CONSTRUCTION TASK ORDER FOR PROJECT 501-15-102, RENOVATE B-11 FOR RESEARCH CORE AREA. MODIFICATION P000054 UNSUSPENSION OF WORK FOR CORONAVIRUS. |
GCH CONSTRUCTION COMPANY |
Department of Veterans Affairs |
June 20, 2019 |
February 25, 2021 |
$0 |
PN: 568-20-208, SITE PREP FOR CHECKPOINT FOR THE HOT SPRINGS (SD) VA MEDICAL CENTER |
GCH CONSTRUCTION COMPANY |
Department of Veterans Affairs |
August 13, 2020 |
September 29, 2020 |
$44,454 |
MUSIC ROOM EXTENSION |
PATRIOT CONSTRUCTION, LLC |
Department of Veterans Affairs |
September 26, 2018 |
October 30, 2020 |
$0 |
ADD ADDITIONAL SPACES FOR NEGATIVE AIR |
JACKSON MECHANICAL SERVICE INC. |
Department of Veterans Affairs |
April 21, 2020 |
April 30, 2021 |
$319,860 |
MEDGAS ED AND GI |
ERIE MECHANICAL CONTRACTORS INC. |
Department of Veterans Affairs |
June 11, 2020 |
September 30, 2020 |
$14,045 |
36C25220N0494 - REPAIR STEAM LINE LEAKS |
RICHARD GROUP LLC |
Department of Veterans Affairs |
August 27, 2020 |
December 10, 2020 |
$1,163,542 |
SURGICAL ROOM C2120 PUMP REPAIR BLDG. 200 TO #37 |
TROOP CONTRACTING, INC. |
Department of Veterans Affairs |
August 27, 2020 |
January 06, 2021 |
$48,939 |
COVID - GARLAND FACILTIES MAINTENANCE |
CBRE, INC |
Department of Veterans Affairs |
April 03, 2020 |
May 31, 2021 |
$0 |
ASBESTOS ABATEMENT IDIQ OPT YR 3 |
AULSON CO., INC., THE |
Department of Veterans Affairs |
July 31, 2020 |
August 07, 2020 |
$7,120 |
FURNISH AND INSTALL (33) PROCARE 8300 ICU / DOU DOORS COVID-19 EMERGENCY TO MAINTAIN NEGATIVE AIR ENVIRONMENT WITHIN ICU AND DOU. |
IAW CONSTRUCTION, INC. |
Department of Veterans Affairs |
May 01, 2020 |
October 02, 2020 |
$0 |
REPLACE STEAM AND CONDENSATE MAINS OVAL 2 - RESUME WORK DUE TO SUSPENSION FROM COVID-19 |
BERING STRAITS TECHNICAL SERVICES, LLC |
Department of Veterans Affairs |
October 29, 2018 |
December 31, 2021 |
$0 |
DESIGN BUILD URGENT CARE AIRBORNE INFECTION ISOLATION ROOM |
WILLIAMS BUILDING COMPANY, INC. |
Department of Veterans Affairs |
October 09, 2020 |
April 02, 2022 |
$558,724 |
DESIGN BUILD URGENT CARE AIRBORNE INFECTION ISOLATION ROOM |
WILLIAMS BUILDING COMPANY, INC. |
Department of Veterans Affairs |
July 28, 2020 |
January 22, 2021 |
$558,724 |
DB NRM 672-19-127 REPLACE PATIENT LIFTERS AT CLC. MOD P00001, MOD P00002 EXCUSABLE DELAYS (COVID-19). MOD P00003 AND P00004 COVID-19. |
GULF BUILDING CORP & HERNANDEZ CONSULTANTS |
Department of Veterans Affairs |
May 07, 2019 |
December 31, 2020 |
$0 |
EMERGENCY COVID-19-INSTALL ELECTRICITY FOR COVID-19 DRIVE THROUGH |
VIRGINIA ENERGY & LIGHTING, LLC |
Department of Veterans Affairs |
July 10, 2020 |
July 20, 2020 |
$1,650 |
MN CONSTRUCTION MATOC, PROJECT: 618-19-109 MODERNIZE LAB UTILITIES AT THE MINNEAPOLIS VAHCS |
VERSACON, INC. |
Department of Veterans Affairs |
August 07, 2020 |
August 16, 2021 |
