Listing all stimulus spending by amount, in descending order. Return to Bureau of Reclamation page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
AERO-METRIC, INC | $166,872 | Contract | : The purpose of this task order is to acquire natural color imagery, thermal infrared (IR) imagery, and related products to be used for a leak detection study of controlled canal reaches that it operates in the Lower Colorado Region. Approximately 116 mil | Interior, Department of / Bureau of Reclamation | 9/27/2009 |
HDR ENGINEERING, INC. | $91,149 | Contract | : This task order is for construction observation assistance during construction of improvements to facilities of the Methow Valley Irrigation District - East (MVID-E) in the Methow River Subbasin near Twisp, WA | Interior, Department of / Bureau of Reclamation | 8/03/2009 |
NATIONAL ELECTRIC COIL, INC. | $324,383 | Contract | : This is a modification to an existing construction contract No. 08CC603730, awarded 9/9/2009, full and open competition. This modification provides American Recovery and Reinvestment Act of 2009 (ARRA) funding for needed changes in the work to be perform | Interior, Department of / Bureau of Reclamation | 9/16/2009 |
SWALLEY IRRIGATION DISTRICT | $1,696,113 | Grant | Water 2025: Recovery Act 2009 Main Canal Piping and Ponderosa Hydroplant Project: This project is to pipe the remaining .75 miles of Swalley 's Main canal; complete the construction of a.75 MW hydropower plant;and develop/instrall SCADA controls and telemetry along | Interior, Department of / Bureau of Reclamation | 9/25/2009 |
LOWER TULE RIVER IRRIGATION DISTRICT | $2,092,107 | Grant | Water 2025: The Lower Tule River Irrigation District's Tule River Intertie Project will help keep several people employed in the private and public sectors of Tulare County where unemployment is now over 16 percent. The stimulus package funds made available to this | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
TRIAD MECHANICAL, INC. | $1,054,477 | Contract | : Roza Diversion Dam Roller Gate Replacement | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
FRED PHILLIPS CONSULTING LLC | $12,691 | Contract | : The Bureau of Reclamation contracted labor for hand-planting of wetland plants at the Imperial Ponds Conservation Area (Imperial National Wildlife Refuge, Arizona). Reclamation and the US Fish and Wildlife Service are working cooperatively to create habit | Interior, Department of / Bureau of Reclamation | 9/14/2009 |
GRANT, COUNTY OF | $422,982 | Contract | : Construction perform on Road 16-NE of the Crab Creek Crossing | Interior, Department of / Bureau of Reclamation | 7/31/2009 |
FORT PECK ASSINIBOINE & SIOUX TRIBES INC | $45,681,000 | Grant | Fort Peck Reservation Rural Water System: (a) Construction of a Phase II Water Treatment Plant; (b) Construction of a Raw Water Intake Extension Pipeline; (c) Construction of a Regional Transmission Pipeline from a Water Treatment Plant to the Community of Poplar, and Wolf Piont and a portion to | Interior, Department of / Bureau of Reclamation | 8/13/2009 |
DELL MARKETING L.P. | $2,435 | Contract | : NOTEBOOKS | Interior, Department of / Bureau of Reclamation | 7/13/2009 |
GREAT BASIN BIRD OBSERVATORY | $166,208 | Grant | Lower Colorado River Multi-Species Conservation Program.: American Recovery and Reinvestment Act of 2009 Elf Owl Studies G?? A detect ability study will be conducted on a known population of elf owls that breeds in riparian habitats in order to determine the best protocol to survey for the elf owl.ThThe issue addr... Show more | Interior, Department of / Bureau of Reclamation | 9/11/2009 |
HELIX WATER DISTRICT | $335,713 | Grant | Water Reclamation and Reuse Program: Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
PADRE DAM MUNICIPAL WATER DISTRICT | $330,000 | Grant | Water Reclamation and Reuse Program: Complete the preliminary and design phase of the expansion of the Padre Dam Water Recycling Facility and obtaining permits. | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
SACRAMENTO SUBURBAN WATER DISTRICT | $4,949,000 | Grant | Water 2025: This is a collaborative project between five water supply agencies in the Sacramento, CA region, with Sacramento Suburban Water District acting as the prime recipient. The project will install an additional 4,164 water meters on an accelerated schedule t | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
SEMITROPIC ROSAMOND WATER BANK AUTHORITY | $4,943,782 | Grant | Water 2025: Water Use Efficiency Grant: Challange Grant Water Bank?Water Markets | Interior, Department of / Bureau of Reclamation | 9/22/2009 |
LAS VIRGENES MUNICIPAL WATER DIST | $1,879,173 | Grant | Water 2025: The Mulholland Highway recycled water transmission main consists of the construction and operation of a new 24-inch recycled water paperline. | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
MOWAT CONSTRUCTION COMPANY | $28,759,589 | Contract | : INSTALLATION OF THE SECOND BARRELS OF THE WEBER BRANCH SIPHON AND THE WEBER COULEE SIPHON EAST LOW CANAL. | Interior, Department of / Bureau of Reclamation | 9/30/2009 |
CENTRAL FLORIDA YAMAHA, INC. | $9,606 | Contract | : Boat motor | Interior, Department of / Bureau of Reclamation | 8/17/2009 |
HYDRA AQUATIC, INC | $21,840 | Contract | : Recovery Multi species conservation program wetland plugs Imperial Ponds Native fish Habitat Expansion Project No 23000 | Interior, Department of / Bureau of Reclamation | 9/14/2009 |
SPIRIT LAKE TRIBE | $3,655,000 | Grant | Garrison Diversion Unit: Spirit Lake rural water supply system, water treatment plant design, pilot plant study, and well field expansion/investigation. | Interior, Department of / Bureau of Reclamation | 9/24/2009 |
CHIPPEWA CREE CONSTRUCTION CORP | $27,526,000 | Grant | Rocky Boy's/North Central Montana Regional Water System: (a) Project Management, Design and Construction of the Intake Superstructure ; (b) Project Management, Design and Construction of the Core Pipeline Segments | Interior, Department of / Bureau of Reclamation | 9/15/2009 |
NORTH KERN WATER STORAGE DISTRICT | $4,945,552 | Grant | Water 2025: Calloway Canal to Lerdo Canal Intertie: Construct improvements to existing water conveyance infrastructure which will increase flexibility in managing available water supplies and thereby improve water supply reliability. Improvements primarily consist | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
GILA RIVER INDIAN COMMUNITY | $36,236,380 | Grant | Miscellaneous Public Law 93-638 Contracts, Grants, and Cooperative Agreements: American Recovery and Reinvestment Act funding enabled the Gila River Indian Community's (Community) Pima-Maricopa Irrigation Project) P-MIP) to accelerate construction of the 8.5 mile long Santan IC and Santan ID Phase IIII canal in District 4. This projec... Show more | Interior, Department of / Bureau of Reclamation | 9/21/2009 |
LONG BEACH, CITY OF | $1,184,000 | Grant | Water Reclamation and Reuse Program: Complete four specific parts of the feasibility study for the Long Beach Desalination Research and Development Project. 1) Seawater Desalination Plant Optimization. This research includes the purchase of different types of NF membranes, which will be in | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
EDEN VALLEY IRRIGATION & DRAINING DISTRICT | $545,120 | Grant | Colorado River Basin Salinity Control Program: This project was for the Farson/Eden Pipeline Project Phase IIIm M-1 & M-1B Laterals which will result in a total annual reduction of 407 tons of salt. | Interior, Department of / Bureau of Reclamation | 8/25/2009 |
MONTEZUMA VALLEY IRRIGATION CO | $1,521,288 | Grant | Colorado River Basin Salinity Control Program: Cooperaitive Agreement NO. R09AC40R05 Between Bureau of Reclamation and Montezuma Valley Irrigation Company for the American Recovery and Reinvestment Act of 2009 Lone Pine Canal Piping Project. The Project involves the MVIC replacing approximately 25,5,51... Show more | Interior, Department of / Bureau of Reclamation | 8/21/2009 |
TECHNI-TOOL INC | $9,283 | Contract | : MICROSCOPE | Interior, Department of / Bureau of Reclamation | 7/10/2009 |
COMPONENT SPECIALTIES, INC. | $13,796 | Contract | : The items to be provided for maintenance network projects including the following 1) interconnect items including Quantity: 220; End plate, IDEC; Part number BNE15W Quantity: 5500; DIN ring terminal block, IDEC Part number: BNH15MW Quantity: 50; M | Interior, Department of / Bureau of Reclamation | 10/01/2009 |
YSI INCORPORATED | $95,577 | Contract | : Provide Environmental Water Quality Monitoring Instrumentation: Multi Parameter Water Quality Loggers; Optical DO Probes; Model 650 Display(s); Field Cables (500ft); Field Cables (175ft); Field Cables (100ft); PH Field Replaceable 6-Series Probe Kits; S | Interior, Department of / Bureau of Reclamation | 9/08/2009 |
FLUID IMAGING TECHNOLOGIES, INC | $166,325 | Contract | : Flow Cytometer | Interior, Department of / Bureau of Reclamation | 8/18/2009 |
