Listing all stimulus spending by amount, in descending order. Return to Department of Veterans Affairs page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
JDM LLC | $1,904,140 | Contract | : Interior renovation. | Department of Veterans Affairs | 11/19/2009 |
AH WEST GROUP, LLC | $362,000 | Contract | : Oscar G Johnson VA Medical Center sidewalk repair | Department of Veterans Affairs | 10/28/2009 |
STOKES WEBB, LLC | $5,999,158 | Contract | : Replace 5KV Underground Feeders at Edward Hines Jr. VAMC | Department of Veterans Affairs | 1/20/2010 |
KJWW, P.C | $46,185 | Contract | : Replace air conditioning system at VA Hines | Department of Veterans Affairs | 11/23/2009 |
KJWW, P.C | $99,500 | Contract | : CONDENSING ECONOMIZER | Department of Veterans Affairs | 8/10/2009 |
KJWW, P.C | $8,700 | Contract | : REPLACE PUMP P-1 | Department of Veterans Affairs | 8/10/2009 |
C3T, INC. | $141,473 | Contract | : INSTALL 1-HOUR SMOKE BARRIER WALLS 7C | Department of Veterans Affairs | 11/23/2009 |
C3T, INC. | $99,334 | Contract | : RE-INSULATE ROOFTOP DUCTWORK BLDG 111 | Department of Veterans Affairs | 11/23/2009 |
C3T, INC. | $188,653 | Contract | : INSTALL 1-HOUR SMOKE BARRIER WALLS, 9C | Department of Veterans Affairs | 11/23/2009 |
C3T, INC. | $163,221 | Contract | : REPLACE AC CONDENSER BLDG 43 | Department of Veterans Affairs | 11/23/2009 |
CONSERVATION ARTISANS | $4,395 | Contract | : Clean and consolidate marble monument; repair of crack; reset brick foundation. | Department of Veterans Affairs | 12/16/2009 |
GREENLEAF RESOURCES, LLC | $78,201 | Contract | : Pre-engineered metal storage building at Jefferson Barracks National Cemetery | Department of Veterans Affairs | 9/29/2009 |
AMERICAN VETERANS CONTRACTING SERVICES LP | $262,205 | Contract | : Remove, Raise, Realign and Clean Upright Headstones and Turf Renovation Services | Department of Veterans Affairs | 6/16/2009 |
DOUBLE U LIMITED | $283,358 | Contract | : Turf renovation and headstone cleaning at Danville National Cemetery | Department of Veterans Affairs | 6/30/2009 |
AMERICAN VETERANS CONTRACTING SERVICES LP | $129,059 | Contract | : Turf Renovation and Cleaning Headstones | Department of Veterans Affairs | 8/17/2009 |
AMERICAN VETERANS CONTRACTING SERVICES LP | $315,600 | Contract | : Raise, Reset, Align, Backfill and Clean Headstones at National Cemetery | Department of Veterans Affairs | 7/21/2009 |
AMERICAN PROCUREMENT DISTRIBUTORS AND ASSOCIATES, LLC | $73,320 | Contract | : Headstone Alignment in National Cemetery | Department of Veterans Affairs | 7/01/2009 |
GAITHERSBURG FARMERS SUPPLY, INC. | $4,054 | Contract | : compact roller bt30 | Department of Veterans Affairs | 7/27/2009 |
DAVID BROWN COATINGS, INC. | $6,800 | Contract | : Furnish all equipment, materials, labor and supervision to paint maintenance building at Barrancas National Cemetery iin Pensacola, Florida | Department of Veterans Affairs | 8/20/2009 |
BOULTON ENTERPRISE, INC | $11,000 | Contract | : Painting Adminstrative and Maintenance Buildings-Nashville National Cemetery, Madison, TN | Department of Veterans Affairs | 9/04/2009 |
AMERIVETS CONSTRUCTION INC | $737,703 | Contract | : Raise and realign headstones and renovate turf at the Togus National Cemetery in Togus, ME. | Department of Veterans Affairs | 9/04/2009 |
KNIGHTO, LLC | $351,063 | Contract | : Renovate and Re-Establish Turf with Sod at the Quantico National Cemetery. | Department of Veterans Affairs | 8/31/2009 |
BUSINESS WORLD CONTRACTORS | $18,750 | Contract | : Project # 91 Painting Administrative and Maintenance Building - Little Rock National Cemetery, Little Rock, AR | Department of Veterans Affairs | 9/29/2009 |
DRS VETERAN ENTERPRISES LLC | $11,497 | Contract | : Contractor sahall provide all materials, equipment, supplies, parts, labor and supervision necessary to repair and resurface roadway athe the WV National Cemetery, Grafton, WV. | Department of Veterans Affairs | 9/24/2009 |
NIKA TECHNOLOGIES, INC. | $3,588 | Contract | : Electrical substation electrical improvements fire design review. San Juan 1001.F.230. Also includes 1001.F.159. | Department of Veterans Affairs | 9/23/2009 |
BBLM ARCHITECTS, A PROFESSIONAL CORPORATION | $121,820 | Contract | : Evaluation of the existing Sterile Compounding Pharmacy on the Eighth Floor of Building #1 at the VAMC East Orange, NJ relating to USP 797 compliance. Ammendment No.1 - Design and documentation of a new Sterile Compounding Pharmacy (720 sf) on the Eight | Department of Veterans Affairs | 6/08/2009 |
BBLM ARCHITECTS, A PROFESSIONAL CORPORATION | $32,684 | Contract | : Relocate and renovate the existing Ear, Nose, and Throat (ENT) Clinic from the 4th Floor to the 8th Floor of Building No.1 at the VAMC - East Orange, NJ. Design and documentation includes limited changes to existing partitions in the existing Eighth Floo | Department of Veterans Affairs | 6/17/2009 |
TREVINO GROUP, INC., THE | $380,870 | Contract | : Construction of Site Preparation for SPD for installation of Steris equipment. | Department of Veterans Affairs | 11/02/2009 |
COX DESIGN ASSOCIATES | $221,371 | Contract | : Architect / Engineer design services | Department of Veterans Affairs | 10/26/2009 |
RMD CONSULTING, LLC | $359,495 | Contract | : Professional Engineering and Architectural Services required to renovate an existing 25,000 sq ft Amory building to serve as an Outpatient Clinic. Project Milestones are reviews at 35% design, 50% design, 90% and 100%. | Department of Veterans Affairs | 11/23/2009 |
TL SERVICES, INC. | $358,238 | Contract | : Renovation of Bldg. 9 Mental Health Unit | Department of Veterans Affairs | 6/30/2009 |
ERSI, LLC | $2,942,556 | Contract | : The project consists of the decontamination and remediation of a 41,575 square foot asbestos contaminated crawlspace. The project involves removing asbestos insulation from active steam lines, the removal of debris from the floor of the crawlspace, and th | Department of Veterans Affairs | 9/02/2009 |
ERSI, LLC | $594,553 | Contract | : The project consists of the decontamination and removal of two incinerators and the renovation of associated loading dock space. The project also includes the removal of a fifty-five foot tall chimney, and a portion of the attached roof. Patching will be | Department of Veterans Affairs | 9/17/2009 |
RANI ENGINEERING, INC. | $35,921 | Contract | : IH services for project 568-09-113 replace corridor floor tile per proposal dated 9/14/09. | Department of Veterans Affairs | 9/25/2009 |
TAGGART FOSTER CURRENCE GRAY ARCHITECTS INC | $71,943 | Contract | : Architectural Fee | Department of Veterans Affairs | 4/21/2009 |
GKKWORKS CONSTRUCTION SERVICES | $430,926 | Contract | : AE firm will provide all design service to convert the exisiting Financial Resource, Service Organization Space, Conference Room Space, and outdoor courtyard areas to Social Work OEF/OIF space, a veteran transition center. | Department of Veterans Affairs | 12/10/2009 |
RANI ENGINEERING, INC. | $98,015 | Contract | : Design contract to perform the environmental assessment and design for the construction of a parking lot and road updrage project at the VAMC Minneapolis, MN per project # 10-106 | Department of Veterans Affairs | 6/01/2009 |
LEO A DALY COMPANY | $81,000 | Contract | : Relocate air intake, consolidate storage. | Department of Veterans Affairs | 7/16/2009 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $9,370 | Contract | : Architectural and Engineering Services for Building 3 Steps - Replace or repair at Des Moines Iowa Facility | Department of Veterans Affairs | 6/17/2009 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $35,210 | Contract | : Renovate Education Space of Building 4 at the Des Moines Iowa VA. | Department of Veterans Affairs | 7/10/2009 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $206,680 | Contract | : Architectural and Engineering Services for the HVAC system on Building 3 located in Des Moines Iowa. | Department of Veterans Affairs | 8/12/2009 |
CALVIN L. HINZ ARCHITECTS, P.C. | $274,741 | Contract | : RECOVERY ACT - Project 636-09-122 - Provide Design Services for the Post Anesthesia Care Unit (PACU) Omaha. | Department of Veterans Affairs | 12/18/2009 |
CALVIN L HINZ ARCHITECTS PC | $15,800 | Contract | : Replace/Upgrade Domestic Hot Water Heaters GI - Provided A/E services for the design of the replacement of the hot water heaters that serve Building 1 Services are full Type A,B, and C. Project Number: 636-09-121. | Department of Veterans Affairs | 4/22/2009 |
TTV ARCHITECTS INC | $165,678 | Contract | : Design EP (Electro Physiology) Lab Site Prep, Labor and Materials to make the rooms for the EP Lab Site Prep compatible to the requirements of the Phillips turn-kep installation requirements. | Department of Veterans Affairs | 6/25/2009 |
S & P REAL ESTATE INVESTMENTS, LLC | $406,084 | Contract | : Leasehold improvements for VA clinic | Department of Veterans Affairs | 7/10/2009 |
LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | $1,679,710 | Contract | : Replace main plumbing Project R646-08-108 | Department of Veterans Affairs | 8/04/2009 |
LOFTUS ASSOCIATES | $408,564 | Contract | : AE servcies to design boiler and boiler plant upgrades | Department of Veterans Affairs | 8/20/2009 |
POLU KAI SERVICES, LLC | $291,966 | Contract | : Renovations and Modifications for Gamma Camera Addition. The work includes but it is not limited to the extensive demolition of existing walls,mechanical, electrical, plumbing, fire protection, medical gas work, and certain other items of work required b | Department of Veterans Affairs | 10/28/2009 |
PIONEER BUILDERS, INC. | $95,466 | Contract | : Renovate E1 Nursing Station | Department of Veterans Affairs | 7/27/2009 |
UNITED CONSTRUCTION & DESIGN, LLC | $499,682 | Contract | : Renovate the Police Dispatch Center at the VA Medical Center in Lexington, Ky | Department of Veterans Affairs | 8/31/2009 |
DOUBLE R CONSTRUCTION, LLC | $3,826,231 | Contract | : Recovery - Furnish all labor, material, equipment and supervision for Upgrade Electrical Distribution System for Safety, Reliability and Compliance Phase 1, Project R626A4-08-113 at the Alvin C. York Medical Center, Tenn Valley Healthcare System, Murfrees | Department of Veterans Affairs | 10/08/2009 |
COMMUNICATIONS TECHNOLOGY, LTD. | $976,597 | Contract | : Replacement of Nurse Call System Building 501 Ground Floor & Building 500 4th | Department of Veterans Affairs | 8/27/2009 |
DONE DEAL GENERAL CONSTRUCTION AND ELECTRICAL INCORPORATED | $983,000 | Contract | : Upgrade and replace electrical distribution system/replace fire alarm | Department of Veterans Affairs | 8/25/2009 |
ENVIRONMENTAL SOLUTIONS GROUP, INC | $199,850 | Contract | : Renovation HVAC Systems Building 3H, 4H & 5H | Department of Veterans Affairs | 11/05/2009 |
GABCO CONSTRUCTION, INC. | $64,260 | Contract | : Relocate Main Telephone | Department of Veterans Affairs | 9/08/2009 |
HOMELAND SECURITY CONSTRUCTION CORP | $294,600 | Contract | : Upgrade A & MM HVAC Controls Project at the VA Maryland Health Care System, VA Medical Center, Baltimore, Maryland | Department of Veterans Affairs | 9/30/2009 |
MASTER SERVICE MID-ATLANTIC, INC. | $440,197 | Contract | : This project covers the rebuilding of existing main switchgear. The switchgear is being upgraded with new breakers (No parts are availiable for the old breakers). This project is calls for the manufacturing of new breaker carrages and the installation o | Department of Veterans Affairs | 9/16/2009 |
JR SERVICES, LLC | $323,450 | Contract | : Repair Roof at two locations Baltimore VA Medical Center, and Loch Raven Baltimore Rehab and Extended Care Center | Department of Veterans Affairs | 9/16/2009 |
RESAPT CONSTRUCTION, INC. | $373,300 | Contract | : REPLACE EXTERIOR OF BUILDINGS 11H,15H,17H & PAINT TRIM ON 23H. | Department of Veterans Affairs | 10/08/2009 |