$4,287,500 |
556-17-014 ONCOLOGY RENOVATION USP 800 - MODIFICATION 7 - RFP003 AND TIME EXTENSION AFTER SUSPENSION. |
SERGEANT CONSTRUCTION INC. |
Department of Veterans Affairs |
March 23, 2019 |
November 19, 2020 |
$0 |
DEEP DUCT CLEANING (COVID-19) PREVENTION |
DUCT DIAGNOSTICS LLC |
Department of Veterans Affairs |
March 18, 2020 |
October 31, 2020 |
-$56,500 |
SATOC, FRONT DOOR REPLACEMENT, WEST ROXBURY, MA |
CARRIGG COMMERCIAL BUILDERS, LLC |
Department of Veterans Affairs |
August 18, 2020 |
March 01, 2021 |
$245,152 |
EMERGENCY COVID-19-INSTALL ELECTRICITY FOR COVID-19 DRIVE THROUGH |
VIRGINIA ENERGY & LIGHTING, LLC |
Department of Veterans Affairs |
July 10, 2020 |
July 20, 2020 |
$9,975 |
WATER INTRUSION ROOT CAUSE |
SKA CONSULTING ENGINEERS, INC. |
Department of Veterans Affairs |
September 27, 2019 |
June 29, 2020 |
-$6,700 |
AHU REPLACEMENTS |
BLUE CORD DESIGN AND CONSTRUCTION, LLC |
Department of Veterans Affairs |
June 29, 2018 |
November 30, 2020 |
$0 |
BUILDOUT DIALYSIS AREA FOR COVID 19 PATIENTS |
MSC DESIGN BUILD LLC |
Department of Veterans Affairs |
June 30, 2020 |
September 18, 2020 |
$39,990 |
UPGRADE NURSE CALL SYSTEM 672-19-115 (DB). MOD P00002 COVID-19. |
VENERGY GROUP, LLC |
Department of Veterans Affairs |
April 09, 2021 |
December 31, 2021 |
$0 |
UPGRADE NURSE CALL SYSTEM 672-19-115 (DB). MOD P00001 AND P00002 COVID-19. |
VENERGY GROUP, LLC |
Department of Veterans Affairs |
April 09, 2021 |
December 31, 2021 |
$0 |
550-15-107 REMEDIATE LEGIONELLA STATION-WIDE PHASE-1 MOD P00007 TIME EXTENSION DUE TO COVID19 ACTIVITIES. |
RICHARD GROUP LLC |
Department of Veterans Affairs |
June 29, 2018 |
September 01, 2020 |
$0 |
EMERGENCY COVID-19 ISOLATION UNIT |
HAMILTON PACIFIC CHAMBERLAIN, LLC |
Department of Veterans Affairs |
June 25, 2021 |
September 30, 2021 |
$39,983 |
CAULKING WINDOWS IN CANTEEN ATRIUM |
CAPLAN BROTHERS, INCORPORATED |
Department of Veterans Affairs |
June 18, 2020 |
December 18, 2020 |
$6,000 |
TEL DATA INSTALL |
E2 TELECOM CO INC |
Department of Veterans Affairs |
June 23, 2020 |
August 12, 2020 |
$22,728 |
MATOC 36C24118D0103|TASK ORDER 36C24120N0754|523-20-011|COVID-19REPLACE REVOLVING DOOR AND ADD ACCESS CONTROL |VETERANS CONSTRUCTION |523C07022 |
VETERANS CONSTRUCTION, LLC |
Department of Veterans Affairs |
June 19, 2020 |
December 17, 2020 |
$634,917 |
CAULKING WINDOWS IN CANTEEN ATRIUM |
CAPLAN BROTHERS, INCORPORATED |
Department of Veterans Affairs |
June 18, 2020 |
December 18, 2020 |
$23,500 |
556-17-014 ONCOLOGY RENOVATION USP 800 - MODIFICATION 7 - RFP003 AND TIME EXTENSION AFTER SUSPENSION. |
SERGEANT CONSTRUCTION INC. |
Department of Veterans Affairs |
March 23, 2019 |
November 19, 2020 |
$8,968 |
BUILDING 9 RENOVATION: NO-COST TIME EXTENSION DUE TO COVID-19 |
IRONCLAD SERVICES, INC. |
Department of Veterans Affairs |
