Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
BAILEY EDWARD DESIGN, INC. | $32,447 | Contract | : Bailey Edward architecure was contracted to conduct a Pre-Design study related to the repair of the exterior brick and re-sealing of the windows at teh reasearch facility in Madison. | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $28,838 | Contract | : A-E design, bid phase and construction phase services to repair/replace the 100-Ton Air Conditioner and Cooling Tower with Aircooled Chiller and associated piping for the Harned Building located at the ARS Research Facility located in Starkville, MS. | Agriculture, Department of / Agricultural Research Service | 8/18/2009 |
MERRICK & COMPANY | $24,774 | Contract | : Akron USDA/ARS Bldg 1 HVAC Repairs - Design Services. | Agriculture, Department of / Agricultural Research Service | 8/11/2009 |
STV INCORPORATED | $34,794 | Contract | : Replace Air Distribution system at the Appalachian Fruit Research Station, Kearneysville, WV | Agriculture, Department of / Agricultural Research Service | 7/16/2009 |
PRO-MARK SERVICES, INC. | $1,511,585 | Contract | : RECOVERY PROJECT FOR REPLACEMENT OF LABORATORY FACILITIES? HVAC SYSTEMS AND COMPONENTS at the Red River Agricultural Research Center 1605 Albrecht Blvd. in Fargo, N.D. | Agriculture, Department of / Agricultural Research Service | 9/29/2009 |
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. | $256,636 | Contract | : Bid Phase and Construction Administration Services for the Replacement of a Chiller, Generator, and UST at the HNRCA in Boston, MA. | Agriculture, Department of / Agricultural Research Service | 9/30/2009 |
CLARO COMPANY INC | $381,795 | Contract | : Contractor shall install a new HVAC system and exhaust for fume hood and all necessary controls. Installing insulation above the ceiling and underside of roof decking. Installing ceiling system and light fixtures. | Agriculture, Department of / Agricultural Research Service | 9/24/2009 |
KSA-KRANTZ SYSTEMS & ASSOCIATES, LLC | $109,166 | Contract | : Repair fire alarm system | Agriculture, Department of / Agricultural Research Service | 7/29/2009 |
ZGA ARCHITECTS AND PLANNERS, CHARTERED | $12,911 | Contract | : PREDESIGN SERVICES FOR REPLACMENT HVAC & ELECTRICAL/CONTROL SYSTEMS | Agriculture, Department of / Agricultural Research Service | 8/13/2009 |
TECTONICS | $116,290 | Contract | : Provide Architect Engineer construction support services for WRRC, Recivery - Repair Exterior Finishes, West Annex Building and Service Building, Albany, CA. | Agriculture, Department of / Agricultural Research Service | 4/05/2010 |
BERNARD JOHNSON CORPORATION | $1,914,635 | Contract | : Design Update for Phase 8 (Power Plant Upgrade) and Phase 9A & 9B (Renovation of Pilot Plant Laboratories) at the Eastern Regional Research Center (ERRC) - Major Renovation to ERRC to address deferred maintenance of critical mechanical, electrical and plu | Agriculture, Department of / Agricultural Research Service | 7/10/2009 |
ARCINI CONSTRUCTION | $151,584 | Contract | : Ft. Collins, CO. Relacing building 1 Cooling Towers for NCGRP constant temperature rooms and heat exchangers | Agriculture, Department of / Agricultural Research Service | 10/14/2009 |
BAILEY EDWARD DESIGN, INC. | $71,993 | Contract | : Bailey Edward architecture has been contracted to perform architectural services related to the repair of the windows and replacement of the roof at the USDA facility in West Lafayette, IN. | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
BAILEY EDWARD DESIGN, INC. | $43,649 | Contract | : Bailey Edward architecture was contracted to replace the glazing systems in Greenhouse 400-40 in St. Paul, Minnesota. | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
TOLAND & MIZELL ARCHITECTS/APPLIED ENGINEERING SOLUTIONS - JOINT VENTURE | $106,543 | Contract | : Electrical and HVAC upgrades Building 35 and Roof Replacement various Buildings Southeast Poultry Research Laboratory, Athens, GA The purpose of this project is to address critical deferred maintenance needs at the research location. The most pressing n | Agriculture, Department of / Agricultural Research Service | 7/20/2009 |
TOLAND & MIZELL ARCHITECTS APPLIED ENGINEERING SOLUTIONS JOINT VENTURE | $138,199 | Contract | : HVAC Upgrades Buildings 1, 4, and 34 Southeast Poultry Research Laboratory, Athens, GA CA Services for the following project designed under separate TO. SEPRL has 3 facilities that are operated as BSL-3 enhanced. Bldgs 1 & 4 are laboratory facilities o | Agriculture, Department of / Agricultural Research Service | 10/08/2009 |