JR SERVICES, LLC | $174,000 | Contract | : Replace the Exterior of buildings 4H and 5H at the VA Maryland HeaLTH Care System | Department of Veterans Affairs | 9/28/2009 |
FIDELIS DESIGN AND CONSTRUCTION LLC | $878,119 | Contract | : Rapiar Roads & walks @ VAMC Perry Point, MD | Department of Veterans Affairs | 12/02/2009 |
NADASKAY & KOPELSON ARCHITECTS, PA (INC) | $55,000 | Contract | : St. Alban Bathrooms | Department of Veterans Affairs | 7/13/2009 |
ARRAY ARCHITECTS, P.C. | $74,634 | Contract | : Project No. 620-09-203 A/E Design CLC Project at VA Hudson Valley Health Care System Castle Point Campus | Department of Veterans Affairs | 4/21/2009 |
ARRAY ARCHITECTS, P.C. | $48,050 | Contract | : Project 630A4-09-409 B91 Roof Replacement Project @VA Medical Center -St. Albans Campus, 179-00 Linden blvd., St. Albans, NY | Department of Veterans Affairs | 5/20/2009 |
ARRAY ARCHITECTS, P.C. | $85,000 | Contract | : Project 630A-09-406 Renovate Radiology VA Brooklyn Medical Center, NY | Department of Veterans Affairs | 6/30/2009 |
FELLENZER ENGINEERING LLP | $65,000 | Contract | : Engineering design for the upgrade to a Gamma Camera Suite for the VA East Orange, East Orange, NJ | Department of Veterans Affairs | 5/14/2009 |
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. | $1,073,813 | Contract | : Contractor shall provide all labor, tools, materials, equipment, supplies and supervision necessary to perform all general construction, milling and paving of roads and parking lots, walks, grading, concrete curbs, ramps, electrical work, and necessary re | Department of Veterans Affairs | 5/29/2009 |
VETERANS CONTRACTING GROUP, INC. | $427,500 | Contract | : Interior Renovation of Research Labratories. | Department of Veterans Affairs | 11/23/2009 |
CONCENTRIC GROUP, LLC | $504,108 | Contract | : Project No. 630A4-08-410 Install Medical Gas Systems at the St. Albans Community Living Center, Jamaica, NY | Department of Veterans Affairs | 12/18/2009 |
GCC ENTERPRISES INC. | $495,000 | Contract | : Contractor shall provide all labor, tools, materials, equipment, supplies and supervision necessary to perform all work | Department of Veterans Affairs | 12/23/2010 |
DONE DEAL GENERAL CONSTRUCTION AND ELECTRICAL INCORPORATED | $470,558 | Contract | : Replace and upgrade light fixtures | Department of Veterans Affairs | 12/23/2009 |
MAC DONALD CHARLES H ELECTRIC | $580,631 | Contract | : Provide all labor, material, equipment and supervision required to upgrade Boiler Plant at Philadelphia VA Medical Center. | Department of Veterans Affairs | 10/13/2009 |
JACK GIBSON CONSTRUCTION COMPANY | $3,332,000 | Contract | : COMMUNITY LIVING CENTER PHASE II-DEMENTIA | Department of Veterans Affairs | 9/28/2009 |
PIEDMONT CONTRACTING & DESIGN, INC. | $489,865 | Contract | : Provide all tools, travel, trades, labor, materials, permits, licenses and supervision for Improve Site Drainage project as indicated in drawings and specifications for project R529-08-107. | Department of Veterans Affairs | 9/08/2009 |
JACK GIBSON CONSTRUCTION COMPANY | $1,898,000 | Contract | : Community Living Center Phase IV - Electrical | Department of Veterans Affairs | 9/17/2009 |
BANCROFT GS, INC. | $1,517,000 | Contract | : Upgrade/Replace HVAC Chillers at the Wilmington VA Medcial Center, Wilmington, DE | Department of Veterans Affairs | 9/02/2009 |
SEAWOLF CONSTRUCTION CORP | $978,196 | Contract | : Renovate Bathrooms for ADA Compliance | Department of Veterans Affairs | 9/01/2009 |
BANCROFT GS, INC. | $724,000 | Contract | : Upgrade Boiler Plant Instrumentation in Building 14 at the Department of Veterans Affairs Medical Center in Coatesville, Pennsylvania | Department of Veterans Affairs | 9/10/2009 |
BANCROFT GS, INC. | $687,400 | Contract | : Correct Electrical Deficiencies at the Department of Veterans Affairs Medical Center in Coatesville, Pennsylvania | Department of Veterans Affairs | 9/29/2009 |
CEDAR ELECTRIC, INC. | $2,498,201 | Contract | : Renovation of exsisting space to create a new pateint check-in at Lebanon, Pa. VAMC | Department of Veterans Affairs | 9/30/2009 |
CEDAR ELECTRIC, INC. | $2,498,201 | Contract | : Renovation of exsisting space to create a new pateint check-in at Lebanon, Pa. VAMC | Department of Veterans Affairs | 9/30/2009 |
TNF VETERAN LLC | $40,000 | Contract | : The work has involved providing complete design to fully replace freight elevator #11 at the VA Medical Center. This project includes the motors, controls, lights, hydraulic system, new cabs, rails, etc. The work also included fire alarm work and security | Department of Veterans Affairs | 8/19/2009 |
WALLACE & WATSON ASSOCIATES, P.C. | $239,452 | Contract | : Professional architectural / engineering design services related to renovation of computer room and development of additional space. | Department of Veterans Affairs | 6/24/2009 |
HOWARD KULP ARCHITECTS, P.C. | $88,609 | Contract | : Dental Lab Renovation | Department of Veterans Affairs | 6/25/2009 |
AMERICAN CONSULTING, INC. | $97,427 | Contract | : A/E Services to design renovation of existing water tower at VA Butler Health Care. | Department of Veterans Affairs | 9/02/2009 |
POWERHOUSE DESIGN ARCHITECTS AND ENGINEERS, LTD | $14,418 | Contract | : Architect/Engineering Services to complete all design services required by the Statement of Work for the design of project number R503-09-101, Correct FCA Safety Deficiencies. See attached Statement of Work. | Department of Veterans Affairs | 8/19/2009 |
AE WORKS LTD. | $46,542 | Contract | : Architect/Engineering Services to complete all design services required by the Statement of Work for the design of project number R503-09-112, Correct FCA Deficienci. See attached Statement of Work. | Department of Veterans Affairs | 8/19/2009 |
CULPEPER VETERANS ASSOCIATES, LLC | $157,085 | Contract | : FCA Correct Electrical Deficiencies, at the VA Medical Center in Altoona, PA. | Department of Veterans Affairs | 9/09/2009 |
R.C. CLARK CONTRACTORS, INC. | $382,357 | Contract | : Security Enhancements | Department of Veterans Affairs | 9/21/2009 |
SEA KNIGHT ASSOCIATES, LLC | $1,785,000 | Contract | : Upgrade of Behavioral Health Clinic at the Phila.VA Medical Center | Department of Veterans Affairs | 9/25/2009 |
I.B.V., LTD | $6,071,360 | Contract | : Renovations to Emergency Dept. | Department of Veterans Affairs | 9/30/2009 |
RBVETCO, LLC | $2,095,000 | Contract | : Renovate 4 East for SICU | Department of Veterans Affairs | 9/29/2009 |
FIDELIS DESIGN AND CONSTRUCTION LLC | $2,334,281 | Contract | : Renovate Pharmacy @ VAMC Coatesville | Department of Veterans Affairs | 9/27/2009 |
TEAMUS CONSTRUCTION CO., INC. | $2,272,430 | Contract | : Remodel a dental office in the VA hospital | Department of Veterans Affairs | 11/17/2009 |
P.J. DICK INCORPORATED | $939,750 | Contract | : Design/Build services for the Research Building Animal Facility Upgrade located at the Department of Veterans Affairs Medical Center in Washington DC. Upgrade in general are to the HVAC system to 4 rooms and a hallway, upgrade entrances to the Animal Faci | Department of Veterans Affairs | 11/20/2009 |
GLOBAL ENGINEERING SOLUTIONS, INC. | $196,695 | Contract | : Replace nursing home chillers and cooling towers and Replace research building chillers. | Department of Veterans Affairs | 12/17/2009 |
URS GROUP, INC. | $257,000 | Contract | : Design services to renovate the Veterans Affair Medical Center, District of Columbia Radiology Department | Department of Veterans Affairs | 11/02/2009 |
DONE DEAL GENERAL CONSTRUCTION AND ELECTRICAL INCORPORATED | $19,726 | Contract | : Install glass front door with keyless hardware | Department of Veterans Affairs | 8/10/2009 |
ROBERTS WELDING WORKS, INCORPORATED | $179,690 | Contract | : Replace heating plant surge tank. | Department of Veterans Affairs | 8/05/2009 |
TRANE U.S. INC. | $217,911 | Contract | : Replace the existing air cooled chillers with new upsized units at the Loch Raven Outpatient Clinic, Baltimore, MD. | Department of Veterans Affairs | 7/20/2009 |
INDUSTRIAL CONTROL & COMPUTER CONSULTANTS INC | $264,035 | Contract | : Patient Wander Prevention System | Department of Veterans Affairs | 8/24/2009 |
A.A.M.C. INC. | $1,633,681 | Contract | : 501A Air Handler Replacement | Department of Veterans Affairs | 9/09/2009 |
BANCROFT GS, INC. | $127,200 | Contract | : underground chilled water upgrade to building 101 | Department of Veterans Affairs | 9/04/2009 |
DRS VETERAN ENTERPRISES LLC | $571,901 | Contract | : Furnish all labor, tools, material, equipment and supervision required to perfom work associated with Secuirty Vulnerability -Mailroom Relocation converting a portion of 6,200 SF warehouse from storage to a fully functional mailroom in accordance with spe | Department of Veterans Affairs | 8/28/2009 |
HARBOR SERVICES, INC. | $644,070 | Contract | : This project was a renovation of the Emergency Department. The work included the renovation the area behind the existing Emergency Deaprtment for increased emergency exam rooms and workspace. Work included demolition of existing walls, ceilings, floors | Department of Veterans Affairs | 8/27/2009 |
US BUILDERS GROUP INC. | $549,900 | Contract | : Modernize patient areas | Department of Veterans Affairs | 8/11/2009 |
US BUILDERS GROUP INC. | $742,100 | Contract | : Steam pipe replacement phase II | Department of Veterans Affairs | 8/11/2009 |
ARRIBA CORPORATION | $1,384,711 | Contract | : Fire Alarm System Upgrade at VA Medical Center Salem, VA | Department of Veterans Affairs | 10/20/2009 |
ADIRA CONSTRUCTION, INC. | $527,759 | Contract | : Provide all labor, materials, tools, equipment, transportation, and qualified supervision to complete project titled Recovery Act Enviornmental Compliance at VA Medical Center, Salem, Va. Work includes, but is not limited to, upgrade of the fuel storage | Department of Veterans Affairs | 11/24/2009 |
ADIRA CONSTRUCTION, INC. | $1,249,327 | Contract | : Provide all labor, materials, tools, equipment, transportation, and qualified supervision to replace select portions of primarily condensate return and the installation of a duplex vacuum condensate pump and two pressure pump traps in separate buidlings. | Department of Veterans Affairs | 12/14/2009 |
ECC CONSTRUCTION LLC | $532,850 | Contract | : Renovation/Addition | Department of Veterans Affairs | 8/28/2009 |
ECC CONSTRUCTION LLC | $3,210,600 | Contract | : HVAC Replacement | Department of Veterans Affairs | 9/01/2009 |
TAT CON GROUP | $994,293 | Contract | : RENOVATE HANDICAP ENTRANCE OF BLDG 100-A @ WJBD VA MEDICAL CENTER, COLUMBIA, SC | Department of Veterans Affairs | 8/04/2009 |
BSI CONTRACTING, INC. | $69,855 | Contract | : Renovate Restrooms | Department of Veterans Affairs | 9/15/2009 |
BSI CONTRACTING, INC. | $51,422 | Contract | : Install Wall Protection, Ground Floor | Department of Veterans Affairs | 9/14/2009 |
BSI CONTRACTING, INC. | $51,594 | Contract | : Replace Flooring, Ground Floor | Department of Veterans Affairs | 10/05/2009 |
BSI CONTRACTING, INC. | $1,369,004 | Contract | : Repair of elevators | Department of Veterans Affairs | 2/10/2009 |
PIONEER BUILDERS, INC. | $807,135 | Contract | : Renovate IT Space | Department of Veterans Affairs | 11/25/2009 |
LANIER CONTRACTING SERVICES, INC. | $2,213,915 | Contract | : Modernize Community Living Center, VAMC Atlanta / Decatur Georiga. Interior Remodel broken out into Phase A-D including 3rd floor, 2nd floor, 1st floor lobby and dining area. | Department of Veterans Affairs | 9/04/2009 |
WEBCO MARYLAND, LLC | $171,467 | Contract | : Mental Health Renovation | Department of Veterans Affairs | 9/14/2009 |
PIONEER BUILDERS, INC. | $1,115,476 | Contract | : Renovate Inpatient Area to Residential Environment | Department of Veterans Affairs | 11/20/2009 |
LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | $523,320 | Contract | : Quality management and pharmacy upgrades - Building 135 | Department of Veterans Affairs | 1/05/2010 |
C&C CONTRACTORS, LLC | $426,835 | Contract | : Renovate Restrooms with Water conservation Measures at Tuskegee VA; Tuskegee, AL | Department of Veterans Affairs | 11/19/2009 |
LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | $294,760 | Contract | : Renovate histology lab involving demolition, renovation and new construction | Department of Veterans Affairs | 11/20/2009 |
DJS CONSTRUCTION SERVICES INC | $446,518 | Contract | : To replace and upgrade Air Handling Equipment in Building 6 at the Carl Vinson VAMC in Dublin, Georgia. | Department of Veterans Affairs | 1/04/2010 |
FIREWATCH CONTRACTING OF FLORIDA LLC | $935,000 | Contract | : STRUCTURAL ATTACHMENTS ROOF AND WALLS, BLDG#32 | Department of Veterans Affairs | 11/09/2009 |
ACRO CONSTRUCTION, LLC | $350,137 | Contract | : Demolition and Replacement of defective steam distribution system components | Department of Veterans Affairs | 11/03/2009 |
AFFILIATED WESTERN, INC. | $219,000 | Contract | : Community Leaving Center elevators upgrade project, Caribbean Health Care system, San Juan, PR | Department of Veterans Affairs | 12/18/2009 |
GAUTIER & DE TORRES | $60,610 | Contract | : Study to address life safety issues on main water distribution system at VA Caribbean Healthcare System in San Juan, Puerto Rico. | Department of Veterans Affairs | 9/24/2009 |
SEAWOLF CONSTRUCTION CORP | $198,500 | Contract | : Upgrade and Repair of Electrical Distribution System | Department of Veterans Affairs | 1/08/2010 |
SEAWOLF CONSTRUCTION CORP | $94,800 | Contract | : Relocate Anesthesiology work room | Department of Veterans Affairs | 12/23/2009 |
KDV, INC | $1,018,386 | Contract | : VA Bldg. 16-2 | Department of Veterans Affairs | 8/24/2009 |
VGC | $393,000 | Contract | : Provide labor, material and expert supervision needed to install sewer main and man hole. Work includes but not limited to the repair of the horizontal waste lines in the sub basement in Bldg. #1, the installation of one manhole, metering devices and the | Department of Veterans Affairs | 6/10/2009 |
BLUEWATER LLC | $98,944 | Contract | : Replace Street Lighting At VAMC-Louisville | Department of Veterans Affairs | 6/12/2009 |
TRADESMEN GROUP INC, THE | $864,351 | Contract | : Repair & Replace Exterior at the Tennessee Valley Healthcare System, Murfreesboro, TN and Nashville, TN. Campus | Department of Veterans Affairs | 9/04/2009 |
KAR CONTRACTING, LLC | $663,981 | Contract | : Project is for the renovations and modernization of the Prosthetics and Orthotics departments. | Department of Veterans Affairs | 6/22/2009 |
TYWATER BROTHERS & ASSOCIATES, LLC | $600,595 | Contract | : Medical Gas Piping Corrections | Department of Veterans Affairs | 7/01/2009 |
BABCOCK CONSTRUCTION COMPANY, LLC | $97,823 | Contract | : Construct Intensive Care Unit Family Waiting Rooms | Department of Veterans Affairs | 10/20/2009 |
BABCOCK CONSTRUCTION COMPANY, LLC | $377,832 | Contract | : Replace Water Cooled Condensors | Department of Veterans Affairs | 10/05/2009 |
SEMPER FI CONSTRUCTORS, LLC | $557,872 | Contract | : Labor, supervision, materials, equipment, and tools for Recovery Act Project #614-09-106 CT Scanner and Ultrasound Renovation at the Department of Verterans Affairs Memphis, TN. | Department of Veterans Affairs | 12/16/2009 |
ATS FIDELIS GROUP, INC. | $503,589 | Contract | : Design and provide construction services to relace electrical switch gear in Building 116. | Department of Veterans Affairs | 9/21/2009 |
ROYCE CONSTRUCTORS, LLC | $3,550,538 | Contract | : Furnish all labor, material, equipment, transportation, and supervision necessary for Renovate Research Lab Phase 1 , Project No. R626-09-102 at the Tennessee Valley Healthcare System, 1310 24th Ave., S., Nashville, TN 37212. This project renovates approx | Department of Veterans Affairs | 10/08/2009 |
PIEDMONT CONTRACTING & DESIGN, INC. | $1,051,448 | Contract | : Furnish all labor, material, equipment and supervision to complete Project No. 621-08-113, Renovate Pharmacy at the James H. Quillen VA Medical Center, Mountain Home, TN in accordance with the terms, conditions, specifications and drawings of Solicitation | Department of Veterans Affairs | 9/29/2009 |
BCI CONSTRUCTION USA, INC. | $1,354,459 | Contract | : Bldg 49 Chiller Plant Addition | Department of Veterans Affairs | 10/29/2009 |
LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | $390,200 | Contract | : Renovate halls and replace exit doors in Building 43. | Department of Veterans Affairs | 11/06/2009 |
SILVER STAR CONSTRUCTION, LLC | $1,612,473 | Contract | : Renovate | Department of Veterans Affairs | 11/16/2009 |
J. W. FULLER CONSTRUCTION, L.L.C. | $590,911 | Contract | : Provide Emergency Power for Building 60 - Main Kitchen at VAMC - Jefferson Barracks. Includes backup Diesel Generator and remote fueling station. | Department of Veterans Affairs | 11/20/2009 |
KEPA- POETTKER JV | $2,637,375 | Contract | : The remediation of rooms with elevated mold counts, and stopping water intrusion into Buildings 37, 42, 43, and TMD-1; remediation of mold, asbestos, and lead, and stopping water intrusion into Building 13; remediation of mold, asbestos, and lead, and sto | Department of Veterans Affairs | 11/20/2009 |
SILVER STAR CONSTRUCTION, LLC | $1,296,192 | Contract | : Renovate | Department of Veterans Affairs | 11/23/2009 |
EMERGENCY PLANNING MANAGEMENT INC. | $600,606 | Contract | : Correct Sprinkler deficiencies | Department of Veterans Affairs | 12/02/2009 |
CONTRACTORS SERVICES LLC | $666,092 | Contract | : Expand Parking Lot to meet patient and visitor demand | Department of Veterans Affairs | 12/31/2009 |
SBH, LLC | $392,522 | Contract | : Work includes removal of cloth wires from electrical panels to lights/outlets. Replace wiring with new electrical wire. Remove/install new meters to specific buildings. Remove outdated electrical panels and replace with new panels. Re-feed panels from | Department of Veterans Affairs | 12/31/2009 |
TUSCA II, INC. | $584,349 | Contract | : Provide all necessary labor, materials, tools, equipment and services to renovate Medical Center. Work includes general construction, painting, replacing signage, replacing handrails, replacing flooring and carpet. The majority of the work will be archi | Department of Veterans Affairs | 12/22/2009 |
AINSWORTH-BENNING OF WYOMING, INC. | $222,628 | Contract | : Repair Historic Buildings on Campus | Department of Veterans Affairs | 12/29/2009 |
W. W. GRAINGER, INC. | $15,696 | Contract | : WELDED STEEL BOOKCASES-TENNSCO-78H X 34W X 13 1/2D - 5 SHELVES, PUTTY COLOR, QUANTITY 60 - SUPPLIES | Department of Veterans Affairs | 12/21/2009 |
HARRIMAN ASSOCIATES | $389,182 | Contract | : VA Center, Togus, ME Building 200 and 200E Facade repairs | Department of Veterans Affairs | 11/20/2009 |
VETERAN ENTERPRISES CO INC | $606,467 | Contract | : To preform milling and repaving to the following D Lot Parking Roadway and Golf Lot Parking located @ VA Western NY Health Sytem Buffalo, NY | Department of Veterans Affairs | 6/12/2009 |
BRICAN, INC. | $1,234,073 | Contract | : Replace windows VAMC Albany MATOC Task Order #1. | Department of Veterans Affairs | 11/12/2009 |
AVETERAN CORP. | $155,000 | Contract | : Bldg. 3 & 8 Corridor Upgrade | Department of Veterans Affairs | 12/16/2009 |
ACTION SERVICES GROUP, INC. | $77,060 | Contract | : PROJECT 621-09-103 THE FOLLOWING SHALL OUTLINE THE SCOPE OF THE WORK FOR THE JOHNSON CITY POWER BOARD TO INSTALL NEW 13-KV SERVICE TO VA MEDICAL CENTER. | Department of Veterans Affairs | 11/30/2009 |
AIRBORNE CONSTRUCTION SERVICES, LLC | $3,018,506 | Contract | : Airborne Construction Services will furnish all labor, materials, tools, equipment necessary to accomplish the work indicated on the contract drawings and as stated in the specifications or reasonably implied for the 'Recovery Act Renovate Elevator Lobby | Department of Veterans Affairs | 8/13/2009 |
KAN CONTRACTING, INC. | $405,325 | Contract | : Replacement of Kitchen Exhaust System at Overton Brooks VA Medical Center, Shreveport, LA | Department of Veterans Affairs | 11/04/2009 |
HONEYWELL INTERNATIONAL INC. | $745,000 | Contract | : Upgrade building Automation system for SLVHCS | Department of Veterans Affairs | 10/20/2009 |
TRI-SYSTEMS, INC. | $45,602 | Contract | : PAVE GRAVEL PARKING LOT | Department of Veterans Affairs | 8/27/2009 |
ISSE, LLC | $3,468,278 | Contract | : Replace Boiler Plant | Department of Veterans Affairs | 9/15/2009 |
ARCULUS LLC | $26,595 | Contract | : Generate an update of the facility asbestos survey using AHERA principles and the creation of an AHERA asbestos management plan based on the identified asbestos from the survey. | Department of Veterans Affairs | 6/16/2009 |
COLAMETTE CONSTRUCTION COMPANY | $141,713 | Contract | : RENOVATE THEATRE RESTROOMS | Department of Veterans Affairs | 9/14/2009 |
SKYTEK LLC | $495,546 | Contract | : Renovation of Phlembotomy Lab of Bldg 100 @ Portland Va Medical Center | Department of Veterans Affairs | 10/28/2009 |
ARCULUS LLC | $23,496 | Contract | : Conduct a survey of possible lead paint in the soil around specific facilities of the VA Hospital to provide data for the Environmental Liability Cost Assessment. | Department of Veterans Affairs | 6/16/2009 |
CALVARY CONTRACTING, INC. | $1,576,211 | Contract | : Project is to remove and replace 8 steam supply and 6 condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids | Department of Veterans Affairs | 10/22/2009 |
LEGENDS CONSTRUCTION, LLC | $748,131 | Contract | : Recovery Act-Renovate Dom Bldg 410 | Department of Veterans Affairs | 9/30/2009 |
AIRBORNE CONSTRUCTION SERVICES, LLC | $2,831,204 | Contract | : Airborne Construction Services will furnish all labor, materials, tools, equipment necessary to accomplish the work indicated on the contract drawings and as stated in the specifications or reasonably implied for the Recovery Act Project 'Canteen, Retail, | Department of Veterans Affairs | 11/13/2009 |
CALVARY CONTRACTING, INC. | $702,338 | Contract | : Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails | Department of Veterans Affairs | 9/28/2009 |
STOKES WEBB, LLC | $675,312 | Contract | : Provide all labor/material tool and equipment to extend electrical power to VAMC Cheyenne, WY | Department of Veterans Affairs | 12/21/2009 |
TUSCA II, INC. | $487,956 | Contract | : Installation of Ground-Mount Photovoltaic Power System; installation of structural steel support for Ground-Mount Photovoltaic Panel Array; installation of an inverter; installation of a new panel board; installation of security lights; demolition. Insta | Department of Veterans Affairs | 10/27/2009 |
SOUTHSIDE PLUMBING & HEATING, INC. | $771,882 | Contract | : Parking Lot and Road Upgrade | Department of Veterans Affairs | 11/13/2009 |
STOKES WEBB, LLC | $696,190 | Contract | : Correct Electric Deficiencies, Phase V at VA Central Health Care Syatem, Des Moines Iowa | Department of Veterans Affairs | 1/07/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $396,179 | Contract | : Hines VA JOC | Department of Veterans Affairs | 12/14/2009 |
PIEDMONT CONTRACTING & DESIGN, INC. | $391,445 | Contract | : Completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials and equipment necessary to perform work for project R538-09-104, entitled Recovery Renovate Basement Building 24 at the | Department of Veterans Affairs | 10/01/2009 |
LEGENDS CONSTRUCTION, LLC | $817,695 | Contract | : Cath Lab Expansion | Department of Veterans Affairs | 8/25/2009 |
