Wisconsin • Washington County
Top 10 Largest Contracts
Other Counties
Project $ | |
---|---|
Adams | $5,424,979 |
Ashland | $3,261,761 |
Barron | $799,870 |
Bayfield | $15,300 |
Brown | $8,535,995 |
Buffalo | $0 |
Burnett | $3,196,143 |
Calumet | $5,653 |
Chippewa | $16,200 |
Clark | $1,647,880 |
Columbia | $0 |
Crawford | $436,610 |
Dane | $45,648,466 |
Dodge | $1,131,154 |
Door | $879,021 |
Douglas | $755,347 |
Dunn | $3,992,927 |
Eau Claire | $1,027,623 |
Florence | $3,788,390 |
Fond du Lac | $5,521,311 |
Forest | $1,878,958 |
Grant | $611,753 |
Green | $0 |
Green Lake | $1,736,750 |
Iowa | $456,351 |
Iron | $666,325 |
Jackson | $2,257,920 |
Jefferson | $3,564,521 |
Juneau | $37,350 |
Kenosha | $66,415,879 |
Kewaunee | $8,325 |
La Crosse | $1,852,311 |
Lafayette | $643,416 |
Langlade | $979,725 |
Lincoln | $3,391,909 |
Manitowoc | $12,032,283 |
Marathon | $19,784,613 |
Marinette | $3,382,500 |
Marquette | $0 |
Menominee | $4,759,370 |
Milwaukee | $9,536,520 |
Monroe | $1,290,301 |
Oconto | $142,873 |
Oneida | $0 |
Outagamie | $709,872 |
Ozaukee | $20,600 |
Pepin | $0 |
Pierce | $11,200 |
Polk | $3,344,397 |
Portage | $6,470,674 |
Price | $514,767 |
Racine | $21,749,795 |
Richland | $446,955 |
Rock | $5,475,082 |
Rusk | $0 |
St. Croix | $4,412,652 |
Sauk | $4,621,114 |
Sawyer | $2,894,786 |
Shawano | $9,900 |
Sheboygan | $16,648,602 |
Taylor | $3,952,406 |
Trempealeau | $828,762 |
Vernon | $952,324 |
Vilas | $5,555,707 |
Walworth | $8,364,768 |
Washburn | $10,260 |
Waukesha | $353,342 |
Waupaca | $2,482,430 |
Waushara | $0 |
Winnebago | $33,051,064 |
Wood | $7,989,990 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for Washington. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
BRIDGE OVER E BR OF ROCK RIVER (Federal ID: 2009395) | PHEIFER BROTHERS CONSTRUCTION CO., INC. | Washington | Bridge Replacement | $375,956 |
BRIDGE OVER E BR OF ROCK RIVER (Federal ID: 2009395) | DAAR ENGINEERING INC | Washington | Bridge Replacement | $23,358 |
BRIDGE OVER E BR OF ROCK RIVER (Federal ID: 2009395) | MIDWEST ENGINEERING CONSULTANT | Washington | Bridge Replacement | $62,941 |
STH 28 (WEST) - NORTH COUNTY LINE (Federal ID: 2009531) | URS CORP | Washington | Pavement Improvement | $23,994 |
STH 28 (WEST) - NORTH COUNTY LINE (Federal ID: 2009531) | NORTHEAST ASPHALT, INC. | Washington | Pavement Improvement | $621,265 |
USH 41/45 TO PILGRIM ROAD (Federal ID: 2009592) | SUPER WESTERN, INC. | Washington | Pavement Widening | $3,052,406 |
USH 41/45 TO PILGRIM ROAD (Federal ID: 2009592) | DAAR ENGINEERING INC | Washington | Pavement Widening | $42,774 |
18TH AVE TO S MAIN ST (Federal ID: 2009886) | No Contractor | Washington | Other | $12,284 |
VINE ST TO HAWTHORN AVE (Federal ID: 2009887) | No Contractor | Washington | Other | $1,956 |
OAK ST TO WASHINGTON ST (STH 33) (Federal ID: 2009888) | No Contractor | Washington | Other | $8,316 |
7TH AVE TO S MAIN ST (Federal ID: 2009889) | No Contractor | Washington | Other | $1,976 |
WILDWOOD RD TO MARSHALL CT (Federal ID: 2009890) | No Contractor | Washington | Other | $1,730 |
GREEN TREE RD TO N MAIN ST (Federal ID: 2009891) | No Contractor | Washington | Other | $4,096 |