U.S. Fish and Wildlife Service
Total Spending |
$320,072,069 |
Parent agency (Interior, Department of) | $3,459,715,017 |
State | Funding |
---|---|
Alabama | $2,026,749 |
Alaska | $15,173,351 |
Arizona | $13,235,791 |
Arkansas | $5,288,104 |
California | $21,218,210 |
Colorado | $15,402,196 |
Connecticut | $1,943,030 |
Delaware | $178,500 |
District of Columbia | $132,177 |
Florida | $8,918,743 |
Georgia | $7,754,072 |
Hawaii | $14,841,239 |
Idaho | $2,568,862 |
Illinois | $1,813,243 |
Indiana | $97,878 |
Iowa | $2,881,183 |
Kansas | $1,231,355 |
Kentucky | $53,850 |
Louisiana | $1,043,318 |
Maine | $2,569,698 |
Maryland | $4,602,465 |
Massachusetts | $9,825,987 |
Michigan | $3,563,865 |
Minnesota | $5,752,476 |
Mississippi | $6,378,105 |
Missouri | $7,079,697 |
Montana | $4,768,536 |
Nebraska | $907,917 |
Nevada | $12,082,294 |
New Hampshire | $1,107,001 |
New Jersey | $4,892,348 |
New Mexico | $6,865,892 |
New York | $12,635,649 |
North Carolina | $9,134,925 |
North Dakota | $13,389,557 |
Ohio | $2,062,048 |
Oklahoma | $1,614,505 |
Oregon | $15,719,512 |
Pennsylvania | $3,922,674 |
Rhode Island | $212,641 |
South Carolina | $3,534,426 |
South Dakota | $1,493,853 |
Tennessee | $10,184,333 |
Texas | $15,880,215 |
Utah | $1,281,814 |
Vermont | $938,464 |
Virginia | $11,160,932 |
Washington | $13,965,765 |
West Virginia | $1,598,901 |
Wisconsin | $6,517,286 |
Wyoming | $8,399,066 |
Puerto Rico | $356,750 |
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
T.G. NICKEL & ASSOCIATES, LLC | $7,921,917 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
: U.S. Fish and Wildlife visitor center in Shirley, NY | ||||
WEST COAST CONTRACTORS OF NEVADA, INC. | $7,368,625 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
: ENVIRONMENTAL DESIGN (LEED) NC VERSION 2009 RATING SYSTEM, AS SPECIFIED . | ||||
KEPLIN-GRACON JV | $6,057,444 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2009 |
: Design build energy efficient headquarters/administrative/visitor building in Audubon NWR, ND. | ||||
SHAW ENVIRONMENTAL & INFRASTRUCTURE, INC. | $5,892,022 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
: Design and Build a Visitor Center / Administration / Environmental Education Facility at the Tennessee National Wildlife Refuge in Paris, TN. The building will be approximately 12,500 square feet. The facility will achieve a LEED certification and incor | ||||
MWH CONSTRUCTORS, INC. | $5,881,153 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 10/29/2009 |
: The project is for the design/build of new headquarters and visitor center at Coastal North Carolina National Wildlife Refuge, Manteo, North Carolina. | ||||
T. L. WALLACE CONSTRUCTION, INC. | $5,659,618 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
: Design-Build Services for the USFWS Texas Chenier Plains Office Complex & Visitors Center in Anahuac, Texas. | ||||
KEPLIN-GRACON JV | $5,566,307 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
: Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww | ||||
ARROWHEAD CONTRACTING, INC. | $5,098,121 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
: Design and construction of visitor center. | ||||
BODELL CONSTRUCTION COMPANY INC | $5,079,867 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
: The project award includes the construction of the Headquarters / Visitor Center (7500 SF), Environmental Education Shelter (960 SF), Landscaping, PV panels and two supporting structures, and land clearing (50 FT perimeter around landscaped areas) for the | ||||
BODELL CONSTRUCTION COMPANY INC | $5,079,867 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
: The project award includes the construction of the Headquarters / Visitor Center (7500 SF), Environmental Education Shelter (960 SF), Landscaping, PV panels and two supporting structures, and land clearing (50 FT perimeter around landscaped areas) for the | ||||
PCL CONSTRUCTION SERVICES, INC | $4,823,606 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
: Construction of Fish & Wildlife Complex. Project includes an administration/visitor center, service building, resource room, an underground sanitary tank, and landscaping for a site trail. A parking lot is also being constructed. Number of subcontracts i | ||||
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $4,474,448 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
: NATIONAL ELK REFUGE: JACKSON IRRIGATION PROJECT. | ||||
