MODIFICATION P00005 DIFFERING SITE CONDITIONS FOR NRM DB PROJ 672-19-710 EXTERIOR DOORS FOR HURRICANE RESISTANCE AND INSTALL HURRICANE SHUTTERS. MOD P00003. MODIFICATION TO EXTENDED THE PERIOD OF PERFORMANCE AND TO LIFT THE SUSPENSION OF WORK. |
VALOR CONSTRUCTION MANAGEMENT, LLC |
Department of Veterans Affairs |
September 20, 2019 |
September 30, 2022 |
$407,217 |
RENOVATE 4B GRECC SPACE AT BALTIMORE VAMC
PROJECT: 512-21-111 |
HAMILTON PACIFIC CHAMBERLAIN, LLC |
Department of Veterans Affairs |
June 25, 2021 |
September 30, 2021 |
$214,595 |
CONSTRUCTION NRM PROJ 672-16-902 RENOVATE HEMA AND ONCO AREAS AT VA CARIBBEAN HEALTHCARE SYSTEM SAN JUAN PUERTO RICO. |
VENERGY GROUP, LLC |
Department of Veterans Affairs |
April 09, 2021 |
December 31, 2021 |
$0 |
PROJ 672-19-710 EXTERIOR DOORS FOR HURRICANE RESISTANCE AND INSTALL HURRICANE SHUTTERS. MOD P00003. MODIFICATION TO EXTENDED THE PERIOD OF PERFORMANCE AND TO LIFT THE SUSPENSION OF WORK. |
VALOR CONSTRUCTION MANAGEMENT, LLC |
Department of Veterans Affairs |
September 20, 2019 |
September 30, 2022 |
$15,496 |
P00007 BI-LATERAL SUPPLEMENTAL AGREEMENT FOR ADDITIONAL IN-SCOPE WORK. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$59,563 |
CONSTRUCT SECURITY LOCKOUT FOR EXTERIOR DOORS PROJECT PROJECT INVOLVES A CAMPUS-WIDE INSTALLATION OF A SECURITY LOCKOUT SYSTEM, INCLUDING CARD ACCESS, DOOR POSITION SWITCHES, DOOR HARDWARE, AND ASSOCIATED CABLING/INFRASTRUCTURE |
GCH CONSTRUCTION COMPANY |
Department of Veterans Affairs |
March 30, 2021 |
March 30, 2022 |
$1,157,385 |
P00006 BI-LATERAL SUPPLEMENTAL AGREEMENT FOR ADDITIONAL IN-SCOPE WORK. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$116,920 |
INSTALL PREFABRICATED STRUCTURE FOR COVID 19 TESTING |
BIG TOP MANUFACTURING, INC. |
Department of Veterans Affairs |
November 16, 2020 |
December 16, 2020 |
$0 |
MATOC TVHS CONSTRUCTION |
JETT'S SPECIALTY CONTRACTING, LLC |
Department of Veterans Affairs |
February 03, 2021 |
September 01, 2021 |
$844,000 |
P00002 EXTEND TASK ORDER COMPLETION DATE TO ALWAYS FOR 3 PARTY INSPECTION |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
P00005 BI-LATERAL SUPPLEMENTAL AGREEMENT DEFINTIZED CHANGE ORDER RELATED TO COVID-19 WORK SUSUPENSION MODIFICATION. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$83,010 |
DEFINITIZE PCO001 - PROVIDE ALL LABOR AND MATERIALS TO REPAIR APPROXIMATELY 6 LINEAR FEET OF 6IN. STORM DRAIN AT B118 PROTESTANT CHAPEL.