CM GOVERNMENTAL SERVICES, LLC | $1,047,831 | Contract | : Provide all labor, materials, equipment, etc., to Replace Roads Curbs & Gutters Phase V at the VA Medical Center Battle Creek MI. This project will consist of accomplishing general construction and alterations to roads, curbs, gutters, storm sewer systems | Department of Veterans Affairs | 10/26/2009 |
SOUTH WESTERN COMMUNICATIONS INC. | $1,804,070 | Contract | : RIV Nurse Call System : Head-end equipment ? 100% completed ? before April 2010 X-Bus pull and termination ? 100% completed ? before April 2010 Home run cable pulls ? 100% completed ? before April 2010 Units Completed ? 100 % complete before April ? 201 | Department of Veterans Affairs | 9/30/2009 |
VALOR FIELD SERVICES, INC. | $984,474 | Contract | : All labor, materials, equipment, tools, and supervision to complete the Resurface and Restripe WTS Parking Lot project. | Department of Veterans Affairs | 12/23/2009 |
OCULUS INC. | $7,130 | Contract | : Replacement or removal of 7 exhaust fans. | Department of Veterans Affairs | 7/06/2009 |
OCULUS INC. | $64,565 | Contract | : Replace Exhaust Fans Study (Phase II of Design and Study of Remainder of Facility) | Department of Veterans Affairs | 7/24/2009 |
MDM/ROBINSON JV | $820,119 | Contract | : Federally Awarded Contract for Exteriror Renovation of Building 15. Asbestos Abatement and Rough & Finish Carpentry. | Department of Veterans Affairs | 9/04/2009 |
BRIGADIER CONSTRUCTION SERVICES, LLC | $1,395,890 | Contract | : Demolition of existing and construction of new research laboratory space in the basement level, Section B, of the Harry S. Truman Memorial Veterans Hospital in Columbia, MO. | Department of Veterans Affairs | 10/16/2009 |
SILVER STAR CONSTRUCTION, LLC | $300,562 | Contract | : Renovate | Department of Veterans Affairs | 12/10/2009 |
C3 SOLUTIONS LLC | $449,400 | Contract | : Replace Paging System at John Cochran VA Medical Center | Department of Veterans Affairs | 12/21/2009 |
ZIESON CONSTRUCTION COMPANY, LLC | $3,199,996 | Contract | : Electrical Upgrades VA Facility KCMO | Department of Veterans Affairs | 12/18/2009 |
SILVER STAR CONSTRUCTION, LLC | $1,275,466 | Contract | : Replace Windows | Department of Veterans Affairs | 12/21/2009 |
ZIESON CONSTRUCTION COMPANY, LLC | $958,271 | Contract | : Project Number: 589A5-09-109 Facade Corrections Building 1 Colmery O'Neil VA Medical Center, Topeka, KS | Department of Veterans Affairs | 12/29/2009 |
DVC, INC. | $79,950 | Contract | : Upgrade Lightning Protection system | Department of Veterans Affairs | 8/17/2009 |
TL SERVICES, INC. | $345,147 | Contract | : Renovate Canteen, Bldg. 8 | Department of Veterans Affairs | 10/28/2009 |
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. | $30,375 | Contract | : Provide A/E Services to replace existing plumbing pipes and fixtures in the ICU area on the 4th floor of building 28 at the Thomas E. Creek VA Medical Center in Amarillo, Texas. | Department of Veterans Affairs | 11/12/2009 |
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. | $58,306 | Contract | : Provide A/E Services for the renovation of old Endo area to make an ICU storage and patient waiting area on the 4th floor of building 28 at the Thomas E. Creek VA Medical Center in Amarillo, Texas. | Department of Veterans Affairs | 11/12/2009 |
GLHN ARCHITECTS AND ENGINEERS, INC | $34,937 | Contract | : Architectural & Engineering Services relative to Air Oxygen and Vacuum Systems Improvements 100% Design at the Big Springs Texas Veterans Affairs Medical Center | Department of Veterans Affairs | 10/20/2009 |
WESTLAKE, REED, LESKOSKY, LTD. | $198,695 | Contract | : I. PURPOSE: The purpose of this project is to improve the backup emergency power system associated with the Carl T. Hayden VA Medical Center. This project may also require construction of new exterior and/or interior features if determined to be requi | Department of Veterans Affairs | 8/31/2009 |
AFFILIATED WESTERN, INC. | $155,690 | Contract | : Fire Sprinkler SystemBldg 3 | Department of Veterans Affairs | 7/27/2009 |
UNITED BUILDERS. LLC | $838,702 | Contract | : CONSTRUCTION CONTRACT: To complete Project 678-09-102, GRC Showers Phase ll (2) at Tucson campus of Southern Arizona VA Health Care System (SAVAHCS). Contractor shall furnish material, equipment, supervision, and labor for all the work to install, as indi | Department of Veterans Affairs | 9/23/2009 |
SDV CONSTRUCTION, INC. | $303,480 | Contract | : Building 15, CCHT Expansion | Department of Veterans Affairs | 8/25/2009 |
DWG & ASSOCIATES, INC. | $794,265 | Contract | : GEMS Replace Fuel Tanks | Department of Veterans Affairs | 9/17/2009 |
AGILE INFRASTRUCTURE SERVICES, L.L.C. | $325,327 | Contract | : OR ENCHANCEMENTS | Department of Veterans Affairs | 9/18/2009 |
H SQUARED INDUSTRIES, INC. | $555,243 | Contract | : Repair steam and condensate phase I | Department of Veterans Affairs | 9/23/2009 |
BRISTON CONSTRUCTION, LLC | $156,562 | Contract | : Pave overflow patient parking at the New Mexico VA Health Care System (NMVAHCS), 1501 San Pedro Dr, SE, Albuquerque, NM 87108. Work includes site preparation, grading, drainage, electrical work, concrete curb and gutter, sidewalk, asphalt paving, and ce | Department of Veterans Affairs | 9/21/2009 |
JE HURLEY CONSTRUCTION, INC. | $532,409 | Contract | : Parking lot and street repairs, asphalt, concrete, sealing, striping | Department of Veterans Affairs | 12/21/2009 |
TUSCA II, INC. | $913,474 | Contract | : Modify HVAC systems located in animal research building. Includes general construction, demolition and removal of existing structures, alterations, balancing and installation of HVAC equipment, ductwork, hot and chilled water piping, electrical, architec | Department of Veterans Affairs | 12/11/2009 |
SBH, LLC | $254,701 | Contract | : Perform sandblasting and recoating of 600,000 gallon elevated water tank. Remove and reinstall cathodic protection. | Department of Veterans Affairs | 12/14/2009 |
TUSCA II, INC. | $2,344,331 | Contract | : Provide two new operating rooms and associated support rooms next to existing changing room and onto roof area above lab. Includes new HVAC units and temperature/humidity control to support new operating rooms. | Department of Veterans Affairs | 5/27/2009 |
CONTRACTORS SERVICES LLC | $470,073 | Contract | : Repair and replace sanitary sewer | Department of Veterans Affairs | 12/31/2009 |
PA CONSTRUCTION GROUP | $696,500 | Contract | : Test, Balance and HVAC maintenance repairs. | Department of Veterans Affairs | 12/30/2009 |
TUSCA II, INC. | $732,300 | Contract | : The majority of the work will be architectural including painting, carpentry, masonry, roofing, gutter repair, window replacement, signage, etc. Some work will require working around existing furniture and staff and their schedules. Work includes window | Department of Veterans Affairs | 12/24/2009 |
BEAMAN ARCHITECTURE LTD | $24,755 | Contract | : Architectural Design and Construction Document preparation | Department of Veterans Affairs | 8/04/2009 |
COLAMETTE CONSTRUCTION COMPANY | $61,777 | Contract | : VA REROOF AND ELEVATOR HANDRAIL | Department of Veterans Affairs | 8/28/2009 |
KEVCON, INC. | $381,178 | Contract | : Nurse Call Alarm Upgrades at VA Medical Center, Roseburg, OR | Department of Veterans Affairs | 8/28/2009 |
L T M INCORPORATED | $670,590 | Contract | : Resurface Main Roadways, Southern Oregon Rehabilitation Center and Clinics | Department of Veterans Affairs | 5/22/2009 |
SUBSTATION SOLUTIONS LLC | $121,366 | Contract | : Roseburg VAMC Surgery Suite Security | Department of Veterans Affairs | 8/03/2009 |
CISNEROS CONSTRUCTION SERVICES, LLC | $62,933 | Contract | : Project consist of upgrading the Nitrogen Farm to new siesmic codes. | Department of Veterans Affairs | 9/29/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $72,535 | Contract | : PROVIDE AND INSTALL MATV | Department of Veterans Affairs | 9/30/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $299,147 | Contract | : DESIGN/BUILD WOMEN'S CLINIC | Department of Veterans Affairs | 9/30/2009 |
BRADFORD CONSULTING ENGINEERS, INC. | $29,460 | Contract | : Renovation of Building 16 Basement at the Portland VA Medical Center | Department of Veterans Affairs | 9/30/2009 |
HARPER HOUF PETERSON RIGHELLIS INC. | $73,470 | Contract | : Project # 648-08-182 Building 16 Lot Wall, for the Portland VA Medical Center Campus Portland, Oregon | Department of Veterans Affairs | 9/29/2009 |
GRAY BEAR CONSTRUCTION CO. | $132,496 | Contract | : Provide all necessary labor, supervision, materials, and equipment to complete the work as described in the Specifications and Drawings for solicitation VA-260-RA-0509 and Deduct Alternate number 1.k. Places of performance are the campuses of the Portland | Department of Veterans Affairs | 9/30/2009 |
KEVCON, INC. | $573,063 | Contract | : Replace Galvanized Piping in Building 212 at West Los Angeles Veterans Center | Department of Veterans Affairs | 8/27/2009 |
LARSCOR GENERAL CONTRACTORS, INC. | $155,129 | Contract | : Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to ?Renovate/Expand Prosthetics? as required by drawings and specifications. Demol | Department of Veterans Affairs | 11/10/2009 |
TEL TECH PLUS, INC. | $220,538 | Contract | : Work includes general construction, alterations, roads, walks, grading, drainage, plumbing and electrical work, utility systems, water storage facilities, necessary removal of existing structures and construction and certain other items. The general scope | Department of Veterans Affairs | 11/30/2009 |
VETERAN CONSTRUCTION GROUP, INC. | $755,336 | Contract | : GLA UPS-823 Building 345 Nuclear Compliance. Two story building addition. | Department of Veterans Affairs | 11/24/2009 |
TARRAF CONSTRUCTION INC | $650,800 | Contract | : Furnish Materials and Perform the work for Remodel Primary Care for Patient Privacy at the VA Black Hills Health Care System, Hot Springs, SD. | Department of Veterans Affairs | 11/02/2009 |
HAMLINE CONSTRUCTION, INC. | $148,900 | Contract | : Replace Carpet in Dom, Bldg 2 | Department of Veterans Affairs | 12/24/2009 |
RED WILK CONSTRUCTION, INC. | $351,802 | Contract | : Furnish labor, equipment and materials to Renovate Pharmacy at the VA Medical Center in Sioux Falls, SD | Department of Veterans Affairs | 12/29/2009 |
ST. PIERRE, INC. | $68,210 | Contract | : BHNC Replace Domestic Water Pump System | Department of Veterans Affairs | 9/22/2009 |
DIVISION21 INC | $1,639,099 | Contract | : Elevator Upgrade | Department of Veterans Affairs | 6/30/2009 |
DIVISION21 INC | $89,731 | Contract | : Clean Screens & Vents | Department of Veterans Affairs | 9/15/2009 |
3ND, INC. | $455,338 | Contract | : Chillers and Spot Cooling | Department of Veterans Affairs | 11/03/2009 |
VERSACON, INC. | $70,837 | Contract | : The overall purpose of this award was to update the flooring in the telephone equipment room at the VA Minneapolis. This room serves as the main server room for not only VA Minneapolis, but various VA clinics through out ther state of MN. It was crucial | Department of Veterans Affairs | 9/24/2009 |
JOHNSON, LAFFEN, GALLOWAY ARCHITECTS, LTD | $62,442 | Contract | : Architectural and Engineering Services related work to reconfigure the Fargo Veterans Administration Medical Center Inpatient Pharmacy | Department of Veterans Affairs | 4/17/2009 |
JOHNSON, LAFFEN, GALLOWAY ARCHITECTS, LTD | $149,979 | Contract | : Architectural and Engineering Services related work to reconfigure the Fargo VA business office into a clinic space and the construction of an approximately 6,500 sf free standing clinic support building | Department of Veterans Affairs | 4/17/2009 |
JOHNSON, LAFFEN, GALLOWAY ARCHITECTS, LTD | $31,479 | Contract | : Architectural and Engineering related work to provide chiller repairs; upgrade of air dist ductwork, temperature controls and air handling; and spot cooling at medical sterilization room | Department of Veterans Affairs | 4/17/2009 |