PERKINS + WILL, INC. | $189,132 | Contract | : Architectural and engineering design for the design of the replacement of standby electrical generator at the National Animal Disease Center, Ames, Iowa. | Agriculture, Department of / Agricultural Research Service | 7/30/2009 |
EWINGCOLE INC | $19,273 | Contract | : The old existing windows at the Robert w Holley Center are difficult to maintain, energy inefficient and admit water to the interior of the building envelope. This contract will coordinate replacement windows specification by visiting the site for measur | Agriculture, Department of / Agricultural Research Service | 9/01/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $44,624 | Contract | : A-E design, bid phase and construction phase services to replace roofs on Buildings 1,2,4,9,12 at USDA ARS Research Facility located in Starkville, MS. | Agriculture, Department of / Agricultural Research Service | 7/29/2009 |
TECTONICS | $20,067 | Contract | : Provide Architect-Engineer pre-design and subsequent design services for Design Replacement Roof at the Columbia Plateau Conservation Research Center, Pendleton, OR. The purpose of the award is to investigate and design solutions to repair the deteriorate | Agriculture, Department of / Agricultural Research Service | 8/04/2009 |
HDR ARCHITECTURE, INC. | $373,799 | Contract | : A&E services to replace underground water and sanitary sewer lines | Agriculture, Department of / Agricultural Research Service | 7/29/2009 |
HDR ARCHITECTURE INC, | $112,601 | Contract | : Architect-Engineering Services to replace roofs on large animal buildings 3 & 4, and utility building 155. | Agriculture, Department of / Agricultural Research Service | 7/29/2009 |
PERKINS + WILL, INC. | $130,394 | Contract | : Investigative report to address replacement of boilers and steam distribution systems serving research facilities at Beltsville Agricultural Research Center, Beltsville, Maryland. | Agriculture, Department of / Agricultural Research Service | 7/06/2009 |
RMF ENGINEERING, INC. | $264,001 | Contract | : Replacement of the deteriorated building envelope, repair of brick facade, and replacement of the plumbing systems. | Agriculture, Department of / Agricultural Research Service | 7/08/2009 |
AJC ARCHITECTS, P.C. | $7,231 | Contract | : USDA Logan Greenhouse HVAC Renovation, Architectural & Engineering services. | Agriculture, Department of / Agricultural Research Service | 8/20/2009 |
BERNARD JOHNSON CORPORATION | $2,200,928 | Contract | : A-E Services for the major renovation of the National Agricultural Utilization Research Center to address deferred maintenance of critical mechanical, electrical and plumbing systems, and incidental repairs (Phase 3 and 4). Services include design, bid p | Agriculture, Department of / Agricultural Research Service | 7/14/2009 |
BAILEY EDWARD DESIGN, INC. | $46,943 | Contract | : Bailey Edward architure was contracted to provide architecture and engineering services related to the repair of building #17 finishes in East Lansing, MI. | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
BAILEY EDWARD DESIGN, INC. | $124,421 | Contract | : Bailey Edward architecture has been contracted to perform architectural and engineering services related to the repair of the mechanical and electrical systems at the USDA facility in St. Paul, MN. | Agriculture, Department of / Agricultural Research Service | 9/10/2009 |
AECOM SERVICES, INC. | $445,457 | Contract | : Design Update for Modernization fo the Laboratory/Office Building at Fort Keogh Livestock and Range Research Laboratory | Agriculture, Department of / Agricultural Research Service | 7/10/2009 |
EWINGCOLE INC | $19,273 | Contract | : Design Replacement Windows | Agriculture, Department of / Agricultural Research Service | 9/01/2009 |
STV INCORPORATED | $19,665 | Contract | : Add emergency generator and automatic transfer switch for an insect laboratory at the University of Delaware. | Agriculture, Department of / Agricultural Research Service | 9/21/2009 |
BAILEY EDWARD DESIGN, INC. | $103,954 | Contract | : Bailey Edward architecture has been contracted to perform architectural and engineering services related to the repair of the mechanical systems and the repair of the greenhouse cooling systems at the Dairy Forage reseach facility in Madison, WI. | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $12,518 | Contract | : A-E design, bid phase and construction phase services to replace the existing main electrical switchgear for the Harned Building located at the ARS Research Facility located in Starkville, MS. | Agriculture, Department of / Agricultural Research Service | 8/13/2009 |