ALSO, ADD REPAIR THE UNFORESEEN DIFFERENTIAL SETTLING OF BELL TOWER FOUNDATION. PROVIDE A NEW FOUNDATION WALL. |
NORTHVIEW ENTERPRISES, INC. |
Department of Veterans Affairs |
September 23, 2019 |
December 04, 2020 |
$48,990 |
P00004 BI-LATERAL SUPPLEMENTAL AGREEMENT FOR ADDITIONAL IN-SCOPE WORK MODIFICATION. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$82,617 |
INSTALL PREFABRICATED STRUCTURE FOR COVID 19 TESTING |
BIG TOP MANUFACTURING, INC. |
Department of Veterans Affairs |
November 16, 2020 |
December 16, 2020 |
$52,119 |
P00002 EXTEND TASK ORDER COMPLETION DATE TO ALWAYS FOR 3 PARTY INSPECTION |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
NO COST TIME EXTENSION |
MARE SOLUTIONS, INC. |
Department of Veterans Affairs |
November 15, 2019 |
June 15, 2021 |
$0 |
PROJ 546-20-127 CONVERT RESTROOMS AND DRINKING FOUNTAINS TO HANDS FREE |
VENERGY GROUP, LLC |
Department of Veterans Affairs |
April 09, 2021 |
December 31, 2021 |
$524,530 |
REPLACE AND RENOVATE ROOFS 1&19 |
DISTRICT VETERANS CONTRACTING, INC. |
Department of Veterans Affairs |
July 03, 2018 |
December 18, 2020 |
$0 |
SUSPENSION OF WORK - RENOVATE 10AB MENTAL HEALTH WARD |
POINTER CONSTRUCTION GROUP, LLC |
Department of Veterans Affairs |
December 20, 2019 |
September 06, 2021 |
$0 |
COVID-19 EMERGENCY- SERVICE IS REQUESTING SITE PREP FOR SECURITY GUARD SHACK BE CONSTRUCTED AT THE MURFREESBORO VAMC. |
DUNBAR MECHANICAL CONTRACTORS, LLC |
Department of Veterans Affairs |
September 01, 2020 |
November 02, 2020 |
$11,809 |
TEMPORARY BUILDING AND ELECTRICAL HOOK-UP |
READY SERVICES, LLC |
Indian Health Service |
August 17, 2020 |
September 16, 2020 |
$10,331 |
PROJ 672-19-710 EXTERIOR DOORS FOR HURRICANE RESISTANCE AND INSTALL HURRICANE SHUTTERS. MOD P00003. MODIFICATION TO EXTENDED THE PERIOD OF PERFORMANCE AND TO LIFT THE SUSPENSION OF WORK. |
VALOR CONSTRUCTION MANAGEMENT, LLC |
Department of Veterans Affairs |
September 20, 2019 |
September 30, 2022 |
$0 |
EMER COVID-19 - CONCRETE PAD FOR COVID CHECKPOINT |
DUNBAR MECHANICAL CONTRACTORS, LLC |
Department of Veterans Affairs |
July 28, 2020 |
August 18, 2020 |
$6,875 |
MULTIPLE AWARD TASK ORDER CONTRACT FOR CONSTRUCTION FOR VA BUTLER HEALTHCARE, BUTLER, PA AND PITTSBURGH VA HEALTHCARE SYSTEMS, PITTSBURGH, PA. |
MARE SOLUTIONS, INC. |
Department of Veterans Affairs |
November 15, 2019 |
June 15, 2021 |
$0 |
COVID-19 EMERGENCY - CROSS CONNECT DHW SYSTEM, GARLAND VA OUTPATIENT CLINIC, GARLAND, TX |
GCC ENTERPRISES INC. |
Department of Veterans Affairs |
April 22, 2020 |
July 31, 2020 |
$0 |
PROJECT 621-19-101, BLDG 205 ROOF LEAK - COVID EMERGENCY |
MSK CONSTRUCTION, INC. |
Department of Veterans Affairs |
April 24, 2020 |
November 08, 2020 |
$0 |
TO INCORPORATE CHANGE ORDER FOR ALTERNATE CARE FACILITY FOR OLD WESTBURY IN NY. |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
$2,989,617 |
CONSTUCTION PROJECT 678-16-103 RENOVATE PATHOLOGY, MORGUE AND IT BLDG.38. P00003 UNILATERAL DIRECTIVE LIFTING SUSUPENSION OF WORK. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$0 |
MULTIPLE AWARD TASK ORDER CONTRACT FOR CONSTRUCTION FOR VA BUTLER HEALTHCARE, BUTLER, PA AND PITTSBURGH VA HEALTHCARE SYSTEMS, PITTSBURGH, PA. |
MARE SOLUTIONS, INC. |
Department of Veterans Affairs |
November 15, 2019 |
June 15, 2021 |
$0 |
PROJ 672-19-710 EXTERIOR DOORS FOR HURRICANE RESISTANCE AND INSTALL HURRICANE SHUTTERS. MOD P00002. EXTENSION OF SUSPENSION OF WORK. |
VALOR CONSTRUCTION MANAGEMENT, LLC |