RON ANDERSON CONSTRUCTION, INC | $181,876 | Contract | : Renovate Processing, Supply, and Distribution Center | Department of Veterans Affairs | 9/04/2009 |
CORNERS CONSTRUCTION | $340,414 | Contract | : REPAIR/UPGRADE WATERLINE TO QUARTERS | Department of Veterans Affairs | 7/02/2009 |
R.W. DISABLED VET CONSTRUCTION, LLC | $193,916 | Contract | : Repair asphalt roadway surfaces. Small area surface patching(chip sealing) full depth patching, crack sealing, pavement marking, replacement of pavement | Department of Veterans Affairs | 7/10/2009 |
BCE INC | $208,332 | Contract | : Replace electrical distribution system (GI) | Department of Veterans Affairs | 7/31/2009 |
CAPITAL CITY BOILER AND MACHINE WORKS, INC. | $116,461 | Contract | : Replace Hot Water Tanks (GI) Project at the Nebraska-Western Iowa Healthcare System, Grand Island Division | Department of Veterans Affairs | 8/31/2009 |
IXL/WORLD CLASS BUILDERS | $637,850 | Contract | : supervision, tools, labor, materials, equipment and transportation necessary for Replace Air Handlers for Laboratory at the Grand Island Division of the Nebraska-Western Iowa Health Care System located at 2201 North Broadwell, Grand Island, NE 68803. Work | Department of Veterans Affairs | 8/31/2009 |
RED WILK CONSTRUCTION, INC. | $1,728,966 | Contract | : Provide all labor, tools, materials and equipment and perform all work for the project to Upgrade / Renovate Supply, Processing and Distribution at the VA Medical Center, St. Cloud, MN | Department of Veterans Affairs | 11/12/2009 |
AINSWORTH-BENNING OF WYOMING, INC. | $210,460 | Contract | : Replace IRM A/C Systems | Department of Veterans Affairs | 11/06/2009 |
SKYLINE ENGINEERING LLC | $35,630 | Contract | : Engineering/Architectural professional services to provide complete design to include Preliminary investigative services, construction documents and construction administration services. | Department of Veterans Affairs | 11/20/2009 |
4X4D CO | $127,438 | Contract | : Renovate/Upgrade Police Office at Ft. Meade, SD VA Black Hills Campus | Department of Veterans Affairs | 12/15/2009 |
H.J. BRANDELES CORPORATION | $961,000 | Contract | : replace ahus, rome va clinic | Department of Veterans Affairs | 11/18/2009 |
DAVIDSON, JOHN E | $2,400 | Contract | : Review of 100% Dental Clinic drawings and specifications for deficiencies, inaccuracies etc. for correction by A&E. | Department of Veterans Affairs | 9/23/2009 |
EMTEQUE CORP | $2,633 | Contract | : Project Monitoring During Asbestos Abatement | Department of Veterans Affairs | 11/20/2009 |
UNITED RENTALS, INC. | $2,631 | Contract | : Rammer tamper | Department of Veterans Affairs | 8/24/2009 |
UNITED RENTALS, INC. | $32,625 | Contract | : BOMAG--BW 120AD-4 | Department of Veterans Affairs | 9/22/2009 |
ANDERSON ENGINEERING OF MN LLC | $233,039 | Contract | : Conduct Safety Compliance Audit and Safety and Health Management System Manual Preparation for 11 Cemeteries. | Department of Veterans Affairs | 8/27/2009 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $98,668 | Contract | : Conduct Environmental Compliance and Environmental Management Audits of 9 Cemeteries | Department of Veterans Affairs | 7/28/2009 |
PLATT CONSTRUCTION, INC. | $218,688 | Contract | : Replace water system at Wood National Cemetery | Department of Veterans Affairs | 8/25/2009 |
VALLEY PAVING, INC | $294,400 | Contract | : Replace asphalt paving at various locations throughout Ft. Snelling Cementary in Minneapolis | Department of Veterans Affairs | 9/15/2009 |
VALLEY PAVING, INC | $321,898 | Contract | : Replace asphalt at various locations at Fort Snelling Cementary at Minneapolis, MN | Department of Veterans Affairs | 9/15/2009 |
MURPHY'S HOME IMPROVEMENTS, INC. | $48,854 | Contract | : Provide and install metal Building | Department of Veterans Affairs | 10/16/2009 |
UNITED CONSTRUCTION & DESIGN, LLC | $136,081 | Contract | : Build a concrete & block three bin storage facility | Department of Veterans Affairs | 11/06/2009 |
US BUILDERS GROUP INC. | $392,000 | Contract | : Asphalt paving | Department of Veterans Affairs | 12/01/2009 |
AEGIS RESTAURO LLC | $13,000 | Contract | : French Cross Monument Conservation | Department of Veterans Affairs | 12/17/2009 |
LOTHROP ASSOCIATES LLP | $13,910 | Contract | : Change order to Contrract for additonal design of HVAC system | Department of Veterans Affairs | 9/09/2009 |
YOUNG ARCHITECTURAL LLC | $16,970 | Contract | : Provide Part 1 A/E Design and Engineering Services for the renovation of Building #1, ground floor Primary Care Unit at the Batavia New York VAMC facility. Develop the design for improved patient privacy at patient registration/information desk area. | Department of Veterans Affairs | 5/26/2009 |
EMTEQUE CORP | $7,350 | Contract | : Asbestos abatement oversight | Department of Veterans Affairs | 12/01/2009 |
PLUMB EXCEL GROUP ENGINEERING, P.C. | $53,437 | Contract | : AE design services for the replacement and upgrade of the existing Panic Alarm System; Provide design and construction administration services for installation of a new Emergency Notification System (ENS) Duress Alarm and removal of existing outdated pan | Department of Veterans Affairs | 9/15/2009 |
KEUKA CONSTRUCTION CORPORATION | $319,000 | Contract | : Renovations to existing Building 39 Chapel was completed in October 2010 | Department of Veterans Affairs | 9/29/2009 |
VETERAN ENTERPRISES CO., INC. | $99,773 | Contract | : Electrical distrbution system in Building 41 @ the VA Medical Center, Bath, NY | Department of Veterans Affairs | 10/14/2009 |
KEUKA CONSTRUCTION CORPORATION | $1,418,806 | Contract | : Order number 528C050048 is for the replacement of existing heating system and includes moficifations to existing fire protection system, electrical system and asbestos abatement along with associated renovations to existing structure to facilitate access | Department of Veterans Affairs | 10/22/2009 |
TOTAL MECHANICAL CONSTRUCTION LLC | $238,000 | Contract | : Masonry repairs | Department of Veterans Affairs | 7/09/2009 |
BCE INC | $194,185 | Contract | : Replace chillers | Department of Veterans Affairs | 7/30/2009 |
IPB, LLC | $469,000 | Contract | : Provide and Connect new Automatic Transfer Switches for the back up power feeds. | Department of Veterans Affairs | 10/29/2009 |
NOVI ENERGY LLC | $25,696 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 11/25/2009 |
NOVI ENERGY LLC | $25,696 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 11/25/2009 |
MEP ASSOCIATES, LLC | $58,149 | Contract | : A/E Services Replace Kitchen Coolers and Freezers - VAMC, Iron Mountain, MI | Department of Veterans Affairs | 7/10/2009 |
A. EPSTEIN AND SONS INTERNATIONAL, INC. | $317,499 | Contract | : Re-roof of Building #217 Architectural and Engineering Design Services | Department of Veterans Affairs | 9/25/2009 |
KEPA SERVICES INC. | $2,845 | Contract | : Rudman Park Exterior Modifications. To provide labor, material, tools and supervision necessary as indicated on the drawings and in the specifications described in Project No. R695-09-141 to complete the Rudman Park Exterior Modifications at Milwaukee VA | Department of Veterans Affairs | 8/20/2009 |
W.L. CONTRACTING INC. | $27,761 | Contract | : Install a new customer service desk in the outpaitient lobby. | Department of Veterans Affairs | 8/25/2009 |
NOVI ENERGY LLC | $25,696 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 11/25/2009 |
NOVI ENERGY LLC | $1,889 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $18,737 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $2,576 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $2,576 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $21,673 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $16,054 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $16,054 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $21,853 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
DYNAMIC ENERGY CONCEPTS INC | $16,054 | Contract | : Wind feasibility study | Department of Veterans Affairs | 11/25/2009 |
GRAY BEAR CONSTRUCTION CO. | $137,884 | Contract | : Remodel Surgical Waiting Area and Patient Exam Rooms at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon. | Department of Veterans Affairs | 9/29/2009 |
ST. PIERRE, INC. | $37,674 | Contract | : BHNC Repair/Replace Water Line | Department of Veterans Affairs | 9/02/2009 |
GLHN ARCHITECTS AND ENGINEERS, INC | $5,895 | Contract | : Architectural & Engineering Services relative to the critical electrical system for Ward 9B Privacy Renovations at the VA Western New York Healthcare System, Buffalo, NY | Department of Veterans Affairs | 9/04/2009 |
ROBERTS SHACKLETON & BOY PC | $79,346 | Contract | : Repair the structural intergrity of the Boiler Plant lower level area known as the Coal Bunker | Department of Veterans Affairs | 4/01/2009 |
ROBERTS SHACKLETON & BOY PC | $34,292 | Contract | : Preliminary Part 1,2 &3 Services for the Warehouse Roof/Patio | Department of Veterans Affairs | 2/16/2007 |
ROBERTS SHACKLETON & BOY PC | $38,967 | Contract | : WArd 7D Dialysis Improvements | Department of Veterans Affairs | 2/01/2008 |
WOOD HARBINGER, INC. | $171,330 | Contract | : Upgrade Electrical services and distribution for Building 67 and 85. | Department of Veterans Affairs | 11/23/2009 |
CUSTOM BUILDERS | $14,267 | Contract | : Window replacement | Department of Veterans Affairs | 12/15/2008 |
DECKER, JAMES A BUILDERS INC | $10,640 | Contract | : PAINTING WORK MAINTENANCE BUILDING, ALEXANDRIA NATIONAL CEMETERY | Department of Veterans Affairs | 9/28/2009 |
WIS BRANDS CO, THE | $18,500 | Contract | : Painting Services @ Chattanooga National Cemetary. | Department of Veterans Affairs | 9/29/2009 |
IMAGE ILLUSTRATIONS INC | $24,375 | Contract | : renovation of office at Chattanooga Nat'l VA Cemetery | Department of Veterans Affairs | 11/01/2009 |
A - Z BUILDING AND CONSTRUCTION SERVICES | $11,510 | Contract | : Paint maintenace building at the st. Augustine National Cementery | Department of Veterans Affairs | 12/17/2009 |
WALCO, INC. | $155,404 | Contract | : San Antonio National Cemetery Turfgrass Renovation Services | Department of Veterans Affairs | 9/15/2009 |
WALCO, INC. | $4,236,808 | Contract | : Fort Sam Houston National Cemetery headstone/realignment and turfgrass renovation | Department of Veterans Affairs | 11/30/2009 |
WALCO, INC. | $831,168 | Contract | : Houston National Cemetery Turfgrass Renovation | Department of Veterans Affairs | 9/03/2009 |
WEBB GROUNDS MAINTENANCE LLC | $777,264 | Contract | : Raise/lower, realign, level and backfill 7,428 upright marble headstones that have sunk into the ground over the years to an unacceptable level. This project will raise them to a standard of 25 high flowing with the contour of the ground improving the ap | Department of Veterans Affairs | 9/17/2009 |
BIG FISH HOLDINGS LLC | $7,600 | Contract | : cypress mulch for Jacksonville National Cemetary | Department of Veterans Affairs | 7/27/2009 |
JDM LLC | $289,009 | Contract | : Masonry Restoration - Phase 6 | Department of Veterans Affairs | 12/09/2009 |
JDM LLC | $277,912 | Contract | : Install ADA Automatic Fixtures in Bathrooms at VAJBMC | Department of Veterans Affairs | 12/10/2009 |
JDM LLC | $44,230 | Contract | : Site Prep For Nuclear Cameras | Department of Veterans Affairs | 12/16/2009 |
JDM LLC | $414,618 | Contract | : Replace AHU #28 at VAJBMC | Department of Veterans Affairs | 12/23/2009 |
FOURFRONT DESIGN, INC. | $24,380 | Contract | : A/E Services for Project 568-09-103, Remodel Police Office, Building 148, Ft. Meade, South Dakota. The project includes professional design services for the remodel of the police office within the Ft. Meade VA Medical Center. | Department of Veterans Affairs | 5/26/2009 |