NAVAJO ENGINEERING & CONSTRUCTION AUTHORITY | $5,794,196 | Grant | Colorado Ute Indian Water Rights Settlement Act: The principal components of work to be performed under this ARRA modification includes the furnishing, storing and delivery of approximately 21 miles of 24-inch PVC and Steel pipe and valves, and 1 each 1 million gallon water tank for the Navajo Nationon Mu... Show more | Interior, Department of / Bureau of Reclamation | 9/30/2009 |
COLUMBIA BASIN RAILROAD COMPANY INC | $380,104 | Contract | : Railroad track removal and installation. Land Contract. | Interior, Department of / Bureau of Reclamation | 8/14/2009 |
METHOW SALMON RECOVERY | $389,000 | Grant | Fish and Wildlife Coordination Act: Improving access to spawning and rearing habitat; improving habitat quantity and quality for native endangered fish species. The objective was to restore passage for ESA listed fish and address adverse affects associated with on-going in-river maintenance | Interior, Department of / Bureau of Reclamation | 9/21/2009 |
SUNNYSIDE DIVISION BOARD OF CONTROL | $21,400,000 | Grant | Yakima River Basin Water Enhancement Project (YRBWEP): The Enclosed Lateral Improvement projects (ELIPS) is the conversion of seven open irrigation ditches/pipes and weir boxes to enclosed laterals and in line flow meters. Gravity pressure in most cases will allow landowners to eliminate pumps or r reduce pum... Show more | Interior, Department of / Bureau of Reclamation | 9/16/2009 |
TEHAMA COLUSA CANAL AUTHORITY | $5,250,000 | Grant | Central Valley Project Improvement Act, Title XXXIV: Construction of 500 CFS Screened Pumping Facility on Sacramento River to provide irrigation water to 150,000 acre service area while providing great benefits to endangered fish species in accord with NMFS Bioligical Opinion for the CVP OCAP | Interior, Department of / Bureau of Reclamation | 6/30/2009 |
WATER DISTRICT #11 BEAR RIVER | $3,774,962 | Grant | Water 2025: Water District #11-Bear River will create a water bank, line a specific amount of canal, and install various types of measuring devices | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
GARRISON DIVERSION CONSERVANCY DISTRICT | $31,800,000 | Grant | Garrison Diversion Unit: Construction of the Southwest Pipeline Project's Oliver, Mercer, North Dunn Water Treatment Plant (WTP) and South Central Regional Water District's (SCRWD) Emmons County Intake and WTP and the North Burleigh WTP Phase 2 Projects. The Southwest Pipeline P | Interior, Department of / Bureau of Reclamation | 7/06/2009 |
JONES & STOKES ASSOCIATES INC | $285,714 | Contract | : Contractor will prepare and perform an Alternative Evaluation Report engineering study for a portion of the Preston Reach on the Entiat River in Washington. The purpose of the study is to develop and evaluate potential habitat improvement projects for ana | Interior, Department of / Bureau of Reclamation | 8/27/2009 |
AAK-DE LOS SANTOS CONSTRUCTION | $2,876,186 | Contract | : Task Oder #2 - Recovery Repair and Replace Canal Lining and Necessary Structures on Drainage Pump Outlet Channel 1 and 2 | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
ROCKART SIGNS & MARKERS INC | $3,243 | Contract | : Water Level Staff Gauges | Interior, Department of / Bureau of Reclamation | 9/14/2009 |
THREE SISTERS IRRIGATION DISTRICT | $1,239,822 | Grant | Water 2025: Phase I will pipe 16,500 feet of Three Sisters Irrigation District?s main canal with 54? HDPE pipe replacing an open canal to improve irrigation management while generating renewable energy through the pressu | Interior, Department of / Bureau of Reclamation | 9/25/2009 |
REDCAP LAKEFORK DITCH COMPANY INC. | $1,780,979 | Grant | Colorado River Basin Salinity Control Program: Public Law 93-320 as amenended - The Colorado River Basin Salinity Control Act - replace earthen ditch with irrigation pipeline | Interior, Department of / Bureau of Reclamation | 8/25/2009 |
LEWIS & CLARK RURAL WATER SYSTEM INC | $59,190,925 | Grant | Lewis and Clark Rural Water System: This project will accelerate completion of Phase 2 of the Lewis & Clark Water Treatment Plant that will result in addressing concerns regarding the low quality, contamination vulnerability, and insufficient supply of existing drinking water sources throug | Interior, Department of / Bureau of Reclamation | 7/01/2009 |
PEOPLES CANAL COMPANY, THE | $5,012,364 | Grant | Colorado River Basin Salinity Control Program: Peoples Pipeline Project in accordance with the Colorado River Basin Salinity Control Act. | Interior, Department of / Bureau of Reclamation | 8/21/2009 |
PERKINS COUNTY RURAL WATER SYSTEM, INC. | $7,537,900 | Grant | Perkins County Rural Water System: Planning and Construction of the Perkins County Rural Water System, Phase VI and Phase VII Distribution System. The public purpose is to accelerate completion of projects that will result in serving more people who have poor quality water or have to haul | Interior, Department of / Bureau of Reclamation | 7/14/2009 |
MOJAVE WATER AGENCY | $3,609,079 | Grant | Water 2025: Construction of the Oro Grande Wash Recharge Project | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
H. L., DALIS, INC. | $3,431 | Contract | : GPS RECEIVERS | Interior, Department of / Bureau of Reclamation | 7/10/2009 |
GREEN ELECTRIC, INC. | $418,660 | Contract | : RECOVERY - SF6 Circuit Breaker Maintenance at Mt Elbert Powerplant, Fryingpan-Project, Colorado | Interior, Department of / Bureau of Reclamation | 9/24/2009 |
FISHER SCIENTIFIC COMPANY L.L.C. | $3,903 | Contract | : Samples Bottles | Interior, Department of / Bureau of Reclamation | 9/15/2009 |
PEORIA, CITY OF (INC) | $1,793,291 | Grant | Water 2025: The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
KPFF, INC. | $150,070 | Contract | : Yuma Area Office Seismic Rehabilitation | Interior, Department of / Bureau of Reclamation | 7/30/2009 |
DAVIS & WEBER COUNTIES CANAL CO | $3,617,178 | Grant | Water 2025: Davis & Weber Counties Canal Company - Canal Lining and Forebay Channel and Headworks Replacement Project. This project will reconstruct the headworks of the Canal in the Weber River, reconstruct the forebay channel and gates, and replace about 1400 feet | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
DESCHUTES RIVER CONSERVANCY | $3,662,250 | Grant | Deschutes River Conservancy (DRC): The Bureau of Reclamation provides financial assistance to the Deschutes River Conservancy (DRC) where the DRC will provide subgrants to local irrigation districts to pipe and/or line portions of irrigation canal systems. The projects will be implemented | Interior, Department of / Bureau of Reclamation | 9/23/2009 |
CONTRA COSTA WATER DISTRICT | $8,350,000 | Grant | Central Valley Project Improvement Act, Title XXXIV: he construction of a fish screen will: 1. Minimize the entrainment of fish resources associated with the diversion of water at the Canal Rock Slough intake. 2. Reduce potential predation on target species in the Rock Slough intake. 3. Fulfill legalal requir... Show more | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
NATURAL RESOURCES, UTAH DEPARTMENT OF | $100,000 | Grant | Lower Colorado River Multi-Species Conservation Program.: The purpose of this study is to monitor vegetation and tamarisk beetle (Diorhabda elongate) dynamics in order to assess the impact of the tamarisk beetle on nesting biology of the endangered southwestern willow flycatcher. Most studies involvlving Diorhabd... Show more | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
CALLEGUAS MUNICIPAL WATER DISTRICT PUBLIC FACILITIES CORPORA | $4,928,000 | Grant | Water Reclamation and Reuse Program: The Brine Line consists of a pipeline to collect concentrate from demineralization of brackish groundwater for municipal, industrial, and agricultural purposes; concentrate from demineralization of potable water for high-tech industrial purposes; and exce | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
PACIFIC GEOMATIC SERVICES, INC. | $32,163 | Contract | : Provided site topography covering an area approximately 7.1 acres in size lying within the area of an existing fish hatchery. The survey coverage included an Adult Trap and Holding Pond, Juvenile Ponds, utilities and paved areas. Structure details were co | Interior, Department of / Bureau of Reclamation | 6/18/2009 |
CH2M HILL INC | $627,580 | Contract | : Engineering Design Services- Planning and design of a water supply intake/fish screen structure, water supply intake conduit, water supply pumping plant, water supply line to the existing Hatchery Sand Settling Basin of the Leavenworth National Fish Hatch | Interior, Department of / Bureau of Reclamation | 7/15/2009 |
HUNTINGTON CLEVELAND IRRIGATION COMPANY | $2,031,776 | Grant | Colorado River Basin Salinity Control Program: HUNTINGTON CLEVELAND SALINITY REDUCTION PROJECT - Abandon 9.1 miles of canal and eliminate winter water in 20.1 miles of canal by constructing 5.1 miles of 30 and 60 inch pipe, a new river diversion, pressure reducing stations and connecting to existing g r... Show more | Interior, Department of / Bureau of Reclamation | 8/21/2009 |
