Listing all stimulus spending by amount, in descending order. Return to Geological Survey page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
CTA INC. | $89,898 | Contract | : USGS Tunison Lab Fire Alarm Fire Sprinkler Upgades; Courtland, New York | Interior, Department of / Geological Survey | 9/17/2009 |
CTA INC. | $46,860 | Contract | : USGS National Wildlife Health Center Fire Alarm Fire Sprinkler Upgades - Madison, Wisconsin | Interior, Department of / Geological Survey | 9/17/2009 |
SYNERGETICS INCORPORATED | $108,443 | Contract | : The US Geological Survey Advanced National Seismic System (ANSS) National Operations Center (NOC) in Golden, Colorado has commenced the development of improved seismic monitoring and information delivery systems in response to the December, 2004, tsunami | Interior, Department of / Geological Survey | 9/18/2009 |
PRESSURE SYSTEMS INCORPORATED | $12,769 | Contract | : Manufacture and ship 12 tranducers | Interior, Department of / Geological Survey | 6/08/2009 |
CTA INC. | $215,329 | Contract | : Architectural Services - A/E Svcs. (Incl Landscaping Interior) | Interior, Department of / Geological Survey | 9/22/2009 |
HONEYWELL TECHNOLOGY SOLUTIONS INC. | $942,665 | Contract | : Non-Personal Services for the Deployment, Operation, Maintenance, Repair, and Support of the US Geological Survey's Global Seismograph Systems. Provide upgrade services of 20-23 Global Seismological Network sites between 15 July 2009 and 30 September 201 | Interior, Department of / Geological Survey | 8/26/2009 |
CTA INC. | $108,891 | Contract | : USGS Great Lakes Science Center - Repair, Correct and Replace Electrical Distribution Service; Ann Arbor, Michigan | Interior, Department of / Geological Survey | 9/17/2009 |
CTA INC. | $144,904 | Contract | : Design/Installation of new fire slarm system and fire sprinkler system. | Interior, Department of / Geological Survey | 9/23/2009 |
SYNERGETICS INCORPORATED | $394,253 | Contract | : The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a | Interior, Department of / Geological Survey | 9/18/2009 |
INSTRUMENTAL SOFTWARE TECHNOLOGIES | $25,000 | Contract | : This award allows the USGS and related seismic networks to monitor the state of health of the Quanterra Q330 seismic instrument now being deployed. This will allow earthquake monitoring networks to become more reliable. | Interior, Department of / Geological Survey | 8/14/2009 |
CTA INC. | $126,567 | Contract | : Architectural Services - Engineering Drafting Services | Interior, Department of / Geological Survey | 9/30/2009 |
HEERY INTERNATIONAL, INC. | $32,936 | Contract | : Architect and Engineering (A/E) Services on the design for rehabilitation of building structures. Work includes rehabilitation of electrical and life safety systems. | Interior, Department of / Geological Survey | 9/22/2009 |
CONSERVATION, CALIFORNIA DEPARTMENT OF | $76,857 | Contract | : Evaluation and Monitoring of Long Valley Caldera volcanic activity, including associated seismic and geologic hazards. Contract of $76,857 to two part-time CGS staff (combined contracts) to assist in project from July 1, 2009 to June 30, 2010. | Interior, Department of / Geological Survey | 7/01/2009 |
GEOSIG AG | $489,950 | Contract | : Provide 135 Accelerograph Appliance Units and ancillary optional equipment | Interior, Department of / Geological Survey | 8/24/2009 |
SYNERGETICS INCORPORATED | $270,250 | Contract | : The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien | Interior, Department of / Geological Survey | 9/18/2009 |
DESIGN ANALYSIS ASSOCIATES, INC. | $5,244,414 | Contract | : Provide Hydrological Instrumentation: High Data Rate (HDR) GOES Data Collection Platforms (DCP) with loggers and radios; Submersible Pressure Sensors; Non-submersible Pressure Sensors; Combination Non-Submersible Pressure Sensors, Gas Systems, and Data Lo | Interior, Department of / Geological Survey | 5/21/2009 |
UNIVERSITY OF ALASKA FAIRBANKS | $532,959 | Grant | Earthquake Hazards Reduction Program: This project is intended to improve the capabilities of the Alaska Earthquake Information Center (AEIC) and the Alaska Seismic Network (ASN) as part of the Advanced National Seismic System (ANSS). Upgrading outdated seismic station instrumentation and com | Interior, Department of / Geological Survey | 9/30/2009 |
IN-SITU, INC | $20,355 | Contract | : Provide water temperature/conductivity/level sensor/dataloggers. | Interior, Department of / Geological Survey | 6/08/2009 |
CAMPBELL SCIENTIFIC, INC. | $21,189 | Contract | : meterlogical Equiptment | Interior, Department of / Geological Survey | 8/24/2009 |
MICRO-G LACOSTE, INC. | $51,200 | Contract | : Deliverables: Service, electronic feedback installation and upgrade to existing Model G Gravity Meters (Quantity 2). Contract modified 14Dec2009 to include additional upgrade in order to retain analog output feature on both gravity meters. Contract amount | Interior, Department of / Geological Survey | 9/02/2009 |
ALPHA SUPPLY, LLC | $14,736 | Contract | : SUPPLY LIQUIDTIGHT FLEXIBLE NONMETALLIC CONDUIT AND FITTINGS IN SUPPORT OF THE HAWAIIAN VOLCANO OBSERVATORY | Interior, Department of / Geological Survey | 9/15/2009 |
CASES BY SOURCE INC. | $24,896 | Contract | : Delivery of 66 nonmetallic waterproof cases in support of the Hawaiian Volcano Observatory | Interior, Department of / Geological Survey | 8/24/2009 |
SAINT LOUIS UNIVERSITY | $121,289 | Grant | Earthquake Hazards Reduction Program: This is a proposal under the USGS Program Announcement 09HQPA00021 for upgrading existing earthquake monitoring systems operated by Saint Louis University as part of the US Geological Survey Advanced National Seismic System. In addition to upgrading | Interior, Department of / Geological Survey | 9/24/2009 |
UNIVERSITY OF MEMPHIS | $350,549 | Grant | Earthquake Hazards Reduction Program: The Center for Earthquake Research and Information (CERI) at the University of Memphis operates 139 seismographs in two seismic networks to monitor seismic activity in the New Madrid and East Tennessee Seismic Zones (NMSZ and ETSZ respectively). We propos | Interior, Department of / Geological Survey | 9/15/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,200,000 | Grant | Earthquake Hazards Reduction Program: This proposal requests Government Furnished Equipment (GFE), funding for installing this equipment and other upgrades of the Southern California Seismographic Network (SCSN), a cooperative project of Caltech and the Pasadena office of the U. S. Geologic | Interior, Department of / Geological Survey | 9/15/2009 |
ALLIED ELECTRONICS, INC | $3,233 | Contract | : COAX CABLE | Interior, Department of / Geological Survey | 8/11/2009 |
MANAGEMENT ANALYSIS, INCORPORATED | $24,000 | Contract | : PWS Writing Support | Interior, Department of / Geological Survey | 5/11/2009 |
DESIGN ANALYSIS ASSOCIATES, INC. | $15,793 | Contract | : Provide Hydrological Instrumentation: pressure transducers, psig(s) with 50ft. of vented cable; psig(s) with 100ft. Of vented cable; SDI-12 Encoders | Interior, Department of / Geological Survey | 9/28/2009 |
SUTRON CORPORATION | $3,684,407 | Contract | : High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | Interior, Department of / Geological Survey | 6/05/2009 |
NANOMETRICS INC | $190,500 | Contract | : The sale of T240seismometers, plus cables for the monitoring of seismic activity such as earthquakes and volcanos. | Interior, Department of / Geological Survey | 8/19/2009 |
MARATHON PRODUCTS | $22,390 | Contract | : Temperature monitoring | Interior, Department of / Geological Survey | 9/08/2009 |
BOSTON COLLEGE, TRUSTEES OF | $170,496 | Grant | Earthquake Hazards Reduction Program: The Weston Observatory of Boston College has primary responsibility for earthquake monitoring and reporting in New England. Weston Observatory operates the New England Seismic Network (NESN), which comprises 16 seismic stations distributed throughout the | Interior, Department of / Geological Survey | 9/28/2009 |
THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK INC | $264,640 | Grant | Earthquake Hazards Reduction Program: The seismic upgrades under ARRA 2009 are a once in a lifetime opportunity for scientists and institutions in the eastern United States. I cannot recall anything like this happening in the last 20 years in the northeastern U.S. for improving earthquake mon | Interior, Department of / Geological Survey | 9/15/2009 |
UNIVERSITY OF NEVADA, RENO | $307,109 | Grant | Earthquake Hazards Reduction Program: Upgrade selected seismic stations of the Western Great Basin Seismic Network. The hardware of the current network is out of date and in need of upgrades in the areas of DAS, sensors, telemetry and infrastructure. The proposal submitted develops a strate | Interior, Department of / Geological Survey | 9/15/2009 |
OCEANSCIENCE GROUP LTD., THE | $135,583 | Contract | : Riverboat for Stream Pro ADCP Riverboat w/GPS for Rio Grande ADCP Riverboat w/o GPS for Rio Grande | Interior, Department of / Geological Survey | 9/29/2009 |
COMPLETE PACKAGING & SHIPPING SUPPLIES INC. | $1,224 | Contract | : PROVIDE U-BOLTS AND HOSE CLAMPS IN SUPPORT OF THE HAWAIIAN VOLCANO OBSERVATORY | Interior, Department of / Geological Survey | 8/13/2009 |
UNIVERSITY OF UTAH, THE | $458,025 | Grant | Earthquake Hazards Reduction Program: This proposal includes six prinicpal tasks. In Tasks 1 and 2, we propose to updgade 11 (of 14) broadband stations and 18 (of 36) short-period stations, all with the University of Utah (UU) station code, that were listed as upgrade targets in Attachments | Interior, Department of / Geological Survey | 9/22/2009 |
UNIVERSITY OF OREGON | $103,435 | Grant | Earthquake Hazards Reduction Program: The University of Oregon (UO) proposes to update Pacific Northwest Siesmic Network (PNSN) stations as well as 2 EarthWorm systems and their related network infrastructure. This proposal is for a portion of the PNSN proposed work included in the separate p | Interior, Department of / Geological Survey | 9/15/2009 |
MICRO-G LACOSTE, INC. | $190,000 | Contract | : Deliverables: Quantity 2 Model CG5 gravity meters | Interior, Department of / Geological Survey | 9/11/2009 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $721,000 | Grant | Earthquake Hazards Reduction Program: Earthquakes are a hazard in most parts of California. In northern California, the Berkeley Seismological Laboratory (BSL) and the USGS Menlo Park collaborate closely to provide timely and reliable earthquake information to the federal, state, and local go | Interior, Department of / Geological Survey | 9/15/2009 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $182,733 | Grant | Earthquake Hazards Reduction Program: The specific operational objective of this proposal consists of one critical element of replacing data acquisition systems at all ANZA non-Q330 equipped stations. The components of this element are: 1. Upgrade of existing Toro Peak Telemetry 2. Upgrade | Interior, Department of / Geological Survey | 7/07/2009 |
KINEMETRICS, INC. | $920,951 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 7/23/2009 |
KINEMETRICS, INC. | $760,733 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 6/29/2009 |
REFRACTION TECHNOLOGY INC. | $533,755 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition systems, accelerometers per United States Geological survey solicitation number 08CRSS0024 | Interior, Department of / Geological Survey | 8/06/2009 |
IN-SITU, INC | $19,214 | Contract | : Provide water temperature/conductivity/level sensor/dataloggers and ancillary equipment in support of the Yellowstone Volcano observatory mission. | Interior, Department of / Geological Survey | 8/13/2009 |
HOME DEPOT U.S.A., INC. | $778 | Contract | : Nail Stakes | Interior, Department of / Geological Survey | 9/02/2009 |
FREEDOM STEEL BUILDING CORPORATION | $10,570 | Contract | : Pre-Engineered Building | Interior, Department of / Geological Survey | 9/03/2009 |
MANGI ENVIRONMENTAL GROUP, INC. | $75,525 | Contract | : Environmental Assessment for Water related projects at Leetown Science Center - Prepare a Programmatic Environmental Assessment (EA) document, in its entirety, consistent with requirements specified in the Department of Interior's and US Geoological Surve | Interior, Department of / Geological Survey | 8/14/2009 |
NANOMETRICS INC | $190,500 | Contract | : Sales of T240 seismometers to USGS. | Interior, Department of / Geological Survey | 8/19/2009 |
SONTEK/YSI INC | $732,251 | Contract | : Acoustic Doppler Hand-held Portable Water Velocity / Flow Measurement System. 81 Handheld Flowtrackers; 15 Shallow Water Acoustic Dopplers; 3 Acoustic Doppler Profilers; Side Looking Doppler Current Meter 17 pcs + 4 pcs + 6 pcs= 27 pcs with different samp | Interior, Department of / Geological Survey | 6/05/2009 |