FOURFRONT DESIGN, INC. | $38,650 | Contract | : A/E Services for Project 568-09-120, Design of HVAC Repairs in Bldgs 113 & 148, Ft. Meade, South Dakota. The project includes professional design services for the repair of HVAC systems in Building 113 and 148 within the Ft. Meade VA Medical Center. | Department of Veterans Affairs | 6/30/2009 |
FCE, INC FRAMPTON CONSULTING ENGINEERS INC. | $274,134 | Contract | : Initial award was 11-10-09 in the amount of 178,290, then on 12-30-09 this contract was ammended in the amount of 85267.23 for the Reduction in TimeLine for services rendered on a fasttrack. to a total contract value of 263557.23 | Department of Veterans Affairs | 12/30/2009 |
PAULI ENGINEERING INC | $128,544 | Contract | : Fresno Veterans Hospital Sidewalks repair / ADA compliance Shade structure - Main entrance improvements | Department of Veterans Affairs | 12/29/2009 |
FRAMPTON CONSULTING ENGINEERS INC. | $120,752 | Contract | : Parking-Sidewalk-Landscaping, East Side of Campus, Payment of Regional Water Quality Control Board Fees (totaling 120,752) | Department of Veterans Affairs | 4/09/2010 |
VETERANS NORTHWEST CONSTRUCTION LLC | $220,636 | Contract | : This construction revovation project splits 3 exam/offices and one shower into 8 exam/offices and split one existing bathroom into two bathrooms. Minor electrical and mechanical items are added or relocated to accommodate the new partition walls. | Department of Veterans Affairs | 12/14/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $172,901 | Contract | : All nessacary labor and euipment to build a Spect CT | Department of Veterans Affairs | 9/08/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $396,142 | Contract | : INSTALLATION OF A OVERHEAD PAGING SYSTEM IN PORTLAND AND VANCOUVER CAMPUSES OF PVAMC | Department of Veterans Affairs | 9/08/2009 |
GRAY BEAR CONSTRUCTION CO. | $197,381 | Contract | : Installation of Ambulatory Surge Chiller at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon. | Department of Veterans Affairs | 9/29/2009 |
HILLIARD ARCHITECTS INC | $354,943 | Contract | : Architecture and Engineering professional services for Wayfinding, Traffic Flow and ADA (Americans with Disabilities Act) Compliance for the VA Medical Center campus in San Francisco, CA. | Department of Veterans Affairs | 11/19/2009 |
WALCO, INC. | $81,309 | Contract | : Kerrville National Cemetery headstone raise/realignment and turfgrass renovation | Department of Veterans Affairs | 7/30/2009 |
RBVETCO, LLC | $192,000 | Contract | : Upgrade Medical Gas Piping | Department of Veterans Affairs | 3/18/2010 |
SEAWOLF CONSTRUCTION CORP | $909,000 | Contract | : The renovation of the emergency room together with the consolidation of the mental health andurology departments. | Department of Veterans Affairs | 9/21/2009 |
BVB CONSTRUCTION, INC | $290,890 | Contract | : Demolition of Building 23 at VA Palo Alto Health Care System | Department of Veterans Affairs | 7/21/2009 |
NORTHWEST PIPE FITTINGS, INC. | $1,619 | Contract | : Irrigation Pipe & Fittings | Department of Veterans Affairs | 3/12/2010 |
WELCH CONSTRUCTION INC. | $239,427 | Contract | : roof repair | Department of Veterans Affairs | 9/18/2009 |
DESIGN PARTNERSHIP LLP, THE | $176,366 | Contract | : The intent of this Evaluation is to provide professional engineering services to assss, analyze, and evaluate all of the elevators in buildings 1,2,6,7,13,200,203,208,&209 on the SFVAMC campus. (Elevators in buildings 8 & 12 have been omitted from this pr | Department of Veterans Affairs | 3/09/2010 |
AMERICAN ARCHITECTURAL RESTORATION, LLC | $42,753 | Contract | : Conserve the Massachusetts Monument at the Baron Rouge Nat'l Cemetery, Baton Rouge, LA | Department of Veterans Affairs | 3/15/2010 |
CARESTREAM HEALTH INC | $114,966 | Contract | : A Picture Archiving and Communication System (PACS) is a combination of hardware and software that allows for the storage, retrieval and management of medical images. These electronic images and reports are transmitted digitally via PACS. This transmissio | Department of Veterans Affairs | 2/09/2010 |
HICAPS, INC. | $1,500,113 | Contract | : Construct new pharmacy code requirements | Department of Veterans Affairs | 3/18/2010 |
BUYS & ASSOCIATES INC | $27,034 | Contract | : Environmental Assessment for Oklahoma City VA Medical Center, Oklahoma, Solar Photovoltaic Energy Project | Department of Veterans Affairs | 3/23/2010 |
TETRA TECH EM, INC. | $2,029 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
TETRA TECH EM, INC. | $2,366 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
TETRA TECH EM, INC. | $2,029 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
TETRA TECH EM, INC. | $2,366 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
TETRA TECH EM, INC. | $2,366 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
TETRA TECH EM, INC. | $2,366 | Contract | : Solar pre-screening & feasibility | Department of Veterans Affairs | 12/01/2009 |
SCHOPFER ARCHITECTS L.L.P. | $41,462 | Contract | : Architectural and Engineering services to design and renovate existing ground floor space at the Syracuse VA Medical Center to accommodate a relocation and expansion of Outpatient Cardiology. | Department of Veterans Affairs | 10/25/2009 |
TOTAL TEAM CONSTRUCTION SERVICES, INC | $275,027 | Contract | : Create Parking Lot, Bldg 11, San Francisco VA Medical Center. | Department of Veterans Affairs | 11/25/2009 |
TOTAL TEAM CONSTRUCTION SERVICES, INC. | $743,223 | Contract | : CLC AIR HANDLING UNITS BUILDING 10 AT VAMC RENO, NV | Department of Veterans Affairs | 1/08/2010 |
TOTAL TEAM CONSTRUCTION SERVICES, INC. | $1,808,019 | Contract | : Repair/Upgrade Water Tower Utility System, San Francisco VA Medical Center. | Department of Veterans Affairs | 1/11/2010 |
JENKS, INC. | $14,875 | Contract | : CONSTRUCTION EQUIPMENT | Department of Veterans Affairs | 9/30/2009 |
OCULUS INC. | $64,565 | Contract | : Replace Exhaust Fans Study (Phase II of Design and Study of Remainder of Facility) | Department of Veterans Affairs | 7/24/2009 |
HAWK CONTRACTING GROUP LLC | $944,000 | Contract | : Interior Maintenance Employee Locker Room to include improvements to existing space as well as new construction at a facility for which we have already been performing contracts. Will enable Hawk Contracting Group LLC to maintain existing employee levels | Department of Veterans Affairs | 3/10/2010 |
ECC CONSTRUCTION LLC | $2,235,500 | Contract | : Electrical Up Grade Replace Generator | Department of Veterans Affairs | 9/01/2009 |
AVETERAN CORP. | $155,000 | Contract | : Corridor Upgrade | Department of Veterans Affairs | 12/06/2009 |
ATS FIDELIS GROUP, INC. | $137,745 | Contract | : Correct HVAC Deficiencies in Pulmonary Lab B-200 | Department of Veterans Affairs | 2/26/2010 |
LW CONSTRUCTION OF CHARLESTON, LLC | $5,525,000 | Contract | : BOILER REPLACEMENT | Department of Veterans Affairs | 1/29/2010 |
CHICORA FOUNDATION INC | $14,248 | Contract | : Architectural conservation of the National Cemetery Memorial, Biloxi National Cemetery, consisting of monument cleaning, pointing of the mortar joints as necessary, and further evaluation of the possible need for consolidation. | Department of Veterans Affairs | 1/14/2010 |
MSC DESIGN BUILD LLC | $810,016 | Contract | : MS Construction has been contracted to complete all earthwork including installing new ductbanks, manholes, backfill and landscape repairs. R&L has been contracted to supply and install new fiber systems and test new systems | Department of Veterans Affairs | 2/02/2010 |
BRICAN, INC. | $1,820,088 | Contract | : FCA Convert High Pressure Steam Boilers to Low Pressure Steam Boilers. | Department of Veterans Affairs | 3/22/2010 |
TNF VETERAN LLC | $400,000 | Contract | : We are providing the architectural and engineering services associated with the replacement and upgrade of the Fire Alarm System at the VAMC in West Palm Beach, FL. | Department of Veterans Affairs | 1/21/2010 |
JENKS, INC. | $47,443 | Contract | : Construction Equipment | Department of Veterans Affairs | 9/30/2009 |
MORTIMER ELECTRIC, INC. | $1,291,070 | Contract | : Recovery FCA Correct Electrical Deficiencies | Department of Veterans Affairs | 3/29/2010 |
K.F. DAVIS ENGINEERING, INC. | $33,929 | Contract | : 35% design documents for energy conservation projects | Department of Veterans Affairs | 1/11/2010 |
SAN DIEGO PROJECT MANAGEMENT PSC | $195,000 | Contract | : 440 linear feet of oxygen line for 25 spaces at the Community Living Center, Caribbean Healthcare, San Juan PR | Department of Veterans Affairs | 3/31/2010 |
WILDWOODS, INC. | $899,947 | Contract | : Completely prepare site for building operations, including demolition, removal of existing equipment and structures, electrical, HVAC, plumbing including medical gas, telecommunications and data, and other related items. Furnish all necessary equipment, | Department of Veterans Affairs | 2/02/2010 |
GLEN/MAR CONSTRUCTION, INC. | $329,844 | Contract | : Renovate rooms in Reno VA Medical Center. | Department of Veterans Affairs | 1/21/2010 |
HAMMER LGC, INC. | $489,184 | Contract | : Abate and Demolish Bldgs 38, 64, 119, and 130 | Department of Veterans Affairs | 3/23/2010 |
GENERAL ELECTRIC COMPANY | $84,962 | Contract | : GE Analog 65KW Xray system, includes installation and training | Department of Veterans Affairs | 12/22/2009 |
CONSIGLI CONSTRUCTION CO., INC. | $258,000 | Contract | : Providing professional services, labor and materials, tools and equipment necessary for compreheive repair, conservation, clean and other treatment as necessary or the soldiors and sailors monument in the Togus National Cematary. | Department of Veterans Affairs | 1/22/2010 |
AMEC E&I, INC | $32,556 | Contract | : Environmental Assessment of a Wind Turbine System at the San Francisco Veterna's Adminstration Medical Center (VAMC), CA. | Department of Veterans Affairs | 2/23/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $14,566 | Contract | : Environmental Assessment of Los Angeles, CA | Department of Veterans Affairs | 3/25/2010 |
JE HURLEY CONSTRUCTION, INC. | $422,445 | Contract | : Sprinkler Piping Repairs | Department of Veterans Affairs | 1/22/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $23,952 | Contract | : Environmental Assessment of Prescott, AZ | Department of Veterans Affairs | 3/19/2010 |
MSC DESIGN BUILD LLC | $781,088 | Contract | : Tasco has been contracted to complete all earthwork including installing new ductbanks, manholes, backfill and landscape repairs. They are also responsible for installing conductors, switch gear and equipment pads | Department of Veterans Affairs | 2/02/2010 |
TOTAL TEAM CONSTRUCTION SERVICES, INC | $208,549 | Contract | : Construction Sitework | Department of Veterans Affairs | 9/29/2009 |
TTI ENVIRONMENTAL, INC. | $37,900 | Contract | : Correct FCA safety deficiencies (Underground Storage Tanks) | Department of Veterans Affairs | 3/03/2010 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $88,761 | Contract | : Environmental Compliance and Environmental Management Audits for MSN V. | Department of Veterans Affairs | 1/07/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $145,761 | Contract | : Environmental Compliance and Environmental Management Audits for MSN III. | Department of Veterans Affairs | 1/07/2010 |
WALCO, INC. | $120,900 | Contract | : Hot Springs National Cemetery turf renovation | Department of Veterans Affairs | 8/05/2009 |
VETERANS DEVELOPMENT CORPORATION, INC. | $1,284,779 | Contract | : FURNISH LABOR, MATERIAL, TRANSPORTATION, EQUIPMENT, DISPOSAL AND SUPERVISION TO REPLACE AIR HANDLING UNIT EQUIPMENT (PHASE 2) AT BUILDING 1 MECHANICAL TOWER, WEST ROXBURY VAMC | Department of Veterans Affairs | 3/29/2010 |
