KREILICK CONSERVATION LLC | $66,000 | Contract | : Conservation of Confederate Mound Monument, Oak Woods Cemetery, Chicago, IL. | Department of Veterans Affairs | 3/17/2010 |
GUERRERO BUILDERS, LLC | $663,272 | Contract | : Replace Main Elevators | Department of Veterans Affairs | 3/19/2010 |
MCGOLDRICK CONSTRUCTION SERVICES CORPORATION | $1,448,191 | Contract | : Replace Steam Traps, Phase II Audie Murphy VA Hospital San Antonio, Texas | Department of Veterans Affairs | 3/29/2010 |
K.F. DAVIS ENGINEERING, INC. | $22,410 | Contract | : 35% design documents for energy conservation projects | Department of Veterans Affairs | 1/07/2010 |
PLATT CONSTRUCTION, INC. | $136,768 | Contract | : Remodel existing interior space to create separate electrical vault to allow segregate of emergenct power into three branches. | Department of Veterans Affairs | 2/11/2010 |
WORCESTER EISENBRANDT, INC. | $8,500 | Contract | : Historic preservation of the Minnesota Monument | Department of Veterans Affairs | 3/31/2010 |
CONSERVATION ARTISANS | $4,425 | Contract | : Cleaning of bronze sculpture on granite pedestal; removal and reapplication of wax coating on bronze, | Department of Veterans Affairs | 1/21/2010 |
FIDELIS DESIGN AND CONSTRUCTION LLC | $3,538,146 | Contract | : Cardiac Catheterization - Hemodialysis Lab Renovations Thru Modificaton #12 | Department of Veterans Affairs | 3/10/2010 |
SEA KNIGHT ASSOCIATES, LLC | $834,000 | Contract | : Correct electrical deficiencies at the VA Medical Center in Coatesville,PA | Department of Veterans Affairs | 1/26/2010 |
ADVANCED TECHNOLOGY CONSTRUCTION CORPORATION | $454,777 | Contract | : To provide construction services including labor, materials, tools, and equipment to extend the existing security and monitoring system at the Seattle Division | Department of Veterans Affairs | 1/25/2010 |
KAL ARCHITECTS INC | $241,089 | Contract | : AE is to provide all Architectural/Engineering services necessary to perform design, furnish working drawings, cost estimates, technical specifications, and related information for the project entitled 'FCA Electrical Equipment Replacement (Secondary) Pha | Department of Veterans Affairs | 2/03/2010 |
DEERE & COMPANY | $8,038 | Contract | : Gator XUV 620i | Department of Veterans Affairs | 8/31/2009 |
CHIANG ARCHITECTURAL CORPORATION | $229,847 | Contract | : Provide professional design services and construction period services for the renovation of basement for Lab, Morgue, and Memotology, building 100, Seattle Division of the VA Puget Sound Health Care System. Design scope will include but is not limited to | Department of Veterans Affairs | 1/14/2010 |
VERSACON, INC. | $884,000 | Contract | : This project is being perfomred at the St. Cloud VA Medical Center in St. Cloud, MN. The purpose of the Building 51 Renovate for Rehab project is to update and remodel various spaces in building 51. This project will be completed in 3 phases. We will be | Department of Veterans Affairs | 1/27/2010 |
PETERSON AFFILIATES INC | $97,700 | Contract | : Upgrade of Fuel Tanks | Department of Veterans Affairs | 2/17/2010 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $224,515 | Contract | : Environmental Compliance and Environmental Management Audits for MSN I. | Department of Veterans Affairs | 1/07/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $21,093 | Contract | : Environmental Assessment of Riverside CA | Department of Veterans Affairs | 3/25/2010 |
AEGIS RESTAURO LLC | $68,200 | Contract | : Memorial Arch Conservation, Marietta Georgia | Department of Veterans Affairs | 1/23/2010 |
WORCESTER EISENBRANDT, INC. | $16,054 | Contract | : Historic Preservation of the Maryland Sons Monument | Department of Veterans Affairs | 1/15/2010 |
R.C. CLARK CONTRACTORS, INC. | $293,900 | Contract | : Work to include Civil, General, Electrical, Plumbing, HVAC, Communications, & Structural Construction, Alterations, Equipment, Utility Systems, Temporary Environmental Controls, Construction Waste Management, Finish Grade and Seeding, Cement and Concrete | Department of Veterans Affairs | 3/29/2010 |
DEERE & COMPANY | $16,795 | Contract | : 2 - Gator XUV 620i's | Department of Veterans Affairs | 9/11/2009 |
