THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION.
Total Committed
$2,254
Product or Service Description
Repair or Alteration of Miscellaneous Buildings
Effective Date
May 29, 2019
Funding Department
NASA AMES RESEARCH CENTER
Type
Firm fixed price
Solicitation Procedure
Subject to multiple award fair opportunity
Extent Competed
Full and open competition after exclusion of sources

Recent Contract Actions

Contracts can have multiple “contract actions”: This is how agencies spend money for a specific purpose, adjust the amount committed or change the contract in a way that doesn’t affect the amount. That last scenario is usually indicated by a $0 action. If there is a contract action for a negative amount, it generally means the contract was adjusted or canceled.

Vendor Description Signed Reason for Change Amount Committed
SOUTHWESTERN DAKOTAH, INC. COVID-19 HISTORIC PRESERVATION OF BUILDING 025 EXPOSURE TO COVID 19, CONSTRUCTION SITE SHUTDOWN FOR 14 CALENDAR DAYS. Dec. 16, 2020 Other Administrative Action $0
SOUTHWESTERN DAKOTAH, INC. COVID-19 N240 SEISMIC RISK REDUCTION, CLEAN ROOM HALF DAY LOST AND COVID SUPPLIES. Oct. 29, 2020 Supplemental Agreement For Work Within Scope $2,254
SOUTHWESTERN DAKOTAH, INC. N240 SEISMIC RISK REDUCTION, CLEAN ROOM THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. July 23, 2020 Other Administrative Action $0
SOUTHWESTERN DAKOTAH, INC. N240 SEISMIC RISK REDUCTION, CLEANROOM. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. June 25, 2020 Other Administrative Action $0
SOUTHWESTERN DAKOTAH, INC. N240 SEISMIC RISK REDUCTION, CLEAN ROOM THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. May 26, 2020 Other Administrative Action $0
SOUTHWESTERN DAKOTAH, INC. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. March 19, 2020 Other Administrative Action $0
About this data
This data comes from the Federal Procurement Data System, which includes all contracts worth $10,000 or more. We look at all contracts that are tagged with the procurement code for COVID-19 or otherwise started in 2020 and contain “COVID-19” in the description. Department of Defense contracting data is subject to a 90-day delay before it appears in the data.
Close Comment Creative Commons Donate Email Facebook Mobile Phone Podcast Print RSS Search Search Twitter WhatsApp
Current site Current page