TELEDYNE R D INSTRUMENTS INC | $658,070 | Contract | : Acoustic Doppler Current Profiler, Streampro and Workhorse Rio | Interior, Department of / Geological Survey | 6/05/2009 |
UNIVERSITY OF WASHINGTON | $599,388 | Grant | Earthquake Hazards Reduction Program: The University of Washington enthusiastically proposes to upgrade the facilities and performance of the Pacific Northwest Seismic Network (PNSN) according to the guidelines of Announcement 09HQPA0021. Like most RSNs, PNSN has developed more-or-less hapha | Interior, Department of / Geological Survey | 9/29/2009 |
HUGHES NETWORK SYSTEMS, LLC | $39,667 | Contract | : USGS purchase of VSAT equipments and delivery of the following units: 16 units of HN7700S-074 with 2 watt ODU (@$795/unit), 21 units of HN7700S-098 with with 2 watt ODU (@$1,087/unit), and 2 units of HN7700S-120A with 2 watt ODU (@$2,060/unit). | Interior, Department of / Geological Survey | 9/03/2009 |
KINEMETRICS, INC. | $651,199 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 6/29/2009 |
NOBLE SALES CO., INC. | $11,612 | Contract | : PROVIDE THHN WIRE IN SUPPORT OF THE USGS HAWAIIAN VOLCANO OBSERVATORY | Interior, Department of / Geological Survey | 9/21/2009 |
KEEFE KAPLAN MARITIME, INC. | $65,830 | Contract | : Supply and install safety equipment for the research vessel Turning Tide including canister life raft, rails, zodiac, modifying vessel for installation of safety equipment and rot repair. | Interior, Department of / Geological Survey | 7/29/2009 |
SUTRON CORPORATION | $13,890 | Contract | : CONSISTS OF SUTRON PART #9210-SL2-2B AND SUTRON PART #8080-0003-1 - XLITE DATALOGGER WITH SATLINK2 GOES TRANSMITTER | Interior, Department of / Geological Survey | 8/13/2009 |
TELEDYNE ISCO, INC. | $7,204 | Contract | : Provide compact portable sampler | Interior, Department of / Geological Survey | 8/13/2009 |
DALECO INC | $34,418 | Contract | : SUPPLY 422 DEEPCYCLE, MAINTENANCE FREE BATTERIES | Interior, Department of / Geological Survey | 9/09/2009 |
FLIR SYSTEMS INC | $64,169 | Contract | : COMMERCIAL ITEM - HANDHELD THERMAL CAMERA, SOFTWARE AND ACCESSORIES | Interior, Department of / Geological Survey | 9/23/2009 |
PACIFIC MACADAMIA NUTS CORP | $12,090 | Contract | : DELIVER 93 EACH 10' x 2 SCHEDULE 40 TYPE 304/304L STAINLESS STEEL WELDED PIPE IN SUPPORT OF THE HAWAIIAN VOLCANO OBSERVATORY | Interior, Department of / Geological Survey | 9/18/2009 |
KINEMETRICS, INC. | $626,850 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 9/18/2009 |
CALIFORNIA STATE UNIVERSITY, FULLERTON | $150,000 | Grant | Volcano Hazards Program Research and Monitoring.: This study focuses on understanding the timescales and manner in which the 2006 eruption of Augustine Volcano in Alaska was triggered, which will improve our understanding of volcanic eruption processes and therefore improve our ability to accurately y fore... Show more | Interior, Department of / Geological Survey | 11/23/2009 |
UNIVERSITY OF WASHINGTON | $220,000 | Grant | Volcano Hazards Program Research and Monitoring.: The University of Washington enthusiastically proposes to upgrade the facilities and performance of the Pacific Northwest Seismic Network (PNSN) according to the guidelines of Announcement 09HQPA0021. Like most RSNs, PNSN has developed more-or-less h hapha... Show more | Interior, Department of / Geological Survey | 12/01/2009 |
UNIVERSITY OF HAWAII SYSTEMS | $331,000 | Grant | Volcano Hazards Program Research and Monitoring.: This proposal will develop accurate and timely volcanic gas forecasting using gas dispersion and wind models, and the development of near real-time volcanic gas emission rate measurements. | Interior, Department of / Geological Survey | 12/01/2009 |
NANOMETRICS INC | $334,040 | Contract | : Sale of T120PA seismometers and accessories to USGS. | Interior, Department of / Geological Survey | 6/29/2009 |
NANOMETRICS INC | $100,435 | Contract | : Sales of digitzers/dataloggers and acCessories to USGS. | Interior, Department of / Geological Survey | 8/26/2009 |
CTA INC. | $207,899 | Contract | : A/E Svcs. - A&E services facility options and site work | Interior, Department of / Geological Survey | 9/22/2009 |
UNIVERSITY OF WISCONSIN SYSTEM | $300,000 | Grant | Volcano Hazards Program Research and Monitoring.: We are carrying out a broad set of studies aimed at improving our understanding of the internal structure of two Alaskan volcanoes, Okmok and Mt. Augustine, and the seismogenic structures that lie within them, with the ultimate goal of improving seismsmic m... Show more | Interior, Department of / Geological Survey | 11/17/2009 |
NATURAL RESOURCES, ALASKA DEPARTMENT OF | $1,500,000 | Grant | Volcano Hazards Program Research and Monitoring.: Alaska volcano investigations and information dissemination. | Interior, Department of / Geological Survey | 12/01/2009 |
GEOLOGY AND MINERAL INDUSTRIES, OREGON DEPARTMENT OF | $180,000 | Grant | Volcano Hazards Program Research and Monitoring.: The goal of this award is to deliver effective risk communication to improve public awareness and understanding of risk management and mitigation concepts associated with volcano and related hazards from Mt. Hood. The approach is qualitative, emphasizizing ... Show more | Interior, Department of / Geological Survey | 11/13/2009 |
UNIVERSITY OF HAWAII SYSTEMS | $90,000 | Grant | Volcano Hazards Program Research and Monitoring.: Models for the eruptions of Kilauea based on the activity of 2008-2009. | Interior, Department of / Geological Survey | 12/01/2009 |
MONTANA TECH OF THE UNIVERSITY OF MONTANA | $50,926 | Grant | Earthquake Hazards Reduction Program: Upgrade of Selected Montana Regional Seismograph Network Stations | Interior, Department of / Geological Survey | 9/29/2009 |
PRESSURE SYSTEMS INCORPORATED | $11,752 | Contract | : 11 Transducers | Interior, Department of / Geological Survey | 10/01/2009 |
CTA INC. | $136,567 | Contract | : Engineering Drafting Services | Interior, Department of / Geological Survey | 9/30/2009 |
MICROCOM DESIGN, INC. | $38,430 | Contract | : EROS USGS Receive System Upgrade | Interior, Department of / Geological Survey | 8/26/2009 |
SAMCO ANTENNAS INC | $97,680 | Contract | : 407 units: GOES Satellite Telemetry Antenna. | Interior, Department of / Geological Survey | 9/29/2009 |
SNYDER ENVIRONMENTAL SERVICES, INC. | $53,040 | Contract | : 1.) PREPARE AND INSTALL 4 THICK CONCRETE SLABS FOR ONE 500 GALLON AND TWO 120 GALLON OUTDOOR PROPANE TANKS. PROVIDE GROUNDING SYSTEMS FOR ALL THREE TANK LOCATIONS. 2.) CLEAN AND PREPARE FOR PAINT SIX EXISTING 1000 GALLON PROPANE TANKS LOCATED AT THE FISH | Interior, Department of / Geological Survey | 9/30/2009 |
HACH COMPANY | $52,316 | Contract | : For purchase of OTT CBS Bubbler | Interior, Department of / Geological Survey | 9/30/2009 |
BOISE STATE UNIVERSITY | $134,195 | Grant | Volcano Hazards Program Research and Monitoring.: The detection and evaluation of time-dependent changes at volcanoes forms the foundation upon which successful volcano monitoring is built. Time-dependent changes at volcanoes occur over all time scales and may be obvious or subtle. Some of the most t chal... Show more | Interior, Department of / Geological Survey | 12/01/2009 |
GEOLOGY AND MINERAL INDUSTRIES, OREGON DEPARTMENT OF | $931,000 | Grant | Volcano Hazards Program Research and Monitoring.: This award provides funds to Oregon Lidar Consortium administered by OR Department of Geology and Mineral Industries (DOGAMI) to collect very accurate elevation data for active volcanoes in the Cascade Range in California, Oregon, and Washington. Thehe dat... Show more | Interior, Department of / Geological Survey | 11/13/2009 |
WYOMING STATE GEOLOGICAL SURVEY | $95,038 | Grant | Volcano Hazards Program Research and Monitoring.: To advance the scientific understanding of volcanic processes and to lessen the harmful impacts of volcanic activity in the Yellowstone Caldera, Wyoming, Montana and Idaho. The WSGS will create a crisis GIS (Geographic Informatin System) for use duriring c... Show more | Interior, Department of / Geological Survey | 12/10/2009 |
UNIVERSITY OF ALABAMA | $125,000 | Grant | Volcano Hazards Program Research and Monitoring.: Simulating Complex Volcano Deformation Systems with Finite Element Models and High-Performance Personal Computing Clusters -- Simulating complex volcano deformation systems with finite element models and highperformance personal computing clusters. ThThe in... Show more | Interior, Department of / Geological Survey | 12/14/2009 |
THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK INC | $357,995 | Grant | Earthquake Hazards Reduction Program: 'Various computer systems evaluated for purchasing to support the project. Decision made on a Supermicro Blade server with 10 AMD 2384 2.7Mhz processors and 32GB memory, and 12 Hitachi Ultrastar enterprise quality 2TB disks with RAID 6 and hot spare usabl | Interior, Department of / Geological Survey | 12/30/2009 |
UNIVERSITY OF UTAH, THE | $280,545 | Grant | Volcano Hazards Program Research and Monitoring.: The University of Utah proposes to upgrade 15 of 26 seismograph stations of the Yellowstone seismic network and related support recording system at the University of Utah Seismograph Station Recording Facility. The upgrades would modernize the seismicic net... Show more | Interior, Department of / Geological Survey | 12/10/2009 |
NORTHERN ARIZONA UNIVERSITY | $119,319 | Grant | Volcano Hazards Program Research and Monitoring.: Reconstructing the 2008 Okmok Eruption from Tephra Stratigraphy: Implications for Volcanic Hazards from Aleutian Phreatomagmatic Eruptions, dated September 10, 2009, revised Oclober 15, 2009 | Interior, Department of / Geological Survey | 12/29/2009 |
UNIVERSITY OF ALASKA FAIRBANKS | $2,000,000 | Grant | Volcano Hazards Program Research and Monitoring.: The University of Alaska Fairbanks Geophysical Institute (UAFGI) plays a unique role in the Alaska Volcano Observatory (AVO). UAFGI was a co-founding member of AVO in 1988. UAFGI personnel have visited and worked all monitored Alaskan volcanoes, and h have ... Show more | Interior, Department of / Geological Survey | 12/01/2009 |
DAVY ENGINEERING COMPANY, INC. | $49,510 | Contract | : A&E DESIGN SERVICES, REMEDIATION OF WASTE WATER, UPPER MIDWEST ENVIRONMENTAL SCIENCE CENTER, 2630 FANTA REED RD, LA CROSSE, WI | Interior, Department of / Geological Survey | 11/12/2009 |
DAVY ENGINEERING COMPANY, INC. | $166,630 | Contract | : A&E DESIGN SERVICES, WATER TOWER REPLACEMENT, UPPER MIDWEST ENVIRONMENTAL SCIENCE CENTER, 2630 FANTA REED RD, LA CROSSE, WI | Interior, Department of / Geological Survey | 11/18/2009 |
SANSONE COMPANY, INC. | $143,630 | Contract | : Removal of drilling sump, dispose and closeure of SAFOD drilling site. | Interior, Department of / Geological Survey | 11/24/2009 |
ALION SCIENCE AND TECHNOLOGY CORPORATION | $912,821 | Contract | : Technical and production management services during the detail design and construction for the vessels upon the successful award of a contract for contract drawings, detail design and a two vessel construction contract. This effort will include review an | Interior, Department of / Geological Survey | 12/08/2009 |
NANOMETRICS INC | $498,400 | Contract | : Supply of T120PA seismometers and accessories for seismic studies. | Interior, Department of / Geological Survey | 11/02/2009 |
NEUBUS, INC. | $150,699 | Contract | : This project is to provide document conversion services for approximately 710 boxes of paper recovery records to Bird Banding Laboratory (BBL). Neubus will deliver approximately 1 million digitized documents in PDF format to BBL. | Interior, Department of / Geological Survey | 11/20/2009 |
OMEGA ENGINEERING INC. | $10,071 | Contract | : Temperature Probes | Interior, Department of / Geological Survey | 10/09/2009 |
PLASCHEM SUPPLY & CONSULTING INC | $134,200 | Contract | : This award allowed us to retain 3 trained employees for the term of the contract. | Interior, Department of / Geological Survey | 12/01/2009 |
MOD ELECTRONICS INC | $17,894 | Contract | : GPS Clocks | Interior, Department of / Geological Survey | 12/08/2009 |
J-SYSTEMS, INC. | $26,000 | Grant | Geologic Sequestration Training and Research Grant Program: ARRA-SV0001J Camera Sys Network Camera System | Interior, Department of / Geological Survey | 12/23/2009 |
VAISALA INC. | $42,326 | Contract | : incremental shaft encoder | Interior, Department of / Geological Survey | 9/30/2009 |
SONTEK/YSI INC | $116,050 | Contract | : Floating platforms for use with Acoustic Doppler Profilers: 17 Riverboat for M9/S5; 28 Hydroboard for S5/M9 Small | Interior, Department of / Geological Survey | 9/29/2009 |