September 27, 2017 |
July 30, 2020 |
$0 |
DB NRM 672-19-127 REPLACE PATIENT LIFTERS AT CLC. MOD P00001, MOD P00002 EXCUSABLE DELAYS (COVID-19). MOD P00003 COVID-19 |
GULF BUILDING CORP & HERNANDEZ CONSULTANTS |
Department of Veterans Affairs |
May 07, 2019 |
December 31, 2020 |
$0 |
556-17-014 ONCOLOGY RENOVATION USP 800 - MODIFICATION 6 - SUSPENSION OF WORK DUE TO COVID19 RELATED ACTIVITIES AND AE DESIGN CORRECTIONS. |
SERGEANT CONSTRUCTION INC. |
Department of Veterans Affairs |
March 23, 2019 |
November 19, 2020 |
$0 |
REPLACE SECURITY DOORS TO PREVENT COVID-19 FROM ENTERING VALBHS. |
HINGEWERKS COMMERCIAL DOORS, INC. |
Department of Veterans Affairs |
April 02, 2020 |
June 30, 2020 |
$0 |
IDIQ TASK ORDER 11 6A NURSES STATION RENO TIME EXTENSION |
DISTRICT VETERANS CONTRACTING, INC. |
Department of Veterans Affairs |
September 27, 2019 |
November 13, 2020 |
$0 |
REPLACE WATER HEATERS IN BUILDING 6 AND 7 |
VETERANS DEVELOPMENT CORPORATION, INC. |
Department of Veterans Affairs |
January 29, 2021 |
March 10, 2022 |
$111,011 |
THREE ELECTTRONIC DOOR LOCKS WITH INSTALLATION |
ASSA ABLOY ENTRANCE SYSTEMS US INC |
Department of Veterans Affairs |
May 29, 2020 |
July 26, 2020 |
$3,800 |
COVID 19 INSTALLATION OF OVERHEAD DOOR ALARMS 9TH FLOOR AND PEC |
MONUMENT CONSTRUCTION, LLC |
Department of Veterans Affairs |
November 20, 2019 |
November 06, 2020 |
$0 |
EMERGENCY RESPONSE, DRIVE THRU COVID-19 TESTING AND ADA COMPLIANT SIDEWALK |
IAW CONSTRUCTION, INC. |
Department of Veterans Affairs |
May 19, 2020 |
February 28, 2021 |
$279,800 |
MODIFICATION TO SUSPEND WORK DUE TO COVID-19 |
LAMAR STRONG ASSOCIATES |
Department of Veterans Affairs |
August 30, 2018 |
August 17, 2020 |
$0 |
JC LIFE SAFETY FINDING CORRECTIONS, WHITERIVER INDIAN HOSPITAL, MODIFICATION P00007 IS TO LIFT THE SUSPENSION OF WORK EFFECTIVE MAY 17, 2020, EXTEND COMPLETION DATE FROM MAY 17 2020 TO JUNE 16, 2020 |
ROCK GAP ENGINEERING LLC |
Indian Health Service |
August 08, 2019 |
June 24, 2020 |
$0 |
MODP0006 REMOBILIZATION OF WORK TO RESTART AFTER COVID19 SUSPENSION |
MASTER DESIGN BUILD, LLC |
Department of Veterans Affairs |
March 29, 2019 |
July 10, 2020 |
$0 |
EXTEND COMPLETION DATE |
VETERANS CONSTRUCTION, LLC |
Department of Veterans Affairs |
June 19, 2020 |
December 17, 2020 |
$0 |
MODIFICATION P00005 LIFT SUSPENSION OF WORK EFFECTIVE 5/14/2020 PROJECT 585-17-107, UPGRADE 4-EAST PATIENT ROOMS CONSTRUCTION AT THE OSCAR G. JOHNSON VA MEDICAL CENTER, IRON MOUNTAIN, MI. |
MBM CONSTRUCTION CO. |
Department of Veterans Affairs |
July 30, 2019 |
August 02, 2020 |
$0 |
REPLACE PHARMACY SINKS - RECIND SUSPENSION OF WORK COVID-19 |
HARTLAND-RELIANT JV LLC |
Department of Veterans Affairs |
September 23, 2019 |
July 31, 2020 |
$0 |
MOD P0006 REMOBILIZATION OF WORK AFTER COVID-19 VIRUS. ALSO ADDITIONAL WORK IS BEING COMPLETED |