ZGA ARCHITECTS AND PLANNERS, CHARTERED | $53,376 | Contract | : Design phase services for research greenhouse mechanical systems and chiller replacement. Riverside, California. | Agriculture, Department of / Agricultural Research Service | 11/20/2009 |
JACOBS FACILITIES INC. | $380,968 | Contract | : Design and Design Update Services for Various Projects at WRRC, Albany, California. Jacobs will provide the design and design updates to combine phases and expedite construction for the following projects at WRRC: 1. Phase 3B Food Processing Laboratory 2 | Agriculture, Department of / Agricultural Research Service | 3/16/2009 |
BAILEY EDWARD DESIGN, INC. | $21,754 | Contract | : Bailey Edward architecture was contracted to perform architecture and engineering services related to the repair of the electrical distribution system at Building #1 in East Lansing, MI. | Agriculture, Department of / Agricultural Research Service | 9/10/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $26,900 | Contract | : A-E design, bid phase and construction phase services to install a new Emergency Generator and Automatic Transfer Switch for the Harned Building located at the ARS Research Facility located in Starkville, MS. | Agriculture, Department of / Agricultural Research Service | 8/18/2009 |
RMF ENGINEERING, INC. | $976,642 | Contract | : The U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS) requires the A-E contractor to perform architectural and engineering services for design update/ reduce scope, for the U.S. National Arboretum Administration Building Renovatio | Agriculture, Department of / Agricultural Research Service | 7/16/2009 |
BARLOW EDDY JENKINS, PA | $740,927 | Contract | : Update drawings for renovation of 5- story main research facility, (Building #1) for the USDA-ARS in Stoneville, MS. Scope of the update includes: Update the specs in UFG format; Architecture and Engineerings services to: indicate staging, construction sc | Agriculture, Department of / Agricultural Research Service | 7/21/2009 |
TECTONICS | $9,254 | Contract | : Provide Fire Protection Engineering services during construction, Main and West Annex Buildings Albany, California. The purpose of the award is to bring the existing fire protection standpipes to meet today's fire codes. The services performed will be to | Agriculture, Department of / Agricultural Research Service | 10/22/2009 |
PEACHTREE MECHANICAL, INC. | $2,449,409 | Contract | : Upgrade Mechanical Systems for Buildings 34, 1 and 4 at the USDA Southeast Poultry Reseach Facility Athens, GA | Agriculture, Department of / Agricultural Research Service | 10/08/2009 |
VIGIL CONTRACTING, INC. | $1,357,177 | Contract | : Brick Repair Phase 4 and 5 (South Face of the Tower and North, East, South and West elevations of the Admin Bldg. includes 300 SF of unsatisfactory brick replacement; | Agriculture, Department of / Agricultural Research Service | 10/06/2009 |
STV INCORPORATED | $39,364 | Contract | : Replace roof of the Jean Mayer Human Nutrition Resource Center in Boston MA. | Agriculture, Department of / Agricultural Research Service | 7/02/2009 |
SHELTONDEAN, INC. | $446,340 | Contract | : Replacement of Systems and Finishes in Insectary. Roof Repairs and Replacement of systems and finishes in Laboratories space | Agriculture, Department of / Agricultural Research Service | 10/19/2009 |
MCCALL & ASSOCIATES - AIA - ARCHITECTS | $19,527 | Contract | : A-E Design and CM/CA services to replace the 10-ton and 15-ton HVAC units serving the West Lab at the East Campus at the Grazinglands Research Lab in El Reno, Oklahoma. | Agriculture, Department of / Agricultural Research Service | 9/29/2009 |
MCCALL & ASSOCIATES - AIA - ARCHITECTS | $76,682 | Contract | : A-E Design and Cm/CA services to remove the existing roofs on eight buildings and replace them with new energy efficient roofing systems at the ARS Laboratory Facilities in College Station, Texas. | Agriculture, Department of / Agricultural Research Service | 9/29/2009 |
MAURER-STUTZ, INC. | $109,337 | Contract | : This contract is for the engineering design and drawing preparation for bidding and construction of repairs to mechanical systems and installation of emergency electrical located at SERL, W. Lafayette, IN | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
MAURER-STUTZ, INC. | $40,617 | Contract | : Pre-Design, Design, Bidding, & Construction Management Services for Repair Mechanical Systems, ADOL, E. Lansing, MI | Agriculture, Department of / Agricultural Research Service | 9/09/2009 |