MOLTZ CONSTRUCTORS, INC. | $2,133,898 | Contract | : Contract No. 07CC603490 for the Green Mountain Dam Spillway Concrete Repair was awarded September 17,2007 on a full and open basis. The work to be performed included concrete removal and replacement in various panels in the spillway floor and walls. As | Interior, Department of / Bureau of Reclamation | 12/21/2009 |
LOWER BRULE SIOUX TRIBE | $2,174,000 | Grant | Mni Wiconi Rural Water Supply Project: (a) Riprap Protection for Water Treatment Plant Intake (b) Backup Generator for Kennebec Booster Station (c) Contract including WTP Contact Basin Expansion, Extension of WTP Intake, and Construction of Grass Rope Pipeline Booster Station | Interior, Department of / Bureau of Reclamation | 10/01/2009 |
STANDING ROCK SIOUX TRIBE | $26,075,000 | Grant | Garrison Diversion Unit: The Standing Rock Sioux Tribe will construct the Standing Rock Water Treatment Plant, the Indian Memorial Intake Pump Station and a raw water pipeline between the water treatment plant and the intake pump station. | Interior, Department of / Bureau of Reclamation | 10/05/2009 |
STOVEN CONSTRUCTION, INC. | $1,921,474 | Contract | : Load, haul, and dump approx. 126,000 tons of Government furnished borrow material from the Val Verde borrow site to the Bosque del Apache | Interior, Department of / Bureau of Reclamation | 10/16/2009 |
STOVEN CONSTRUCTION, INC. | $784,752 | Contract | : SUPPLY CONTRACT: Bernalillo Riprap furnishing, hauling and stockpiling | Interior, Department of / Bureau of Reclamation | 12/01/2009 |
THREE AFFILIATED TRIBES | $8,382,000 | Grant | Garrison Diversion Unit: * Four Bears Water Treatmrnt Plant Expansion. Phase I will include the addition of a new clearwell structure (159,000 gallons) adjacent to the existing clearwell in the Four Bears water treatment plant (WTP). The clearwell capacity will increase from 139 | Interior, Department of / Bureau of Reclamation | 11/02/2009 |
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $12,708,000 | Grant | Mni Wiconi Rural Water Supply Project: ? BIA School Water System Improvements ? The water systems for seven BIA schools on the Pine Ridge Reservation will be repaired or replaced under this ARRA project, including the repair or replacement of the deficient school yard piping and appurtenances, | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
ROSEBUD SIOUX TRIBE | $3,431,000 | Grant | Mni Wiconi Rural Water Supply Project: * Backup Generators installed at key water supply or pumping facility locations within the Rosebud Sioux Rural Water System to ensure continuity of water service during power outages. * Water Storage Reservoirs -- construction of water storage reservoirs | Interior, Department of / Bureau of Reclamation | 12/16/2009 |
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $2,441,000 | Grant | Mni Wiconi Rural Water Supply Project: * Backup Generators will be installed at key water pumping facility locations on the Oglala Sioux Rural Water Supply System Core System to ensure continuity of water conveyance during power outages; the purchase includes the costs for other pertinent equi | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
ECOANALYSTS INC | $1,102,914 | Contract | : EcoAnalysts, Inc. received a Recover Act funded award to assist the US Bureau of Reclamation (BOR). The BOR requires field, laboratory, and administrative support towards the early detection study of the invasive Dreissenid larvae in various reservoirs of | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $7,890,000 | Grant | Water Reclamation and Reuse Program: The design and construction of the Northwest Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program. | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
BIO-WEST, INC. | $55,248 | Contract | : Wetland Delineation and Soil Sampling for the Laguna Habitat Restoration Project , Lower Colorado River MultiSpecies Conservation Implementation. Work includes field delineation of wetlands and collection of 75 soil samples, analysis, and preparation of | Interior, Department of / Bureau of Reclamation | 11/05/2009 |
WATER RESOURCES, CALIFORNIA DEPARTMENT OF | $3,950,372 | Grant | Fish and Wildlife Coordination Act: This Cooperative Agreement is entered into between the United State of America, acting through the Department of Interior, Bureau of Reclamation, and State of California Department of Water Resources pursuant to Fish and Wildlife Coordination Act as amend | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
RANCHO CALIFORNIA WATER DISTRICT | $4,129,000 | Grant | Water Reclamation and Reuse Program: The Vail Lake Water Storage Pipeline and Pump Station Project is a component of the Rancho California Water District's (RCWD) Demineralization and Non-Potable Water Conversion Project, which when completed will increase water storage by 10,000 acre feet p | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
CENTRAL BASIN MUNICIPAL WATER DISTRICT FINANCING CORPORATION | $5,545,000 | Grant | Water Reclamation and Reuse Program: The Southeast Water Reliability Project Phase 1 consists of the following three phases: 30-inch Pipeline, Pico Rivera Recycled Water Pipeline, and Pico Rivera Recycled Water Pipeline. | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
IRVINE RANCH WATER DISTRICT | $1,755,414 | Grant | Water Reclamation and Reuse Program: The design and construction of Natural Treatment System Site No. 67. | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
CITY OF OXNARD | $19,840,000 | Grant | Water Reclamation and Reuse Program: The US Bureau of Reclamation Title 16 Cooperative Agreement is for Phase 1 of the City of Oxnard Groundwater Recovery Enhancement and Treatment (GREAT) Program. The GREAT Program is a water resources project that combines wastewater recycling and reuse; | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT | $481,000 | Grant | Water Reclamation and Reuse Program: This work includes the design and construction of recycled water pipelines varying from 4 to 16 inches in diameter extending west from the Whittier Narrows Water Reclamation Facility. The project facilities to be constructed are: - The main pipeli | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT | $4,969,000 | Grant | Water Reclamation and Reuse Program: The Recipient shall design and construct the following facilities: * The Project includes about 12.4 miles of recycled water distribution pipelines, varying from 6 to 24 inches in diameter, installed in existing streets. The proposed alignment will cross | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
MOJAVE WATER AGENCY | $11,265,000 | Grant | Water Reclamation and Reuse Program: Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
STATE PARKS AND CULTURAL RESOURCES, WYOMING DEPT OF | $575,000 | Grant | Recreation Resources Management: The project objective is to construct a public water supply system that will provide a reliable water supply on the east side of Keyhole State Park, as the supply from the existing system has become increasingly high in iron over time and produces poor wa | Interior, Department of / Bureau of Reclamation | 12/15/2009 |
ECOPLAN ASSOCIATES INC | $250,000 | Grant | Lower Colorado River Multi-Species Conservation Program.: The purpose of this contract is to determine hydraulic conditions such as soil moisture, depth to ground water, and amount of standing water needed beneath habitat for the willow flycatcher and yellow-billed cuckoos in order to duplicate condiditions at hab... Show more | Interior, Department of / Bureau of Reclamation | 11/30/2009 |
TRIAD MECHANICAL, INC. | $134,037 | Contract | : Furnish/Install Flow Meters, Cold Springs and Stanfield Pumping Plants | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
DELANO-EARLIMART IRRIGATION DISTRICT | $954,831 | Grant | Water 2025: Turnipseed Groundwater Bank Phase II American Recovery and Reinvestment Act of 2009. This would consist of construction and implementation of a groundwate banking facitlity. The purpose of this project would be to bank surface water supplies when water | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | $2,415,000 | Grant | Water Reclamation and Reuse Program: Southside Municipal Effluent Polishing and Water Reclamation Project | Interior, Department of / Bureau of Reclamation | 9/30/2009 |
KOONTZ ELECTRIC COMPANY, INCORPORATED | $4,739,713 | Contract | : Folsom Powerplant Transformers K1A and K2A Replacements | Interior, Department of / Bureau of Reclamation | 8/04/2009 |
BASEPOINT DESIGN CORPORATION | $3,254,393 | Contract | : Canal Inspections for Urbanized Areas - Canal Inspections for Urbanized Areas - onsite inspections to collect data associated with canals in proximity of urbanized areas, analysis of inspection data and follow up inspections as required | Interior, Department of / Bureau of Reclamation | 12/29/2009 |
QUANTUM AUTOMATION | $7,579 | Contract | : Qty 35 Power Supplies + Qty 18 Redundancy Kits | Interior, Department of / Bureau of Reclamation | 10/07/2009 |
