION OF STATE ROUTE 2005 BRIDGE OVER BLOCKHOUSE CREEK IN LIBERTY TOWNSHIP (Federal ID: Z037225) SUSQUEHANNA SUPPLY CO., INC. Tioga Bridge Replacement $974,325
BRIDGE REHABILITATION OF STATE ROUTE 8006 OVER INTERSTATE 80 IN PAINT TOWNSHIP (Federal ID: Z103194) HRI, INC. Clarion Bridge Improvement $6,335,330
PRESERVATION OF STATE ROUTE 66 MCGREGOR ROAD BRIDGE OVER LITTLE PINEY CREEK IN LIMESTONE TOWNSHIP (Federal ID: Z103196) FRANCIS J. PALO, INC. Clarion Bridge Improvement $747,066
REPLACEMENT OF PA 28 HAWTHORN BRIDGE OVER PINE CREEK IN REDBANK TOWNSHIP (Federal ID: Z103200) FRANCIS J. PALO, INC. Clarion Bridge Replacement $1,865,028
PRESERVATION OF STATE ROUTE 3011 HAMILTON BRIDGE OVER LITTLE MAHONING CREEK IN PERRY TOWNSHIP (Federal ID: Z105182) FRANCIS J. PALO, INC. Jefferson Bridge Improvement $588,044
REHABILITATION OF STATE ROUTE 2023 OVER CONRAIL RAILROAD IN PINE CREEK TOWNSHIP (Federal ID: Z105183) FRANCIS J. PALO, INC. Jefferson Bridge Improvement $962,022
RESURFACING OF STATE ROUTE 36 FROM MAIN STREET TO NEWCOME ROAD (T-402) IN PUNXSUTAWNEY BOROUGH AND YOUNG, PERRY AND OLIVER TOWNSHIPS (Federal ID: Z105185) QUAKER SALES CORPORATION Jefferson Pavement Improvement $1,615,570
BRIDGE REPLACEMENT ON STATE ROUTE 44 OVER JANDERS RUN IN CERES TOWNSHIP (Federal ID: Z025187) No Contractor McKean Bridge Replacement $1,050,000
MILLING, RESURFACING AND DRAINAGE IMPROVEMENTS TO SR 1005 (ELECTRIC AVENUE) FROM THE US 22 WESTBOUND ON-RAMP AT ELECTRIC AVENUE TO THE SR 1005 BUCKS RUN BRIDGE IN DERRY TOWNSHIP AND BURNHAM BOROUGH (Federal ID: Z027151) No Contractor Mifflin Pavement Improvement $1,383,935
MILLING, RESURFACING, DRAINAGE IMPROVEMENTS, AND BRIDGE PRESERVATION ON US 219 IN JOHNSONSBURG BOROUGH TO THE PA 321/SR 219 INTERSECTION NEAR THE VILLAGE OF WILCOX IN RIDGWAY AND JONES TOWNSHIPS (Federal ID: Z028158) No Contractor Elk Bridge Improvement $1,225,000
STATE ROUTE 3028 SECTION 41M FROM APPROXIMATELY THE INTERSECTION | FOR MILLING AND RESURFACING INCLUDING SUPERPAVE ASPHALT MIXTUR (Federal ID: Z032298) No Contractor Lycoming Pavement Improvement $419,136
MILL AND RESURFACE PA 44 FROM ALLEGHENY STREET TO US 220 INTERCHANGE IN PORTER TOWNSHIP AND JERSEY SHORE BOROUGH (Federal ID: Z032300) No Contractor Lycoming Pavement Improvement $175,000
RECONSTRUCT CURB RAMPS ALONG US 322 (MAIN STREET) FROM THE WESTERN LIMITS OF CLARION BOROUGH TO NINTH AVENUE IN CLARION TOWNSHIP (Federal ID: Z103201) No Contractor Clarion Transportation Enhancements $367,000
CONSTRUCT CURB RAMPS WITHIN BROCKWAY BOROUGH ALONG PA 28 (Federal ID: Z105187) No Contractor Jefferson Transportation Enhancements $445,000
RESURFACING AND CONSTRUCTION OF CURB RAMPS FROM THE INTERSECTION OF PA 36 AT THE MARGIOTTI BRIDGE IN PUNXSUTAWNEY BOROUGH SOUTH TO THE INTERSECTION OF US 119 IN YOUNG TOWNSHIP (Federal ID: Z105188) No Contractor Jefferson Pavement Improvement $450,000