JACOBS ENGINEERING GROUP INC. | $2,423,304 | Contract | : Design and Design Update, Bid Phase, and Construction Phase Services for Various Projects at Western Regional Research Center, Albany, California. Jacobs will provide the design and design updates to combine phases and expedite construction for the follow | Agriculture, Department of / Agricultural Research Service | 7/08/2009 |
SERGENT MECHANICAL SYSTEMS (INC) | $301,386 | Contract | : Fire Alarms and fire suppression | Agriculture, Department of / Agricultural Research Service | 10/21/2009 |
BB & K CONSTRUCTION, LLC | $99,850 | Contract | : Replace electrical switchgear Harned Laboratory building Mississippi State, Mississippi | Agriculture, Department of / Agricultural Research Service | 12/08/2009 |
AIRGO USA LLC | $243,000 | Contract | : Replace the roofs, on Buildings #1-24 and #2-24 and on the Feedmill, Building #3 at the UNITED STATES DEPARTMENT OF AGRICULTURE, Agricultural Research Service, Roman L. Hruska U.S. Meat Animal Research Center, Clay Center, Nebraska | Agriculture, Department of / Agricultural Research Service | 9/14/2009 |
ARCINI CONSTRUCTION | $147,461 | Contract | : Replace Light Fixtures at NCGRP. | Agriculture, Department of / Agricultural Research Service | 10/14/2009 |
JOHNSON CONTROLS, INC. | $46,143 | Contract | : Install new Metasys superviosr controller, install new computer workstation, install and commission DX9100 Controllers, replace five zone temp sensors, three humidity sensors and outside air temp sensor | Agriculture, Department of / Agricultural Research Service | 10/07/2009 |
VIGIL CONTRACTING, INC. | $2,663,096 | Contract | : Tower window replacement, NAL Building, Beltsville, MD to include removal of all existing finishes at punch window openings; remove and replace existing punch windows and window walls; mock-up and testing of each type of window. MOD #1 dated 09/28/2010 i | Agriculture, Department of / Agricultural Research Service | 1/29/2010 |
TECTONICS | $9,916 | Contract | : Provide services during construction including construction submittal reviews, answering and resolving field issues, and conducting site inspections. | Agriculture, Department of / Agricultural Research Service | 1/29/2010 |
E-CORP. | $129,361 | Contract | : LOGAN - REPLACEMENT OF HVAC SYSTEMS AND COMPONENTS IN RESEARCH GREENHOUSES | Agriculture, Department of / Agricultural Research Service | 3/26/2010 |
AD VERITAS CONSTRUCTION CO. INC. | $85,265 | Contract | : Replace the HVAC System in Building 3 Rooms 300 and 302 | Agriculture, Department of / Agricultural Research Service | 1/15/2010 |
BB & K CONSTRUCTION, LLC | $99,850 | Contract | : Replace existing electrical switchboard at the Harned Laboratory Building in Starkville, Ms. | Agriculture, Department of / Agricultural Research Service | 12/08/2009 |
ROBBERT CONSTRUCTION, INC. | $287,905 | Contract | : Repair Mechanical System ADOL, East Lansing, MI | Agriculture, Department of / Agricultural Research Service | 3/25/2010 |
RED WILK CONSTRUCTION, INC. | $1,515,745 | Contract | : Replacement of laboratory facilities HVAC systems and components Project at the Roman L. Hruska U.S. Meat Animal Research Center (USMARC), Clay Center, Nebraska. | Agriculture, Department of / Agricultural Research Service | 2/18/2010 |
VIGIL CONTRACTING, INC. | $2,193,985 | Contract | : Provide all labor, material and equipment necessary to demolish and renovate designated restrooms including tile, fixtures, toilet partitions, plumbing and mechanical piping at the National Agricultural Library (NAL), Beltsville, Maryland. | Agriculture, Department of / Agricultural Research Service | 2/02/2010 |
VETERANS CONSTRUCTION, LLC | $2,700,426 | Contract | : Chiller, Generator and Underground Storage Tank Replacement | Agriculture, Department of / Agricultural Research Service | 1/05/2010 |
PATRIOT CONSTRUCTION, INC. | $644,875 | Contract | : Provide material, labor, and equipment for roof rehabilitation of 4-story laboratory building (Main Building - North Wing); 4-story laboratory building (West Annex Buildig, Labs); 1-story building (West Annex Building, Director's Wing); and 2-story boiler | Agriculture, Department of / Agricultural Research Service | 10/08/2009 |
S&M AND ASSOCIATES, INC. | $439,610 | Contract | : Replace Roofs, Buildings No. 1,2,4,9 and 12 USDA, ARS, Mississippi State, MS One Subcontract awarded to 2SW for roofing.One modification issued for 19,623.00 for installation of backets on roof. | Agriculture, Department of / Agricultural Research Service | 2/19/2010 |
TECTONICS | $5,825 | Contract | : Provide construction support services including submittal reviews, resolving field issues and answering field questions, conduct site inspections. | Agriculture, Department of / Agricultural Research Service | 2/16/2010 |