CTA INC. | $19,113 | Contract | : Engineering Drafting Services | Interior, Department of / Geological Survey | 9/30/2009 |
CTA INC. | $70,934 | Contract | : ENGINEERING DRAFTING SERVICES-A & e SERVICES FOR IDAHO WATER SCIENCE CENTER, BLDG #3 | Interior, Department of / Geological Survey | 12/01/2009 |
CTA INC. | $41,924 | Contract | : A & E SERVICES FOR DESIGN OF MECHANICAL FIRE SPRINKLER | Interior, Department of / Geological Survey | 12/08/2009 |
RED RIVER COMPUTER CO., INC. | $74,892 | Contract | : Sun Equipment and Maint. | Interior, Department of / Geological Survey | 9/23/2009 |
NATURAL RESOURCES, WASHINGTON STATE DEPARTMENT OF | $130,000 | Grant | Volcano Hazards Program Research and Monitoring.: This project addresses the research priorities : G?G? Develop multi-hazard risk and vulnerability assessments at selected drainages around Mount Rainier (WA) using methodologies that would be applicable to other volcanic areas.G? Specifically it aimims: ... Show more | Interior, Department of / Geological Survey | 1/22/2010 |
MWE SERVICES, INC. | $102,397 | Contract | : Removal of USGS Streamguages and Cableways in Minnesota. | Interior, Department of / Geological Survey | 3/31/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $96,628 | Contract | : xSeries Servers | Interior, Department of / Geological Survey | 2/24/2010 |
WOOLPERT, INC. | $319,763 | Contract | : Detail for Ohio Completion LiDAR enhancement. | Interior, Department of / Geological Survey | 3/18/2010 |
MIKRON INFRARED, INC. | $106,480 | Contract | : Thermal Imaging Cameras | Interior, Department of / Geological Survey | 3/15/2010 |
AVAYA INC. | $76,382 | Contract | : USGS HAWAIIAN VOLC OBS - Fufill req. for new Avaya phone system to furnsih, install, label and test system and phones. Incl. 4-pair cable and jacks, and wired patch panels. | Interior, Department of / Geological Survey | 3/31/2010 |
G M R AERIAL SURVEYS, INC. | $108,136 | Contract | : Photo Science is collecting and processing LiDAR data along a section of the Tennessee River. This area is located on the Alabama-Mississippi border, running approximately 133 miles, with a total area of 152 square miles. The project runs from near Demop | Interior, Department of / Geological Survey | 3/25/2010 |
SHA-NIC, INC. | $420,552 | Contract | : Construct Modular Duplex Residence | Interior, Department of / Geological Survey | 3/24/2010 |
MWE SERVICES, INC. | $124,176 | Contract | : Removal of USGS Streamguages and Cableways in Puerto Rico. | Interior, Department of / Geological Survey | 3/18/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $57,850 | Contract | : Location and abandonment of unused groundwater monitoring wells. | Interior, Department of / Geological Survey | 3/29/2010 |
SAN FRANCISCO STATE UNIVERSITY | $457,686 | Grant | National Geospatial Program: Building The National Map: The Golden Gate Lidar Project | Interior, Department of / Geological Survey | 3/02/2010 |
COUNTY OF PIERCE | $355,575 | Grant | National Geospatial Program: Building The National Map: 2010-2011 Lidar Update for Pierce County, Washington | Interior, Department of / Geological Survey | 2/16/2010 |
TEAM HENRY ENTERPRISES, LLC | $23,076 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/05/2010 |
FLIR SYSTEMS, INC. | $103,771 | Contract | : Commercial item: Handheld Thermal Camera, Software and accessories | Interior, Department of / Geological Survey | 3/26/2010 |
MWE SERVICES, INC. | $79,401 | Contract | : Removal of USGS Streamguages and Cableways in Indiana. | Interior, Department of / Geological Survey | 3/22/2010 |
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC. | $389,481 | Grant | National Geospatial Program: Building The National Map: The aim of this project with the U.S. Geological Survey is to collect and process high resolution Light Detection And Ranging (LiDAR) data for the Tennessee portion of the Great Smoky Mountains National Park and adjacent Foothills Parkway. Our f funding beg... Show more | Interior, Department of / Geological Survey | 2/04/2010 |
COUNTY OF, PALM BEACH | $249,866 | Grant | National Geospatial Program: Building The National Map: To fly Palm Beach county for the creation of Digital OrthoImagery. | Interior, Department of / Geological Survey | 3/31/2010 |
BROWN, COUNTY OF | $251,666 | Grant | National Geospatial Program: Building The National Map: The purpose of this project is to obtain 561 square miles of LiDAR mapping in all of Brown County and part of Oconto County Wisconsin. The LiDAR data will greatly reduce the costs associated with collecting terrain and elevation information dururing the pl... Show more | Interior, Department of / Geological Survey | 2/15/2010 |
AERO-METRIC, INC | $130,961 | Contract | : USDA-NRCS has a requirement for lidar covering approximately 241 square miles in Illinois and Kentucky. Area 1 is for approximately 115 square miles in Illinois and shall be collected at a nominal pulse spacing (NPS) of 0.7 meters. Area 2 is for approxima | Interior, Department of / Geological Survey | 3/30/2010 |
MWE SERVICES, INC. | $375,272 | Contract | : Removal of USGS Streamguages and Cableways in Washington. | Interior, Department of / Geological Survey | 3/18/2010 |
KATHREIN INC., SCALA DIVISION | $80,959 | Contract | : Antennas for USGS project | Interior, Department of / Geological Survey | 3/17/2010 |
KINEMETRICS, INC. | $191,509 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/18/2010 |
YOUR RECRUITING COMPANY, INC. | $502,025 | Contract | : This requirement is to provide expertise of all phases of the full life-cycle procurement process [cradle-to-grave] with emphasis on customer service, working with other government personnel and companies offering various supplies and services. | Interior, Department of / Geological Survey | 2/14/2010 |
NATURAL RESOURCES, SOUTH CAROLINA DEPARTMENT OF | $490,700 | Grant | National Geospatial Program: Building The National Map: The South Carolina Department of Natural Resources has been coordinating a Consortium of Federal, State and local governments agencies to develop digital elevelation models using Light Detection and Ranging (LiDAR) technologies since 2007. To d date, twent... Show more | Interior, Department of / Geological Survey | 2/02/2010 |
UNAVCO, INC | $802,913 | Grant | Earthquake Hazards Reduction Program: Procure and install two tensor strainmeter instruments in California. This project includes the procurement of the instruments, reconnaissance and permitting of sites, drilling and construction, and delivery of data through September 15, 2011. These strai | Interior, Department of / Geological Survey | 1/29/2010 |
REFRACTION TECHNOLOGY INC. | $423,562 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE053. | Interior, Department of / Geological Survey | 3/18/2010 |
KINEMETRICS, INC. | $89,880 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/16/2010 |
YSI INCORPORATED | $1,074,199 | Contract | : Acoustic Doppler instruments used to measure water flow: 4 Flowtrackers, 32 RiverSurveyor M9 and power communication modules, 1 RiverSurveyor S5 and power communication module | Interior, Department of / Geological Survey | 3/30/2010 |
NANOMETRICS INC | $38,540 | Contract | : 10 Titan accelerometers and 10 cables | Interior, Department of / Geological Survey | 3/18/2010 |
SOUTHERN METHODIST UNIVERSITY INC | $249,949 | Grant | Volcano Hazards Program Research and Monitoring.: Infrastructure and Support for Monitoring Volcanoes of the Commonwealth of the Northern Mariana Islands Volcanic eruptions within the Commonwealth of the Northern Mariana Islands (CNMI) threaten commercial and military aviation and local economies, a and c... Show more | Interior, Department of / Geological Survey | 12/31/2009 |
G M R AERIAL SURVEYS, INC. | $456,911 | Contract | : Photo Science will acquire and process digital orthophotography for the northern portion of New Hampshire. This area is estimated at approximately 5,772 square miles (including water). This will include high resolution 0.30 meter (one foot) 4-band ortho | Interior, Department of / Geological Survey | 3/30/2010 |
AERO-METRIC, INC | $160,236 | Contract | : This task order requests LiDAR surveys be collected over a 407 square mile area located in western Nebraska as defined by Attachments A and B. The State of Nebraska is at a critical juncture in the management of water-resources. Legislation has required t | Interior, Department of / Geological Survey | 3/25/2010 |
UNIVERSITY OF WASHINGTON | $44,115 | Grant | Volcano Hazards Program Research and Monitoring.: We will use WWLLN lightning location data to develop the software for an explosive volcano monitor. We will augment the WWLLN coverage in Alaska by installing a new WWLLN station in Alaska. Other than travel to install a new station, there is no temempora... Show more | Interior, Department of / Geological Survey | 2/02/2010 |
MWE SERVICES, INC. | $39,163 | Contract | : Removal of USGS Streamguages and Cableways in New Hampshire. | Interior, Department of / Geological Survey | 3/30/2010 |
CENTRAL WASHINGTON UNIVERSITY INC | $694,350 | Grant | Earthquake Hazards Reduction Program: The Pacific Northwest Geodetic Array (PANGA) is comprised of 134 continuously operating, high-sample rate GPS receivers whose data is telemetered in real-time to Central Washington University. These receivers straddle the Cascadia megathrust forearc and | Interior, Department of / Geological Survey | 1/28/2010 |
CENTRAL MICHIGAN UNIVERSITY (INC) | $391,949 | Grant | National Geospatial Program: Building The National Map: Lidar Data Acquistion and Processing Covering Iosco, Arenac, an Bay County on Michigan's Lower Pennisula: In an attempt to provide scientific data to address the environmental challenges facing the Great Lakes coastal wetlands, we propose to acqcquire airbo... Show more | Interior, Department of / Geological Survey | 3/31/2010 |
C & S PRODUCTS, INC. | $55,203 | Contract | : Video teleconference equipment | Interior, Department of / Geological Survey | 2/22/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $23,950 | Contract | : Location and abandonment of unused groundwater monitoring wells | Interior, Department of / Geological Survey | 3/25/2010 |
DIRECTNET, INC. | $25,726 | Contract | : 42U will provide racks and filler panels for the USGS data center located in the Federal Center in Lakewood, CO. The racks provide a secure and organized storage location for IT and networking equipment. In addition, the racks and filler panels allow US | Interior, Department of / Geological Survey | 3/16/2010 |
TEAM HENRY ENTERPRISES, LLC | $20,860 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/03/2010 |
SCIPAR, INC. | $105,320 | Contract | : Solar Panels (40-65W) | Interior, Department of / Geological Survey | 3/17/2010 |
MWE SERVICES, INC. | $159,877 | Contract | : Removal of USGS Streamguages and Cableways in Massachusetts. | Interior, Department of / Geological Survey | 4/30/2010 |
CONSERVATION & NATURAL RESOURCES, PENNSYLVANIA DEPARTMENT OF | $308,851 | Grant | National Geospatial Program: Building The National Map: This project will finish processing recently collected imagery data that is critical to environmental and cultural assessments in relation to hazards related to flooding, landslides and other natural disasters. Orthoimagery is used to update hahazards maps... Show more | Interior, Department of / Geological Survey | 3/02/2010 |
AERO-METRIC, INC | $219,334 | Contract | : This task order requests LiDAR surveys be collected over Grand County Colorado. The project area is made up of three rectangular areas of interest, the main area in Grand County, and two small areas, one in Larimer County and one in Park County. Total a | Interior, Department of / Geological Survey | 1/27/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $27,381 | Contract | : xSeries Servers | Interior, Department of / Geological Survey | 2/23/2010 |
W M GREGG MASONRY | $360,000 | Contract | : Demolition of discontinued stream gauges and cableways. | Interior, Department of / Geological Survey | 3/12/2010 |
DEERFIELD VALLEY RE-FAB,INC. | $200,611 | Contract | : steel stairs ,bulkheads and sluice gates | Interior, Department of / Geological Survey | 2/02/2010 |
ST LUCIE, COUNTY OF | $80,000 | Grant | National Geospatial Program: Building The National Map: Countywide 15 cm and 30 cm GSD Ortho Imagery Update, Color and Color Infrared Photography | Interior, Department of / Geological Survey | 2/04/2010 |
INTERSCAN CORPORATION | $111,536 | Contract | : Environmental measurement devices for measuring toxic gases related to volcanic activity. Ultimate delivery schedule pending payment in accordance with our N30 day terms as invoiced. Tentative delivery schedule as follows: SO2 and H2S Analyzers: Week o | Interior, Department of / Geological Survey | 3/29/2010 |