VETERANS CONTRACTING GROUP, INC. | $145,000 | Contract | : Upgrade sprinklers at the Brooklyn VA. | Department of Veterans Affairs | 3/25/2010 |
FHC CONTRACTING, INC. | $553,698 | Contract | : Program Source (TAS)* | Department of Veterans Affairs | 3/16/2010 |
HERMAN CONSTRUCTION GROUP, INC. | $833,966 | Contract | : Main Bid Item: Contractor shall furnish all management, supervision, labor, transportation, equipment and materials, and perform work to include general construction, demolition, alterations, drainage, mechanical and electrical work, water storage facili | Department of Veterans Affairs | 12/16/2009 |
SEAWOLF CONSTRUCTION CORP | $155,370 | Contract | : Relocation of the Anesthesiology Work Room | Department of Veterans Affairs | 12/22/2009 |
HYMAN HAYES ASSOCIATES LLC | $157,771 | Contract | : Architectural and Engineering Design and preparation of construction documents and construction administration assistance for PACU at Samuel S. Stratton VA Medical Center. | Department of Veterans Affairs | 6/16/2009 |
ARG CONSERVATION SERVICES | $46,686 | Contract | : Comprehensive repair, conservation, cleaning and other treatment as necessry of the NHDVS Monument, Los Angeles National Cemetery | Department of Veterans Affairs | 3/07/2010 |
SUBSTATION SOLUTIONS LLC | $22,500 | Contract | : Install upgraded lighting fixtures in cemetery Admin building | Department of Veterans Affairs | 6/04/2009 |
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. | $117,878 | Contract | : Provide Contract Drawings, Specifications, construction Cost Estimates, Phasing Requirements, Construction Duration, Engineering Calculations, subsequent Construction Period Services and develop and recommend bid deducts for alternate construction proposa | Department of Veterans Affairs | 1/07/2010 |
THOMPSON INTERNATIONAL INC | $136,500 | Contract | : CLEANING OF HEATING COOLING AIR DUCT | Department of Veterans Affairs | 2/10/2010 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $9,420 | Contract | : Provide Architectural and Engineering services to design a new storm sewer line near the oxygen storage tank west of building 2 at the Des Moines VA. | Department of Veterans Affairs | 12/22/2009 |
BMCI CONSTRUCTION, LLC | $585,299 | Contract | : Replace Medical Center Windows - Phase 1 | Department of Veterans Affairs | 1/05/2010 |
POINTER CONSTRUCTION GROUP, LLC | $2,761,088 | Contract | : Upgrade Public Restrooms | Department of Veterans Affairs | 3/31/2010 |
BUYS & ASSOCIATES INC | $27,034 | Contract | : Environmental Assessment for San Juan Health Care System, Puerto Rico, Solar Photovoltaic Energy Project | Department of Veterans Affairs | 3/23/2010 |
SEMPER FI CONTRACTING, LLC | $32,250 | Contract | : Reseal Existing Road with Slurry Pavers | Department of Veterans Affairs | 7/16/2009 |
CONSERVATION ARTISANS | $3,270 | Contract | : Conservation of Grand Army of the Republic (GAR) Monument at Loudon Park National Cemetery, Maryland. | Department of Veterans Affairs | 1/21/2010 |
B R CONSTRUCTION LLC | $2,047,000 | Contract | : This project will upgrade the electrical distribution for the Veterans Administration Medical Center in Bath, NY. The Project includes construction of new medium voltage ductbank, manhole and cable systems to serve the existing campus buildings. The new | Department of Veterans Affairs | 2/02/2010 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $233,347 | Contract | : Environmental Compliance and Environmental Management Audits for MSN IV. | Department of Veterans Affairs | 1/07/2010 |
TTL ASSOCIATES, INC. | $20,399 | Contract | : NEPA Environmental Assessment | Department of Veterans Affairs | 3/24/2010 |
BERGMANN ASSOCIATES INC | $208,381 | Contract | : Design engineering services for Energy Conservation Measures at Canandaigua Veterans Affairs Medical Center | Department of Veterans Affairs | 1/26/2010 |
DAVIDSON, JOHN E | $3,000 | Contract | : Review 95% Pre-Final Design PACU Renovations technical drawings and specifications for deficiencies, inaccuracies, constructability, etc. for correction by A&E. Provide Design Review Sheet (Report). | Department of Veterans Affairs | 1/14/2010 |
RIGHT ELECTRIC INC. | $7,227,000 | Contract | : Upgrade Emergency Power Distribution | Department of Veterans Affairs | 9/04/2009 |
MANGI ENVIRONMENTAL GROUP, INC. | $23,584 | Contract | : Prepare an Environmental Assessment of the Northport VAMC, NY | Department of Veterans Affairs | 3/02/2010 |
MJL ENTERPRISES, LLC | $5,963 | Contract | : Product | Department of Veterans Affairs | 9/22/2009 |
TMAD TAYLOR & GAINES ENGINEERS | $215,538 | Contract | : Engineering Design Services | Department of Veterans Affairs | 12/10/2009 |
O'CONNELL ELECTRIC COMPANY, INC. | $51,440 | Contract | : Installing emergency power to panel 16-1A | Department of Veterans Affairs | 10/30/2009 |
MENDEZ BRUNNER BADILLO & ASSOCIATES | $181,545 | Contract | : A&E Services for Project Replace Sanitary System. | Department of Veterans Affairs | 3/03/2010 |
U.S. VETERANS CONSTRUCTION & MANAGEMENT CORP. | $3,127,000 | Contract | : GI Clinical Improvement VA New York Harbor Healthcare System | Department of Veterans Affairs | 2/04/2010 |
C3T, INC. | $317,540 | Contract | : Replace Roof Bldg 123 E-Wing | Department of Veterans Affairs | 3/25/2010 |
RCI CONTRACTORS & ENGINEERS, INC. | $1,159,000 | Contract | : Replace HVAC Controls | Department of Veterans Affairs | 3/18/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
R&R CONSTRUCTION SERVICES, INC. | $343,000 | Contract | : Conservation and Repairs of the USS Bennington Monument and surrounding enclosure wall at Ft. Rosecrans National Cemetery, San Diego, CA | Department of Veterans Affairs | 1/28/2010 |
DEERE & COMPANY | $22,652 | Contract | : Pro-Gator | Department of Veterans Affairs | 2/24/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
DIVERSE CONSTRUCTION GROUP, LLC, THE | $1,231,015 | Contract | : Chiller removal and replacement at Syracuse Veteran's Affairs Hospital | Department of Veterans Affairs | 3/31/2010 |
FRANCIS LLC/HAND CONSTRUCTION LLC JOINT VENTURE | $4,740,725 | Contract | : VA256-RA-0795,Renovate/Upgrade Surgical Services, 3rd Floor, West Wing | Department of Veterans Affairs | 11/19/2009 |
BURTON CONSTRUCTION, INC. | $180,590 | Contract | : Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte | Department of Veterans Affairs | 2/01/2010 |
C3T, INC. | $214,051 | Contract | : INSTALL 1 HR. SMOKE BARRIER 4C | Department of Veterans Affairs | 1/19/2010 |
TRAFFIC ANALYSIS & DESIGN, INC. | $236,751 | Contract | : Edward Hines Jr. VA Hospital Campus Traffic and Parking Study | Department of Veterans Affairs | 1/21/2010 |
DEERE & COMPANY | $19,383 | Contract | : 2030A Diesel ProGator | Department of Veterans Affairs | 9/28/2009 |
ALLIANCE ROOFING LLC | $1,285,205 | Contract | : Reroofing project at the DAllas VA | Department of Veterans Affairs | 4/01/2010 |
HOAG CONSTRUCTION COMPANY | $680,000 | Contract | : Renovate 1st Floor NE for Dental Lab Project | Department of Veterans Affairs | 3/26/2010 |
BROWN CONSTRUCTION MANAGEMENT INC. | $5,582,539 | Contract | : EXPAND THE LOCH RAVEN COMMUNITY LIVING CENTER | Department of Veterans Affairs | 12/03/2009 |
SEAWOLF CONSTRUCTION CORP | $206,986 | Contract | : Upgrade and Repair Electrical Distribution System | Department of Veterans Affairs | 1/08/2010 |
TTL ASSOCIATES, INC. | $34,924 | Contract | : NEPA Environmental Assessment | Department of Veterans Affairs | 3/12/2010 |
DUDLEY ROOFING CORPORATION | $48,815 | Contract | : reroofing | Department of Veterans Affairs | 9/19/2009 |
TRI-TECH | $719,208 | Contract | : Underground Electrical Feeder Replacement. | Department of Veterans Affairs | 3/12/2010 |
GAITHERSBURG FARMERS SUPPLY, INC. | $6,663 | Contract | : BROOM 84 FOR SKID STEER | Department of Veterans Affairs | 9/30/2009 |
WINN CONSTRUCTION COMPANY | $766,030 | Contract | : Renovate Radiology for Position Electron Transformation CT Install | Department of Veterans Affairs | 3/15/2010 |
OV CONSTRUCTION, LLC | $3,161,068 | Contract | : Replace and Upgrade Electrical Systems in Multiple Buildings - VAMC Hampton, Virginia | Department of Veterans Affairs | 1/14/2010 |
TOTAL TEAM CONSTRUCTION SERVICES, INC. | $1,033,837 | Contract | : New Sewer Lift Station for VA Medical Facilities | Department of Veterans Affairs | 3/31/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
BAILEY EDWARD DESIGN, INC. | $56,703 | Contract | : Bailey Edward architecture has been contracted to perform architecture and engineering services to paint and provide cathodic protection at the water tower. | Department of Veterans Affairs | 1/27/2010 |
TUSCA II, INC. | $527,300 | Contract | : Carport installation and solar panels: work includes general construction, alterations, electrical work, existing structures and construction and certain other items. The photovoltaic carport assembly and structure shall be installed to deliver solar ele | Department of Veterans Affairs | 3/12/2010 |
BRICAN, INC. | $1,700,000 | Contract | : Upgrade Supply, Processing and Distribution Heating, Ventilation and Air Conditioning and Sterilization in Building 1 Basement. | Department of Veterans Affairs | 3/26/2010 |
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. | $484,000 | Contract | : Install Utility Metering at VA Hudson Valley Healtcare System, Castle Point NY. | Department of Veterans Affairs | 2/24/2010 |
TORO COMPANY, THE | $48,023 | Contract | : Utility vehicle | Department of Veterans Affairs | 8/05/2009 |
CONSERVATION ARTISANS | $5,005 | Contract | : Clean and consolidate cast stone monument; repoint open mortar joints; inject open cracks; replace missing stones. | Department of Veterans Affairs | 1/16/2010 |
AFFILIATED WESTERN, INC. | $665,926 | Contract | : Upgrade fire alarm Systems | Department of Veterans Affairs | 2/25/2010 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $32,190 | Contract | : Design and update boiler controls | Department of Veterans Affairs | 3/30/2010 |
PACE BUILDING CORPORATION | $1,313,000 | Contract | : Project calls removal and replacement of ten (10) existing air handler units at the Kerrville, Texas VA Hospital. Work involves: selective demolition, mechanical (HVAC), fire protection and electrical work, etc. | Department of Veterans Affairs | 3/29/2010 |
BUYS & ASSOCIATES INC | $20,863 | Contract | : Environmental Assessment for Albuquerque, New Mexico Health Care System, Solar Photovoltaic Energy Project | Department of Veterans Affairs | 2/19/2010 |
CONSERVATION ARTISANS | $13,680 | Contract | : Cleaning of bronze sculpture and plaques, granite pedestal, cast iron cannons, granite bollards; repainting of chain; realignment of curbstones. | Department of Veterans Affairs | 2/25/2010 |
BALTIMORE HYDRAULICS, INC. | $15,539 | Contract | : Remove & Replace Hydraulic Dock Leveler at Loch Raven VA Medical Facility in Baltimore, MD | Department of Veterans Affairs | 8/26/2009 |
347 CONSTRUCTION GROUP | $325,594 | Contract | : Evaulate Feasibiltiy of Direct Geothermal Sacramento | Department of Veterans Affairs | 12/16/2009 |
INNOV8 CONTRACTING, INC. | $43,000 | Contract | : Replace/Update Hospital Interior Finishes | Department of Veterans Affairs | 2/20/2010 |
HAMMER LGC, INC. | $580,276 | Contract | : Relocate surgical center to 6th floor. | Department of Veterans Affairs | 3/31/2010 |
KAL ARCHITECTS INC | $54,777 | Contract | : AE to provide professional design services to furnish Design Development and Construction Document Packages including demolition, architectural, structural, drawings, phasing plan and narrative, cost estimates, technical specifications, and related inform | Department of Veterans Affairs | 1/19/2010 |