IMPERIAL ROOF SYSTEMS CO. | $498,895 | Contract | : Replace roof & paint exterior building 3 at the Center for Grain & Animal Health Research -- USDA Manhattan KS | Agriculture, Department of / Agricultural Research Service | 2/19/2010 |
AFFILIATED CONSTRUCTION GROUP, INCORPORATED | $3,226,370 | Contract | : Modernization of the Fort Keogh Livestock and Range Reasearch Laboratory | Agriculture, Department of / Agricultural Research Service | 1/07/2010 |
POWER PRO INC | $204,193 | Contract | : Provide construction services for repair/ replace roof at the main building, at the Columbia Plateau Conservation Research Center, in Pendleton, OR. | Agriculture, Department of / Agricultural Research Service | 2/16/2010 |
CORE CONSTRUCTION SERVICES OF ILLINOIS, INC. | $14,378,314 | Contract | : Major renovation to the National Center for Agricultural Utilization Research in Peoria, Illinois to address critical deferred maintenance repairs of the mechanical, Electrical, and Plumbing Systems | Agriculture, Department of / Agricultural Research Service | 1/19/2010 |
STV INCORPORATED | $790,894 | Contract | : Provide design bridging documentation and CA Services for building 306 renovations at the BARC campus. | Agriculture, Department of / Agricultural Research Service | 2/19/2010 |
CONSTRUCTION SERVICE CORPORATION | $274,283 | Contract | : Replacement of 2 roofs on 2 lab/office buildings in Corvallis, Oregon | Agriculture, Department of / Agricultural Research Service | 1/15/2010 |
ROBBERT CONSTRUCTION, INC. | $94,541 | Contract | : Building 1-Repair Electrical Distribution System ADOL, East Lansing, MI | Agriculture, Department of / Agricultural Research Service | 3/24/2010 |
TECTONICS | $5,825 | Contract | : Provide construction support services including submittal reviews, resolving field issues and answering field questions, conduct site inspections. | Agriculture, Department of / Agricultural Research Service | 2/16/2010 |
BAILEY EDWARD DESIGN, INC. | $374,436 | Contract | : Bailey Edward architecture was contracted to perform architectural and engineering services related the replacement of the electrical systems in low containment animal facilities buildings #3 and #4 in Ames, IA. | Agriculture, Department of / Agricultural Research Service | 6/11/2010 |
BARLOW EDDY JENKINS, PA | $148,824 | Contract | : Bid phase services and soil testing for hazardous substances in the area the utility tunnel will be location | Agriculture, Department of / Agricultural Research Service | 4/23/2010 |
NAGEL-TVJ JV 3 | $797,509 | Contract | : DFRC Repair Mechanical Systems/CCRU Repair Greenhouse Cooling System, Madison, WI | Agriculture, Department of / Agricultural Research Service | 5/24/2010 |
TGR SERVICES, INC. | $680,881 | Contract | : Replacement of research greenhouse mechanical systems (NCGR) and replacement of chiller (USSL), in Riverside, CA | Agriculture, Department of / Agricultural Research Service | 5/18/2010 |
WELCH CONSTRUCTION INC. | $521,829 | Contract | : REPLACE MAIN BUILDING HVAC, PLANT GENETIC RESOURCES UNIT, GENEVA N.Y. | Agriculture, Department of / Agricultural Research Service | 5/14/2010 |
SAF, INC. | $469,730 | Contract | : Roof and Window replacement | Agriculture, Department of / Agricultural Research Service | 5/12/2010 |
BAILEY EDWARD DESIGN, INC. | $25,236 | Contract | : Bailey Edward architecture was contracted to perform architecture and engineering bidding phase services for the replacement of electrical systems in low containment animal facilities #3 and #4 at the National Animal Disease Center in Ames, IA | Agriculture, Department of / Agricultural Research Service | 6/11/2010 |
GREENLAND ENTERPRISES, INC. | $363,200 | Contract | : Replace Multi-Zone Air Handler System at the Appalachian Fruit Research Station (AFRS) in Kearneysville, WV | Agriculture, Department of / Agricultural Research Service | 5/14/2010 |
JE HURLEY CONSTRUCTION, INC. | $510,466 | Contract | : Repair Building 1 HVAC Systems | Agriculture, Department of / Agricultural Research Service | 6/01/2010 |
BAILEY EDWARD DESIGN, INC. | $306,435 | Contract | : Bailey Edward architecture was contracted to perform architectural and engineering services related to the exterior brick repair and window re-sealing projects at the research facility in Madison, WI. | Agriculture, Department of / Agricultural Research Service | 6/03/2010 |
WIEBOLT ELECTRIC, INC | $1,716,010 | Contract | : UPGRADE OF ELECTRICAL AND MECHANICAL EQUIPMENT AT THE CEREAL DISEASE LABORATORY | Agriculture, Department of / Agricultural Research Service | 6/03/2010 |
