BISCAYNE CONTRACTORS, INC.
|
$3,686,421 |
Contract |
Smithsonian Institution |
9/30/2009 |
: General Contracting, demolition, Hazmat removal
|
SEVERN ASSOCIATES, LLC
|
$2,703,958 |
Contract |
Smithsonian Institution |
6/02/2009 |
: Providing all of the supervision, labor, material, and equipment tp perform construction services necessary for replacement of the roof and exterior repairs at the Lion/Tiger Complex and Research Hill Buildings, which include the Neocropsy, Biological Res
|
SCHINDLER ELEVATOR CORPORATION
|
$2,646,101 |
Contract |
Smithsonian Institution |
6/12/2009 |
: SEC shall furnish all supervision, labor, materials,and equipment necessary to complete escalator repair and upgrade work at NASM, as well as elevator upgrade work at the NMAH
|
M & M SALES, INC.
|
$2,136,885 |
Contract |
Smithsonian Institution |
4/10/2009 |
: Recovery-Install high voltage electrical safety improvements
|
FORT MYER CONSTRUCTION CORPORATION
|
$1,959,505 |
Contract |
Smithsonian Institution |
10/15/2009 |
: To provide supervision, labor, equipment and materials required to Repair the three (3) Bridges at the National Zoological Park (NZP). Washington DC
|
CFM PROJECT CONSULTING GROUP, INC.
|
$1,919,282 |
Contract |
Smithsonian Institution |
6/16/2009 |
: Provide all work associated with the installation of the backflow preventers at the Suitland Collections Center, including the National Museum of the American Indian - Cultural Resource Center (NMAI-CRC), Museum Support Center Greenhouses (MSCG), and Garb
|
EDIFICE GROUP, INC.
|
$1,845,546 |
Contract |
Smithsonian Institution |
6/18/2009 |
: Provide all labor, equipment, material, and supervision for the Restoration fo the Slate Hill Barn (Proj No 0970103), to include roof replacement and interior/exterior renovation of the a utility loop for water and fire protection to the barn area (Proj N
|
EDIFICE GROUP, INC.
|
$1,225,908 |
Contract |
Smithsonian Institution |
6/05/2009 |
: Provide New 1000 KW Generator associated with building and implementation of the electrical systems a the SERC
|
HSU DEVELOPMENT, INC.
|
$1,083,303 |
Contract |
Smithsonian Institution |
6/05/2009 |
: Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
|
HSU DEVELOPMENT, INC.
|
$1,000,865 |
Contract |
Smithsonian Institution |
6/05/2009 |
: Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
|
EDIFICE GROUP, INC.
|
$932,261 |
Contract |
Smithsonian Institution |
6/18/2009 |
: Provide all labor, materials, equipment, and supervision for the restoration of the exterior masonary at the Smithsonian Institution's Arts and Industries Building (AIB)
|
EDIFICE GROUP, INC.
|
$809,854 |
Contract |
Smithsonian Institution |
6/03/2009 |
: Provide all supervision, labor, materials and equipment needed for the complete renovation of the Greenhill Barn and the replacement of the Waller Barn Roof at the National Zoological Park's Conservation and Research Center (CRC) Project Nos. 0970104 and
|
EDIFICE GROUP, INC.
|
$746,490 |
Contract |
Smithsonian Institution |
4/07/2009 |
: Modification No.01 to Smithsonian Institution Work Order Contract F09CW00169 for the upgrade of the electrical systems of the Smithsonian Environmental Research Center (SERC)
|
BOVIS LEND LEASE, INC.
|
$550,626 |
Contract |
Smithsonian Institution |
4/16/2009 |
: Provide project management support for the Smithsonian's AIB & NZP projects relating to the Recovery Act projects
|
BOVIS LEND LEASE, INC.
|
$383,728 |
Contract |
Smithsonian Institution |
9/23/2009 |
: Provide Construction Management support services for Smithsonian's AIB ARRA Demolition & Hazmat Removal and Masonry Restoration Projects
|
BOVIS LEND LEASE, INC.
|
$366,323 |
Contract |
Smithsonian Institution |
5/04/2009 |
: Construction Management support services for Smithsonian NZP Bridge Repairs Project
|
DJB CONTRACTING, INCORPORATED
|
$323,008 |
Contract |
Smithsonian Institution |
8/17/2009 |
: NZP Rock Creek Police Station and Outlying buildings
|
PARKER TIDE CORP.
|
$195,681 |
Contract |
Smithsonian Institution |
4/24/2009 |
: Order number changed from 09-DO-270-0000173254 due to vendor name change. New order 10-DO-270-0000199044. Contract Support for the Office of Contracting and Personal Property Management
|
AEROSOL MONITORING & ANALYSIS
|
$111,867 |
Contract |
Smithsonian Institution |
11/15/2009 |
: This is Smithsonian Institution Contract for Industrial Hygiene and Hazardous Material Abatement Services required for the Arts and Industries Building, Washington, DC.
|
EWINGCOLE INC
|
$61,573 |
Contract |
Smithsonian Institution |
8/18/2009 |
: Architect/Engineer services for the preparation and/or revision of existing design documents for the referenced project in order to capture the requirements for the installation of the previously purchased 1 MEG Emergency Generator.
|
SMITHGROUP, INC.
|
$56,479 |
Contract |
Smithsonian Institution |
6/26/2009 |
: Recovery funds- Arts & Industries Bldg Phase 1 Demolition and Hazmat Removal Construction Phase Services
|
SMITHGROUP, INC.
|
$39,331 |
Contract |
Smithsonian Institution |
7/09/2009 |
: Recovery funds- Arts & Industries Bldg Masonry Repairs Construction Phase Services
|
ARCHITRAVE, P.C. ARCHITECTS
|
$21,169 |
Contract |
Smithsonian Institution |
6/09/2009 |
: To provide Construction Administration services for Suitland, MD Facilities on an as needed basis in accordance with the Smithsonian Institution's Scope of Work.
|