BLUE YONDER, INC. |
Department of Veterans Affairs |
May 06, 2019 |
July 10, 2020 |
$69,962 |
IGF: CT: IGF |
MIDWESTERN CONSTRUCTION SERVICES, INC. |
Department of Veterans Affairs |
April 23, 2020 |
August 18, 2020 |
$73,610 |
630A4-20-201 (RENOVATE LAUNDRY BATHROOMS, LOCKERS, OFFICE SPACE) |
LOWDER ELECTRIC AND CONSTRUCTION CORP |
Department of Veterans Affairs |
May 08, 2020 |
September 30, 2020 |
$688,706 |
MOD P00004 - 537-20-114 OVER THE DOOR ALARMS
REMOBILIZATION OF WORK AFTER THE SUSPENSION OF WORK. |
TL SERVICES, INC. |
Department of Veterans Affairs |
December 12, 2019 |
June 30, 2020 |
$0 |
EMERGENCY ROOF LEAK REPAIR |
VETERANS DEVELOPMENT CORPORATION, INC. |
Department of Veterans Affairs |
January 29, 2021 |
March 10, 2022 |
$51,943 |
FURNISH AND INSTALL (33) PROCARE 8300 ICU / DOU DOORS COVID-19 EMERGENCY TO MAINTAIN NEGATIVE AIR ENVIRONMENT WITHIN ICU AND DOU. |
IAW CONSTRUCTION, INC. |
Department of Veterans Affairs |
May 01, 2020 |
October 02, 2020 |
$310,964 |
COVID-19 EMERGENCY FOR AUTOMATIC DOOR REPLACEMENT. |
NEW ENGLAND DOOR CLOSER, INC. |
Department of Veterans Affairs |
April 30, 2020 |
July 13, 2020 |
$14,289 |
MODIFICATION P0004 TO 676-18-001 REPLACE FIRE DOORS AT THE TOMAH VAMC IN TOMAH, WI. THIS ACTION SHALL LIFT THE TEMPORARY SUSPENSION OF WORK THAT WAS PREVIOUSLY ISSUED DUE TO THE COORDINATION COVID-19 ACTIVITIES. |
RHI LLC |
Department of Veterans Affairs |
March 29, 2019 |
October 26, 2020 |
$0 |
EMERGENCY COVID-19 REPAIR SINK HOLE IN ROAD EFFECTS AMBULANCES TO BRING COVID-19 PAITIENTS TO HOSPITAL. |
MAINEX |
Department of Veterans Affairs |
April 27, 2020 |
May 13, 2020 |
$7,540 |
MODIFICATION P00004 SUSPENSION OF WORK 30 FOR AN ADDITIONAL CALENDAR DAYS DUE TO THE COVID-19 PANDEMIC FOR PROJECT 585-17-107, UPGRADE 4-EAST PATIENT ROOMS CONSTRUCTION AT THE OSCAR G. JOHNSON VA MEDICAL CENTER, IRON MOUNTAIN, MI. |
MBM CONSTRUCTION CO. |
Department of Veterans Affairs |
July 30, 2019 |
August 02, 2020 |
$0 |
MODIFICATION P0003 TO 676-18-001 REPLACE FIRE DOORS AT THE TOMAH VAMC IN TOMAH, WI. INCORPORATE TEMPORARY SUSPENSION OF WORK DUE DO COORDINATION WITH THE COVID-19 ACTIONS. |
RHI LLC |
Department of Veterans Affairs |
March 29, 2019 |
October 26, 2020 |
$0 |
2ND FLOOR CARPET, TILE WITH GLUE (ASBESTOS MATERIAL) REMOVAL
AND THREE (3) NEGATIVE AIR SCRUBBERS FOR COVID-19 OPERATIONS. |
WALTER THOMAS & ASSOCIATES, INCORPORATED |
Department of Veterans Affairs |
April 24, 2020 |
May 31, 2020 |
$49,717 |
EMERGENCY COVID-19 REQUIREMENT FOR REMOVAL/INSTALLATION OF GLASS WINDOWS |
KAN CONTRACTING, INC. |
Department of Veterans Affairs |
April 22, 2020 |
October 21, 2020 |
$46,020 |
COVID-19 ON CALL ROOM RENOVATION |
CONCENTRIC GROUP, LLC |
Department of Veterans Affairs |
April 21, 2020 |
May 01, 2020 |
$239,072 |