RICKLY HYDROLOGICAL COMPANY, INC | $8,494 | Contract | : Purchase of 15 water sampling bottles. | Interior, Department of / Bureau of Reclamation | 8/13/2009 |
SAGINAW CONTROL & ENGINEERING, INC. | $9,186 | Contract | : METAL ELECTRICAL ENCLOSURES | Interior, Department of / Bureau of Reclamation | 10/01/2009 |
CASCADIA CONSERVATION DISTRICT | $894,000 | Grant | Fish and Wildlife Coordination Act: The two projects being supported with Recovery Act funding under this cooperative agreement are the Preston Reach habitat improvement project and the Entiat Wells Project in the Entiat watershed. Preston Reach Habitat: This project's objective is to con | Interior, Department of / Bureau of Reclamation | 12/28/2009 |
WEST BAY BUILDERS,INC. | $22,955,602 | Contract | : Construction of the Red Bluff Pumping Plant and Fish Screen Canal, Siphon and Access Bridge located near Red Bluff Diversion Dam on the Sacramento River, approximately 2 miles southeast of the City of Red Bluff, California in Tehama County. Construction c | Interior, Department of / Bureau of Reclamation | 12/21/2009 |
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $5,938,454 | Grant | Water Reclamation and Reuse Program: The design and construction of the Northeast Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
EASTERN MUNICIPAL WATER DISTRICT | $9,313,000 | Grant | Water Reclamation and Reuse Program: The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
WATER REPLENISHMENT DISTRICT OF SOUTHERN CALIFORNIA | $238,803 | Grant | Water Reclamation and Reuse Program: The preparation of preliminary designs, preparation of a Title 22 engineering report, compliance with CEQA and NEPA, permitting support, and final design for the Alamitos Barrier Recycled Water Project Expansion. | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
GAME, FISH AND PARKS, SOUTH DAKOTA DEPARTMENT OF | $3,518,064 | Grant | Recreation Resources Management: ARRA funds will be used to share in the cost of the following projects: Angostura Unit, Bank Stabilization and Road Repairs: construction of a connecting road between the north and south units of the recreation area, including approximately 1300 linear | Interior, Department of / Bureau of Reclamation | 10/22/2009 |
SUPPRESSION SYSTEMS INC | $322,819 | Contract | : Award will have us demolish the existing CO2 fire suppression system & install a new Novec clean agent fire suppression system, sliding fire doors, and new fire/smoke HVAC Dampers. | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
LASATER CONSTRUCTION CO, INC | $287,225 | Contract | : Our project consists of removing an existing sand potable water treatment plant and replace it with a filtered water treatment plant with a backwash tank. The new water treatment plant will be designed and built by a vender and will be delivered to the s | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
SAFE AND SECURE CONSTRUCTION, LLC | $1,265,954 | Contract | : Paving Repair and Replacement for the Yuma Desalting Plant, Yuma Area Office, and Levee, Project No. 12.000 | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
C J W CONSTRUCTION, INC. | $11,873,000 | Contract | : Imperial Dam Dredging and Laguna Settling Basin, Yuma, AZ | Interior, Department of / Bureau of Reclamation | 12/08/2009 |
ALLSTATE ENGINEERING | $109,000 | Contract | : RECOVERY - North Shore Marina RV Park Cleanup, Riverside County, CA | Interior, Department of / Bureau of Reclamation | 12/29/2009 |
ABHE & SVOBODA, INC. | $12,557,481 | Contract | : Flatiron Powerplant, Recoating and Relining of Penstocks 1 and 2, Colorado-Big Thompson Project, Colorado. This contract was funded by the American Recovery and Reinvestment Act of 2009 | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
SCOTT TECHNOLOGIES, INC. | $63,640 | Contract | : Self Contained Breathing Apparatus (AP75) with AV-3000 Facepieces and Carbon Cylinders. | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
MAGNUM PRODUCTS, LLC | $47,413 | Contract | : Diesel powered mobile generators | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
WILLIAM E. MUNSON COMPANY | $240,308 | Contract | : Work boat with twin diesel I/O engines. | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
BARLOWORLD HANDLING LLC | $32,026 | Contract | : Purchase Hyster Forklift model J40ZT for the Dept of Interior | Interior, Department of / Bureau of Reclamation | 12/03/2009 |
ONAN CORPORATION | $23,435 | Contract | : Cummins Power Generation to provide to the Customer, One (1) 80kw, Model DFAE Generator. Along with the Generator, Cummins to provide Startup and Training. | Interior, Department of / Bureau of Reclamation | 12/10/2009 |
RESEARCH TRIANGLE INSTITUTE | $867,333 | Contract | : RTI responsibilities fall into three broad categories: (1) prepare necessary documentation and conduct follow-up activities as needed to obtain OMB clearance for the non-use valuation survey, (2) design and implement the survey and analyze survey data, an | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
PRIZIM INC | $53,995 | Contract | : This is a fixed price contract. Final Report submitted. Work is being undertaken south of Imperial Dam for the Laguna Restoration Project in support of Lower Colorado River Multi-Species Conservation Program (LCR MSCP). Work proposed for the Laguna Rest | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
SURVEYING SERVICES INC | $192,680 | Contract | : This survey is to provide up-to-date As-Built condition of the LFCC. Deliverables: Electronic files and one set of hard copy prints of final P&P maps, including copies of the Field Survey Books. | Interior, Department of / Bureau of Reclamation | 12/09/2009 |
COFFMAN ELECTRICAL EQUIPMENT CO. | $40,234 | Contract | : Item #0001, Qty 1 - GENERATOR SET, 100Kw, 60 hZ, 120/240 v, 3 PHASE DELTA, 3W, 0.8PF 100kw Standby Generator Set for Flatiron Gatehouse - standby power output of 100 kilo-watt; set ratings shall be 3-phase, Delta, 60 Hz, 120/240V with 0.8 PF; furnished wi | Interior, Department of / Bureau of Reclamation | 12/29/2009 |
FROST ELECTRIC SUPPLY COMPANY | $18,283 | Contract | : Programmable automation controller, miscellaneous interconnect devices including the following: Item #1 Quantity: 35; 1m SC/SC Duplex 62.5/125 Multimode Fiber Patch Cable ? Black, Wirewerks, Part number; PC-2ABK-SCCSCC-001; Item #2 Quantity: 3; RJ45 Ca | Interior, Department of / Bureau of Reclamation | 12/08/2009 |
ATLAS POLAR COMPANY LIMITED | $162,100 | Contract | : Unrestricted | Interior, Department of / Bureau of Reclamation | 12/18/2009 |
WAZEE COMPANIES, LLC | $128,642 | Contract | : This Federal award is for the fabrication of a ring seal gate hoist system. | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
COAST CRANE COMPANY | $275,730 | Contract | : Purchase of a 30 Ton Hydraulic Rough Terrain Crane | Interior, Department of / Bureau of Reclamation | 12/03/2009 |
JONES, ROACH & CARINGELLA, INC. | $99,250 | Contract | : Real Estate Appraisals plus contract modification for construction easement valuation. | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
WESTERN OILFIELDS SUPPLY COMPANY | $1,651,023 | Contract | : DROUGHT RELIEF TEMPORARY PUMPS AND PIPING PROJECT SUPPLIES | Interior, Department of / Bureau of Reclamation | 11/13/2009 |
GRAND STRATEGY, LLC | $393,500 | Contract | : Furnish and deliver trailer mounted plate filter dewatering press including set up of the equimpment and training. | Interior, Department of / Bureau of Reclamation | 11/10/2009 |
SCIPAR, INC. | $245,875 | Contract | : The programmable automation components include the following Allen Bradley parts: Item #1 Quantity: 13; 17-slot PAC Backplane Chassis, part number 1756-A17; Item #2 Quantity: 4; 10-slot PAC Backplane Chassis, part number 1756-A10; Item #3 Quantity: 24; | Interior, Department of / Bureau of Reclamation | 10/22/2009 |
CUSTOM BUILDERS | $191,000 | Contract | : Removal and dismanteling of trailers at Lake Berryesa. Windows will be removed prior to demolish. If metal roof and siding can be saved it will be recycled. Job site will be cleaned. Removal of all patio and parking pads and concrete will be removed f | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
BASEPOINT DESIGN CORPORATION | $492,383 | Contract | : Yuma Mesa Conduit Final Design - Design of sediment removal maholes, air vessels, and surge stands. Operation plan for overall system operation. Hydraulic, structural, and geotechnical engineering to design system modifications. Preparation of construc | Interior, Department of / Bureau of Reclamation | 2/26/2010 |
SEMITROPIC WATER STORAGE DISTRICT IRRIGATION WATER SYSTEM FI | $2,169,655 | Grant | Water 2025: Pond Poso Spreading and Recovery Facility: Construct spreading and recovery facilities which will increase flexibility in managing available water supplies and thereby improve water supply reliability. Improvements primarily consist of the following: (1 | Interior, Department of / Bureau of Reclamation | 1/29/2010 |