Department of Veterans Affairs |
September 20, 2019 |
September 30, 2022 |
$0 |
CREDITS |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
-$85,084 |
NO-COST TIME EXTENSION DUE TO COVID-19 WHICH HAS CAUSED DELAYS IN RECEIVING CASEWORK. |
NORTHVIEW ENTERPRISES, INC. |
Department of Veterans Affairs |
September 23, 2019 |
December 04, 2020 |
$0 |
SUSPENSION OF WORK - RENOVATE 10AB MENTAL HEALTH WARD |
POINTER CONSTRUCTION GROUP, LLC |
Department of Veterans Affairs |
December 20, 2019 |
September 06, 2021 |
$0 |
AWARD TASK ORDER CONTRACT (MATOC)IDIQ FOR VISN 18 CONSTRUCTION AT SOUTHERN ARIZONA VA HEALTH CARE SYSTEM, TUCSON, ARIZONA OF CONSTUCTION PROJECT 678-16-103 RENOVATE PATHOLOGY, MORGUE AND IT BLDG.38. P00002 BI-LATERAL SUPPLEMENTAL AGREEMENT OF IN-SCOPE WORK. |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$85,117 |
ALTERNATE CARE FACILITY AT JACOB JAVITS CENTER IN NEW YORK, NY. |
NEW YORK CONVENTION CENTER OPERATING CORPORATION |
Department of the Army |
March 25, 2020 |
April 30, 2020 |
-$19,135,047 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE ALTERNATE CARE FACILITY (ACF) AT SUNY OLD WESTBURY - OLD WESTBURY, NY |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): WESTCHESTER COMMUNITY CENTER - WHITE PLAINS, NY |
HAUGLAND ENERGY GROUP LLC |
Department of the Army |
March 26, 2020 |
April 16, 2020 |
$4,021,895 |
PROJECT 621-19-101, BLDG 205 ROOF LEAK - COVID EMERGENCY |
MSK CONSTRUCTION, INC. |
Department of Veterans Affairs |
April 24, 2020 |
November 08, 2020 |
$841,887 |
COVID-19 EMERGENCY - CROSS CONNECT DHW SYSTEM, GARLAND VA OUTPATIENT CLINIC, GARLAND, TX |
GCC ENTERPRISES INC. |
Department of Veterans Affairs |
April 22, 2020 |
July 31, 2020 |
$11,222 |
PROJ 672-19-710 EXTERIOR DOORS FOR HURRICANE RESISTANCE AND INSTALL HURRICANE SHUTTERS. MOD P00001. |
VALOR CONSTRUCTION MANAGEMENT, LLC |
Department of Veterans Affairs |
September 20, 2019 |
September 30, 2022 |
$0 |
ALTERNATE CARE FACILITY (ACF): MIAMI BEACH CONVENTION CENTER - MIAMI, FL - MODIFICATION |
ROBINS & MORTON GROUP, THE |
Department of the Army |
April 06, 2020 |
April 28, 2020 |
$0 |
COVID-19 EMERGENCY - CROSS CONNECT DHW SYSTEM, GARLAND VA OUTPATIENT CLINIC, GARLAND, TX |
GCC ENTERPRISES INC. |
Department of Veterans Affairs |
April 22, 2020 |
July 31, 2020 |
$19,776 |
ALTERNATE CARE FACILITY (ACF): SUNY OLD WESTBURY - OLD WESTBURY, NY |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
$2,004,737 |
ALTERNATE CARE FACILITY AT NEW YORK WESTCHESTER COMMUNITY CENTER |
HAUGLAND ENERGY GROUP LLC |
Department of the Army |
March 26, 2020 |
April 16, 2020 |
$12,950,000 |
ALTERNATE CARE FACILITY (ACF): MIAMI BEACH CONVENTION CENTER - MIAMI, FL - DEFINITIZATION |
ROBINS & MORTON GROUP, THE |
Department of the Army |
April 06, 2020 |
April 28, 2020 |
-$1,074,308 |
MULTIPLE AWARD TASK ORDER CONTRACT FOR CONSTRUCTION FOR VA BUTLER HEALTHCARE, BUTLER, PA AND PITTSBURGH VA HEALTHCARE SYSTEMS, PITTSBURGH, PA. |
MARE SOLUTIONS, INC. |
Department of Veterans Affairs |
November 15, 2019 |
June 15, 2021 |
$0 |
ALTERNATE CARE FACILITY (ACF): MIAMI BEACH CONVENTION CENTER - MIAMI, FL - MODIFICATION TO INCREASE NTE AMOUNT |
ROBINS & MORTON GROUP, THE |
Department of the Army |
April 06, 2020 |
April 28, 2020 |
$4,500,000 |
ALTERNATE CARE FACILITY (ACF): ALASKA AIRLINES CENTER, PHASE 1A |
NEESER PAUG VIK JV, LLC |
Department of the Army |
April 09, 2020 |
June 09, 2020 |
$1,263,776 |
COVID-19 - EMERGENCY INSTALLATION 2 ANTI-ROOM WALLS AND DOORS WARD 1A |