AMERICAN PLANT PRODUCTS & SERVICES INC | $364,188 | Contract | : Greenhouse 400/401 Glazing Systems | Agriculture, Department of / Agricultural Research Service | 4/22/2010 |
MPS ENGINEERS, P.C. | $1,100,000 | Contract | : Replace Large Animal Building Roofs 3 & 4, and Utility Building Roof 155 at the National Animal Disease Center (NADC), Ames, Iowa | Agriculture, Department of / Agricultural Research Service | 5/28/2010 |
SCHNEIDER ELECTRIC USA, INC. | $35,142 | Contract | : Install electric panel surge protection and meter upgrade | Agriculture, Department of / Agricultural Research Service | 6/07/2010 |
ZZ-SQUARED LLC | $103,200 | Contract | : Replace the Heating and Air conditioning system in the Annex Building | Agriculture, Department of / Agricultural Research Service | 5/03/2010 |
HOAR CONSTRUCTION, LLC | $32,887,274 | Contract | : The project is a major renovation to the Jamie Whitten Delta States Research Center in Stoneville, MS to address deferred maintenance of critical architectural, mechanical, electrical, plumbing systems, repair of the deteriorated building envelope, and in | Agriculture, Department of / Agricultural Research Service | 6/30/2010 |
HUNTER ROBERTS CONSTRUCTION GROUP, L.L.C. | $14,416,552 | Contract | : Construction for the ERRC Site located in Wyndmoor, PA including renovations for approximately 3,815 Square Meters. The project is multi-phased, encompassing two separate buildings including Service Building #5 Power Plant and Research Laboratory Building | Agriculture, Department of / Agricultural Research Service | 5/25/2010 |
SOCON, LLC | $231,644 | Contract | : Replace 100 Ton Chiller/ Cooling Tower | Agriculture, Department of / Agricultural Research Service | 5/14/2010 |
COMPUCRAFT, INC. | $306,994 | Contract | : GENERATOR INSTALLATION | Agriculture, Department of / Agricultural Research Service | 6/01/2010 |
BAKER ELECTRIC, INC. | $4,673,322 | Contract | : Replacement of Electrical Systems in Low Containment Animal Facilities Buildings 3 and 4 at the National Animal Disease Center, Ames, IA | Agriculture, Department of / Agricultural Research Service | 4/01/2010 |
PERKINS & WILL GROUP, LTD., THE | $244,299 | Contract | : Architectural and engineering design for the replacement of the underground contaminated waste piping system at the National Animal Disease Center, Ames, Iowa. | Agriculture, Department of / Agricultural Research Service | 4/29/2010 |
ROBBERT CONSTRUCTION, INC. | $256,916 | Contract | : Repair Building 17 Finishes ADOL, East Lansing, MI | Agriculture, Department of / Agricultural Research Service | 6/04/2010 |
ZGA ARCHITECTS AND PLANNERS, CHARTERED | $7,826 | Contract | : Construction support services for research greenhouse mechanical systems and chiller replacement. Riverside, California. | Agriculture, Department of / Agricultural Research Service | 5/21/2010 |
SWINERTON BUILDERS | $13,256,187 | Contract | : TAS Recovery - Major renovation to the Western Reginal Research Center (WRRC) to address deferred maintenance of critical mechanical, electrical, and plumbing systems, repairs. Phases 3b through 6. | Agriculture, Department of / Agricultural Research Service | 6/03/2010 |
SMART LLC | $354,225 | Contract | : FURNISH ALL LABOR, MATERIAL, EQUIP, ETC TO REPLACE STEAM AND CONDENSATE LINES, PLANT GENETIC RESOURCES UNIT, GENEVA, NY | Agriculture, Department of / Agricultural Research Service | 5/13/2010 |
HONEYWELL INTERNATIONAL INC. | $313,947 | Contract | : Replace air handling units. Replace zone dampers with VAV boxes. Repace pneumatic controls with digital controls. Replace direct drive exhaust fans with epoxy coated fans with VFDs. Replace 4 electrical panels. | Agriculture, Department of / Agricultural Research Service | 9/08/2010 |
MPS ENGINEERS, P.C. | $1,192,576 | Contract | : Construction Services for replacement of underground animal waste lines connecting buildings 3, 4, 125, and 155. | Agriculture, Department of / Agricultural Research Service | 9/14/2010 |
MPS ENGINEERS, P.C. | $2,540,808 | Contract | : Construction services to replace underground water and sewer lines at the National Animal Disease Center (NADC) in Ames, Iowa. | Agriculture, Department of / Agricultural Research Service | 7/08/2010 |
KEN TILLAGE CONSTRUCTION COMPANY, LLC | $117,969 | Contract | : Replace electrical switchgear, harned building | Agriculture, Department of / Agricultural Research Service | 9/09/2010 |
DH ORTEGA CONSTRUCTION, LLC | $35,090 | Contract | : Repair/replace deteriorated roofing systems, Building 102 and 103, at the USDA, ARS, PWA, Small Grains and Germplasm Research Unit in Aberdeen, ID | Agriculture, Department of / Agricultural Research Service | 7/01/2010 |
