HomeAll VendorsVendor
UNIVERSITY OF SOUTHERN MISSISSIPPI, THE
Total Committed Value of Federal Contracts
$0
Total Contracts
3
Total Actions
4
Location
Hattiesburg, MS

Recent Contract Actions

Contracts can have multiple “contract actions”: This is how agencies spend money for a specific purpose, adjust the amount committed or change the contract in a way that doesn’t affect the amount. That last scenario is usually indicated by a $0 action. If there is a contract action for a negative amount, it generally means the contract was adjusted or canceled.

Description Category Agency Signed Amount Committed
THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE LANGUAGE OF THE PREVIOUS ADMINISTRATIVE BILATERAL MODIFICATION P0002 AND CITE FAR 52.212.-4 (F) EXCUSABLE DELAYS AS JUSTIFICATION FOR THE FAR 52.217-8, 180 DAY EXTENSION OF THE CONTRACT THROUGH OCTOB Other Professional Services Small Business Administration December 15, 2020 $0
REGIONAL INNOVATION CLUSTER INITIATIVE SERVICES Other Professional Services Small Business Administration April 17, 2020 $0
THE CONTRACTOR SHALL PROVIDE ENGINEERING AND SCIENTIFIC RESEARCH TO NASA, OTHER GOVERNMENT AGENCIES AND VARIOUS TENANTS AT THE JOHN C. STENNIS SPACE CENTER. THE AREAS OF WORK INCLUDE ROCKET PROPULSION TESTING RESEARCH AND DEVELOPMENT, PROJECT FORMULATION, NEW BUSINESS DEVELOPMENT, REMOTE SENSING APPLICATIONS, ECOSYSTEM INTEGRATION AND ANALYSIS, COASTAL COMMUNITY RESILIENCY AND SUSTAINABLE DEVELOPMENT, WATER QUALITY, CLIMATE CHANGE AND VARIABILITY EFFECTS ON REGIONAL ECOSYSTEMS, ACOUSTICS, IMAGE ANALYSIS, GEOGRAPHIC INFORMATION SYSTEMS, COMPUTATIONAL FLUID DYNAMICS, POLYMERS/CERAMICS, ELECTRON MICROSCOPY, MICRO-ELECTROMECHANICAL SYSTEMS, MAGNETO HYDRODYNAMICS, DIAGNOSTICS INSTRUMENTATION, AND OTHER ASSOCIATED SCIENTIFIC, COMPUTATIONAL AND ENGINEERING AREAS. SPECIFIC EXAMPLES OF PAST RESEARCH IN SEVERAL OF THESE AREAS IS SHOWN IS SECTION 5 BELOW. THE MISSISSIPPI RESEARCH CONSORTIUM (MRC) IS A COLLABORATION OF FOUR MISSISSIPPI UNIVERSITIES DEDICATED TO PROVIDING RESEARCH AND TECHNOLOGY DEVELOPMENT TO VARIOUS STATE AND FEDERAL AGENCIES. THE MRC CONSISTS OF JACKSON STATE UNIVERSITY (JSU), MISSISSIPPI STATE UNIVERSITY (MSU), UNIVERSITY OF SOUTHERN MISSISSIPPI (USM) AND UNIVERSITY OF MISSISSIPPI (UM). SECTION 2 ADMINISTERING INSTITUTION: THE CONTRACT WILL BE ADMINISTERED BY A SINGLE MRC INSTITUTION THAT WILL SERVE AS THE MRC LIAISON TO NASA IN THE PERFORMANCE OF THIS CONTRACT. THE ADMINISTERING INSTITUTION WILL BE RESPONSIBLE FOR: A. RECEIVING STATEMENTS OF WORK FROM THE NASA OFFICE OF PROCUREMENT. B.DISTRIBUTE THE SOW WITHIN THREE WORK DAYS TO EACH MRC INSTITUTION