TOKUNAGA MASONRY, INC. | $270,243 | Contract | : Replace Slurry Seal Roads National Cemetary of the Pacific | Department of Veterans Affairs | 8/06/2009 |
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. | $103,744 | Contract | : Provide Contract Drawings, Specifications, Construction Cost Estimates, Phasing Requirements, Construction Duration, Engineering Calculations, subsequent Construction Period Services and develop and recommend bid deducts for alternate construction proposa | Department of Veterans Affairs | 1/07/2010 |
C D I ENGINEERS INC | $53,740 | Contract | : Upgrade the HVAC in Building 13 Seattle Division of Puget SOund Health Care System | Department of Veterans Affairs | 1/21/2010 |
PLATT CONSTRUCTION, INC. | $156,868 | Contract | : Asphalt Replacement | Department of Veterans Affairs | 7/29/2009 |
KYLEE CONSTRUCTION INC. | $14,400 | Contract | : PAINTING OF ADMINISTRATION BUILDING AT THE MEMPHIS NATIONAL CEMENTERY | Department of Veterans Affairs | 2/11/2010 |
PACE BUILDING CORPORATION | $1,441,139 | Contract | : Project calls removal and replacement of existing roofing on Buildings 11, 18, 46 and 47. Work involves: selective demolition, roofing, sheet metal, plumbing and mechanic systems relocation, electrical and lightning protection, etc. at the Kerrville, Tex | Department of Veterans Affairs | 3/29/2010 |
EARLE KINLAW & ASSOCIATES, INC. | $19,980 | Contract | : MOWER PURCHASE | Department of Veterans Affairs | 1/12/2010 |
AIRBORNE CONSTRUCTION SERVICES, LLC | $1,167,890 | Contract | : Airborne Construction Services will furnish all labor, materials, tools, and equipment necessary to accompligh the work indicated on the contract drawings and as stated in the specifications or reasonably implied, for the Recovery Act Project Hemo-Oncolog | Department of Veterans Affairs | 3/15/2010 |
VETERANS DEVELOPMENT CORPORATION, INC. | $255,271 | Contract | : Provide labor, materials, equipment, transportation and supervision to replace FCA Chilled Water Valves at the Miami VAMC | Department of Veterans Affairs | 3/25/2010 |
CSA ARCHITECTS & ENGINEERS LLP | $342,030 | Contract | : Design and consulting services for the construction of a new electrical substation at the VA San Juan Medical Center. | Department of Veterans Affairs | 9/24/2009 |
DWG & ASSOCIATES, INC. | $1,614,703 | Contract | : Upgrade/Replace Dlectrical Systems and Generators | Department of Veterans Affairs | 3/23/2010 |
MOUNTAIN CREST CONSTRUCTION, LLC | $1,083,900 | Contract | : General Construction for emergency room expansion/upgrade. Information on sub awards will be provided once awards have been made. | Department of Veterans Affairs | 4/01/2010 |
CLUB CAR, INC. | $9,972 | Contract | : 1-Club Car TransPorter 6 Gas Vehicle | Department of Veterans Affairs | 11/25/2009 |
AEGIS RESTAURO LLC | $18,000 | Contract | : 39th Missouri Infantry Monument Conservation | Department of Veterans Affairs | 1/20/2010 |
CALVARY CONTRACTING, INC. | $530,356 | Contract | : Recovery (Addition) Replace Finishes, Lower Level Bldg 26 | Department of Veterans Affairs | 3/31/2010 |
ASTOR CONSTRUCTION SERVICES INC | $133,775 | Contract | : Replace Fire Alarm System Lakemont Campus | Department of Veterans Affairs | 6/15/2009 |
VETERANS DEVELOPMENT CORPORATION, INC. | $12,495 | Contract | : Provide supervision, labor and materials to install manual roll down Hurricane Shutters for building 10 at the West Palm Beach VA Medical Center | Department of Veterans Affairs | 1/20/2010 |
KEPA- POETTKER JV | $2,628,875 | Contract | : The remediation of rooms with elevated mold counts, and stopping water intrusion into Buildings 37, 42, 43, and TMD-1; remediation of mold, asbestos, and lead, and stopping water intrusion into Building 13; remediation of mold, asbestos, and lead, and sto | Department of Veterans Affairs | 11/20/2009 |
W.L. CONTRACTING INC. | $308,096 | Contract | : Remove old telephone room HVAC equipment and install all new equipment, ducting and chilled water lines. also upgrade the HVAC in two additional rooms. All windows in work area are being replaced. | Department of Veterans Affairs | 8/24/2009 |
CONSERVATION ARTISANS | $8,350 | Contract | : Cleaning of a granite monument; fill open joints with lead; remove biological growth; clean and recoat bronze plaque. | Department of Veterans Affairs | 1/21/2010 |