MOCKEL PRECAST & EXCAVATING CO | $450,441 | Contract | : Universal Accessibility Modifications, Silos Campground, Hellgate Campground, Confederate Campground, Cottonwood Campground, White Earth Campground, and Canyon Ferry Visitor Center, Canyon Ferry Reservoir, Helena, Montana. The contractor shall furnish la | Interior, Department of / Bureau of Reclamation | 3/24/2010 |
ESA PWA | $157,396 | Contract | : Purpose: To procure physical (geomorphic) and biological technical services for TRRP ecosystem restoration activities. Required services will include performing a review of existing activities and making recommendations on how to improve the physical an | Interior, Department of / Bureau of Reclamation | 2/24/2010 |
HYDRO RESOURCES - WEST, INC. | $1,278,622 | Contract | : Drought Relief Water Well Rehabilitation. | Interior, Department of / Bureau of Reclamation | 3/27/2010 |
DON PETERSON ENGINEERS, INC. | $90,600 | Contract | : Gravel for Imperial Ponds Imperial Ponds Native Fish Habitat Expansion | Interior, Department of / Bureau of Reclamation | 3/26/2010 |
WEEMINUCHE CONSTRUCTION AUTHORITY | $2,940,099 | Grant | Colorado Ute Indian Water Rights Settlement Act: The Principal components of work to be performed under this ARRA Award includes the design and construction of a new building for the Permanent Operations Facility in Durango, Colorado for the Animas-La Plata Project. The total building shall be approrox. ... Show more | Interior, Department of / Bureau of Reclamation | 3/04/2010 |
COLORADO NETWORK STAFFING, INC. | $223,447 | Contract | : Construction inspection services for the Weber Branch Siphon and Weber Coulee Siphon construction project located in central Washington near Ephrata. | Interior, Department of / Bureau of Reclamation | 2/25/2010 |
FRED PHILLIPS CONSULTING LLC | $94,036 | Contract | : Fred Phillips Consulting, LLC has been awarded a contract by to Bureau of Reclamation to obtain and install native wetland and riparian plants along pond shorelines at the Imperial Ponds Conservation Area (Imperial National Wildlife Refuge, Arizona). Recl | Interior, Department of / Bureau of Reclamation | 3/12/2010 |
FLAGSTAFF EQUIPMENT COMPANY, INC. | $45,050 | Contract | : Diesel Engine Powered Backhoe Tractor-Bubbling Ponds Fish Hatchery | Interior, Department of / Bureau of Reclamation | 3/26/2010 |
NORTHWEST MARINE TECHNOLOGY, INC. | $26,940 | Contract | : RECOVERY - Multi Species Conservation Program (MSCP), Wire Tags and Detectors, Fish Hatchery Improvements, Project No. 23.000, TAS::14 0681::TAS | Interior, Department of / Bureau of Reclamation | 3/29/2010 |
AZCA DRILLING & PUMP, INC. | $3,017,404 | Contract | : The Bureau of Reclamation has a requirement to redrill high-capacity production well systems in the Yuma, Arizona area. This project is wholly funded from the American Recovery and Reinvestment Act of 2009 (ARRA). In order to meet current and future co | Interior, Department of / Bureau of Reclamation | 2/27/2010 |
IRVINE RANCH WATER DISTRICT | $398,000 | Grant | Water Reclamation and Reuse Program: The design and construction of the Tustin Legacy Well 1. | Interior, Department of / Bureau of Reclamation | 3/29/2010 |
PRECAST CONCEPTS, LLC | $1,710,045 | Contract | : Precast Concrete Box Culverts, Pole Hill Canal, Colorado-Big Thompson Project, Colorado | Interior, Department of / Bureau of Reclamation | 3/24/2010 |
IN-SITU, INC | $122,274 | Contract | : Equip | Interior, Department of / Bureau of Reclamation | 3/24/2010 |
RAVI ASSOCIATES LLC | $68,166 | Contract | : PVC PIPE AND FITTINGS FOR FISH HATCHERY IMPROVEMENTS AT DEXTER NATIONAL FISH HATCHERY BUBBLING PONDS HATCHERY,AZ WILLOW BEACH HATCHERY,AZ | Interior, Department of / Bureau of Reclamation | 3/25/2010 |
CDM FEDERAL PROGRAMS CORPORATION | $7,621,124 | Contract | : AWARD DESCRIPTION: COMPLETE 1) AN ENVIRONMENTAL REVIEW SUBJECT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) OF THE KLAMATH HYDROELECTRICAL SETTLEMENT AGREEMENT (KHSA), INCLUDING THE SECRETARY OF THE INTER | Interior, Department of / Bureau of Reclamation | 3/31/2010 |
DPE CONSTRUCTION, INC. | $205,600 | Contract | : GRAVEL FOR LAGUNA WETLANDS | Interior, Department of / Bureau of Reclamation | 2/26/2010 |
RAFAEL CONSTRUCTION, INC. | $1,582,048 | Contract | : Recovery-0+00 Wastewater/Wasteway and Diversion Structure, Yuma Area Office, Yuma Arizona | Interior, Department of / Bureau of Reclamation | 2/27/2010 |
HARTMAN-WALSH PAINTING COMPANY | $282,787 | Contract | : outlet works pipe interior coating and minor repairs | Interior, Department of / Bureau of Reclamation | 2/08/2010 |
ABIDE INTERNATIONAL, INC. | $8,177,670 | Contract | : Continued Rehabilitation of three fixed wheel gates and lifting cylinders. Furnish and install three new hydraulic systems with controls and electrical. | Interior, Department of / Bureau of Reclamation | 3/05/2010 |
MOCKEL PRECAST & EXCAVATING CO | $156,970 | Contract | : Recovery-Universal Accessibility Modifications, Jo Bonner Campground, Lewis & Clark Day Use Area, Goose Bay Campground, Chinamen's Gulch Campground, Canyon Ferry Reservoir, Montana. The contractor shall furnish labor, equipment, material to perform unive | Interior, Department of / Bureau of Reclamation | 3/08/2010 |
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $1,020,576 | Contract | : Upper Still Water Dam Left Abutment Road and Parking Lot Repair | Interior, Department of / Bureau of Reclamation | 2/01/2010 |
SMITH-ROOT, INC. | $98,217 | Contract | : Design, Fabricate and deliver SR-18H Electrofishing Boat with 7.5GPP Plus Evinrude Outboard Engine Plus Matching Tandem Axle Trailer. | Interior, Department of / Bureau of Reclamation | 3/31/2010 |
BOOM CONCRETE, INC. | $43,489 | Contract | : Furnish and install prefabricated concrete single-user vault toilets for Minimum Basic Camping Facilities - Belle Fourche Reservior, Belle Fourche Unit, Butte County, South Dakota | Interior, Department of / Bureau of Reclamation | 1/08/2010 |
CH2M HILL, INC. | $497,061 | Contract | : Preparation of four Environmental Assessments, groundwater analysis, and Cultural Resources Report. | Interior, Department of / Bureau of Reclamation | 3/31/2010 |
BERRYESSA GARBAGE SERVICE INC | $913,259 | Contract | : Provide 30yd Debris Boxes for Haulong and Disposal of Debris from various sites located at Lake Berryessa, Napa County, CA | Interior, Department of / Bureau of Reclamation | 2/25/2010 |
WASHOE TRIBE OF NEVADA & CALIFORNIA | $362,598 | Grant | Reclamation States Emergency Drought Relief: Stewart Ranch Irrigation Well - To Drill a Well to Provide Dependable Water Supply to the Pivot Irrigation System at the Washoe Tribe Stewart Ranch. | Interior, Department of / Bureau of Reclamation | 3/03/2010 |
FEDERAL CONTRACTS CORP | $203,148 | Contract | : Rental of Heavy Equipment for Lake Berryessa Resort Area through December, 2011. | Interior, Department of / Bureau of Reclamation | 3/08/2010 |
DON PEDRO COMPANY, INC. | $1,253,725 | Contract | : Recovery TAS: 14-0681 ARRA 28.00 Drought Relief - Well Enhancement - Schedule 2 | Interior, Department of / Bureau of Reclamation | 3/27/2010 |
LANDSCAPES UNLIMITED, L.L.C. | $346,435 | Contract | : Contract No. R10PC60R15 was awarded to Landscapes Unliminted LLC on March 25, 2010. The work to be performed includes the following: 1) cofferdam instalaltion and dewatering, 2) furnish and install 48diameter manhole irrigation intake structure, 3) furn | Interior, Department of / Bureau of Reclamation | 3/25/2010 |
MWI CORPORATION | $6,963,398 | Contract | : AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA | Interior, Department of / Bureau of Reclamation | 1/16/2010 |
M.J. HUGHES CONSTRUCTION, INC. | $1,601,347 | Contract | : The principal components of the work to be performed under these specifications include control of water for foundation,backfill and compaction about structures,channel reshaping,constructing embankment,furnishing and placing riprap and gravel bedding,fur | Interior, Department of / Bureau of Reclamation | 10/19/2009 |
YUCAIPA VALLEY WATER DISTRICT | $4,146,000 | Grant | Water Reclamation and Reuse Program: Phases I, II and III of the Yucaipa Valley Regional Brineline, a component of the Yucaipa Valley Regional Water Supply Renewal Project. Phase I includes approximately 4.3 miles of 12-inch pipeline, and Phase II includes approximately 4.5 miles of 16-inch | Interior, Department of / Bureau of Reclamation | 3/29/2010 |
JONES & STOKES ASSOCIATES INC | $50,000 | Contract | : This contract is part of the American Recovery and Reinvestment Act (ARRA). The purpose of this contract is to locate privately-owned properties with potential willing sellers within the LCR MSCP planning area in the State of California with either (1) ex | Interior, Department of / Bureau of Reclamation | 3/22/2010 |
PRIDMORE BROTHERS CONSTRUCTION, INC. | $487,055 | Contract | : Concrete Removal | Interior, Department of / Bureau of Reclamation | 3/31/2010 |