REMODEL AREAS TO CREATE NEGATIVE AIR PRESSURE ROOMS. |
JACKSON MECHANICAL SERVICE INC. |
Department of Veterans Affairs |
April 21, 2020 |
April 30, 2021 |
$439,598 |
COVID-19 SOIL ASBESTOS ABATEMENT |
JOHNSONDANFORTH, INC. |
Department of Veterans Affairs |
April 21, 2020 |
September 30, 2020 |
$401,633 |
AH-17 EMERGENCY HVAC REPLACE |
BORLIE MECHANICAL CONTRACTING, LLC |
Department of Veterans Affairs |
April 21, 2020 |
July 21, 2020 |
$40,105 |
IGT::OT::IGT-SINGLE AWARD INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT TO SUPPORT SMALL MEDICAL CENTER CONSTRUCTION PROJECTS, AND SOME SMALL NRM PROJECTS FROM TIME TO TIME |
SEMPER TEK, INC. |
Department of Veterans Affairs |
January 08, 2020 |
April 16, 2020 |
$0 |
INSTALL PNEUMATIC TUBE TRANSPORT SYSTEM CONSTRUCTION 672-14-901. MOD 1 NEW CD: 10-4-2020. MOD P00002. MOD P00003 |
SDPM JFM CONSTRUCCIONES JOINT VENTURE |
Department of Veterans Affairs |
June 26, 2018 |
September 30, 2021 |
$0 |
WARD AIR PRESSURE CONVERSION |
CONCENTRIC GROUP, LLC |
Department of Veterans Affairs |
April 01, 2020 |
April 30, 2020 |
$136,640 |
SERVICES TO MODIFY HVAC IN EMERGENCY DEPARTMENT ROOMS IN ORDER TO BE AIRBORNE INFECTION ISOLATION ROOMS FOR COVID-19 AT VA LOMA LINDA HEALTHCARE SYSTEM, LOMA LINDA, CA 92357. |
ALLEGIANCE AIR & MECHANICAL, INC. |
Department of Veterans Affairs |
April 01, 2020 |
June 30, 2020 |
$37,300 |
COVID-19 PACU NURSE CALL SYSTEM |
JOHNSON CONTROLS SECURITY SOLUTIONS LLC |
Department of Veterans Affairs |
March 26, 2020 |
May 29, 2020 |
$0 |
DB NRM 672-19-127 REPLACE PATIENT LIFTERS AT CLC. MOD P00001, MOD P00002 EXCUSABLE DELAYS (COVID-19). |
GULF BUILDING CORP & HERNANDEZ CONSULTANTS |
Department of Veterans Affairs |
May 07, 2019 |
December 31, 2020 |
$0 |
WINDOW AND SCREEN REQUIREMENTS CONTRACT |
COMMERCIAL WINDOW REPAIR SOLUTIONS INC |
Department of Veterans Affairs |
April 14, 2020 |
December 01, 2020 |
$40,000 |
M&O SUPPORT |
2H MECHANICAL LLC |
Department of Veterans Affairs |
March 19, 2020 |
May 25, 2020 |
$50,000 |
AHU REPLACEMENTS |
BLUE CORD DESIGN AND CONSTRUCTION, LLC |
Department of Veterans Affairs |
June 29, 2018 |
November 30, 2020 |
$0 |
MOD P00002 - SUSPENSION OF WORK DUE TO COVID-19 FOR THE
OVER THE DOOR ALARMS FOR MENTAL HEALTH AREA, PROJECT # 537-20-113 AT JESSE BROWN VAMC, CHICAGO, ILLINOIS. THE SHELTER IN PLACE WAS EXTENDED IN ILLINOIS SO NOW THE SUSPENSION IS EXTENDED. |
TL SERVICES, INC. |
Department of Veterans Affairs |
December 12, 2019 |
June 30, 2020 |
$0 |
MODP0005 IAW FAR 52.242-14 CLAUSE A SUSPENSION OF WORK IS BEING DIRECTED DUE TO THE COVID-19 VIRUS. THE SHELTER IN PLACE WAS EXTENDED SO THE MOD IS BEING EXTENDED. |
MASTER DESIGN BUILD, LLC |
Department of Veterans Affairs |
March 29, 2019 |
July 10, 2020 |
$0 |
ICU BRIDGE TO COMPLETE PREVIOUS STARTED PROJECT |