GEOTECH INSTRUMENTS LLC | $46,410 | Contract | : Geotech Model PA-23 Accelerometer, 15 units | Interior, Department of / Geological Survey | 3/29/2010 |
KINEMETRICS, INC. | $1,667,541 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/12/2010 |
WORLD WIDE TECHNOLOGY, INC. | $50,370 | Contract | : Real Time and Post Processing Servers | Interior, Department of / Geological Survey | 3/19/2010 |
SACRED POWER, CORPORATION | $36,255 | Contract | : to insiall a PV system in New Mexico and Florida | Interior, Department of / Geological Survey | 3/31/2010 |
BLUESCOPE CONSTRUCTION, INC. | $256,119 | Contract | : Provide new fire alarm and fire suppression system in the Maintenance/Garage located at National Wildlife Health Center, Madison, WI. In addition, connect the new fire alarm system to the Main Building's annuciator panel. Upgrade Tight Isolation Buildin | Interior, Department of / Geological Survey | 3/26/2010 |
SOUTHERN NEVADA WATER AUTHORITY | $180,000 | Grant | National Geospatial Program: Building The National Map: The project will complete 540 square-miles of high-resolution, color and infrared aerial imagery in the Las Vegas Metropolitan area. These activities will aid efforts to identify new opportunities and approaches to water conservation in the Lasas Vegas Val... Show more | Interior, Department of / Geological Survey | 2/17/2010 |
YSI INCORPORATED | $498,833 | Contract | : Acoustic doppler instruments used to measure water flow: 45 Flowtrackers, 6 Shallow Water (SW's), 30 Side Looking Argonauts (ASL) | Interior, Department of / Geological Survey | 3/29/2010 |
REFRACTION TECHNOLOGY INC. | $21,770 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAV072. | Interior, Department of / Geological Survey | 3/15/2010 |
LI-COR, INC. | $50,994 | Contract | : Continuous CO2 Flux Monitoring System | Interior, Department of / Geological Survey | 3/19/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $24,200 | Contract | : Location and abandonment of unused groundwater monitoring wells in Indiana. | Interior, Department of / Geological Survey | 3/31/2010 |
SUTRON CORPORATION | $844,226 | Contract | : HIGH DATA RATE GOES DATA COLLECTION PLATFORM EQUIPMENT | Interior, Department of / Geological Survey | 4/08/2010 |
PORTER SCIENTIFIC, INC. | $130,400 | Contract | : Refurbishment of 250mg Waterspheriod Water Tower: Porject requires cleaning and painting of interior and exterior of complete tower. | Interior, Department of / Geological Survey | 3/23/2010 |
IODYNAMIX, INC. | $7,105 | Contract | : Purchase of computer hardware for data back up solution. | Interior, Department of / Geological Survey | 2/10/2010 |
G M R AERIAL SURVEYS, INC. | $116,981 | Contract | : Photo Science is collecting and processing LiDAR data for approximately 380 square miles in Stone County, Missouri. Photo Science is responsible for completing acquisition of the project area at the required data density and for the processing of data to | Interior, Department of / Geological Survey | 2/04/2010 |
KINEMETRICS, INC. | $105,473 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/18/2010 |
COULEE REGION MECHANICAL CONTRACTORS, INC | $89,077 | Contract | : Replace Humidifiers in ER Station Air Handlers | Interior, Department of / Geological Survey | 9/23/2009 |
YSI INCORPORATED | $452,285 | Contract | : Acoustic doppler instruments used to measure water flow: 37 Flowtrackers, 10 Shallow Water (SW's), 21 Side Looking Argonauts (ASL), 5 Extended Range Argonauts (AXR) | Interior, Department of / Geological Survey | 3/31/2010 |
IODYNAMIX, INC. | $10,551 | Contract | : Computer hardward for data backup, disaster recovery. | Interior, Department of / Geological Survey | 1/12/2010 |
JOHN C. SMITH CONTRACTING, INC. | $55,900 | Contract | : STREAMGAGE AND CABLEWAY DEMOLITION | Interior, Department of / Geological Survey | 3/16/2010 |
SUTRON CORPORATION | $429,693 | Contract | : DATA COLLECTION EQUIPMENT | Interior, Department of / Geological Survey | 3/30/2010 |
JOHN C. SMITH CONTRACTING, INC. | $70,400 | Contract | : streamgage demolition contract# G10PC00045 UNDER THREE ORDERS# G10PD00790 ($70,400), G10PD01010 ($55,900), G10PD01235 ($51,600) | Interior, Department of / Geological Survey | 3/17/2010 |
KATYLYST INTEGRATION | $288,412 | Contract | : SOFTWARE DESIGN IMPLEMENTATION SERVICES | Interior, Department of / Geological Survey | 2/21/2010 |
SERCEL INC | $134,281 | Contract | : SUPPLY THE USGS WITH NEW SEISMIC SENSORS | Interior, Department of / Geological Survey | 3/03/2010 |
KINEMETRICS, INC. | $66,427 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/25/2010 |
KINEMETRICS, INC. | $243,508 | Contract | : Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/31/2010 |
G M R AERIAL SURVEYS, INC. | $494,270 | Contract | : Photo Science is collecting and processing LiDAR data for approximately 2,000 square miles of the Lake Lanier, Georgia area. This includes all of Union, Towns, Rabun, White, Habersham, and Hall Counties; and portions of Lumpkin, Dawson, Forsyth, and Gwin | Interior, Department of / Geological Survey | 2/19/2010 |
INTUICOM, INC. | $435,260 | Contract | : Manufacture of the following deliverables: Item 1) Qty 326 of Intuicom Model EB-3 Plus Data Transceiver at $910.00 each - Extended Total: $296,660; Item 2) Qty 126 of Intuicom Model EB-6 Plus Data Transceiver at $1100.00 each - Extended Total: $138,600 | Interior, Department of / Geological Survey | 3/18/2010 |
ARCHITECTURAL DESIGN WEST INC | $84,773 | Contract | : design and replacement of an existing security booth and road replacement | Interior, Department of / Geological Survey | 3/26/2010 |
ENVIRONMENTAL DESIGN & CONSTRUCTION, L.L.C. | $378,972 | Contract | : Reduction of the facility footprint and restoration of habitat through asset reduction. Demolishing approximatlely 47 assets that are dilapidated, unused , unsafe or otherwise excess research structures. | Interior, Department of / Geological Survey | 3/30/2010 |
MWE SERVICES, INC. | $13,850 | Contract | : Removal of USGS Streamguages and Cableways in Connecticut. | Interior, Department of / Geological Survey | 3/16/2010 |
TEAM HENRY ENTERPRISES, LLC | $34,514 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/04/2010 |
AFAR COMMUNICATIONS, INC | $75,366 | Contract | : Supply of 53 data radio units to USGS. | Interior, Department of / Geological Survey | 3/23/2010 |
BRYAN GEOPHYSICAL LLC | $258,833 | Contract | : research supporting and development of algorithms for computation of magnitudes of and determination of the physics of faulting in large earthquakes | Interior, Department of / Geological Survey | 1/29/2010 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $190,000 | Grant | Earthquake Hazards Reduction Program: The program announcement 10HQPA0008 through the United States Geological Survey's (USGS) National Earthquake Hazards Reduction Program (NEHRP) entitled, Proposals for Upgrades to Crustal Deformation Monitoring Systems under the American Recovery and Reinv | Interior, Department of / Geological Survey | 2/25/2010 |
MCC DEVELOPMENT, INC. | $57,476 | Contract | : Shop fabrication, delivery & installation of FISC Chem Storage Building (DM0018)for ARRA Facility at USGS. | Interior, Department of / Geological Survey | 2/25/2010 |
UNAVCO, INC | $582,524 | Grant | Earthquake Hazards Reduction Program: Install 8 permanent GPS Stations in Northern California. This project includes procurement of station materials, reconnaissance and permitting of sites, and construction. UNAVCO will install telecommunications infrastructure and antennas pointed to USGS t | Interior, Department of / Geological Survey | 1/29/2010 |
APPLIED GEOMECHANICS INC | $87,850 | Contract | : Lily Tiltmeters: High-precision, digital, self-leveling borehole tiltmeters | Interior, Department of / Geological Survey | 1/13/2010 |
MWE SERVICES, INC. | $207,995 | Contract | : Removal of USGS Streamguages and Cableways in Oregon. | Interior, Department of / Geological Survey | 3/11/2010 |
TEAM HENRY ENTERPRISES, LLC | $46,466 | Contract | : Demolition of streamgage and cableways. | Interior, Department of / Geological Survey | 3/02/2010 |
DESIGN ANALYSIS ASSOCIATES, INC. | $81,945 | Contract | : Provide Hydrological Instrumentation: 111 GOES Antenna with pole mount, 9 Data Logger with integrated GOES Transmitter, 10 Voice Capability/Data Modem | Interior, Department of / Geological Survey | 3/30/2010 |
TEAM HENRY ENTERPRISES, LLC | $91,963 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/26/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $101,100 | Contract | : Location and abandonment of unused groundwater monitoring wells. | Interior, Department of / Geological Survey | 3/31/2010 |
TRIMBLE NAVIGATION LIMITED | $75,390 | Contract | : SURVEY PRODUCT IS BEING PURCHASED. | Interior, Department of / Geological Survey | 3/31/2010 |
COASTAL ENVIRONMENTAL SYSTEMS, INC | $122,889 | Contract | : Environmental monitoring equipment deployment for areas in proximity to volcanos in Alaska and Hawaii. | Interior, Department of / Geological Survey | 2/18/2010 |
MWE SERVICES, INC. | $527,762 | Contract | : Removal of USGS Streamguages and Cableways in California. | Interior, Department of / Geological Survey | 2/24/2010 |
TEAM HENRY ENTERPRISES, LLC | $40,813 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/05/2010 |
WOOLPERT, INC. | $165,601 | Contract | : The collecting and processing of LiDAR and ground control over a 1,810 square mile area in Ingham, Eaton and Clinton counties, MI | Interior, Department of / Geological Survey | 3/18/2010 |
TECHNICAL COMMUNITIES, INC. | $38,892 | Contract | : Anritsu S332E cable and antenna analyzer | Interior, Department of / Geological Survey | 3/31/2010 |
PENNRAM DIVERSIFIED MANUFACTURING CORPORATION | $71,050 | Contract | : Replacement and installation of incinerator and Disposal of Existing Incinerator in accordance with the Statement of Work | Interior, Department of / Geological Survey | 3/18/2010 |
REFRACTION TECHNOLOGY INC. | $122,215 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE071. | Interior, Department of / Geological Survey | 3/31/2010 |
INSTRUMENTAL SOFTWARE TECHNOLOGIES | $114,848 | Contract | : Software development for the volcano hazards program | Interior, Department of / Geological Survey | 3/01/2010 |
KINEMETRICS, INC. | $158,204 | Contract | : Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/31/2010 |
NORSEMAN, INC. | $37,345 | Contract | : 3 Phase Uninterpretable power supply | Interior, Department of / Geological Survey | 3/31/2010 |
GURALP SYSTEMS LTD | $248,900 | Contract | : BroadBand seismometers for the US Geological Survey. | Interior, Department of / Geological Survey | 3/30/2010 |
6K SWPPP, LLC | $377,420 | Contract | : Demolition and removal of discontinued streamgages and cableways from various locations throughout the state of Arizona. | Interior, Department of / Geological Survey | 3/10/2010 |
TEAM HENRY ENTERPRISES, LLC | $34,522 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/16/2010 |
MWE SERVICES, INC. | $89,192 | Contract | : Removal of USGS Streamguages and Cableways in Indiana. | Interior, Department of / Geological Survey | 3/18/2010 |
BW TECHNOLOGIES LTD | $25,090 | Contract | : Personal gas monitors for Sulfur Dioxide. | Interior, Department of / Geological Survey | 12/16/2009 |
POWER SYSTEMS ENGINEERING | $42,203 | Contract | : Furnish, Deliver, Install and Startup one Uninterruptilbe Power Supply. | Interior, Department of / Geological Survey | 3/31/2010 |
KINEMETRICS, INC. | $1,961,763 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/09/2010 |
PC MALL GOV INC | $17,036 | Contract | : SOFTWARE AND MAINTENANCE | Interior, Department of / Geological Survey | 2/22/2010 |
MWE SERVICES, INC. | $328,947 | Contract | : Removal of USGS Streamguages and Cableways in Alaska. | Interior, Department of / Geological Survey | 3/25/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $35,000 | Contract | : Location and abandonment of unused groundwater monitoring wells. | Interior, Department of / Geological Survey | 3/31/2010 |
UNIVERSITY OF SOUTH FLORIDA | $159,781 | Grant | Volcano Hazards Program Research and Monitoring.: This proposal is in response to a USGS ARRA solicitation for two components of interrelated work: A research component aimed at understanding precursory patterns of unrest during the 2009 erruption sequence at Redoubt Volcano and testing the applicabibility... Show more | Interior, Department of / Geological Survey | 1/07/2010 |
TEAM HENRY ENTERPRISES, LLC | $62,316 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/04/2010 |
TEAM HENRY ENTERPRISES, LLC | $41,720 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/05/2010 |