J. & L. MAVILIA INCORPORATED | $3,138,143 | Contract | : Replacement of Boiler System in Boiler Plant #014. | Agriculture, Department of / Agricultural Research Service | 9/10/2010 |
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. | $85,836 | Contract | : Item No. 0001 Construction Phase A-E Services for the HVAC Laboratory System at the Plant Genetic Resources Unit (PGRU) in Geneva, NY; Item No. 0002 Construction Phase A-E Services for the Steam and Condensate Lines (Administration Building) at the Plant | Agriculture, Department of / Agricultural Research Service | 9/23/2010 |
JOHNSON-MCADAMS FIRM, P.A., THE | $44,624 | Contract | : Buildings No. 1,2,4,9,12 | Agriculture, Department of / Agricultural Research Service | 7/29/2009 |
AMERICAN CONTRACTING, LLC | $135,443 | Contract | : Replace Windows at the Central Great Plains Research Station in Akron, Colorado. | Agriculture, Department of / Agricultural Research Service | 7/22/2010 |
MERRICK & COMPANY | $24,828 | Contract | : Akron CO Building 1 HVAC Repairs - Construction Administration | Agriculture, Department of / Agricultural Research Service | 7/26/2010 |
VIGIL CONTRACTING, INC. | $355,054 | Contract | : Install Emeregency Generator at the Beneficial Insects Introduction Research Unit (BIIRU), Newark, DE | Agriculture, Department of / Agricultural Research Service | 9/24/2010 |
MISSISSIPPI POWER COMPANY | $177,942 | Contract | : Provide recommission measures on bldg. HVAC, energy controls, and emergency stand-by electric generation for the Southern Lab. Research Center. | Agriculture, Department of / Agricultural Research Service | 9/16/2010 |
JOHNSON-MCADAMS FIRM, P.A., THE | $28,838 | Contract | : A-E design services to repair/replace the MS State 100-ton air conditioner and cooling tower | Agriculture, Department of / Agricultural Research Service | 8/18/2009 |
PERKINS & WILL GROUP, LTD., THE | $154,350 | Contract | : Decentralization of the steam plant and distribution system serving the 100 Area research facilities at BARC | Agriculture, Department of / Agricultural Research Service | 9/20/2010 |
VIGIL CONTRACTING, INC. | $2,391,284 | Contract | : Replacement of all boiler systems and components (removal of three boilers and replacement with three 350 HP firetube boilers) at BARC Building 309 | Agriculture, Department of / Agricultural Research Service | 9/27/2010 |
JM INDUSTRIAL SUPPLY, INC / RIVER CITY CONSTRUCTION LLC JOINT VENTURE | $2,845,767 | Contract | : The award is for construction work at the USDA - ARS - Dairy Forage Research Center, located in Madison, Wisconsin. The construction work includes: removal of the existing exterior brick, damaged exterior sheating, insulation and interior gypsum board, | Agriculture, Department of / Agricultural Research Service | 9/13/2010 |
ABIDE INTERNATIONAL, INC. | $1,778,705 | Contract | : Repair Exterior Finishes West Annex Building and Service Building, Western Regional Research Center | Agriculture, Department of / Agricultural Research Service | 7/09/2010 |
SOCO CONTRACTING COMPANY, INC | $4,101,503 | Contract | : Replacement of Critical Mechanical and Electrical Systems in Main Laboratory at the Southeast Poultry Research Laboratory in Athens, GA | Agriculture, Department of / Agricultural Research Service | 7/22/2010 |
JOHNSON-MCADAMS FIRM, P.A., THE | $28,899 | Contract | : A-E design services to install an emergency generator at MS State | Agriculture, Department of / Agricultural Research Service | 8/18/2009 |
PERKINS & WILL GROUP, LTD., THE | $252,980 | Contract | : A-E servies to provide construction management in support of replacement of boiler systems in BLDG 309. | Agriculture, Department of / Agricultural Research Service | 9/23/2010 |
VETERANS CONSTRUCTION, LLC | $615,771 | Contract | : Roof Replacement at the USDA Jean Mayer Human Nutrition Research Center | Agriculture, Department of / Agricultural Research Service | 9/07/2010 |
MPS ENGINEERS, P.C. | $1,555,971 | Contract | : Install Emergency Standby Generator at the National Amimal Disease Center (NADC) in Ames, Iowa. | Agriculture, Department of / Agricultural Research Service | 8/26/2010 |
BISCAYNE CONTRACTORS, INC. | $8,343,183 | Contract | : This contract is for critical deferred maintenance of the U.S. National Arboretum Administration Building in Washington, DC. | Agriculture, Department of / Agricultural Research Service | 8/02/2010 |
BLOOM COMPANIES, LLC | $539,513 | Contract | : Replace Chiller | Agriculture, Department of / Agricultural Research Service | 9/20/2010 |