D SQUARE CONSTRUCTION, LLC |
Department of Veterans Affairs |
August 28, 2019 |
May 15, 2020 |
$23,157 |
MOD P0005 SUSPENSION OF WORK BEING ISSUED IAW FAR 52.242-14 DUE TO THE COVID-19 VIRUS. SUSPENSION EXTENDED UNTIL JUNE 1, 2020 DUE TO THE SHELTER IN PLACE BEING EXTENDED |
BLUE YONDER, INC. |
Department of Veterans Affairs |
May 06, 2019 |
July 10, 2020 |
$0 |
ADD ELECTRICAL SERVICE TO TRIAGE TENT COVID 19. |
SAGE CONSTRUCTION GROUP LLC |
Department of Veterans Affairs |
March 30, 2020 |
April 30, 2020 |
$9,864 |
EMERGENCY COVID-19 ISOLATION UNIT |
HAMILTON PACIFIC CHAMBERLAIN, LLC |
Department of Veterans Affairs |
June 25, 2021 |
September 30, 2021 |
$350,000 |
REPLACE STEAM AND CONDENSATE MAINS OVAL 2 |
BERING STRAITS TECHNICAL SERVICES, LLC |
Department of Veterans Affairs |
October 29, 2018 |
December 31, 2021 |
$0 |
550-15-107 REMEDIATE LEGIONELLA STATION-WIDE PHASE-1 MOD P00007 TIME EXTENSION DUE TO COVID19 ACTIVITIES. |
RICHARD GROUP LLC |
Department of Veterans Affairs |
June 29, 2018 |
September 01, 2020 |
$0 |
COVID - GARLAND FACILTIES MAINTENANCE |
CBRE, INC |
Department of Veterans Affairs |
April 03, 2020 |
May 31, 2021 |
$2,000,000 |
MODIFICATION P00004 - LIFT SUSPENSION, PROJECT CONSIDERED MISSION-CRITICAL UNDER TASK ORDER #5 UPGRADE SUBBASEMENT SANITARY SEWER SYSTEMS CONSTRUCTION, ON CONSTRUCTION MATOC AT THE OSCAR G. JOHNSON VAMC IN IRON MOUNTAIN, MICHIGAN. |
MBM CONSTRUCTION CO. |
Department of Veterans Affairs |
November 07, 2019 |
January 01, 2021 |
$0 |
COVID 19 INSTALLATION OF OVERHEAD DOOR ALARMS 9TH FLOOR AND PEC |
MONUMENT CONSTRUCTION, LLC |
Department of Veterans Affairs |
November 20, 2019 |
November 06, 2020 |
$0 |
SURGE CAPACITY FOR 8TH FLOOR COVID-19 PATIENT CARE |
CONCENTRIC GROUP, LLC |
Department of Veterans Affairs |
April 02, 2020 |
April 30, 2020 |
$121,144 |
REPLACE SECURITY DOORS TO PREVENT COVID-19 FROM ENTERING VALBHS. |
HINGEWERKS COMMERCIAL DOORS, INC. |
Department of Veterans Affairs |
April 02, 2020 |
June 30, 2020 |
$548,332 |
PROJECT 578-20-010: TEMP WALLS FOR COVID-19 |
TROOP CONTRACTING, INC. |
Department of Veterans Affairs |
April 02, 2020 |
August 31, 2020 |
$45,320 |
WARD AIR PRESSURE CONVERSION |
CONCENTRIC GROUP, LLC |
Department of Veterans Affairs |
April 01, 2020 |
April 30, 2020 |
$218,336 |
SERVICES TO MODIFY HVAC IN EMERGENCY DEPARTMENT ROOMS IN ORDER TO BE AIRBORNE INFECTION ISOLATION ROOMS FOR COVID-19 AT VA LOMA LINDA HEALTHCARE SYSTEM, LOMA LINDA, CA 92357. |
ALLEGIANCE AIR & MECHANICAL, INC. |
Department of Veterans Affairs |
April 01, 2020 |
June 30, 2020 |
$87,700 |
PROJECT 578-20-009: PAVE GRAVEL AREA AT BLDG 200 FOR COVID-19 |
RICHARD GROUP LLC |
Department of Veterans Affairs |
August 27, 2020 |
December 10, 2020 |
$58,728 |
MOD P00002 - $0 MOD TO EXTEND THE POP UNTIL SEPTEMBER 21, 2020.