GAINESVILLE STATE COLLEGE | $485,390 | Contract | : Acquisition and analysis of high spatial resolution orthoimagery for the Great Smokey Mountain National Park and the Chattahoochee National Forest | Interior, Department of / Geological Survey | 3/02/2010 |
HYDROLOGICAL SERVICES AMERICA LLC | $204,297 | Contract | : Supply of Remote Controlled Cableway Systems & ancilliary equipment for Gauging Rivers. | Interior, Department of / Geological Survey | 9/29/2009 |
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $6,012,164 | Contract | : Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan | Interior, Department of / Geological Survey | 3/24/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $47,900 | Contract | : Location and abandonment of unused groundwater monitoring wells in Indiana. | Interior, Department of / Geological Survey | 3/24/2010 |
JOHN C. SMITH CONTRACTING, INC. | $51,600 | Contract | : STREAMGAGE AND CABLEWAY DEMOLITION | Interior, Department of / Geological Survey | 3/30/2010 |
DEERFIELD VALLEY RE-FAB,INC. | $91,960 | Contract | : 3 ton overhead crane | Interior, Department of / Geological Survey | 1/26/2010 |
DESIGN ANALYSIS ASSOCIATES, INC. | $506,785 | Contract | : Provide Hydrological Instrumentation: 77 High Data Rate (HDR) GOES Data Collection Platform (DCP) with logger and radio, 25 High Data Rate (HDR) GOES Data Collection Platform (DCP), 5 Combination Non-Submersible Pressure Sensor (0-15 psi) Gas System and D | Interior, Department of / Geological Survey | 3/31/2010 |
APPLIED REMEDIATION COMPANY, INC. | $586,016 | Contract | : Locate and Abandon 41 Abandoned Groundwater Monitoring Wells throughout the State of California. | Interior, Department of / Geological Survey | 3/05/2010 |
MET ONE INSTRUMENTS, INC. | $187,622 | Contract | : Manufacture and delivery of Particulate Monitors, per USGS specifications in solicitation # 10WRQQ0128 | Interior, Department of / Geological Survey | 3/31/2010 |
TEAM HENRY ENTERPRISES, LLC | $59,550 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/02/2010 |
KINEMETRICS, INC. | $24,581 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 1/04/2009 |
ALACHUA COUNTY PROPERTY APPRAISER | $100,000 | Grant | National Geospatial Program: Building The National Map: 30-centimeter, high-resolution color orthoimagery is based on a draft high-resolution imagery specification under development at the U.S. Geological Survey for Alachua County | Interior, Department of / Geological Survey | 2/16/2010 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $440,000 | Grant | Earthquake Hazards Reduction Program: In the San Francisco Bay Area, two million people live in a geologically complex, tectonically active region that has experienced several historic earthquakes. Geodetic measurements show that Bay Area deformation is both spatially complex and varies with | Interior, Department of / Geological Survey | 2/15/2010 |
APPLIED GEOMECHANICS INC | $215,620 | Contract | : Lily Tiltmeters: High-precision, digital, self-leveling borehole tiltmeters | Interior, Department of / Geological Survey | 3/31/2010 |
KINEMETRICS, INC. | $1,147,862 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/12/2010 |
G M R AERIAL SURVEYS, INC. | $179,377 | Contract | : Photo Science is collecting and processing LiDAR data for approximately 700 square miles just east of Mobile Bay, Alabama. The goal of the project in the post-Katrina environment is to provide scientific knowledge and tools required to make optimal decis | Interior, Department of / Geological Survey | 2/03/2010 |
WOOLPERT, INC. | $79,796 | Contract | : Sandy River LiDAR collection. Woolpert will be collecting and processing LiDAR and ground control over a 25.3 square mile area in Oregon. Work will begin in September due to river waterflow patterns. | Interior, Department of / Geological Survey | 3/18/2010 |
ENGINEERED EQUIPMENT COMPANY OF ALASKA, INC. | $91,541 | Contract | : Battery, 12VDC, Lead/Acid, AGM | Interior, Department of / Geological Survey | 3/12/2010 |
BLUESCOPE CONSTRUCTION, INC. | $724,034 | Contract | : Install new fire alarm sprinkler for Upper R & D, Lower R & D, and Maintennace Building; install fire sprinkler for Upper R & D including site piping. located at Tunison Labratory of Aquatic Science, Courtland, NY. In addition, install fire sprinkler sys | Interior, Department of / Geological Survey | 3/29/2010 |
TEAM HENRY ENTERPRISES, LLC | $123,753 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/29/2010 |
REFRACTION TECHNOLOGY INC. | $255,014 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE024. | Interior, Department of / Geological Survey | 3/17/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $72,150 | Contract | : Location and abandonment of unused groundwater monitoring wells. | Interior, Department of / Geological Survey | 3/31/2010 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $62,200 | Grant | Earthquake Hazards Reduction Program: Title: Infrastructure Upgrades and Repairs for Improved Monitoring of Crustal Deformation at Pinon Flat and Durmid Hill. Description: Efforts supported by this award are to improve the long-term reliability of the long baseline strainmeters l | Interior, Department of / Geological Survey | 1/27/2010 |
AERO-METRIC, INC | $139,377 | Contract | : This task order requests LiDAR surveys be collected over eight sites in Indiana which comprise approximately 297 total square miles. The lidar data of this task order will be used to develop libraries of flood inundation maps for use by Federal, State, a | Interior, Department of / Geological Survey | 1/27/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $50,400 | Contract | : Location and abandonment of unused groundwater monitoring wells | Interior, Department of / Geological Survey | 3/31/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $14,199 | Contract | : IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Interior, Department of / Geological Survey | 4/01/2010 |
MWE SERVICES, INC. | $203,553 | Contract | : Removal of USGS Streamguages and Cableways in Minnesota. | Interior, Department of / Geological Survey | 3/31/2010 |
TEAM HENRY ENTERPRISES, LLC | $40,131 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/08/2010 |
MWE SERVICES, INC. | $16,238 | Contract | : Removal of USGS Streamguages and Cableways in Wisconsin. | Interior, Department of / Geological Survey | 3/23/2010 |
PERINI MANAGEMENT SERVICES INC | $35,483 | Contract | : Construction Services for the upgrade,repair,and replacement at Building 5 | Interior, Department of / Geological Survey | 3/24/2010 |
REFRACTION TECHNOLOGY INC. | $621,980 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE058/0001. | Interior, Department of / Geological Survey | 3/23/2010 |
AIR STREAM GENERAL CONSTRUCTION, INC. | $29,347 | Contract | : 10 ton air conditioner | Interior, Department of / Geological Survey | 2/22/2010 |
HOV SERVICES, INC. | $293,160 | Contract | : Microfilm scanning and Data Capture Services. | Interior, Department of / Geological Survey | 10/15/2009 |
REFRACTION TECHNOLOGY INC. | $376,136 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAV038. | Interior, Department of / Geological Survey | 3/29/2010 |
SOUTHERN EXCAVATING LLC | $95,743 | Contract | : Demolition of Discontinued Streamgages and Cableways | Interior, Department of / Geological Survey | 4/07/2010 |
GERALD TAYLOR & CO INC | $99,800 | Contract | : Dredge ponds | Interior, Department of / Geological Survey | 1/22/2010 |
CONSERVATION & NATURAL RESOURCES, PENNSYLVANIA DEPARTMENT OF | $350,000 | Grant | National Geospatial Program: Building The National Map: The project will finish processing recently collected digital data. This data is used to create a three dimensional image, or map of areas that are prone to flooding, landslides and other naturally occurring events. This data, coupled with ththe orthoima... Show more | Interior, Department of / Geological Survey | 3/02/2010 |
TEAM HENRY ENTERPRISES, LLC | $145,990 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/31/2010 |
KINEMETRICS, INC. | $76,247 | Contract | : Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Interior, Department of / Geological Survey | 3/29/2010 |
TEAM HENRY ENTERPRISES, LLC | $45,451 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/22/2010 |
SACRED POWER, CORPORATION | $36,255 | Contract | : Provide and integrate a 1300 watt, 24 VDC, stand alone, PV, grid tie, pole top, power system, Albuquerque, NM Provide and integrate a 1300 watt, 24 VDC, stand alone, PV, grid tie, pole top, power system, disney Wilderness Preserve, FL | Interior, Department of / Geological Survey | 3/31/2009 |
REFRACTION TECHNOLOGY INC. | $14,588 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE062. | Interior, Department of / Geological Survey | 3/26/2010 |
UNIVERSITY OF WEST GEORGIA | $491,214 | Grant | National Geospatial Program: Building The National Map: Extending the LiDar Project of Coastal Regional Commission of Georgia to Okefenokee National Wildlife Refuge | Interior, Department of / Geological Survey | 2/12/2010 |
ADVANCED GEOSCIENCES, INC. | $48,606 | Contract | : Purchase of AGI earth resistivity/IP system by USGS South Dakota for groundwater detection and monitoring | Interior, Department of / Geological Survey | 2/05/2010 |
TEAM HENRY ENTERPRISES, LLC | $23,296 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/15/2010 |
LAKE, COUNTY OF | $161,269 | Grant | National Geospatial Program: Building The National Map: The purpose of the grant is to process countywide LiDAR data captured in 2007. In 2007 the county contracted with Merrick & Company to acquire high resolution color aerial imagery. The vendor used an aircraft also equipped with a LiDAR system. . On specula... Show more | Interior, Department of / Geological Survey | 3/31/2010 |
BLUESCOPE CONSTRUCTION, INC. | $359,546 | Contract | : Supply and Erect a Single Family Residence - Laurel MD. | Interior, Department of / Geological Survey | 3/31/2010 |
SOUTHEAST MICHIGAN COUNCIL OF GOVERNMENTS | $234,316 | Grant | National Geospatial Program: Building The National Map: 2010 Southeast Michigan Council of Governments Lidar Acquisition Project. SEMCOG will collect LiDAR data at 1.5-meter average post spacing for the Livingston, Macomb, Monroe, and St. Clair counties in the Spring of 2010, to align with the 2008 a and 2009 da... Show more | Interior, Department of / Geological Survey | 2/22/2010 |
MWE SERVICES, INC. | $405,005 | Contract | : Removal of USGS Streamguages and Cableways in Indiana. | Interior, Department of / Geological Survey | 3/25/2010 |
TEAM HENRY ENTERPRISES, LLC | $101,395 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/19/2010 |
NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT | $225,000 | Grant | Earthquake Hazards Reduction Program: Grant awarded for the acquisition/processing of LiDAR data in Liberty County, Florida. | Interior, Department of / Geological Survey | 2/18/2010 |
CONTRACTING SPECIALISTS INCORPORATED | $73,746 | Contract | : SOS Building Masonry Sealing | Interior, Department of / Geological Survey | 1/21/2010 |
GEOVISION, INC. | $498,909 | Contract | : Geotechnical (Vs30) site measurements at 189 sites | Interior, Department of / Geological Survey | 3/31/2010 |
NANOMETRICS INC | $18,985 | Contract | : 5 Titan accelerometers and 5 cables | Interior, Department of / Geological Survey | 3/25/2010 |
NANOMETRICS INC | $274,200 | Contract | : 20 trillium 120 seismometers, 20 trillium 120 insulating covers | Interior, Department of / Geological Survey | 3/17/2010 |
NANOMETRICS INC | $151,510 | Contract | : broadband seismometer package | Interior, Department of / Geological Survey | 1/15/2010 |
TEAM HENRY ENTERPRISES, LLC | $86,919 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/19/2010 |
DEWBERRY & DAVIS LLC | $239,958 | Contract | : LiDAR elevation data and derivative products. Elevation data are used for cost-effective analyses of vegetation, flood hazards. effects of sea level change, hydrologic and hydraulic modeling, and diverse land/resource mananagement applications. | Interior, Department of / Geological Survey | 3/23/2010 |
DEWBERRY & DAVIS LLC | $231,757 | Contract | : Geospatial Products and Services Contract for photogrammetric mapping, survey and control services, including cadastral surveying, aerotriangulation, multi-sensor aircraft data acquisition including LiDAR, and first generation orthophotography. | Interior, Department of / Geological Survey | 2/25/2010 |