PATRIOT COMPANY, INC | $17,189 | Contract | : Install replacement windows at the robert Holley Center for Agriculture and Health, Ithaca, NY | Agriculture, Department of / Agricultural Research Service | 9/01/2010 |
PERKINS & WILL GROUP, LTD., THE | $225,002 | Contract | : Construction Management support to address replacement of boilers, electrical and steam distribution system serving the Beltsville research campus | Agriculture, Department of / Agricultural Research Service | 9/09/2010 |
PERKINS & WILL GROUP, LTD., THE | $296,811 | Contract | : Re-Commissioning, to Inspect Mechanical System Deficiencies at Plant Science Institute on the BARC campus. | Agriculture, Department of / Agricultural Research Service | 7/01/2010 |
BARLOW EDDY JENKINS, PA | $2,570,639 | Contract | : A/E Services for construction management phase of Jamie Whitten Delta State Research Center | Agriculture, Department of / Agricultural Research Service | 8/18/2010 |
PERKINS & WILL GROUP, LTD., THE | $34,715 | Contract | : Construction management services for repair of water tower at Appalachian Fruit Research Station. | Agriculture, Department of / Agricultural Research Service | 9/24/2010 |
STV INCORPORATED | $84,000 | Contract | : Construction administration to replace roof of the Jean Mayer Human Nutrition Research Center in Boston, MA. | Agriculture, Department of / Agricultural Research Service | 9/13/2010 |
STV INCORPORATED | $44,918 | Contract | : Construction administration for replacement of multi-zone air handling system in Kearneysville, WV. | Agriculture, Department of / Agricultural Research Service | 9/24/2010 |
RD SUMNER INC | $158,351 | Contract | : Replace HVAC System and components in campus west laboratory facility in El Reno, OK. | Agriculture, Department of / Agricultural Research Service | 9/15/2010 |
STV INCORPORATED | $32,000 | Contract | : Construction administration for installation of emergency generator for BIIRU in Newark, DE. | Agriculture, Department of / Agricultural Research Service | 9/22/2010 |
E & E ENTERPRISES GLOBAL, INC. | $628,161 | Contract | : The project generally consists of the replacement/repairs to mechanical equipment and systems and the installation of an emergency electrical system at National Soil Erosion Laboratory located in West Lafayette, Indiana. The project components include the | Agriculture, Department of / Agricultural Research Service | 7/30/2010 |
ADVANCETECH SYSTEMS 2, INC. | $1,412,369 | Contract | : Erosion Control improvements at the ARS Facility in College Station, TX. | Agriculture, Department of / Agricultural Research Service | 9/20/2010 |
PERKINS & WILL GROUP, LTD., THE | $588,989 | Contract | : Recommissioning of Facility at the Southern Horticulture Laboratory in Poplarville, MS. | Agriculture, Department of / Agricultural Research Service | 6/30/2010 |
MCCALL & ASSOCIATES - AIA - ARCHITECTS | $43,414 | Contract | : A/E Construction Phase Inspection Services. | Agriculture, Department of / Agricultural Research Service | 9/28/2010 |
INTEGRIS ROOFING SERVICES LLC | $1,169,543 | Contract | : Reroof buildings 7,8,9,10,11,12,1 1A | Agriculture, Department of / Agricultural Research Service | 9/20/2010 |
TRADEMASTERS SERVICE, INC. | $2,313,426 | Contract | : Decentralization of the 100 Series Area Steam Stystems of the Betlsville Agricultural Research Center in Beltsville, MD | Agriculture, Department of / Agricultural Research Service | 9/14/2010 |
TOLAND & MIZELL ARCHITECTS APPLIED ENGINEERING SOLUTIONS JOINT VENTURE | $169,696 | Contract | : CA Services for Building 35 Southeast Poultry Research Laboratory, Athens, GA The A/E will provide all services associated with bid phases services and construction administration as required for the construction associated with the Electrical and HVAC up | Agriculture, Department of / Agricultural Research Service | 7/29/2010 |
WHITING-TURNER CONTRACTING COMPANY, THE | $12,982,889 | Contract | : Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD. | Agriculture, Department of / Agricultural Research Service | 8/10/2010 |
TMI COATINGS, INC. | $625,706 | Contract | : Repair Water Tower at the Appalachian Fruit Research Station (AFRS) | Agriculture, Department of / Agricultural Research Service | 8/27/2010 |
EWING COLE, INC. | $13,200 | Contract | : Construction management services for installation of replacement windows. | Agriculture, Department of / Agricultural Research Service | 9/30/2010 |
MISSISSIPPI POWER COMPANY | $177,942 | Contract | : Provide recommission measures on bldg. HVAC, energy contols, and emergency stand-by electric generation for the Southern Lab. Research Center. | Agriculture, Department of / Agricultural Research Service | 9/16/2010 |