OFFICE OF SPONSORED RESEARCH WITH INSTRUCTIONS ON THE PROCEDURE AND REQUIRED SCHEDULE FOR SUBMITTING PROPOSALS. C. COLLECTING AND REVIEWING THE PROPOSALS TO VERIFY THE TECHNICAL REQUIREMENTS ARE MET, INCLUDING BUDGET AND SCHEDULE. D. PROVIDING ALL SUBMITTED PROPOSALS TO NASA, ALONG WITH MRC RECOMMENDATION OF THE PROPOSAL THAT BEST MEETS THE REQUIREMENTS OF THE INDIVIDUAL SOW AND PROVIDES BEST VALUE TO THE GOVERNMENT. E. PROVIDE THE TOTAL COST OF THE PROPOSAL TO GOVERNMENT. F. ENTERING INTO A CONTRACT WITH THE MRC INSTITUTION SELECTED BY NASA WHEN A FIXED COST RESEARCH PROPOSAL IS FUNDED BY NASA. G. PERFORMING GENERAL OVERSIGHT AND ADMINISTRATIVE FUNCTIONS. H. PROVIDING MONTHLY INVOICES. I. PROVIDING STATUS REPORTS ON PROJECT SCHEDULES TO THE MRC INSTITUTIONS, THE NASA CONTRACTING OFFICER (CO) AND THE NASA CONTRACTING OFFICER REPRESENTATIVES (COR) J. REQUIRE EACH PRINCIPAL INVESTIGATOR (PI) TO PROVIDE A TECHNICAL REPORT AT THE CONCLUSION OF THE RESEARCH BEFORE FINAL PAYMENT IS MADE TO THE PI OR THE PI INSTITUTION K. PROVIDE NASA CO AND COR ONE COPY OF ALL FINAL REPORTS WITHIN 90 DAYS OF THE COMPLETION OF EACH PROJECT. L. INCLUDE THE FINAL REPORT IN THE SSC S TECHNICAL DOCUMENTATION SYSTEM PRIOR Other Professional Services National Aeronautics and Space Administration March 24, 2020 $0
RESEARCH AND DEVELOPMENT SERVICES FROM THE MISSISSIPPI RESEARCH CONSORTIUM. SECTION 1 INTRODUCTION: THE CONTRACTOR SHALL PROVIDE ENGINEERING AND SCIENTIFIC RESEARCH TO NASA AND THE TENANTS AT THE JOHN C. STENNIS SPACE CENTER (SSC) IN THE AREAS OF ROCKET ENGINE AND PROPULSION SYSTEM TESTING, UNMANNED SYSTEMS, AUTONOMOUS SYSTEMS, MACHINE LEARNING, COMPUTATIONAL MODELING AND SIMULATION, COMPONENT ENGINEERING, CYBERSECURITY, ADVANCED MANUFACTURING, MATERIALS SCIENCE, ADVANCED SENSORS AND INSTRUMENTATION, MODEL-BASED SYSTEMS, ENGINEERING, PROCESS OPTIMIZATION, ACOUSTICS, MAGNETO HYDRODYNAMICS, AND ASSOCIATED SCIENTIFIC, COMPUTATIONAL AND ENGINEERING. EXAMPLES OF THE ANTICIPATED RESEARCH IN THESE AREAS ARE DESCRIBED IN SECTION 5 BELOW. THE MISSISSIPPI RESEARCH CONSORTIUM (MRC) IS A COLLABORATION OF FOUR MISSISSIPPI UNIVERSITIES DEDICATED TO PROVIDING RESEARCH AND TECHNOLOGY DEVELOPMENT TO VARIOUS STATE AND FEDERAL AGENCIES. THE MRC CONSISTS OF JACKSON STATE UNIVERSITY (JSU), MISSISSIPPI STATE UNIVERSITY (MSU), UNIVERSITY OF SOUTHERN MISSISSIPPI (USM) AND UNIVERSITY OF MISSISSIPPI (UM). SECTION 2 ADMINISTERING INSTITUTION: THE CONTRACT WILL BE ADMINISTERED BY A SINGLE MRC INSTITUTION THAT WILL SERVE AS THE MRC LIAISON TO NASA IN THE PERFORMANCE OF THIS CONTRACT. THE ADMINISTERING INSTITUTION WILL BE RESPONSIBLE FOR: A. RECEIVING