ARROWHEAD CONTRACTING, INC. | $3,574,614 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
: Design and construction of Visitor Center. | ||||
C3 LIMITED LIABILITY COMPANY | $3,354,562 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2010 |
: ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE | ||||
B&M PHIPPS | $3,234,284 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 4/21/2010 |
: Construction of Visitors Center | ||||
C3 LIMITED LIABILITY COMPANY | $3,214,590 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
: CONSTRUCT CANAL INLET AND FIRE BREAK AT TOPOCK HAVASU NATIONAL WILDLIFE REFUGE. | ||||
MARSH CREEK, LLC | $3,194,985 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/18/2009 |
: Feasibility study,Preliminary Design and Construction of Wind Turbines at King Salmon & Cold Bay.The installation of wind turbines will help reduce the refuge's greenhouse gas emissions and could decrease utility costs. | ||||
C3 LIMITED LIABILITY COMPANY | $3,083,114 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
: EAST WEST TWIN CREEK CROSSING REHABILITATION. | ||||
IMPERIAL CONSTRUCTION, INC. | $2,930,366 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/03/2010 |
: Construction of New Headquarters/Admin Facility/Visitor Center at Hagerman National Wildlife Refuge | ||||
K-CON, INC. | $2,925,148 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
: Construction of (3) Visitor Contact Stations (Bald Knob NWR, Big Lake NWR and Wapanocca NWR) and construction of (1) Shop Building at Big Lake NWR, Arkansas. | ||||
URS GROUP, INC. | $2,899,845 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 8/02/2010 |
: Extend utilities to and within the site and to construct an Administrative Facility including an Administrative Building, Crew Quarters, and Storage Building along with miscellaneous site improvements including utilities, trash pad, decks, drives, walks, | ||||
C3 LIMITED LIABILITY COMPANY | $2,771,016 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
: CONSTRUCT INLET CANAL AT TOPOCK MARSH AT HAVASU NWR | ||||
REILLY CONSTRUCTION, INC | $2,768,689 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2010 |
: Construct a Visitor Center at the Mammoth Spring National Fish Hatchery, Mammoth Spring, Arkansas | ||||
FIVE RIVERS CONSTRUCTION, INC. | $2,642,169 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/23/2009 |
: NISQUALLY REFUGE BOARDWALK | ||||
DOYON PROJECT SERVICES LLC | $2,435,101 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
: Relocation of Existing 25kv Transmission Line crossing Coquille River and floodplain - Restoration of 400 acres of tidal marshlands along the Coquille River, near Bandon, Oregon. An existing 25kV line will be relocated from an overhead line to below groun | ||||
MCMILLEN, LLC | $2,333,660 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
: The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a | ||||
CHUGACH INDUSTRIES, INC. | $2,283,905 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
: The purpose of this mod is to add additional funding for energy renovation work for Office Row Housing on Midway Atoll. | ||||
NORTHCON, INC. | $2,273,880 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
: Construct fish passages and screen at Malheur National Wildlife Refuge | ||||
PANGEA INC | $2,168,946 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
: Effluent Treatment System project, Jordan River National Fish Hatchery, Elmira, MI | ||||
URS GROUP, INC. | $1,915,817 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2010 |
: Extend utilities into the new building and construct a Hotshots Fire Facility along with the specified site improvements of landscaping. | ||||
MWH CONSTRUCTORS, INC. | $1,826,519 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
: MWH is performing the Design/Build of an effluent wastewater treatment system at the Dale Hollow National Fish Hatchery in Celina, TN. The purpose of the system, once installed, is to improve discharge water quality by reducing the concentration of total | ||||
AMEC E&I, INC | $1,729,229 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
: Rehabilitate existing Geothermal system at Longfellow National Historic site in Cambridge, MA. | ||||
PERINI MANAGEMENT SERVICES INC | $1,584,346 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