PROJECT 537-18-160 CORRECTIONS TO ER&AUDITORIUM EXHAUST
MECHANICAL CORRECTIONS TO THE EXHAUST SYSTEM |
MASTER DESIGN BUILD, LLC |
Department of Veterans Affairs |
February 05, 2019 |
September 21, 2020 |
$0 |
INSTALL ELECTRICAL CONDUIT TO COVID 19 TENT |
SAGE CONSTRUCTION GROUP LLC |
Department of Veterans Affairs |
March 30, 2020 |
April 30, 2020 |
$6,984 |
"CORRECT RETRO COMMISSIONING DISCREPANCIES PHASE 2", PROJECT # 503-15-205 |
SERVIAM CONSTRUCTION, LLC |
Department of Veterans Affairs |
October 23, 2018 |
June 01, 2020 |
$29,329 |
EQUITABLE ADJUSTMENT FOR DELAY, EMERGENCY DEPARTMENT EXPANSION WITH RELOCATION OF INFUSION/ONCOLOGY SERVICES, SIOUX FALLS, SD. PROJECT#: 438-385. COVID-19, MODIFICATION P00021- THIS IS A NO-COST TIME EXTENSION MODIFICATION,AND ADDITIONAL TIME MUST BE ADDED TO THE PERIOD OF PERFORMANCE TO ALLOW FOR THE COMPLETION OF PLUMBING WORK THAT REQUIRES AN ELECTRICAL SHUT DOWN THAT CAN ONLY OCCUR DURING WARMER WEATHER AND AFTER JUNE 1, 2020 DUE TO COVID-19. THE CONTRACT IS EXTENDED TO JUNE 26, 2020. |
INDUSTRIAL MAINTENANCE SERVICES, INC. |
Department of Veterans Affairs |
April 29, 2016 |
June 26, 2020 |
$0 |
COVID-19 PACU NURSE CALL SYSTEM |
JOHNSON CONTROLS SECURITY SOLUTIONS LLC |
Department of Veterans Affairs |
March 26, 2020 |
May 29, 2020 |
$29,779 |
556-17-014 ONCOLOGY RENOVATION USP 800 - MODIFICATION 5 - SUSPENSION OF WORK DUE TO COVID19 RELATED ACTIVITIES. |
SERGEANT CONSTRUCTION INC. |
Department of Veterans Affairs |
March 23, 2019 |
November 19, 2020 |
$0 |
TASK ORDER #6 - SUSPENSION FOR 30 DAYS DUE TO COVID-19 PANDEMIC FOR THE RENOVATE 5-CENTER CONSTRUCTION PROJECT, ON THE MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR THE OSCAR G. JOHNSON VA MEDICAL CENTER IN IRON MOUNTAIN, MICHIGAN. |
MBM CONSTRUCTION CO. |
Department of Veterans Affairs |
November 07, 2019 |
January 01, 2021 |
$0 |
MODIFICATION P00003 - SUSPENSION OF WORK DUE TO COVID-19 PANDEMIC UNDER TASK ORDER #5 UPGRADE SUBBASEMENT SANITARY SEWER SYSTEMS CONSTRUCTION, ON CONSTRUCTION MATOC AT THE OSCAR G. JOHNSON VAMC IN IRON MOUNTAIN, MICHIGAN. |
MBM CONSTRUCTION CO. |
Department of Veterans Affairs |
November 07, 2019 |
January 01, 2021 |
$0 |
JC LIFE SAFETY FINDING CORRECTIONS, WHITERIVER INDIAN HOSPITAL |
ROCK GAP ENGINEERING LLC |
Indian Health Service |
August 08, 2019 |
June 24, 2020 |
$0 |
MED GAS LINES IN ROOMS - COVID 19 |
ERIE MECHANICAL CONTRACTORS INC. |
Department of Veterans Affairs |
March 25, 2020 |
April 07, 2020 |
$19,910 |