DEWBERRY & DAVIS LLC | $405,399 | Contract | : Geospatial Products and Services Contract for photogrammetric mapping, survey and control services, including cadastral surveying, aerotriangulation, multi-sensor aircraft data acquisition including LiDAR, and first generation orthophotography. | Interior, Department of / Geological Survey | 2/25/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $1,083,054 | Contract | : IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Interior, Department of / Geological Survey | 3/31/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $53,928 | Contract | : IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Interior, Department of / Geological Survey | 3/31/2010 |
PROTECTIVE SECURITY, INC. | $317,483 | Contract | : To Furnish and Install access control, video surveillance, and intercom security at the Patuxent Research Refuge in Laurel Md. HSPD-12 compliant. | Interior, Department of / Geological Survey | 3/30/2010 |
TISSA ENTERPRISES, INC. | $52,720 | Contract | : Replace roof on pumphouse A & B | Interior, Department of / Geological Survey | 2/02/2010 |
EAGLE DEER RESERVE LIMITED | $66,000 | Contract | : Demolish Stream gages and restore ground to origial condition | Interior, Department of / Geological Survey | 1/08/2010 |
TELEDYNE RD INSTRUMENTS, INC. | $500,540 | Contract | : Purchase of Discharge Measurement Systems wth Flotation Devices, Acoustic Doppler Current Profilers (ADCP). | Interior, Department of / Geological Survey | 3/30/2010 |
DELAWARE CORNERSTONE BUILDERS, INC. | $794,539 | Contract | : Renovate Owl/Kestrel Pen Areas | Interior, Department of / Geological Survey | 4/21/2010 |
LGS INNOVATIONS LLC | $1,478,971 | Contract | : The USGS Northern California Seismic Network (NCSN) and Southern California Seismic Network (SCSN) have issued a comprehensive contract to LGS to provide all of the equipment and services needed to make these sites operational as part of the microwave net | Interior, Department of / Geological Survey | 6/30/2010 |
ALL AMERICAN EQUIPMENT | $223,551 | Contract | : LOCATING AND ABANDONING WELLS | Interior, Department of / Geological Survey | 4/07/2010 |
S.E.T. - PACIFIC, INC. | $35,151 | Contract | : Contractor to provide all tools, equipment, labor and supervision necessary to complete the electrical upgrades in accordance with the Statement of Work. | Interior, Department of / Geological Survey | 4/19/2010 |
GAINESVILLE STATE COLLEGE | $485,390 | Grant | National Geospatial Program: Building The National Map: Acquisition and analysis of high spatial resolution orthoimagery for the Great Smokey Mountain National Park and the Chattahoochee National Forest | Interior, Department of / Geological Survey | 3/02/2010 |
BLUESCOPE CONSTRUCTION, INC. | $10,084,998 | Contract | : Award for turn-key Design/Build construction of the Columbia Environmental Reserch Center for the USGS in Columbia, MO. Work includes design, site work, site utilities, concrete, mechanical, electrical, casework, finishes, demolition of existing structur | Interior, Department of / Geological Survey | 4/16/2010 |
BLUESCOPE CONSTRUCTION, INC. | $1,696,319 | Contract | : Remove and Replace Roofing on 1. Fish Passage Complex -16,000 sq. ft. 2. Research Lab -16,000 sq. ft. 3. Vehicle Storage Bldg -4,000 sq. ft. Construct new Fish Lab Building- 3,000 sq.ft. | Interior, Department of / Geological Survey | 4/30/2010 |
AERO-METRIC, INC | $95,238 | Contract | : For this project, Aero-Metric is acquiring new 2010 lidar data at a nominal pulse spacing (NPS) of 2.0 meters in conjunction with the task order. Aero-MetricG??s services include: planning, acquisition, processing, and derivative products of lidar data. A | Interior, Department of / Geological Survey | 6/02/2010 |
CAMPBELL SCIENTIFIC, INC. | $76,909 | Contract | : Meteor Comm. Equiptment | Interior, Department of / Geological Survey | 5/05/2010 |
AMERICAN ENVIRONMENTAL CORPORATION | $57,600 | Contract | : Location and abandonment of unused groundwater monitoring wells | Interior, Department of / Geological Survey | 4/07/2010 |
TEAM HENRY ENTERPRISES, LLC | $29,014 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/19/2010 |
HOV SERVICES, INC. | $293,160 | Contract | : Microfilm Scanning and Data Capture Services | Interior, Department of / Geological Survey | 10/26/2009 |
PRESSURE SYSTEMS INCORPORATED | $86,189 | Contract | : Manufacture & ship 81 units of SDI 12 Submersible Transducers used for environmental monitoring | Interior, Department of / Geological Survey | 4/08/2010 |
ROWE DRILLING COMPANY, INC. | $35,065 | Contract | : Completed all paperwork and administrative services per the contract and submitted to the proper authority | Interior, Department of / Geological Survey | 3/19/2010 |
HORRY, COUNTY OF | $297,449 | Contract | : To expand employment and business opportunities within a key sector of geospatial industry while enabling America to revitalize its physical infrasturcture, improve public safety, and adapt to climate change through the collection of high-resolution lidar | Interior, Department of / Geological Survey | 2/02/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $192,500 | Contract | : locate or decommission monitor wells in Washington State no longer in use | Interior, Department of / Geological Survey | 3/24/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $33,270 | Contract | : xSeries Servers | Interior, Department of / Geological Survey | 4/09/2010 |
GREAT LAKES TOWING COMPANY, THE | $274,100 | Contract | : R/V KIYI - Furnish and Install New Anchor Handling System | Interior, Department of / Geological Survey | 4/01/2010 |
BLUESCOPE CONSTRUCTION, INC. | $528,510 | Contract | : Remediation of Waste Water Treament Facility. Includes install UV system, UV building and upgrade electrical service located at Upper Midwest Environmental Services Center. In addition, refurbish existing secondary pond with new liner, geotextile and li | Interior, Department of / Geological Survey | 3/26/2010 |
G M R AERIAL SURVEYS, INC. | $1,410,513 | Contract | : Photo Science is collecting and processing LiDAR data for approximately 5,085 square miles of the North East Coastal regions. This area is non-contiguous and covers the coastal regions of Connecticut, Massachusetts, Maine, New Hampshire, New York, and Rh | Interior, Department of / Geological Survey | 5/05/2010 |
NATIONAL SUPPLY & INSTALLATION | $39,210 | Contract | : Furnish, install, inspect, and test a vaccum pump and an air compressor. | Interior, Department of / Geological Survey | 12/29/2009 |
MACTEC ENGINEERING AND CONSULTING, INC. | $281,687 | Contract | : Design/Build services for removal of an existing ballasted EPDM (Ethylene-Propylene-Diene-Monomer) roof with a fully adhered PVC (Polyvinyl Chloride) roofing system located at EROS Science Center in Sioux Falls, SD. ARRA Project DM0053B | Interior, Department of / Geological Survey | 6/03/2010 |
GANT BRUNNETT, ARCHITECTS, INC. | $3,636,965 | Contract | : Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with | Interior, Department of / Geological Survey | 5/26/2010 |
CELAIR CORP | $73,000 | Contract | : 2AS10-2 Primary Batteries. | Interior, Department of / Geological Survey | 2/12/2010 |
HANDER INC | $81,986 | Contract | : Staged boiler with asbestos abatement | Interior, Department of / Geological Survey | 3/29/2010 |
NEUBUS, INC. | $150,699 | Contract | : This project is to provide document conversion services for approximately 710 boxes of paper recovery records to Bird Banding Laboratory (BBL). Neubus will deliver approximately 1 million digitized documents in PDF format to BBL. | Interior, Department of / Geological Survey | 11/20/2009 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $85,137 | Contract | : xSeries Servers | Interior, Department of / Geological Survey | 2/09/2010 |
APPLIED REMEDIATION COMPANY, INC. | $36,000 | Contract | : Locate and abandon 41 US Geological Survey, Sacramento, CA abandoned groundwater monitoring wells | Interior, Department of / Geological Survey | 6/02/2010 |
EAGLE DEER RESERVE LIMITED | $83,000 | Contract | : Demolish stream gauges and restore ground to original condition | Interior, Department of / Geological Survey | 1/08/2010 |
TM CONSTRUCTION, INC. | $50,000 | Contract | : The Sitka Vault Demolition project consists of removing a concrete vault used for seismic monitoring at the Sitka Observatory site. A gravel road and electrical conduit will be constructed to the vault site. | Interior, Department of / Geological Survey | 6/25/2010 |
HDR ENGINEERING, INC. | $322,411 | Contract | : A&E redesign of existing heating, ventilating, and air conditioning (HVAC) system at EROS Mundt Bldg in Sioux Falls, SD. | Interior, Department of / Geological Survey | 5/26/2010 |
REFRACTION TECHNOLOGY INC. | $1,717 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAE071. | Interior, Department of / Geological Survey | 6/23/2010 |
INTELLIGENT DECISIONS, INC. | $3,420 | Contract | : ARRA Award for Monitors | Interior, Department of / Geological Survey | 4/13/2010 |
SOUTHERN EXCAVATING LLC | $44,767 | Contract | : Demolition of Discontinued Streamgages and Cableways | Interior, Department of / Geological Survey | 3/22/2010 |
MWE SERVICES, INC. | $21,970 | Contract | : Removal of USGS Streamguages in Wisconsin. | Interior, Department of / Geological Survey | 6/16/2010 |
DONE DEAL GENERAL CONSTRUCTION AND ELECTRICAL INCORPORATED | $741,856 | Contract | : Electrical & Lighting upgrades. | Interior, Department of / Geological Survey | 5/26/2010 |
PERINI MANAGEMENT SERVICES INC | $901,461 | Contract | : Construction Services to repair/Replace Electrical Distribution System at Great Lakes Science Center, Ann Arbor, MI | Interior, Department of / Geological Survey | 4/30/2010 |
DEWBERRY & DAVIS LLC | $975,273 | Contract | : LiDAR elevation data and derivative products. Elevation data are used for cost-effective analyses of vegetation, flood hazards, effects of sea level change, hydrologic and hydraulic modeling, and diverse land/resource management applications. | Interior, Department of / Geological Survey | 4/02/2010 |
PACIFIC WIRELESS COMMUNICATIONS LLC | $682,695 | Contract | : To design and install a backbone telemetry network on the Island of Hawaii for the USGS Hawaiian Volcano Observatory (HVO). The creation of this backbone will provide a single, higher performing, and more robust path for HVO to receive data from existing | Interior, Department of / Geological Survey | 5/28/2010 |
INSTRUMENTAL SOFTWARE TECHNOLOGIES | $68,416 | Contract | : Software development and installation at Alaska Volcano Observatory, Anchorage | Interior, Department of / Geological Survey | 5/07/2010 |
AMEC E&I, INC | $1,235,614 | Contract | : Seismic upgrade/retrofit of USGS (United States Geological Survey) warehouse and storage facility. DM0031. | Interior, Department of / Geological Survey | 6/28/2010 |
JEOL USA, INC. | $169,500 | Contract | : DELIVERED; INVOICED | Interior, Department of / Geological Survey | 4/07/2010 |
SUTRON CORPORATION | $650,566 | Contract | : HIGH DATA RATE GOES DATA COLLECTION PLATFORMS | Interior, Department of / Geological Survey | 6/29/2010 |
AERO-METRIC, INC | $92,795 | Contract | : Aero-Metric is to provide the USGS with aerial photograph acquisition, photographic prints, digital orthophoto production, and 2? contour generation from existing DEMs for an area covering the Kenai River corridor (from the mouth of Skilak Lake to the Coo | Interior, Department of / Geological Survey | 7/07/2010 |
GREAT LAKES TOWING COMPANY, THE | $8,589,496 | Contract | : Two (2) New Research Vessels for the Great Lakes. | Interior, Department of / Geological Survey | 6/25/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $59,500 | Contract | : locate or decommission monitor wells in Washington State no longer in use | Interior, Department of / Geological Survey | 3/31/2010 |
C3 LIMITED LIABILITY COMPANY | $77,997 | Contract | : MAINT-REP-ALT/OTHER ADMIN BLDGS | Interior, Department of / Geological Survey | 6/25/2010 |
REFRACTION TECHNOLOGY INC. | $217,104 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, and cables per United States Geological Survey requisition number 10ARRAE061. | Interior, Department of / Geological Survey | 4/01/2010 |
AERO-METRIC, INC | $10,915 | Contract | : Aero-Metric is providing the USGS with digital orthophotos from existing aerial photography covering approximately 12 square miles in Big Lake, Alaska. | Interior, Department of / Geological Survey | 6/30/2010 |
R. J. JUROWSKI CONSTRUCTION, INC. | $5,179,125 | Contract | : In general, the project will involve the construction of a new 22,700 SF, 2-level building wing addition onto the south side of the existing Segment 'C' of the Upper Midwest Environmental Sciences Center located at 2630 Fanta Reed Road. The addition will | Interior, Department of / Geological Survey | 6/30/2010 |