CLARK EQUIPMENT COMPANY | $33,790 | Contract | : PORTABLE AIR COMPRESSOR FOR THE BUREAU OF RECLAMATION AT GRAND COULEE, WASHINGTON | Interior, Department of / Bureau of Reclamation | 12/18/2009 |
KIEWIT INFRASTRUCTURE WEST CO. | $17,480,694 | Contract | : 8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP. | Interior, Department of / Bureau of Reclamation | 3/27/2010 |
IMPERIAL IRRIGATION DISTRICT INC | $1,800,000 | Contract | : The Senator Wash pump-generating facility and reservoir facilitates Colorado River water deliveries to users in the United States and reduces excess flows to the Republic of Mexico. Due to the deterioration of aging pumping units at the Senator Wash pump | Interior, Department of / Bureau of Reclamation | 1/29/2010 |
SC SOLAR, INC. | $73,523 | Contract | : The Bureau of Reclamation-LC is purchasing seven solar pond aeration systems for various aquatic applications. These are complete systems that include solar modules, battery backup, battery box, pole mount, etc. | Interior, Department of / Bureau of Reclamation | 3/29/2010 |
WESTLANDS WATER DISTRICT | $3,700,000 | Grant | Water 2025: WATER CONSERVATION THROUGH IRRIGATION SYSTEM PURCHASE PROGRAM: Using existing revolving funds, WWD will purchase irrigation systems for qualified farmers growing on drainage impaired lands. The District will loan 50% of the cost (from existing revolving | Interior, Department of / Bureau of Reclamation | 3/30/2010 |
FLATIRON WEST, INC. | $14,025,512 | Contract | : Widen existing canal, construct fish screen structure and new irrigation pump system for local ranchers | Interior, Department of / Bureau of Reclamation | 5/06/2010 |
CSRW, INC. | $1,048,276 | Contract | : Recreation Area at Lake Berryessa ADA Improvements | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
SAN JOSE, CITY OF | $6,335,000 | Grant | Water Reclamation and Reuse Program: The award of Recovery Act grant funds by the U.S. Bureau of Reclamation allows the City of San Jose and its tributary partners in the South Bay Water Recycling (SBWR) Program to invest in new water recycling facilities with an estimated total cost of $14. | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
BRISTON CONSTRUCTION, LLC | $1,081,496 | Contract | : Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS | Interior, Department of / Bureau of Reclamation | 6/30/2010 |
SPECTRUM SERVICES GROUP, INC. | $404,037 | Contract | : testing, sampling, analysis, closure | Interior, Department of / Bureau of Reclamation | 6/29/2010 |
KORTE CONSTRUCTION COMPANY | $25,000 | Contract | : Green building stipend | Interior, Department of / Bureau of Reclamation | 5/21/2010 |
BELSAAS AND SMITH CONSTRUCTION INC | $713,124 | Contract | : Construction of a Pollution Abatement Pond at a National Fish Hatchery located in Washington State. | Interior, Department of / Bureau of Reclamation | 6/09/2010 |
DELTA DIABLO SANITATION DISTRICT | $690,859 | Grant | Water Reclamation and Reuse Program: Funding for the Antioch Recycled Water Project will be used to expand the water reuse system to establish recycled water service for use as landscape irrigation at municipal parks, medians, and other green spaces along the pipeline alignment. | Interior, Department of / Bureau of Reclamation | 4/29/2010 |
CHEMETEK LLC | $1,040,929 | Contract | : The scope of this contract will be to provide the required 24) continuous stream Silt Density Index (SDI) Analyzers to support the Yuma Desalting Plant and Water Quality Improvement Center (WQIC) and (24) Spare Kits. The contractor shall furnish all contr | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
JONES & STOKES ASSOCIATES INC | $177,756 | Contract | : Award will build upon work under the previously completed Preston Alternatives Evaluation Report for the Preston Habitat Improvement Project. Under this current award the draft and final plans and specifications for the Yurt Site preferred alternative wil | Interior, Department of / Bureau of Reclamation | 4/19/2010 |
WEEMINUCHE CONSTRUCTION AUTHORITY | $441,961 | Grant | Colorado Ute Indian Water Rights Settlement Act: The Principal components of work to be performed under this ARRA Award includes: Lake Nighthorse Boundry Fencing entailing the construction of approximately 15.75 miles of high tensile boundry fence partially encompassing future Lake Nighthorse, and dedelin... Show more | Interior, Department of / Bureau of Reclamation | 4/29/2010 |
NORMANDEAU ASSOCIATES INC | $74,284 | Contract | : The Bureau of Reclamation is the implementing entity of the Lower Colorado River Multi-Species Conservation Program (LCR MSCP), a multi-stakeholder Federal and non-Federal partnership responding to the need to balance the use of the Lower Colorado River ( | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
ROCKSOL CONSULTING GROUP INC | $88,499 | Contract | : Architect and Engineering services for New Melones entrance building site development, New Melones Lake Recreation Area | Interior, Department of / Bureau of Reclamation | 5/19/2010 |
ERICK AMMON INC | $3,047,918 | Contract | : Rehabilitation of the Lowden Ranch Area | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
NORCON CORPORATION | $2,325,024 | Contract | : The Contractor shall furnish labor, equipment and material to repair existing reinforced concrete spillway inlet floor slab, gate structure, and piers at Glen Elder Dam Spillway, located at Glen Elder, Kansas | Interior, Department of / Bureau of Reclamation | 5/03/2010 |
LAS VEGAS VALLEY WATER DISTRICT | $261,700 | Contract | : Intergovernmental Personnel Assignment to provide construction management support on the Contra Costa Fish Screen project. | Interior, Department of / Bureau of Reclamation | 6/28/2010 |
WHITING-TURNER CONTRACTING COMPANY, THE | $17,811,044 | Contract | : Overall purpose of this contract is to provide a Desing Build, LEED Platinum Certified offcie building for the Lower Colorado Division of the Burea of Reclamation in Boulder City, NV. Expected outcome would be to provide a quality office building meetin | Interior, Department of / Bureau of Reclamation | 4/08/2010 |
BALFOUR BEATTY INFRASTRUCTURE, INC. | $71,608,439 | Contract | : Construction of a Fish Screen, Forebay and Pumping Plant for the Tehama Colusa Canal at Red Bluff, CA. | Interior, Department of / Bureau of Reclamation | 5/11/2010 |
PROCESS POWER AND CONTROL, INC. | $1,698,376 | Contract | : Life Safety Code Additions to Wyoming Area Power Plants | Interior, Department of / Bureau of Reclamation | 5/13/2010 |
SANTA CLARA VALLEY WATER DISTRICT | $8,125,000 | Grant | Water Reclamation and Reuse Program: Cooperative Agreement between the United States Bureau of Reclamation (USBR) and the Santa Clara Valley Water District (SCVWD) to construct the South Bay Advanced Recycled Water Treatment Facility (ARWTF) to treat secondary effluent from the San Jose/Sant | Interior, Department of / Bureau of Reclamation | 5/17/2010 |
CORPS NETWORK, THE | $912,949 | Grant | Fish and Wildlife Coordination Act: Clean up and restore designated sites in support of future recreation development in six concession areas at Lake Berryessa for public use. The crews will conserve and enhance natural and cultural resources. | Interior, Department of / Bureau of Reclamation | 6/30/2010 |
ASSOCIATED UNDERWATER SERVICES, INC. | $1,093,850 | Contract | : The overall purpose of this award is to perform High-Pressure Gate Modifications at Pinto Dam, located on the Columbia Basin Project in the State of Washington. AUS (Associated Underwater Services, Inc.) expects to successfully complete this project usin | Interior, Department of / Bureau of Reclamation | 4/19/2010 |
NORTH COAST COUNTY WATER DISTRICT | $2,077,750 | Grant | Water Reclamation and Reuse Program: The North Coast County Water District has initiated the North Coast County Water District Recycled Water project to provide tertiary treated recycled water (meeting Title 22) to irrigation sites within the District. The project components include construc | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
RICHARD PHILLIPS MARINE, INC. | $478,110 | Contract | : Slide Gate Modifications , Pueblo Dam, Frying Pan -Arkansas Project, Colorado | Interior, Department of / Bureau of Reclamation | 6/09/2010 |
AU AUTHUM KI, INC. | $869,664 | Contract | : MODE III, Repair and Upgrade Drains / Drainage Systems, Yuma, AZ | Interior, Department of / Bureau of Reclamation | 5/21/2010 |
K.D. HUEY COMPANY, LLC | $444,680 | Contract | : RECOVERY- Seven Rivers Brantley Dam Mitigation | Interior, Department of / Bureau of Reclamation | 6/08/2010 |
WESTERN OILFIELDS SUPPLY COMPANY | $2,638,402 | Contract | : Purchase of Commercial Pumps and Piping Supplies for Drought Relief | Interior, Department of / Bureau of Reclamation | 6/23/2010 |
SANTA BARBARA, COUNTY OF | $472,390 | Grant | Recreation Resources Management: Lake Cachuma ARRA Improvements Mohawk Restroom and Shower Facility - ADA Upgrades | Interior, Department of / Bureau of Reclamation | 6/07/2010 |