BOYKIN CONTRACTING GROUP, INC. | $54,710 | Contract | : aluminum entrance work including storefront construction, hung doors, interior ICU sliding doors, and other components to make a complete assembly | Department of Veterans Affairs | 7/31/2009 |
HOMELAND SECURITY CONSTRUCTION CORP | $188,225 | Contract | : Upgrade the Outpatient Waiting Area @ VA Medical Center in Huntington, WV. | Department of Veterans Affairs | 3/29/2010 |
MAKOVICH & PUSTI ARCHITECTS INC | $36,462 | Contract | : Surgical Renovations Design Change at the Louis Stokes Veterans Affairs Medical Center | Department of Veterans Affairs | 10/27/2009 |
VETERANS OF THE LAND, INC. | $1,443,197 | Contract | : Raise and Realign, Refasten, and Turf Renovation. | Department of Veterans Affairs | 9/17/2009 |
SCHNEIDER ELECTRIC USA, INC. | $365,036 | Contract | : ELECTRICAL UPGRADE TO BLDG 1 WACO VAMC RECOVERY ACT FUNDED | Department of Veterans Affairs | 1/27/2010 |
OEC MEDICAL SYSTEMS, INC. | $158,384 | Contract | : OEC 9900 Elite Mobile C-Arm | Department of Veterans Affairs | 2/22/2010 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $14,500 | Contract | : Project Management and Monitoring of Building 3 HVAC Asbestos Abatement. | Department of Veterans Affairs | 1/19/2010 |
ENGINUITY SYSTEMS, LLC | $70,087 | Contract | : Provided design for the remodel the existing visitor lobby of Building 100 at the Department of Veterans' Affairs Medical Center in Seattle Washington to create a new Emergency Department office wing. The area of remodel to be approximately 3,737 square | Department of Veterans Affairs | 1/15/2010 |
OCULUS INC. | $169,129 | Contract | : Provide design documents for the replacement or modification of existing exhaust systems to bring these existing systems into compliance with current codes and industry standards. The main focus of the project will be to modify the exhaust fan system in t | Department of Veterans Affairs | 1/29/2010 |
TORO COMPANY, THE | $9,644 | Contract | : mid-duty utility vehicle | Department of Veterans Affairs | 9/29/2009 |
PLATT CONSTRUCTION, INC. | $184,098 | Contract | : Remove existing windows and replace with new thermally broken insulated window units, patch and paint disturbed interior finishes. | Department of Veterans Affairs | 2/23/2010 |
SEAWOLF CONSTRUCTION CORP | $868,000 | Contract | : Upgrade Building Safety & Security @ VA Lyons Campus | Department of Veterans Affairs | 2/17/2010 |
SYSTECH FIRE PROTECTION | $377,739 | Contract | : AE Services for Design and Construction Period Services for Upgrade Fire Alarm System at VAMC Clarksburg, WV | Department of Veterans Affairs | 3/26/2010 |
CONSERVART LLC | $36,250 | Contract | : The restoration of the bronze and granite Minnesotta Monument in Little Rock National Cemetery | Department of Veterans Affairs | 3/03/2010 |
WORCESTER EISENBRANDT, INC. | $33,497 | Contract | : Historic Preservation of the Union Monument | Department of Veterans Affairs | 1/15/2010 |
JENSEN CONSERVATION SERVICE | $13,500 | Contract | : Conserve Battle Mountain Sanitarium Monument, 1914, at Hot Springs National Cemetery, Hot Springs, SD | Department of Veterans Affairs | 3/03/2010 |
LEGION CONSTRUCTION, INC. | $723,700 | Contract | : SPD HVAC Systems Upgrades in Building 2 on the Basement Level. Upgrades to above ceiling mechanical systems at various locations utilizing existing utility systems. Additional fire suppression upgrades will also take place. Work will take place in four p | Department of Veterans Affairs | 3/31/2010 |
TUSCA II, INC. | $543,000 | Contract | : Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Replace Ward 3 Air Handing Unit (AHU) as required by drawings and specification | Department of Veterans Affairs | 3/12/2010 |
FLOYD CONSTRUCTION CORPORATION | $341,830 | Contract | : Improve IT & Facility Security | Department of Veterans Affairs | 3/16/2010 |
VETERANS CONTRACTING GROUP, INC. | $538,981 | Contract | : Repave Parking lot, streets, and sidewalks at Cypress Hills Cemetery. | Department of Veterans Affairs | 3/22/2010 |
HARBOR SERVICES, INC. | $2,070,383 | Contract | : Renovation of building 15B for an acute care ward. Project includes converting existing call center into private room with individual toilet facilities as well as upgrades and modifications to utility systems, new mechanical equipment, exterior masonry s | Department of Veterans Affairs | 1/15/2010 |
ACRO CONSTRUCTION, LLC | $384,080 | Contract | : Replace Interior Finishes at Building 1 | Department of Veterans Affairs | 3/19/2010 |
AKEA, INC. | $43,605 | Contract | : Provide Architect / Engineering services to Replace Chiller #4 at Lake City Medical Center, Fl | Department of Veterans Affairs | 1/20/2010 |
DAL CONSTRUCTION LLC | $1,332,500 | Contract | : HVAC Upgrades- unit 24 (Building 500) in Richmond VAMC | Department of Veterans Affairs | 3/01/2010 |
WESCOTT ELECTRIC COMPANY | $332,313 | Contract | : Elevator Replacement | Department of Veterans Affairs | 2/25/2010 |
CSRW, INC. | $98,499 | Contract | : Re-Roof Building 117 VA Prescott AZ. | Department of Veterans Affairs | 3/31/2010 |
DAEDALUS INC | $18,250 | Contract | : Conserve Maine Monument at the Salisbury National Cemetery, Salisbury, NC | Department of Veterans Affairs | 1/15/2010 |
CONSERVATION ARTISANS | $4,788 | Contract | : Restoration of Andrews Raiders Monument. | Department of Veterans Affairs | 9/28/2009 |
KEVCON, INC. | $296,003 | Contract | : Telecomm Closet Climate Control Upgrades at VA HealthCare Center, White City, OR | Department of Veterans Affairs | 3/12/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $15,250 | Contract | : Environmental Assessment of San Diego, CA | Department of Veterans Affairs | 3/25/2010 |
AKEA, INC. | $285,443 | Contract | : Provide professional architect / engineer services to upgrade electrical distribution system | Department of Veterans Affairs | 1/20/2010 |
K.F. DAVIS ENGINEERING, INC. | $61,414 | Contract | : Replacement of finishes in patient care areas | Department of Veterans Affairs | 5/27/2009 |
AFFILIATED WESTERN, INC. | $577,000 | Contract | : Upgrade Elevators in building 107 A&B, 649-09-105. | Department of Veterans Affairs | 3/31/2010 |
AEGIS RESTAURO LLC | $61,465 | Contract | : 35th Division Water Fountain Monument Conservation | Department of Veterans Affairs | 3/03/2010 |
NORTHERN HILLS SOD FARM | $6,425 | Contract | : To supply & deliver 25,000 sq feet of Kentucky Blue Grass sod to the Black Hills National Cemetary, Sturgis SD. Project pending expected in 2nd quarter. | Department of Veterans Affairs | 3/12/2010 |
WORCESTER EISENBRANDT, INC. | $82,998 | Contract | : Historic Preservation of the Confederate POW Dead Monument | Department of Veterans Affairs | 1/27/2010 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $396,142 | Contract | : DESIGN/BUILD OVERHEAD PAGING | Department of Veterans Affairs | 8/26/2009 |
C J M S CONTRACTING LLC | $654,095 | Contract | : Replace Asphalt Roads - Varioius Locations - Jefferson Barracks Cemetery | Department of Veterans Affairs | 10/10/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $23,218 | Contract | : Prepare an environmental assessment for the Sepulveda VA Outpatient Clinic in support of the installation of solar photovoltaic systems; prepare Finding of No Significant Impact (FONSI) report. | Department of Veterans Affairs | 3/26/2010 |
MEP ASSOCIATES, LLC | $578,027 | Contract | : A/E Services - Upgrade Electrical Distribution & Generator - Phase III, VAMC - Iron Mountain, MI | Department of Veterans Affairs | 2/19/2010 |
GUARDIAN ENVIRONMENTAL SERVICES COMPANY, INC. | $949,219 | Contract | : Phase 2 Renovations at the VA Hospital Community Living Center, Wilmington DE | Department of Veterans Affairs | 2/25/2010 |
VETERAN CONSTRUCTION SOLUTIONS, LLC | $5,362,531 | Contract | : Upgrade and Replace Medical Gas System in Building 200 at Edward Hines Jr VA Medical Center | Department of Veterans Affairs | 2/05/2010 |
RANI ENGINEERING, INC. | $17,647 | Contract | : ** The total Original Contract was $41,707.61. First Authorization was for $17,647. The remaining of the award for $24,060.61 was cancelled. Services Provided: Asbestos removal for project 568-403 Renovate Building 4 for patient Privacy at the VA Black Hi | Department of Veterans Affairs | 3/26/2010 |
W. W. GRAINGER, INC. | $13,613 | Contract | : Office Furniture, Welded Steel Bookcase, Tennsco B78CP, Height 78 inches,width 34 1/2 inches, depth 13 1/2 inches. Part number 1PX82 | Department of Veterans Affairs | 3/25/2010 |
D SQUARE CONSTRUCTION, LLC | $879,263 | Contract | : SPD Humidification / Dehumidification at Phoenix VA Health Care System, 650 E. Indian School Road, Phoenix, AZ 85012 | Department of Veterans Affairs | 3/29/2010 |
CONSERVATION ARTISANS | $3,775 | Contract | : Cleaning of bronze statue and granite pedestal; removal of wax coating (on bronze) and reapplication. | Department of Veterans Affairs | 2/25/2010 |
NOBLE SALES CO., INC. | $16,692 | Contract | : Wacker Equipment 0009338, BS50-2i, Rammer, 11 Shoe, Oil Injection | Department of Veterans Affairs | 8/05/2009 |
STROLLO ARCHITECTS, INCORPORATED | $386,989 | Contract | : Provide design and construction documents for the Upgrade of Public Restrooms Phase II | Department of Veterans Affairs | 4/27/2009 |
SEAWOLF CONSTRUCTION CORP | $817,195 | Contract | : Renovate Nuclear Medicine for New Gamma Cameras | Department of Veterans Affairs | 3/26/2010 |
IME-ACC INC. | $5,220 | Contract | : Replace Windows Bldg. 7 for VA Palo Alto Health Care System | Department of Veterans Affairs | 2/01/2010 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $16,827 | Contract | : GDIT to provide Environmental Asessment(EA) of Veterans Administration Sacramento Valley National Cemetery, Solar PV Project. | Department of Veterans Affairs | 3/25/2010 |
PETERSON AFFILIATES INC | $810,072 | Contract | : Replacement of drainage system in building 76. | Department of Veterans Affairs | 1/28/2010 |
UTILITY SYSTEMS SOLUTIONS, INC. | $738,563 | Contract | : TAS 36-0158 (VHA) Recovery Act Steam and Chiller Improvements @ WTXVAHCS 300 Veterans Blvd., Big Spring, TX 79720 SOW description includes the following: 1. Provide all labor, tools, equipment, materials, and supervision to complete chiller improvements | Department of Veterans Affairs | 2/11/2010 |
FT JAMES CO | $45,250 | Contract | : Slurry/Sealcoat of Fort Richardson National Cemetery | Department of Veterans Affairs | 9/24/2009 |
LEC-CMS, LP | $472,000 | Contract | : Repairt Water Tower Bldg. 107 | Department of Veterans Affairs | 3/29/2010 |
GKKWORKS CONSTRUCTION SERVICES | $95,993 | Contract | : Providing professional design services to furnish design development and construction document packages including demolition, architectural, structural, drawings, phasing plan and narrative, cost estimates, technical specifications, and related informatio | Department of Veterans Affairs | 1/19/2010 |
INDUSTRIAL MAINTENANCE SERVICES, INC. | $578,804 | Contract | : Correct Mechanical HVAC Defficiencies | Department of Veterans Affairs | 1/19/2010 |
ENTERGY MISSISSIPPI, INC. | $5,633,918 | Contract | : Provide all labor, supervision, equipment and materials to provide and install 6.75 megawatts (standby), 6 megawatt (prime) electrical generation facilities to serve the non-essential electric, load curtailment, and load management needs of the G.V. (Sonn | Department of Veterans Affairs | 1/13/2010 |
MERLIN INTERNATIONAL, INC. | $1,051,460 | Contract | : VA Virtual Regional Office Prototype | Department of Veterans Affairs | 12/16/2009 |
JPE, INCORPORATED | $319,944 | Contract | : 1. Demolition, alteration, installation of roads, parking lots, walks, grading, drainage, irrigation, and landscaping to create additional parking spots and correcting the identified areas to better accommodate a safe and designated route for wheelchair a | Department of Veterans Affairs | 3/25/2010 |