Navy, Department of
Total Spending |
$2,012,016,284 |
No sub-agency specified | $1,783,246,063 |
Naval Facilities Engineering Command | $188,069,610 |
Naval Space and Warfare Systems Command | $35,649,549 |
Office of Naval Research | $3,345,778 |
Naval Sea Systems Command | $1,249,994 |
Naval Air Systems Command | $455,290 |
State | Funding |
---|---|
Alabama | $3,457,886 |
Arizona | $6,534,582 |
California | $818,218,023 |
Colorado | $7,310,073 |
Connecticut | $3,628,622 |
Delaware | $15,999,593 |
District of Columbia | $5,861,758 |
Florida | $76,763,894 |
Georgia | $23,307,197 |
Hawaii | $228,165,591 |
Illinois | $8,121,994 |
Indiana | $11,939,872 |
Kansas | $475,363 |
Kentucky | $374,298 |
Louisiana | $22,542,557 |
Maine | $20,074,493 |
Maryland | $110,154,824 |
Massachusetts | $27,354,724 |
Michigan | $7,567,745 |
Mississippi | $29,444,017 |
Missouri | $3,898,457 |
Nebraska | $4,337,797 |
Nevada | $14,130,846 |
New Hampshire | $705,100 |
New Jersey | $2,906,202 |
New Mexico | $16,711,049 |
New York | $7,151,333 |
North Carolina | $87,519,515 |
North Dakota | $179,658 |
Ohio | $11,108,683 |
Oklahoma | $130,531 |
Oregon | $7,219,152 |
Pennsylvania | $9,639,242 |
Rhode Island | $3,296,558 |
South Carolina | $44,287,254 |
Tennessee | $15,622,774 |
Texas | $68,642,427 |
Utah | $28,938 |
Virginia | $216,104,547 |
Washington | $52,611,148 |
Wisconsin | $6,041,501 |
Guam | $14,934,656 |
The following stimulus spending are items which were not designated for a specific sub-agency.
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
CLARK/MCCARTHY, A JOINT VENTURE | $401,438,378 | Contract | Navy, Department of | 9/01/2010 |
: RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA | ||||
WALSH CONSTRUCTION COMPANY | $131,103,000 | Contract | Navy, Department of | 8/31/2010 |
: TAS:: 13 1454::TAS ARRA::YES::ARRA RECOVERYPROJECT#::5014: :RP# Construction of the NOAA PRC at Ford Island, Pearl Harbor, HI. The work to be performed provides for and involves adaptive reuse of historic hangars and new construction on an historic landma | ||||
HENSEL PHELPS CONSTRUCTION CO | $64,735,873 | Contract | Navy, Department of | 9/30/2009 |
: RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu | ||||
BARTON MALOW COMPANY | $53,599,266 | Contract | Navy, Department of | 7/21/2009 |
: N40080-09-C-0165 Recovery Renovations to King Hall Galley at the U.S. Naval Academy, Annapolis, MD | ||||
GENERAL ATOMICS | $44,208,318 | Contract | Navy, Department of | 7/08/2009 |
: Research and Development activities associated with the development of a proof of concept for the Arleigh Burke (DDG 51) Class Destroyer Hybrid Electric Drive (HED) | ||||
BLUERIDGE GENERAL, INC. | $33,655,729 | Contract | Navy, Department of | 6/18/2010 |
: Replace Roof and Repair Exterior Building, Naval Medical Admin Bldg. 3, Naval Medical Cneter | ||||
BULLTRACK-WATTS, A JOINT VENTURE | $24,786,569 | Contract | Navy, Department of | 4/28/2009 |
: Repave Runway 16-34, Taxiway 1-19 and Aprons at Pacific Missile Range, Barking Sands, Kauai, Hawaii. The work includes, but is not limited to, sawcutting and cold mill planing up to 4' of the existing asphalt concrete pavement of the runway, taxiway, and | ||||
BARNHART-BALFOUR BEATTY, INC. | $22,663,074 | Contract | Navy, Department of | 12/18/2009 |
: RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106 | ||||
SCHNEIDER ELECTRIC USA, INC. | $22,511,234 | Contract | Navy, Department of | 7/14/2009 |
: ADVANCE METER INSTALLATIONS LOCATED AT NORTHWEST REGION, WA STATE | ||||
VIRTEXCO CORPORATION | $19,273,702 | Contract | Navy, Department of | 11/30/2009 |
: Design/Build, RM211-08 Modernization of Central HVAC Plant, Naval Support Activity, Norfolk, VA | ||||
RICH MOE/COAKLEY & WILLIAMS JV | $18,516,025 | Contract | Navy, Department of | 9/30/2009 |
: Contract for Design Build Services, ARRA - Hanger 110 Modernization, Naval Air Station, Patuxent River, Maryland | ||||
T. B. PENICK & SONS, INC. | $17,124,105 | Contract | Navy, Department of | 8/31/2010 |
: RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA | ||||
HOURIGAN CONSTRUCTION CORP. | $15,270,389 | Contract | Navy, Department of | 9/30/2009 |
: Work includes all labor, material, superivision & testing for design and repair of Runway 5R/23L, Naval Air Station Oceana, Virginia Beach, VA, approximately as indicated. Typical repairs shall include but not be limited to: Asphalt milling and resurfac | ||||
NIKING CORPORATION | $15,237,555 | Contract | Navy, Department of | 12/30/2009 |
: As a part of TAS program construction on design-build of grid-tied photovoltaic power sytems on the roof of various buildings at Pearl Harbor, Oahu, HI project | ||||
GENERAL ELECTRIC COMPANY | $15,040,381 | Contract | Navy, Department of | 2/16/2010 |
: The required effort is to demonstrate technologies to reduce Specific Fuel Consumption in F/A-18E/F and E/A-18G aircraft engines. Specific tasks are as follows: a) demonstrate technologies capable of reducing fuel consumption of the F414-GE-400 engine thr | ||||
ATLANTIC ELECTRIC, LLC | $15,008,237 | Contract | Navy, Department of | 8/28/2009 |
: Repair and Replace Airfield Lighting at NAS JRB New Orleans, LA | ||||
REYES CONSTRUCTION, INC. | $13,968,450 | Contract | Navy, Department of | 7/09/2010 |
: RECOVERYPROJECT#::ST09-1934::RP# REPAIR MAIN RUNWAY 8/26, NAF EL CENTRO, CA | ||||
CHOATE CONSTRUCTION COMPANY | $13,249,156 | Contract | Navy, Department of | 9/22/2009 |
: ARRA-DORMITORY (144 ROOM) TAC SHAW AFB, SUMTER, SC | ||||
R.A. BURCH CONSTRUCTION CO., INC. | $13,154,571 | Contract | Navy, Department of | 9/30/2009 |
: RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA. | ||||
TETRA TECH TESORO, INC. | $12,495,707 | Contract | Navy, Department of | 7/15/2010 |
: Design and construction of the steam plant area decentralization at Naval Station Norfolk. The work to be performed provides for reduction of energy consumption while improving infrastructure. The project consists of energy conservation measures for light | ||||
BULLTRACK-WATTS-II, A JOINT VENTURE | $11,623,676 | Contract | Navy, Department of | 9/28/2009 |
: P-236 Water Distribution System at Naval Air Station Whidbey Island, Oak Harbor, WA. Replace cement asbestos water distribution lines on Ault Field, Seaplane Base and the lines connecting the two bases. Project includes site restoration, sustainable desi | ||||
HARPER CONSTRUCTION COMPANY, INC. | $11,165,832 | Contract | Navy, Department of | 9/29/2009 |
: RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA | ||||
GREENHUT CONSTRUCTION COMPANY, INC. | $11,119,715 | Contract | Navy, Department of | 9/18/2009 |
: Repair and modernize administrative building #1500 at NAS Pensacola, Florida. | ||||
HEALY TIBBITTS BUILDERS, INC. | $10,862,232 | Contract | Navy, Department of | 4/24/2009 |
: Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o | ||||
RELIABLE BUILDERS, INC. | $10,607,335 | Contract | Navy, Department of | 5/29/2009 |
: This work is to furnish all design, labor, equipment, materials, and incidentals to repair and modernize Buildings, 580, 581, and 584 spaces to comply with BEQ construction standards as outlined in MIL-HDBK 1036A for transient personnel, new interior/ext | ||||
STRONGHOLD ENGINEERING INCORPORATED | $10,600,127 | Contract | Navy, Department of | 8/31/2009 |
: RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA. | ||||
SOUZA CONSTRUCTION, INC. | $10,221,050 | Contract | Navy, Department of | 4/05/2010 |
: RECOVERYPROJECT#::P970M::RP# FACILITY ENERGY IMPROVEMENTS, MCLB BARSTOW, CALIFORNIA | ||||
STRONGHOLD ENGINEERING INCORPORATED | $9,955,127 | Contract | Navy, Department of | 8/28/2009 |
: RECOVERYPROJECT#::RM33-05::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 14 & 15, NAS LEMOORE, CA | ||||
AMEC - NAN JOINT VENTURE | $9,763,104 | Contract | Navy, Department of | 7/31/2009 |
