Total # Projects: 12
Total # Contracts: 10
Total $ Projects: $67,683,850
Total $ Contracts: $21,606,007

Other Counties

Project $
Adams $762,232
Asotin $641,147
Benton $3,422,158
Chelan $2,528,067
Clallam $1,737,000
Clark $11,344,366
Columbia $373,593
Cowlitz $11,489,799
Douglas $0
Ferry $370,000
Franklin $750,000
Garfield $230,915
Grant $12,588,059
Grays Harbor $5,490,233
Island $1,682,871
Jefferson $2,317,623
Kitsap $5,879,358
Kittitas $28,346,081
Klickitat $4,822,196
Lewis $5,282,161
Lincoln $814,000
Mason $500,000
Okanogan $783,583
Pacific $1,083,103
Pend Oreille $6,802,649
Pierce $60,741,651
San Juan $416,620
Skagit $1,213,436
Skamania $320,430
Snohomish $14,092,073
Spokane $10,228,556
Stevens $10,326,117
Thurston $5,288,683
Wahkiakum $790,000
Walla Walla $2,038,000
Whatcom $4,148,765
Whitman $1,565,687
Yakima $14,452,299
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for King. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
PROVIDE A BYPASS FOR SURFACE WATER DRAINING INTO THE RAINIER AVE S PUMP STATION. THE BYPASS SYSTEM WILL PROVIDE A CONSIDERABLE COST SAVINGS BY AVOIDING REPLACEMENT/UPGRADES TO THE EXISTING STORMWATER (Federal ID: 0167044) PIVETTA BROTHERS CONSTRUCTION King Other $1,450,609
RECONSTRUCT SR 509/1ST AVE SW BETWEEN SW 192ND AND SW 200TH STREETS IN NORMANDY PARK. THREE LANE CROSS-SECTION, BIKE LANES, PLANTING STRIP WITH LIGHTING AND STREET TREES, AND SIDEWALK ON BOTH SIDES. (Federal ID: 0509020) GRANITE CONSTRUCTION King Pavement Improvement $0
RECONSTRUCT SR 509/1ST AVE SW BETWEEN SW 192ND AND SW 200TH STREETS IN NORMANDY PARK. THREE LANE CROSS-SECTION, BIKE LANES, PLANTING STRIP WITH LIGHTING AND STREET TREES, AND SIDEWALK ON BOTH SIDES. (Federal ID: 0509020) PIVETTA BROTHERS CONSTRUCTION King Pavement Improvement $3,553,412
CONSTRUCT A NEW BRIDGE OVER SR 520 BETWEEN NE 31ST ST AND NE 36TH ST TO ACCOMMODATE A TWO LANE ROAD INCLUDING BIKE LANES, SIDEWALKS, LIGHTING, UTILITIES, LANDSCAPING, A ROUNDABOUT AT THE EAST APPROACH (Federal ID: 0520042) TRI-STATE CONSTRUCTION CO. King New Bridge Construction $11,000,000
CONSTRUCT NEW, CURB, GUTTER AND SIDEWALK ALONG EAST VALLEY HIGHWAY BETWEEN S. 212TH ST. AND SR 167 WHERE THEY DO NOT CURRENTLY EXIST, WHILE PROVIDING A THIRD NORTH AND SOUTHBOUND LANE FOR TRAFFIC. SI (Federal ID: 1073004) RW SCOTT CONSTRUCTION King Pavement Widening $2,000,000
CONSTRUCT NEW, CURB, GUTTER AND SIDEWALK ALONG EAST VALLEY HIGHWAY BETWEEN S. 212TH ST. AND SR 167 WHERE THEY DO NOT CURRENTLY EXIST, WHILE PROVIDING A THIRD NORTH AND SOUTHBOUND LANE FOR TRAFFIC. SI (Federal ID: 1073004) KRIEG CONSTRUCTION, INC. King Pavement Widening $0
CONSTRUCTION OF A 6 TO 7-FOOT WIDE SIDEWALK, 5-FOOT WIDE BICYCLE LANE AND STREET LIGHTS ON THE EAST SIDE OF 4TH AVENUE SW BETWEEN SW 153RD STREET ALLEY AND SW 156TH STREET. (Federal ID: 1301003) KBH CONSTRUCTION CO. King Transportation Enhancements $469,357
CONSTRUCT A PEDESTRIAN WALKWAY ALONG THE SW 98TH ST. CORRIDOR BETWEEN 12TH AVENUE SW AND 11TH AVENUE SW. THE PAVED PATHWAY WILL BE 12 FEET WIDE WITH RAMPS AND STAIRWAY ELEMENTS THAT MEET AMERICANS WI (Federal ID: 2017090) RW SCOTT CONSTRUCTION King Transportation Enhancements $0
CONSTRUCT A PEDESTRIAN WALKWAY ALONG THE SW 98TH ST. CORRIDOR BETWEEN 12TH AVENUE SW AND 11TH AVENUE SW. THE PAVED PATHWAY WILL BE 12 FEET WIDE WITH RAMPS AND STAIRWAY ELEMENTS THAT MEET AMERICANS WI (Federal ID: 2017090) RL ALIA King Transportation Enhancements $1,129,761
ON AND OFF RAMPS WILL BE CONSTRUCTED. THE REDUCED CONGESTION WILL RESULT IN A DECREASE IN THE NUMBER OF ACCIDENTS. (Federal ID: 4053858) Unknown Company 01032 King Pavement Improvement $2,002,868
CREATES A NORTH/SOUTH GRADE SEPARATION ON DUWAMISH AVE S. PROVIDING ACCESS OVER HEAVILY USED RAIL LINES AND OFFERING IMPROVED CONNECTION BETWEEN MANUFACTURING AND WAREHOUSE DISTRICTS, THE PORT TERMINA (Federal ID: 0099078) No Contractor King New Construction $3,405,925
THE PROJECT IS LOCATED IN THE NORTH CREEK BUSINESS PARK AND WILL CONSTRUCT A PORTION OF MISSING TRAIL BETWEEN NE 195TH STREET AND NORTH CREEK PARKWAY, CONSTRUCT PEDESTRIAN SIGNALS AT TWO LOCATIONS AND (Federal ID: 0110008) No Contractor King Transportation Enhancements $500,000
THE PROPOSED PROJECT WILL CONSTRUCT A PEDESTRIAN BRIDGE (APPROXIMATELY 100 FOOT LONG) OVER NORTH CREEK NORTH OF 228TH STREET SE, CONSTRUCT APPROXIMATELY 4,000 LINER FEET OF NEW AND EXISTING 10-12 FOOT (Federal ID: 0110009) No Contractor King Transportation Enhancements $600,000
WIDEN THE SPOKANE VIADUCT BY BUILDING A PARALLEL STRUCTURE NORTH OF AND CONNECTED TO THE EXISTING STRUCTURE. ALSO, DEMOLISH THE EXISTING WESTBOUND RAMPS AT 4TH AVE S AND CONSTRUCT NEW RAMPS AT 1ST AVE (Federal ID: 1482010) No Contractor King Pavement Widening $15,443,000
IMPROVEMENTS INCLUDE A CENTER TURN LANE/RAISED MEDIAN; TWO TRAVEL LANES; BIKE LANES; CURB AND GUTTER; AND A PLANTER STRIP AND SIDEWALK ON THE EAST SIDE OF THE ROADWAY. INCLUDES ADDING AN ENCLOSED DRA (Federal ID: 1915008) No Contractor King Pavement Improvement $3,500,000