BROWN CONSTRUCTION, INC. | $25,000 | Contract | : This was a stipend for consulting work completed by the company for their efforts on the bid process for the Green building project. | Interior, Department of / Bureau of Reclamation | 6/07/2010 |
EATON CORPORATION | $277,428 | Contract | : O'Neill 4160V Switchgear Breaker Replacement, Project # 73.000 | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
LARON, INC. | $158,766 | Contract | : Inspection and rebuild of two Fairbanks Morse Pumps, Umatilla Project Office | Interior, Department of / Bureau of Reclamation | 4/08/2010 |
AMERGREEN, INC. | $26,883 | Contract | : The contract is for the procurement of life and safety equipment. The contract requires the delivery of Self-Luminous Exit Signs; 68 Single face, 24 Double face, and 8 custom faced; and 9 Exit door panic hardware kits. | Interior, Department of / Bureau of Reclamation | 5/13/2010 |
KEVCON, INC. | $1,289,000 | Contract | : Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
NORTH RIVER BOATS INC | $46,898 | Contract | : 2010 North River Seahawk OB Boat with Honda Motors & an EZ Loader Trailer. Fabrication and delivery. | Interior, Department of / Bureau of Reclamation | 4/07/2010 |
J. I. GARCIA CONSTRUCTION, INC. | $1,382,306 | Contract | : The purpose of this project is to make several different specified campsites and campgrounds ADA compliant. In order to do this the Contractor will be removing some existing site furnishings and replacing them with ADA compliant furnishings. Existing grad | Interior, Department of / Bureau of Reclamation | 5/15/2010 |
BRONZE STAR INC. | $120,490 | Contract | : Recovery Yuma Area Office Stockpile Sites | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
IRVINE RANCH WATER DISTRICT | $11,602,000 | Grant | Water Reclamation and Reuse Program: The design and construction of Wells 21 and 22 Project. | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
JONES & STOKES ASSOCIATES INC | $50,028 | Contract | : This contract is part of the American Recovery and Reinvestment Act (ARRA). The purpose of this contract is to locate privately-owned properties with potential willing sellers within the LCR MSCP planning area in the State of California with either (1) ex | Interior, Department of / Bureau of Reclamation | 3/12/2010 |
STOVEN CONSTRUCTION, INC. | $362,223 | Contract | : Construction of a chainlink fence around the perimeter of the Middle Rio Grande Endangered Species Collaborative Program Minnow Sanctuary | Interior, Department of / Bureau of Reclamation | 5/20/2010 |
AERO-METRIC, INC | $1,245,349 | Contract | : The purpose of this task order is to acquire natural color imagery, thermal infrared (IR) imagery, and related products to be used for a leak detection study of controlled canal reaches that it operates in the Mid Pacific, Pacific Northwest, upper Colorad | Interior, Department of / Bureau of Reclamation | 5/26/2010 |
ELLICOTT DREDGES, LLC | $4,094,400 | Contract | : Purchase of a Hydraulic Dredge -YUMA | Interior, Department of / Bureau of Reclamation | 6/29/2010 |
DON PETERSON ENGINEERS, INC. | $90,600 | Contract | : Gravel for Imperial Ponds Imperial Ponds Native Fish Habitat Expansion | Interior, Department of / Bureau of Reclamation | 3/26/2010 |
HANKIN SPECIALTY ELEVATORS, INC. | $39,556 | Contract | : INSTALL VERTICAL PLATFORM LIFT AND HAVE IT INSPECTED | Interior, Department of / Bureau of Reclamation | 6/09/2010 |
RTA CONSTRUCTION/RAY TONEY JV | $7,929,227 | Contract | : Battle Creek Salmon and Steelhead Restoration Project - Hydropower Facility Modifications Stage I | Interior, Department of / Bureau of Reclamation | 6/05/2010 |
DAN HART PATROL SERVICE, LLC | $269,307 | Contract | : Contract No R10PC60R18 was awarded to Dan Hart Patrol Service, LLC on May 19, 2010. The work to be performed includes constructing single lane road loops for access to campsites at Gaden's Point on Belle Fourche Reservoir. | Interior, Department of / Bureau of Reclamation | 5/19/2010 |
SANSONE COMPANY, INC. | $1,712,333 | Contract | : Water wells for Wild Life Refuge. | Interior, Department of / Bureau of Reclamation | 5/28/2010 |
COLORADO NETWORK STAFFING, INC. | $120,933 | Contract | : Construction Inspector Services for Canyon Ferry Dam, Montana for monitoring compliance with contract specifications, contractor safety compliance, and developments on progress of field work. | Interior, Department of / Bureau of Reclamation | 5/19/2010 |
SANSONE COMPANY, INC. | $4,939,224 | Contract | : Construction of Goundwater wells at wildlife refuges. | Interior, Department of / Bureau of Reclamation | 5/14/2010 |
ACCORD ENGINEERING, INC. | $727,864 | Contract | : Provide firm fixed price Mitigation Services for Gasoline Contamination at Putah Creek Resort. The scope of work includes providing all labor, materias, equipment, supplies, permits, transportation and supervision nessary to perform the work described in | Interior, Department of / Bureau of Reclamation | 5/14/2010 |
ERICK AMMON INC | $1,848,135 | Contract | : Rehabilitation of the Reading Creek Site | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
GREY WOLF SERVICES | $58,565 | Contract | : DELIVERY OF HDPE PRESSURE PIPE AND FITTINGS TO BUREAU OF RECLAMATION YUMA, AZ. | Interior, Department of / Bureau of Reclamation | 9/15/2010 |
LAGUNA AND HALEY CORPORATION | $44,959 | Contract | : Dive Helmets and communication equipment | Interior, Department of / Bureau of Reclamation | 9/23/2010 |
GREENVILLE RANCHERIA | $376,754 | Grant | Reclamation States Emergency Drought Relief: Greenville Rancheria Drought Wells and Associated Appurtenances. | Interior, Department of / Bureau of Reclamation | 9/27/2010 |
VIDEORAY, LLC | $64,103 | Contract | : Remote Operated Vehicle for PN Region Dive Team | Interior, Department of / Bureau of Reclamation | 9/23/2010 |
DYKMAN ELECTRICAL, INC. | $479,971 | Contract | : Medium voltage electric motor and medium voltage variable frequency drive. | Interior, Department of / Bureau of Reclamation | 8/17/2010 |
BIG LAGOON RANCHERIA | $246,246 | Grant | Reclamation States Emergency Drought Relief: This contract authorizes Tribal project management activities and construction activities necessary to facilitate drought well drilling and installation of associated appurtenances, as delineated in the project scope of work. | Interior, Department of / Bureau of Reclamation | 9/22/2010 |
ELSINORE VALLEY MUNICIPAL WATER DISTRICT | $1,847,000 | Grant | Water Reclamation and Reuse Program: This Agreement covers the construction of Phase I of the Wildomar Recycled Water System, a component of the Elsinore Valley Municipal Water District Projects. The project is located in Riverside County, California. | Interior, Department of / Bureau of Reclamation | 9/14/2010 |
ROUND ROCK, CITY OF | $1,188,575 | Grant | Water Reclamation and Reuse Program: To construct a consolidated water reclamation and reuse system within the City of Round Rock, Texas, to help accelerate the conversion to effluent reuse at locations now using raw water or potable drinking water for irrigation purposes. The Reuse Water pr | Interior, Department of / Bureau of Reclamation | 8/31/2010 |
HIGH PLAINS COMPUTING, INC. | $66,713 | Contract | : Construction inspection services for a construction project at Pinto Dam, 2.5 miles northwest of Stratford, Washington.TAS::14 0681::TAS. BOR Project No. 6.0000 Provide a Construction Inspector to represent Bureau of Reclamation interest and enforce cons | Interior, Department of / Bureau of Reclamation | 8/30/2010 |
SANTA CLARA VALLEY WATER DISTRICT | $1,493,000 | Grant | Water Reclamation and Reuse Program: Cooperative Agreement between the United States Bureau of Reclamation (USBR) and the Santa Clara Valley Water District (SCVWD) to implement the South County Recycled Water Master Plan which is expected to provide multiple benefits, including: increasing t | Interior, Department of / Bureau of Reclamation | 8/31/2010 |
CHER-AE HEIGHTS INDIAN COMMUNITY | $194,425 | Grant | Reclamation States Emergency Drought Relief: With this contract the Trinidad Rancheria developed one new production well for emergency water supply. The Rancheria had selected ten possible locations for the well. Using a licensed hydro-geologist a preliminary investigative report was provided relatii... Show more | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
TETRA TECH, INC. | $222,103 | Contract | : As part of TAS 14-0681 (Middle Rio Grande Project-NM SO-EB Hydrographic Surveys, Arroyo de las Canas (RM-95) to EB-50 (RM-46) Tetra Tech will provide hydrographic surveys in accordance with the detailed requirements specified in Section 2 of part A, B & C | Interior, Department of / Bureau of Reclamation | 8/19/2010 |
UNDERSEA SYSTEMS INTERNATIONAL, INC. | $32,809 | Contract | : Dive Masks For PN Region Dive Team | Interior, Department of / Bureau of Reclamation | 9/22/2010 |
SANTA BARBARA, COUNTY OF | $1,083,859 | Grant | Recreation Resources Management: Fire Suppression Water Storage Reservoir. | Interior, Department of / Bureau of Reclamation | 8/25/2010 |