DUNBAR MECHANICAL CONTRACTORS, LLC |
Department of Veterans Affairs |
April 06, 2020 |
September 30, 2020 |
$4,800 |
COVID-19 - EMERGENCY INSTALLATION OF 8 POWER RECEPTACLES WARD 1A |
TIBBETTS ELECTRICAL SERVICES, INC. |
Department of Veterans Affairs |
April 06, 2020 |
May 06, 2020 |
$4,850 |
COVID-19 - EMERGENCY INSTALLATION OF 8 POWER RECEPTACLES WARD 1A |
TIBBETTS ELECTRICAL SERVICES, INC. |
Department of Veterans Affairs |
April 06, 2020 |
May 06, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): MIAMI BEACH CONVENTION CENTER - MIAMI, FL |
ROBINS & MORTON GROUP, THE |
Department of the Army |
April 06, 2020 |
April 28, 2020 |
$22,500,000 |
ALTERNATE CARE FACILITY (ACF): JACOB JAVITS CONVENTION CENTER - NEW YORK, NY - MODIFICATION |
NEW YORK CONVENTION CENTER OPERATING CORPORATION |
Department of the Army |
March 25, 2020 |
April 30, 2020 |
$15,250,000 |
ALTERNATE CARE FACILITY (ACF): WESTCHESTER COMMUNITY CENTER - WHITE PLAINS, NY - MODIFICATION |
HAUGLAND ENERGY GROUP LLC |
Department of the Army |
March 26, 2020 |
April 16, 2020 |
$15,000,000 |
ALTERNATE CARE FACILITY (ACF): SUNY OLD WESTBURY - OLD WESTBURY, NY - MODIFICATION |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
$58,250,000 |
P00006 IS TO DEFINITIZE CHANGE ORDER P00004 AND EXTEND CONTRACT COMPLETION DATE. |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
ALTERNATE CARE FACILITY (ACF): SUNY OLD WESTBURY - OLD WESTBURY, NY |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
March 28, 2020 |
April 27, 2020 |
$58,250,000 |
ALTERNATE CARE FACILITY (ACF): WESTCHESTER COMMUNITY CENTER - WHITE PLAINS, NY |
HAUGLAND ENERGY GROUP LLC |
Department of the Army |
March 26, 2020 |
April 16, 2020 |
$15,000,000 |
ALTERNATE CARE FACILITY (ACF): JACOB JAVITS CONVENTION CENTER - NEW YORK, NY |
NEW YORK CONVENTION CENTER OPERATING CORPORATION |
Department of the Army |
March 25, 2020 |
April 30, 2020 |
$15,250,000 |
REPLACE AND RENOVATE ROOFS 1&19 |
DISTRICT VETERANS CONTRACTING, INC. |
Department of Veterans Affairs |
July 03, 2018 |
December 18, 2020 |
$0 |
P00001 FOR TO TO DIRECT CONTRACTOR TO CONTINUE WORK AND REQUESTE EXEMPTION FROM STATE OF PA DURING THE CORONAVIRUS PANDEMIC. TASK ORDER FOR PLUMBING AGAINST MATOC VA BUTLER&PITTSBURGH MATOC IDIQ CONTRACT FOR CONSTRUCTION PROJECTS |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
TASK ORDER MOD TO ADVISE THE CONTRACTOR THAT THEIR CONTRACT IS MISSION CRITICAL AND THEY ARE TO CONTINUE TO WORK DURING THE CONORAVIRUS PANDEMIC |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
P00005 IS A CHANGE ORDER TO DIRECT CONTRACTOR TO CONTINUE WORKING |
R. A. GLANCY & SONS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 30, 2021 |
$0 |
MULTIPLE AWARD TASK ORDER CONTRACT FOR CONSTRUCTION FOR VA BUTLER HEALTHCARE, BUTLER, PA AND PITTSBURGH VA HEALTHCARE SYSTEMS, PITTSBURGH, PA. |
MARE SOLUTIONS, INC. |
Department of Veterans Affairs |
November 15, 2019 |
June 15, 2021 |
$0 |
VA BUTLER AND PITTBURGH HEALTHCARE CENTERS CONSTRUCTION MATOC CONTRACT TASK ORDER CORONA VIRUS GUIDANCE |
RBVETCO, LLC |
Department of Veterans Affairs |
July 12, 2019 |
September 30, 2020 |
$0 |
AWARD TASK ORDER CONTRACT (MATOC)IDIQ FOR VISN 18 CONSTRUCTION AT SOUTHERN ARIZONA VA HEALTH CARE SYSTEM, TUCSON, ARIZONA OF CONSTUCTION PROJECT 678-16-103 RENOVATE PATHOLOGY, MORGUE AND IT BLDG.38. P00001 MOD SUSPENSION OF WORK (COVID-19). |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
May 31, 2019 |
December 29, 2021 |
$0 |