APPLIED REMEDIATION COMPANY, INC. | $101,930 | Contract | : Locate and abandon 41 US Geological Survey, Sacramento, CA abandoned groundwater monitoring wells | Interior, Department of / Geological Survey | 5/28/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $27,000 | Contract | : locate or decommission monitor wells in Washington State no longer in use | Interior, Department of / Geological Survey | 3/24/2010 |
INTELLIGENT DECISIONS, INC. | $5,320 | Contract | : Order for 14 24 Monitors | Interior, Department of / Geological Survey | 4/09/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $210,634 | Contract | : IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Interior, Department of / Geological Survey | 4/01/2010 |
PERINI MANAGEMENT SERVICES INC | $226,223 | Contract | : Repair and remediation of bridges and culverts at Leetown Science Center located in Kearneysville, West Virginia. | Interior, Department of / Geological Survey | 5/26/2010 |
ACTIVE ENVIRONMENTAL TECHNOLOGIES, INC. | $33,690 | Contract | : Demolition of Stream guage stations througout New Jersey | Interior, Department of / Geological Survey | 2/04/2010 |
6K SWPPP, LLC | $526,730 | Contract | : Demolition and removal of discontinued streamgages and cableways from various locations throughout the State of Arizona. | Interior, Department of / Geological Survey | 1/29/2010 |
EAGLE DEER RESERVE LIMITED | $55,000 | Contract | : Demolish stream gauges and restore ground to original condition | Interior, Department of / Geological Survey | 1/08/2010 |
SOUTHERN EXCAVATING LLC | $67,305 | Contract | : Demolition of Discontinued Streamgages and Cableways | Interior, Department of / Geological Survey | 3/09/2010 |
UNIVERSITY OF GEORGIA | $389,481 | Grant | National Geospatial Program: Building The National Map: The aim of this project with the U.S. Geological Survey is to collect and process high resolution Light Detection And Ranging (LiDAR) data for the Tennessee portion of the Great Smoky Mountains National Park and adjacent Foothills Parkway. Our f funding beg... Show more | Interior, Department of / Geological Survey | 2/04/2010 |
NANOMETRICS INC | $125,018 | Contract | : 17 trillium compact seismometers, 17 cables | Interior, Department of / Geological Survey | 4/01/2010 |
TRIMEDIA HOLDINGS, LLC | $91,160 | Contract | : Locate abandoned Michigan Wells for the United States Geological Survey | Interior, Department of / Geological Survey | 3/30/2010 |
DEWBERRY & DAVIS LLC | $999,995 | Contract | : Alaska IFSAR elevation data and derivative products. Elevation data are used for cost-effective analyses of vegetation, flood hazards, effects of sea level change, hydrologic and hydraulic modeling, and diverse land/resource management applications. | Interior, Department of / Geological Survey | 5/18/2010 |
ARK-TEX COUNCIL OF GOVERNMENTS | $310,314 | Grant | National Geospatial Program: Building The National Map: Leaf-off High Resolution Orthoimagery Data Collection in High Priority Hazard Collection Areas of Red River,Delta,Lamar and Hopkins Counties in Texas | Interior, Department of / Geological Survey | 4/30/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $847,000 | Contract | : locate or decommission monitor wells in Washington State no longer in use | Interior, Department of / Geological Survey | 3/19/2010 |
ALL AMERICAN EQUIPMENT | $170,873 | Contract | : LOCATING AND ABANDONING WELLS | Interior, Department of / Geological Survey | 3/26/2010 |
REFRACTION TECHNOLOGY INC. | $35,349 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey requisition number 10ARRAV093. | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $30,720 | Contract | : 4 trillium compact seismometers, 4 cables, 4 insulating cases | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $140,020 | Contract | : 10 Trillium 120 Seismometers, 10 Cables, 10 Insulating Covers | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $151,176 | Contract | : 8 Trillium 120 PA Seismometers with insulating case and cable, 2 Trillium compact seismometers, 1 Trillium 240 Seismometer with insulating cover, 1 10 meter cable | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $27,538 | Contract | : 3 Trillium Compact Seismometers, 4 3 meter cables, 10 5 meter cables | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $93,912 | Contract | : 13 Trillium compact seismometers, 13 cables. | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $194,602 | Contract | : 27 Trillium Compacts, 26 Cables | Interior, Department of / Geological Survey | 4/01/2010 |
NANOMETRICS INC | $66,120 | Contract | : 8 Trillium Compacts, 8 Cables, 21 Insulating cases | Interior, Department of / Geological Survey | 6/24/2010 |
MWE SERVICES, INC. | $25,074 | Contract | : Removal of USGS Streamguages and Cableways in Puerto Rico. | Interior, Department of / Geological Survey | 2/03/2010 |
JOE FUNK CONSTRUCTION ENGINEERS, INC. | $229,854 | Contract | : NARL Fish Raceway Covers | Interior, Department of / Geological Survey | 6/30/2010 |
DESIGN ANALYSIS ASSOCIATES, INC. | $297,185 | Contract | : As part of TAS: Recovery Project 14-0803 the purchase of Stream Gauge Equipment for various locations throughout the United States. This instrumentation is for ground water level monitoring - 50 DCP with full featured logger and display; 20 DCP with ful | Interior, Department of / Geological Survey | 6/29/2010 |
EAGLE DEER RESERVE LIMITED | $72,000 | Contract | : Demolish stream gages and restore ground to original condition | Interior, Department of / Geological Survey | 3/19/2010 |
UNAVCO, INC | $61,814 | Contract | : Upgrade the telemetry on 7 Yellowstone GPS stations to support 1 Hz data | Interior, Department of / Geological Survey | 6/28/2010 |
BRIDGETTE, INC | $48,906 | Contract | : 48TB 4U SAS/SATA RAID Storage System -48 Bay SAS to SAS/SATA 4U Rackmount disk enclosure, with dual disk IO Module (3) 4x SAS External connections. Triple Integrated Fan Module and N 1 Power Supplies, Integrated Enclosure Services, and pre-assembled | Interior, Department of / Geological Survey | 4/01/2010 |
APPLIED REMEDIATION COMPANY, INC. | $23,760 | Contract | : Proceed to abandon three (3) located groundwater monitoring wells. | Interior, Department of / Geological Survey | 9/15/2010 |
CONCENTRIS SYSTEMS LLC | $29,120 | Contract | : Purchase Order for 56 outdoor wireless router units. | Interior, Department of / Geological Survey | 3/24/2010 |
SUTRON CORPORATION | $3,684,407 | Contract | : High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | Interior, Department of / Geological Survey | 6/05/2009 |
GANT BRUNNETT, ARCHITECTS, INC. | $3,636,965 | Contract | : Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with | Interior, Department of / Geological Survey | 5/24/2010 |
REFRACTION TECHNOLOGY INC. | $59,335 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey's purchase requisition. | Interior, Department of / Geological Survey | 8/13/2010 |
LION AIR INC | $37,950 | Contract | : Final stream gage has been removed from Bethesda, MD. This project is complete. | Interior, Department of / Geological Survey | 3/16/2010 |
REFRACTION TECHNOLOGY INC. | $7,327 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey's purchase requisition. | Interior, Department of / Geological Survey | 8/12/2010 |
LION AIR INC | $14,380 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/23/2010 |
SYNERGETICS INCORPORATED | $252,250 | Contract | : The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien | Interior, Department of / Geological Survey | 9/18/2009 |
LION AIR INC | $111,640 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/31/2010 |
LION AIR INC | $128,430 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/31/2010 |
AERO-METRIC, INC | $733,615 | Contract | : This task order is for Planning,Acquisition, processing, and derivative products of lidar data to be collected at a nominal pulse spacing (NPS) of 2.0 meters. This task is for lidar for three (3) counties in Southern Texas, Calhoun, Willacy, and Neuces. T | Interior, Department of / Geological Survey | 9/17/2010 |
SYNERGETICS INCORPORATED | $108,443 | Contract | : The US Geological Survey Advanced National Seismic System (ANSS) National Operations Center (NOC) in Golden, Colorado has commenced the development of improved seismic monitoring and information delivery systems in response to the December, 2004, tsunami | Interior, Department of / Geological Survey | 9/18/2009 |
BLUESCOPE CONSTRUCTION, INC. | $191,557 | Contract | : Design and Construct one Earthen Dam | Interior, Department of / Geological Survey | 9/10/2010 |
EAGLE DEER RESERVE LIMITED | $106,000 | Contract | : Contract just awarded, no activity yet | Interior, Department of / Geological Survey | 3/08/2010 |
SYNERGETICS INCORPORATED | $388,253 | Contract | : The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a | Interior, Department of / Geological Survey | 9/18/2009 |
LION AIR INC | $64,710 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/31/2010 |
LION AIR INC | $76,390 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/31/2010 |
C3 LIMITED LIABILITY COMPANY | $44,500 | Contract | : Provide Title III (Construction Managment) tasks for energy savings performance contract at National Wildlife Health Center, Madison, Wisconsin - $38,500. Modification 0001 - Add Title III Construction Management services in support of Phase 2 of the Ener | Interior, Department of / Geological Survey | 9/08/2010 |
C3 LIMITED LIABILITY COMPANY | $77,997 | Contract | : DM0043B REHAB BUILDING STRUCTURES, TLAS, CORTLAND, NY | Interior, Department of / Geological Survey | 6/25/2010 |
EAGLE DEER RESERVE LIMITED | $25,000 | Contract | : demolish stream gauges and restore ground to original condition | Interior, Department of / Geological Survey | 1/08/2010 |
RED RIVER COMPUTER CO., INC. | $83,862 | Contract | : SUN ADP EQUIPMENT - SERVER & CONTROLLER | Interior, Department of / Geological Survey | 5/06/2010 |
EAGLE DEER RESERVE LIMITED | $61,000 | Contract | : Demolish stream gages and restore ground to original condition | Interior, Department of / Geological Survey | 3/17/2010 |
RED RIVER COMPUTER CO., INC. | $105,793 | Contract | : ADP Equipment - Controller, Array/Racks, Maintenance | Interior, Department of / Geological Survey | 5/06/2010 |
GEOSIG AG | $92,460 | Contract | : Provide 23 Accelerograph Appliance Units and ancillary optional equipment | Interior, Department of / Geological Survey | 2/08/2010 |
LION AIR INC | $105,660 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/31/2010 |
LION AIR INC | $26,570 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/29/2010 |
URS GROUP, INC. | $36,100 | Contract | : Inspection services during the construction of seismic upgrades to three existing buildings; # 20 Warehouse Building; # 21 Old Service Station Building and; # 22 Locomotive Repair / Fab. Shop | Interior, Department of / Geological Survey | 9/20/2010 |
POWER SYSTEMS ENGINEERING | $42,203 | Contract | : Furnish install and startup Uninterruptible power system. | Interior, Department of / Geological Survey | 3/31/2010 |
LION AIR INC | $190,660 | Contract | : Removal of stream gages | Interior, Department of / Geological Survey | 3/31/2010 |
WOOLPERT, INC. | $946,094 | Contract | : Louisiana Region 1 & 2 LiDAR collection. | Interior, Department of / Geological Survey | 9/17/2010 |
INTUICOM, INC. | $40,040 | Contract | : Manufacture of the following deliverables: Item 1) Qty 44 of Intuicom Model EB-3 Plus Data Transceiver at $910.00 each - Extended Total: $40,040.00; | Interior, Department of / Geological Survey | 8/10/2010 |
REFRACTION TECHNOLOGY INC. | $3,675 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey's purchase requisition. | Interior, Department of / Geological Survey | 5/19/2010 |
REFRACTION TECHNOLOGY INC. | $45,215 | Contract | : The manufacture and delivery of earthquake seismic equipment, which includes sensors, data acquisition system, and accelerometers per United States Geological Survey's purchase requisition. | Interior, Department of / Geological Survey | 8/13/2010 |
SWORD & SHIELD ENTERPRISE SECURITY, INC. | $38,987 | Contract | : Storage Servers | Interior, Department of / Geological Survey | 6/14/2010 |
NANOMETRICS INC | $7,921 | Contract | : 1 Trillium compact seismometer, 1 Carrying case, 1 leveling cradle , 5 M Cable | Interior, Department of / Geological Survey | 8/12/2010 |
ASSOCIATION OF MONTEREY BAY AREA GOVERNMENT | $500,000 | Grant | National Geospatial Program: Building The National Map: The proposed project would provide a more accurate elevation dataset for the Central California Coastal region that would provide valuable data to support all agencies including federal, state, and local jurisdictions in planning, infrastructurere improveme... Show more | Interior, Department of / Geological Survey | 2/16/2010 |