: TAS:: 17 1206::TAS Child Development Center, Marine Corp Base Hawaii (MCBH), Kaneohe, Hawaii. All labor, materials, services, equipment and travel necessary to design-build a Child Development Center located at Marine Corp Base Hawaii (MCBH), Kaneohe, H | ||||
BRASFIELD & GORRIE, L.L.C. | $9,561,533 | Contract | Navy, Department of | 12/18/2009 |
: Renovation of existing Naval Hospital in Jacksonville, Florida. | ||||
T. B. PENICK & SONS, INC. | $9,401,430 | Contract | Navy, Department of | 9/30/2009 |
: RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA | ||||
SYNERGY ELECTRIC COMPANY, INC. | $9,379,828 | Contract | Navy, Department of | 12/03/2009 |
: RECOVERYPROJECT#::P856M::RP# PHOTOVOLTAIC SYSTEM, MARINE CORPS BASE CAMP PENDLETON, CALIFORNIA | ||||
HDR ARCHITECTURE, INC. | $8,469,034 | Contract | Navy, Department of | 9/18/2009 |
: RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA. | ||||
CURTIS CONTRACTING, INC. | $8,131,738 | Contract | Navy, Department of | 9/21/2009 |
: Whole Center repairs and new VMF facility | ||||
LOCKHEED MARTIN CORPORATION | $8,119,625 | Contract | Navy, Department of | 8/21/2009 |
: OTEC Project | ||||
SAUER INCORPORATED | $7,867,295 | Contract | Navy, Department of | 9/15/2009 |
: Design and build P761 Child Development Center at Naval Station Mayport, Florida | ||||
ENERGY/MATTER CONVERSION CORPORATION | $7,855,504 | Contract | Navy, Department of | 9/11/2009 |
: The purpose of the AGEE program is to test the properties of the Polywell Plasma Confinement Concept. We expect to determine if the plasma scaling agrees with the Theoretical models. | ||||
CURTIS CONTRACTING, INC. | $7,718,686 | Contract | Navy, Department of | 9/21/2009 |
: Whole center repair adn New Vehicle Maintenance Facility | ||||
AMERICAN SYSTEMS CORPORATION | $7,686,778 | Contract | Navy, Department of | 8/21/2009 |
: RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training | ||||
STRONGHOLD ENGINEERING INCORPORATED | $7,661,049 | Contract | Navy, Department of | 7/08/2010 |
: RECOVERYPROJECT#::P0875 P0876::RP# PHOTOVOLTAIC SYSTEM, SPAWAR, SAN DIEGO, CA | ||||
LIFECYCLE CONSTRUCTION SERVICES, LLC | $7,547,665 | Contract | Navy, Department of | 6/29/2009 |
: Complete renovation of two barracks facilities. Existing facilities will be upgraded to current Unified Facility Criteria and IBC codes. Improved buildings will provide better living conditions for Marines and improved working conditions for civilian empl | ||||
BLUE ROCK STRUCTURES INC. | $7,521,443 | Contract | Navy, Department of | 9/27/2010 |
: New construction of Child Development Center with necessary utility infrastructure and incidental related work, including playground equipment. | ||||
HAL HAYS CONSTRUCTION, INC. | $7,495,103 | Contract | Navy, Department of | 3/02/2010 |
: ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING | ||||
T. B. PENICK & SONS, INC. | $7,475,529 | Contract | Navy, Department of | 6/15/2009 |
: RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA | ||||
BARNHART-BALFOUR BEATTY, INC. | $7,407,463 | Contract | Navy, Department of | 6/18/2009 |
: RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA | ||||
QUALITY ROOFERS & GUTTERING INC | $7,308,437 | Contract | Navy, Department of | 6/29/2009 |
: PV Roofs, Buildings 1116, 1117, 1211 & 1212, MCB, Camp Lejeune, NC | ||||
SCHNEIDER ELECTRIC USA, INC. | $7,069,716 | Contract | Navy, Department of | 9/15/2009 |
: ADVANCE METER INSTALLATIONS- SOUTHEAST REGION | ||||
HEAD, INC. | $6,924,246 | Contract | Navy, Department of | 12/23/2009 |
: ARRA - RM173-05 Design / Build Repair Aircraft Parking Aprons, Landing Plane and Landing Field Areas; Phase II: Landing Plane Area, Naval Station Norfolk, Norfolk, VA | ||||
SU-MO / NAN JV | $6,791,916 | Contract | Navy, Department of | 12/10/2009 |
: PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI | ||||
HDR ARCHITECTURE INC, | $6,500,000 | Contract | Navy, Department of | 9/18/2009 |
: Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA. |
Showing only the top (by amount) 50 entries. Go here for the full list