STATEMENTS OF WORK FROM THE NASA OFFICE OF PROCUREMENT. B. DISTRIBUTE THE SOW WITHIN THREE WORK DAYS TO EACH MRC INSTITUTION OFFICE OF SPONSORED RESEARCH WITH INSTRUCTIONS ON THE PROCEDURE AND REQUIRED SCHEDULE FOR SUBMITTING PROPOSALS. C. COLLECTING AND REVIEWING THE PROPOSALS TO VERIFY THE TECHNICAL REQUIREMENTS ARE MET, INCLUDING BUDGET AND SCHEDULE. D. PROVIDING ALL SUBMITTED PROPOSALS TO NASA, ALONG WITH MRC RECOMMENDATION OF THE PROPOSAL THAT BEST MEETS THE REQUIREMENTS OF THE INDIVIDUAL SOW AND PROVIDES BEST VALUE TO THE GOVERNMENT. E. PROVIDE THE TOTAL COST OF THE PROPOSAL TO GOVERNMENT. F. ENTERING INTO A CONTRACT WITH THE MRC INSTITUTION SELECTED BY NASA WHEN A FIXED COST RESEARCH PROPOSAL IS FUNDED BY NASA G. PERFORMING GENERAL OVERSIGHT AND ADMINISTRATIVE FUNCTIONS. H. PROVIDING MONTHLY INVOICES. 1. PROVIDING STATUS REPORTS ON PROJECT SCHEDULES TO THE MRC INSTITUTIONS, THE NASA CONTRACTING OFFICER (CO) AND THE NASA CONTRACTING OFFICER REPRESENTATIVES (COR) J. REQUIRE EACH PRINCIPAL INVESTIGATOR (PI) TO PROVIDE A TECHNICAL REPORT AT THE CONCLUSION OF THE RESEARCH BEFORE FINAL PAYMENT IS MADE TO THE PI OR THE PI INSTITUTION K. PROVIDE NASA CO AND COR ONE COPY OF ALL FINAL REPORTS WITHIN 90 DAYS OF THE COMPLETION OF EACH PROJECT. 1. INCLUDE THE FINAL REPORT IN THE SSC'S TECHNICAL DOCUMENTATION SYSTEM PRIOR TO CLOSEOUT OF A PROJECT. M. CLOSE OUT ALL PROJECTS WITHIN 90 DAYS OF COMPLETION OF EACH PROJECT. THE ADMINISTERING INSTITUTION WILL PROVIDE A MANAGEMENT PLAN DESCRIBING THE STATISTICS TO BE COLLECTED AND PERIODICALLY REPORTED. NASA WILL SELECT THE ADMINISTERING INSTITUTION BASED ON AN EVALUATION OF "PROPOSALS FOR ADMINISTRATION" WHICH MAY BE SUBMITTED BY ANY MRC INSTITUTION. THE PROPOSAL FOR ADMINISTRATION MUST INCLUDE A DETAILED MANAGEMENT PLAN THAT DESCRIBES THE PROCESS FLOW THAT WOULD BE USED FOR OPERATION OF THE MRC. THE MANAGEMENT PLAN NARRATIVE IS LIMITED TO 10 PAGES AND THE ENTIRE PROPOSAL INCLUDING PRICING AND PERSONNEL QUALIFICATIONS IS LIMITED TO A TOTAL OF 20 PAGES INCLUDING ATTACHMENTS. Other Professional Services National Aeronautics and Space Administration March 23, 2020 $0
About this data
This data comes from the Federal Procurement Data System, which includes all contracts worth $10,000 or more. We look at all contracts that are tagged with the procurement code for COVID-19 or otherwise started in 2020 and contain “COVID-19” in the description. Department of Defense contracting data is subject to a 90-day delay before it appears in the data.
Close Comment Creative Commons Donate Email Facebook Mobile Phone Podcast Print RSS Search Search Twitter WhatsApp
Current site Current page