: Rehabilitate historic upper and middle dams and rehabilitate historic stone walls and the Ice Pond Dam at the Vanderbilt Mansion National Historic Site in Hyde Park, New York. | ||||
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $1,500,000 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
: Rehabilitate infrastructure associated with Patuxent Facilities Modernization program. Rehabilitation of the Nelson Building, Laurel, MD. | ||||
C3 LIMITED LIABILITY COMPANY | $1,499,301 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/07/2010 |
: REPAIR DRAINAGE CULVERTS ON THE NATCHEZ TRACE PARKWAY | ||||
RMD HOLDINGS, LTD. | $1,444,699 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
: Rehabilitation of wetland maintenance control ditching and access road levees. | ||||
BARLOVENTO, L.L.C. | $1,442,732 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
: D/B Headquarters Office Bldgs Yazoo and Panther Swamp NWR | ||||
PERINI MANAGEMENT SERVICES INC | $1,357,296 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/11/2010 |
: Fire Protection System installation and HVAC System at Fredericksburg/Spotsylvania Military National Park. | ||||
CATALYST ARCHITECTURE, LLC | $1,315,784 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 5/30/2009 |
: On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W | ||||
PERINI MANAGEMENT SERVICES INC | $1,283,830 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 4/13/2010 |
: Design, purchase, and installation of a 120kw photovoltaic system at the maintenance shop. Design, purchase, and installation of a 1.5kw wind system at the maintenance shop. Design, purchase, and installation of a 75kw tecogen or approved equal generato | ||||
SHAW ENVIRONMENTAL & INFRASTRUCTURE, INC. | $1,282,500 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 4/29/2010 |
: Design and rehabilitate refuge road, route 113 - Cuddo Unit, Santee National Wildlife Refuge (NWR), Design and rehabilitate refuge road, route 101 - Pine Island Unit, Santee NWR, Design and rehabilitate well at the Holding House, Orangeburg National Fish | ||||
LINC GOVERNMENT SERVICES, LLC | $1,281,082 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
: Mammoth Springs Phase 2 - Design Build Mammoth Spring Fish Hatchery. | ||||
NORTHERN MANAGEMENT SERVICES, INC. | $1,272,058 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
: Scope of work at the Spring Creek National Fish Hatchery is replacement of 14 pumps and motors along with upgrade of new service switchgear to include ATS (automatic transfer switch) and motor control center. All motors for pumps will be high efficient w | ||||
CENTENNIAL CONTRACTORS ENTERPRISES, INC. | $1,262,191 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
: Construction of new administration/visitor center and repair work to the the Fish Hatchery facility in Tupelo, Mississippi | ||||
AQUATIC VEGETATION CONTROL, INC. | $1,250,000 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
: TREATMENT OF CATEGORY I & II EXOTIC PLANT SPECIES LOXAHATCHEE NWR | ||||
CAMPBELL CONSTRUCTION GROUP, LLC | $1,238,820 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
: Rehabilitation of the Lighthouse & Lightkeeper's House on Monomoy Island - Chatham, MA | ||||
SPAEDER, WM. T. CO., INC. | $1,216,837 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
: Furnish all labor, materials, and equipment to construct Aeration (Degasser) Building at the Allegheny National Fish Hatchery, Warren, PA | ||||
CHUGACH INDUSTRIES, INC. | $1,212,942 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
: Electrical and heating, ventilation, and air conditioning (HVAC) rehabilitation for 3-story converted U.S. Navy dormitory now used for Midway Atoll National Wildlife Refuge Visitors. Recent modifications to scope include installation of heavy duty door cl | ||||
URS GROUP, INC. | $1,202,335 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 7/19/2010 |
: Design and construct solar wildlife water collection system including water well pumps and booster stations, numerous tanks, localized fencing. Over 33 miles of small-diameter (1.5) water line and tanks for multiple systems in various locations. | ||||
NORTHERN MANAGEMENT SERVICES, INC. | $1,200,000 | Contract | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2009 |
: San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur |
Showing only the top (by amount) 50 entries. Go here for the full list