DYKMAN ELECTRICAL, INC. | $242,500 | Contract | : One medium voltage electric motor and one medium voltage variable frequency drive. | Interior, Department of / Bureau of Reclamation | 9/14/2010 |
BSA ENVIRONMENTAL SERVICES, INC. | $102,000 | Contract | : The purpose of this award is to analyze a total of approximately 1200 water samples from 17 states under the jurisdiction of the U.S. Bureau of Reclamation. For approximately 600 of these samples, phytoplankton species will be identified, enumerated, and | Interior, Department of / Bureau of Reclamation | 7/09/2010 |
ELK VALLEY RANCHERIA | $413,345 | Grant | Reclamation States Emergency Drought Relief: The Elk Valley Rancheria, California has been award a Bureau of Reclaimation Drought Relief Award to conduct test well drilling and well development on two parcels of trust land on the reservation; the Stary Ranch and Martin Ranch. The water wells will bb... Show more | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
PIT RIVER TRIBAL COUNCIL | $260,124 | Grant | Reclamation States Emergency Drought Relief: The PRT plans to develop one new production well for irrigation water. The water from the well will feed a stand pipe that will allow for connection to a pivot or directly to an irrigation pipe. The new well will require power to be delivered on site. Thh... Show more | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
SMITH RIVER RANCHERIA | $171,476 | Grant | Reclamation States Emergency Drought Relief: Well Drilling - Drought Program Smith River Rancheira Water Resource Development Project Reclamation Tracking No 28.125 | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
BLUE LAKE RANCHERIA | $249,269 | Grant | Reclamation States Emergency Drought Relief: Drought assistance well drilling project for Tribal lands | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
BISHOP INDIAN TRIBAL COUNCIL | $1,000,000 | Grant | Fish and Wildlife Coordination Act: Overall purpose of the project is to install a water distribution system to provide a perennial and controlled water supply to a wetland portion of the Tribe?s Conservation Open Space Area (COSA) to restore the beneficial uses of that water for sensitive, | Interior, Department of / Bureau of Reclamation | 8/30/2010 |
CEDARVILLE RANCHERIA | $84,565 | Contract | : One community well will be installed on the Cedarville Rancheria. It will have an pitless adaptor or irrigation water. The water from the well will feed a hose bib on site. One existing well will be abandoned. | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
SHIMMICK CONSTRUCTION COMPANY, INC. | $15,313,773 | Contract | : The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T | Interior, Department of / Bureau of Reclamation | 7/30/2010 |
NORTH RIVER BOATS INC | $151,032 | Contract | : To manufacture 2 aluminum boats | Interior, Department of / Bureau of Reclamation | 9/24/2010 |
ROCKSOL CONSULTING GROUP INC | $2,257,932 | Contract | : Onsite Inspection of Dewatered Urbanized Canals. Bureau of Reclamation Project No. 8.000, TAS::14 0681::TAS | Interior, Department of / Bureau of Reclamation | 7/16/2010 |
HIGH PLAINS COMPUTING, INC. | $513,782 | Contract | : To provide construction inspection services for the contstruction of second barrels for the Weber coulee siphon and Weber branch siphon. The requirement is for the inspector to monitor compliance with the specifications, monitor contractor safety complian | Interior, Department of / Bureau of Reclamation | 9/27/2010 |
RESIGHINI RANCHERIA | $142,561 | Grant | Reclamation States Emergency Drought Relief: Bureau of Reclamation drought relief funding: Drill and develop second well for public water system. Construct pump house and connect well to existing storage tank. Extend water line to camping area for homeless tribe members. | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
LAS VEGAS VALLEY WATER DISTRICT | $29,400 | Contract | : Intergovernmental Personnel Assignment to provide construction management support on the Contra Costa Fish Screen project. | Interior, Department of / Bureau of Reclamation | 7/27/2010 |
QUARTZ VALLEY INDIAN RESERVATION | $264,024 | Grant | Reclamation States Emergency Drought Relief: Quartz Valley Indian Reservation Water Well and Associated Apputenances | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
BRONZE STAR INC. | $120,490 | Contract | : Recovery Yuma Area Office Stockpile Sites | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
GREAT LAKES ENVIRONMENTAL CENTER, INC. | $124,194 | Contract | : To conduct analysis and report results for up to 600 water samples plus quality control samples using Standard Operating Procedures for the following parameters: ammonia nitrogen, calcium, magnesium, sodium, ptassium, sulfate and total organic carbon. | Interior, Department of / Bureau of Reclamation | 8/13/2010 |
LAYNE CHRISTENSEN COMPANY | $16,202,640 | Contract | : Drought Relief - Construction of New Wells | Interior, Department of / Bureau of Reclamation | 8/03/2010 |
PERKINELMER HEALTH SCIENCES, INC | $71,416 | Contract | : 800 AA SPECTROMETER | Interior, Department of / Bureau of Reclamation | 9/22/2010 |
FORT BIDWELL INDIAN COMMUNITY COUNCIL | $193,153 | Grant | Reclamation States Emergency Drought Relief: Fort Bidwell Reservation Drought Water Well and Associated Appurtenances. Reclamation Tracking No. 28.110 | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
TABLE BLUFF RESERVATION | $312,000 | Grant | Reclamation States Emergency Drought Relief: Grant to fund installation of a new community drinking water well (including electrical supply and water transmission to treatment plant)on the Table Bluff Reservation. | Interior, Department of / Bureau of Reclamation | 8/24/2010 |
CENTRAL UTAH WATER CONSERVANCY DISTRICT | $100,000 | Grant | Fish and Wildlife Coordination Act: Vendor will remove 500,000 pounds of common carp from Utah Lake and properly dispose of the removed fish in an approved facility. Removal of common carp from Utah Lake is intended as a recovery action to benefit the endangered June sucker. This action w | Interior, Department of / Bureau of Reclamation | 7/30/2010 |
STOVEN CONSTRUCTION, INC. | $3,546,656 | Contract | : excavating embayments and/or backwaters, lowering bank lines and small channels through the floodplain area, creating a habit for wildlife during prolonged dewatering /no-flow periods. | Interior, Department of / Bureau of Reclamation | 8/16/2010 |
LAS VEGAS VALLEY WATER DISTRICT | $131,330 | Contract | : Intergovernmental personnel assignment to provide contract administration. | Interior, Department of / Bureau of Reclamation | 6/10/2010 |
JAMES TALCOTT CONSTRUCTION, INC. | $120,649 | Contract | : Build vehicle storage at Hungry Horse Dam | Interior, Department of / Bureau of Reclamation | 7/29/2010 |
WILLIAM E. MUNSON COMPANY | $107,539 | Contract | : 24' Packman Dive Boat | Interior, Department of / Bureau of Reclamation | 9/23/2010 |
BUILDING SOLUTIONS, INC. | $6,753,706 | Contract | : 22000sf metal building for civil maintenance | Interior, Department of / Bureau of Reclamation | 8/03/2010 |
SONOMA COUNTY WATER AGENCY | $7,203,000 | Grant | Water Reclamation and Reuse Program: This Project consists of the planning, design, and construction of multi-county activities that will provide recycled water for agricultural, urban, and environmental uses and to expand the recycled water system in the North Bay region. The Project will i | Interior, Department of / Bureau of Reclamation | 9/16/2010 |
EASTERN MUNICIPAL WATER DISTRICT | $10,793,000 | Grant | Water Reclamation and Reuse Program: The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Longfellow Road | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
CENTRAL STATES MANUFACTURING & SALES CORPORATION | $79,288 | Contract | : Plumbing material and supplies. | Interior, Department of / Bureau of Reclamation | 8/19/2010 |
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $325,200 | Contract | : Upper Stillwater Dam Rehabilitation and Revitalization | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
EDTEC INSTRUMENTS LLC | $30,961 | Contract | : AXIO Observer A1 Inverted Microscope. Bureau of Reclamation Project No. 13.000. TAS:: 14 0681::TAS | Interior, Department of / Bureau of Reclamation | 9/08/2010 |
LAS VEGAS VALLEY WATER DISTRICT | $90,300 | Contract | : Intergovernmental Personnel Assignment to provide construction management support on the Folsom Pier/Gates. | Interior, Department of / Bureau of Reclamation | 4/11/2011 |
CEDARVILLE RANCHERIA | $101,565 | Grant | Reclamation States Emergency Drought Relief: One community well to be drilled and make operational on the Cedarville Rancheria. I t will have a pitless adaptor or irrigation water. The water from the well will feed a hose bib on site. One existing well will be closed and abandoned. | Interior, Department of / Bureau of Reclamation | 9/28/2010 |
MCCONNELL, MIKE CONSTRUCTION | $1,378 | Contract | : Josephine and Rainbow mine closure | Interior, Department of / Bureau of Reclamation | 11/30/2010 |