BLUESCOPE CONSTRUCTION, INC. | $1,626,255 | Contract | : Renovation of 24 existing research ponds including excavation,grading, repairing and replacing kettles, water distribution, concrete and electrical work. | Interior, Department of / Geological Survey | 8/25/2010 |
MWE SERVICES, INC. | $26,746 | Contract | : Removal of USGS Streamguages in Wisconsin. | Interior, Department of / Geological Survey | 6/30/2010 |
LION AIR INC | $64,710 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/25/2010 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $13,505 | Contract | : Architectural Historic Assessment and Archaeological Resource Assessment for Nine Discontinued Steamgages | Interior, Department of / Geological Survey | 9/23/2010 |
APPLIED REMEDIATION COMPANY, INC. | $42,760 | Contract | : Locate and abandon three (3) groundwater monitoring wells in Shasta County, California | Interior, Department of / Geological Survey | 3/26/2010 |
LION AIR INC | $67,710 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 9/17/2010 |
LION AIR INC | $237,270 | Contract | : Stream Gage Removal | Interior, Department of / Geological Survey | 3/18/2010 |
LION AIR INC | $40,950 | Contract | : Stream Gage Removal. All areas assigned have been identified and successfully removed. This project complete. | Interior, Department of / Geological Survey | 3/16/2010 |
ROWE DRILLING COMPANY, INC. | $1,081,825 | Contract | : LOCATE AND ABANDON MONITORING WELLS | Interior, Department of / Geological Survey | 3/19/2010 |
JAVAD GNSS, INC. | $278,032 | Contract | : Delivery of 67 GNSS receivers w/ choke ring antenna. | Interior, Department of / Geological Survey | 9/17/2010 |
TEAM HENRY ENTERPRISES, LLC | $42,095 | Contract | : Demolition of streamgages and cableways. | Interior, Department of / Geological Survey | 3/19/2010 |
SYNERGETICS INCORPORATED | $246,539 | Contract | : The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien | Interior, Department of / Geological Survey | 9/18/2009 |
DAY MANAGEMENT CORP. | $177,002 | Contract | : Design and install Telemtry system at Crater Lake. | Interior, Department of / Geological Survey | 8/17/2010 |
NANOMETRICS INC | $43,920 | Contract | : 6 Trillium Compact Seismometers, 6 5 m cables | Interior, Department of / Geological Survey | 8/16/2010 |
DAY MANAGEMENT CORP. | $77,745 | Contract | : Telemetry design and installation of Telemetry system at Lassen Peak. | Interior, Department of / Geological Survey | 8/17/2010 |
NANOMETRICS INC | $191,600 | Contract | : 10 Trillium 240, 10 Cables | Interior, Department of / Geological Survey | 8/19/2009 |
POWER UP SOLAR CORP | $111,934 | Contract | : solar panels | Interior, Department of / Geological Survey | 12/04/2009 |
POWER UP SOLAR CORP | $137,272 | Contract | : solar panel kits | Interior, Department of / Geological Survey | 9/29/2009 |
SYNERGETICS INCORPORATED | $379,013 | Contract | : The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a | Interior, Department of / Geological Survey | 9/18/2009 |
BLUESCOPE CONSTRUCTION, INC. | $340,486 | Contract | : Design/Build a Single Family Residences - Laurel MD | Interior, Department of / Geological Survey | 5/26/2010 |
NANOMETRICS INC | $21,960 | Contract | : 3 Trillium Compacts, 3 5-M cables | Interior, Department of / Geological Survey | 4/01/2010 |
DIGITAL AERIAL SOLUTIONS LLC | $593,193 | Contract | : This task order is for Planning, Acquisition, processing, and derivative products of lidar data to be collected at a nominal pulse spacing (NPS) of 2.0 meters. This task order is for lidar for three (3) areas in Florida: Lower Kissimmee River, Suwannee | Interior, Department of / Geological Survey | 9/17/2010 |
EAGLE DEER RESERVE LIMITED | $106,000 | Contract | : Demolish stream gauges and restore land to original condition | Interior, Department of / Geological Survey | 3/08/2010 |
TEAM HENRY ENTERPRISES, LLC | $29,861 | Contract | : Demolition of streamgages ad cableways. | Interior, Department of / Geological Survey | 3/09/2010 |
POWER SYSTEMS ENGINEERING | $42,203 | Contract | : Deliver,Install and Startup one MGE Galaxy 4000, 40 Kva UPS | Interior, Department of / Geological Survey | 3/31/2010 |
ALION SCIENCE AND TECHNOLOGY CORPORATION | $1,034,444 | Contract | : Technical and production management services during the detail design and construction for the vessels upon the successful award of a contract for contract drawings, detail design and a two vessel construction contract. This effort will include review an | Interior, Department of / Geological Survey | 12/08/2009 |
HORRY, COUNTY OF | $297,449 | Grant | National Geospatial Program: Building The National Map: To expand employment and business opportunities within a key sector of geospatial industry. This will enable America to revitalize its physical infrastructure, improve public safety, and adapt to climate change through the collection of high-reresolution l... Show more | Interior, Department of / Geological Survey | 2/02/2010 |
MIKRON INFRARED, INC. | $106,480 | Contract | : US GEOLOGICAL SURVEY Infrared Cameras | Interior, Department of / Geological Survey | 3/18/2010 |
BROOKS RAND LABS, LLC | $37,079 | Contract | : Award was for trace metals analyses of biological tissue samples. | Interior, Department of / Geological Survey | 9/21/2010 |
DAY MANAGEMENT CORP. | $27,000 | Contract | : Engineering desing services for Glacier Peak Telemetry System | Interior, Department of / Geological Survey | 8/17/2010 |
DAY MANAGEMENT CORP. | $75,845 | Contract | : Telemetry system design and installation at Walker Mtn | Interior, Department of / Geological Survey | 8/17/2010 |
UNIVERSITY OF WASHINGTON | $44,115 | Contract | : We will use WWLLN lightning location data to develop the software for an explosive volcano monitor. We will augment the WWLLN coverage in Alaska by installing a new WWLLN station in Alaska. Other than travel to install a new station, there is no tempora | Interior, Department of / Geological Survey | 3/04/2010 |
NANOMETRICS INC | $100,435 | Contract | : 8 Trident connector kits, 8 Trident digitizers, 8 Taurus | Interior, Department of / Geological Survey | 8/26/2009 |
DAY MANAGEMENT CORP. | $149,490 | Contract | : Telemtry Design and Telemtry installation at Crescent Tower site. | Interior, Department of / Geological Survey | 8/17/2010 |
DAY MANAGEMENT CORP. | $61,295 | Contract | : Telemetry design and installation at Pine Mountain tower site. | Interior, Department of / Geological Survey | 8/16/2010 |
AVAYA FEDERAL SOLUTIONS, INC. | $76,382 | Contract | : PBX Communications Equipment and Installation | Interior, Department of / Geological Survey | 3/31/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $38,500 | Contract | : locate or decommission monitor wells in Washington State no longer in use | Interior, Department of / Geological Survey | 3/31/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $56,500 | Contract | : locate wells in washington to be decommissioned | Interior, Department of / Geological Survey | 3/31/2010 |
POWER UP SOLAR CORP | $63,357 | Contract | : SOLAR PANELS | Interior, Department of / Geological Survey | 12/04/2009 |
DELL FEDERAL SYSTEMS L.P. | $150,700 | Contract | : Computer Equipment | Interior, Department of / Geological Survey | 7/01/2010 |
EAGLE DEER RESERVE LIMITED | $25,000 | Contract | : demolish stream gauges and restore ground to original condition | Interior, Department of / Geological Survey | 3/13/2010 |
COUNTY OF PIERCE | $25,000 | Contract | : 2010-2011 LiDAR update for Pierce County, Washington-Increased resolution for the Tacoma Fault and White River Fault System. | Interior, Department of / Geological Survey | 4/14/2011 |
Horry County Government | $297,449 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Pee Dee Regional Ortho Project | Interior, Department of / Geological Survey | 2/04/2010 |
Putnam County Commission | $72,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Orthoimagery of the Entirety of Putnam County | Interior, Department of / Geological Survey | 2/24/2010 |
SC Department of Natural Resources | $490,700 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Lidar for the South Carolina Coastal Plain | Interior, Department of / Geological Survey | 2/02/2010 |
Association of Monterey Bay Area Governments | $500,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 California Central Coast Lidar Project | Interior, Department of / Geological Survey | 2/16/2010 |
Oregon Dept of Geology | $180,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Multi-Hazard Risk and Vunerability Assessments | Interior, Department of / Geological Survey | 11/13/2009 |
St. Lucie County Property Appraiser | $80,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Countywide 15 cm and 30 cm GSD Ortho Imagery Update | Interior, Department of / Geological Survey | 2/04/2010 |
Brown County Wisconsin | $251,666 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Brown/Oconto County Lidar Elevation Mapping | Interior, Department of / Geological Survey | 2/15/2010 |
Boise State University | $134,195 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Real-Time Volcano Monitoring | Interior, Department of / Geological Survey | 11/30/2009 |
University of Alaska | $2,000,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Improvement of the Volcano and Other Monitoring Systems | Interior, Department of / Geological Survey | 11/30/2009 |
University of Georgia | $389,481 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Acquisition of Lidar for the Tennessee Portion of Great Smoke Mountains National Park | Interior, Department of / Geological Survey | 3/08/2010 |
Alachua County Property Appraiser | $100,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Countywide 30 cm GSD Ortho Imagery Update | Interior, Department of / Geological Survey | 2/16/2010 |
Pierce County | $355,575 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 2010-2011 Lidar Update for Pierce County Washington | Interior, Department of / Geological Survey | 2/16/2010 |
University of Wisconsin | $300,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 High-Resolution Analysis of Structure and Seismicity of Alaskan Volcanoes | Interior, Department of / Geological Survey | 11/17/2009 |
CSU Fullerton | $150,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Magma Mixing in Real-Time | Interior, Department of / Geological Survey | 3/08/2010 |
Virginia Information Technologies Agency | $500,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 A High-Resolution Comprehensive Elevatioon Map | Interior, Department of / Geological Survey | 3/08/2010 |
Southeast Michigan Council of Governments | $234,316 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 2010 Southeast Michigan Council of Governments Lidar Acquisition Project | Interior, Department of / Geological Survey | 2/22/2010 |
University of Washington | $220,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 ARRA Upgrades to Seismic Monitoring of Cascade Volcanoes | Interior, Department of / Geological Survey | 11/30/2009 |
University of West Georgia | $491,214 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Extending the Lidar Project of Coastal Regional Commission | Interior, Department of / Geological Survey | 2/12/2010 |
University of Hawaii | $90,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Understanding of Basaltic Eruption Dynamics and Mechanism | Interior, Department of / Geological Survey | 3/09/2010 |
ABOR for and on the behalf of Northern Arizon | $119,319 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Reconstructing the 2008 Okmok Eruption from Tephra Stratigraphy | Interior, Department of / Geological Survey | 12/29/2009 |
Southern Nevada Water Authority | $180,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Water Smart Landscape Program Orthoimagery Project | Interior, Department of / Geological Survey | 2/17/2010 |
State of Alaska | $1,500,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Alaska Volcano Investigations and Information Dissemination | Interior, Department of / Geological Survey | 11/20/2009 |
Washington Department Natural Resources | $130,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Loss Estimation Pilot Project for Lahar Hazard from Mount Rainier | Interior, Department of / Geological Survey | 1/22/2010 |
University of Georgia | $389,481 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Acquisition of Lidar for the Tennessee Portion of Great Smoke Mountains National Park | Interior, Department of / Geological Survey | 2/04/2010 |
Northwest Florida Water Management District | $225,000 | Grant | U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Liberty County Lidar Acquisition and Processing | Interior, Department of / Geological Survey | 2/18/2010 |