INDUSTRIAL MAINTENANCE SERVICES, INC. | $2,287,926 | Contract | : Renovate Pathology Labs | Department of Veterans Affairs | 8/21/2009 |
ENTHALPY ENGINEERING CORP. | $984,290 | Contract | : Design-Build project to include the design and construction of new OR HVAC Upgrades, demo existing OR HVAC at Viera OPC | Department of Veterans Affairs | 3/31/2010 |
VALOR CONSTRUCTION MANAGEMENT, LLC | $265,822 | Contract | : Install new electrical cabinets and breakers along with remodeling two electrical rooms and installing two new feeders. | Department of Veterans Affairs | 2/02/2010 |
I N M CORPORATION | $9,220 | Contract | : Replace light fixtures at Wood Cemetery | Department of Veterans Affairs | 1/13/2010 |
ADVANCED TECHNOLOGY CONSTRUCTION CORPORATION | $199,831 | Contract | : Provide all labor, equipment, supervision, materials and transportation to perform work the preparation of the site for building operations, including demolitions. | Department of Veterans Affairs | 4/02/2010 |
MANGI ENVIRONMENTAL GROUP, INC. | $20,866 | Contract | : Prepare an Environmental Assessment of the Manhattan Health Care System, NY | Department of Veterans Affairs | 3/02/2010 |
VETERANS ALASKA CONSTRUCTION, LLC | $210,671 | Contract | : Award includes chage order 1. Project consists of multiple upgrades to clinical and administrative areas for the Department of Veterans Affairs. Project is approximately 99 percent complete, including the change order. | Department of Veterans Affairs | 9/03/2009 |
E.B. GALAXY CONSTRUCTION INC. | $509,644 | Contract | : Coal Bunker Restoration and Repair | Department of Veterans Affairs | 2/26/2010 |
HAMMER LGC, INC. | $613,383 | Contract | : Ventilate dialysis room | Department of Veterans Affairs | 1/22/2010 |
LM2 CONSTRUCTION CO., INC. | $685,000 | Contract | : Upgrade SPD HVAC at the San Diego Healthcare System | Department of Veterans Affairs | 2/04/2010 |
ALL AMERICAN BROTHERS COMPANY, LLC | $1,637,976 | Contract | : Design Build Construction Services to Build five new parking lots and Modify one existing parking lot | Department of Veterans Affairs | 11/18/2009 |
GCS LLC | $1,071,277 | Contract | : A design-build construction project to upgrade the existing underground cable/cable components in manholes and specified transformers of the underground electric distribution system at the Grand Junction VA Medical Center. Contract anticipates the remova | Department of Veterans Affairs | 12/23/2009 |
NADASKAY & KOPELSON ARCHITECTS, PA (INC) | $55,000 | Contract | : AE Services for St. Albans Public Bathroom Upgrades | Department of Veterans Affairs | 5/14/2009 |
H.J. BRANDELES CORPORATION | $1,045,755 | Contract | : replace ahus, rome va clinic | Department of Veterans Affairs | 11/18/2009 |
VALOR CONSTRUCTION MANAGEMENT, LLC | $206,628 | Contract | : Remove old vanities and install new ones with new sinks and plumbing fixtures. | Department of Veterans Affairs | 3/16/2010 |
AMERICAN SERVICES CONTRACTING INCORPORATED | $628,245 | Contract | : HVAC PHASE II BUILDING 1 | Department of Veterans Affairs | 3/15/2010 |
PICHARDO DEVELOPMENT CORP | $325,000 | Contract | : Reconstruct the Grounds Unit Building at the VA New Jersey Healthcare System, Lyons Campus. | Department of Veterans Affairs | 1/28/2010 |
BSE ENGINEERING INC | $187,104 | Contract | : A/E Service for Construction documents per scope of work based on Engineering Study completed by BSE Engineering for Electrical Switchboard Upgrade. | Department of Veterans Affairs | 7/09/2009 |
C3T, INC. | $239,208 | Contract | : DAY TANK LINING | Department of Veterans Affairs | 3/17/2010 |
TORO COMPANY, THE | $19,245 | Contract | : grounds mowers | Department of Veterans Affairs | 6/03/2009 |
NAC, INC. | $218,379 | Contract | : Design services for replacement of emergency generators at VAMC Spokane | Department of Veterans Affairs | 7/09/2009 |
ARCHITECTS BEAZLEY MOLIERE A PROFESSIONAL ARCHITECTURAL CORPORATION | $35,151 | Contract | : A/E Design for Recondition Boiler No. 1 | Department of Veterans Affairs | 9/29/2009 |
IRONCLAD SERVICES, INC. | $1,192,226 | Contract | : Medical Gas Upgrades Phase II located at the Stratton VA Medical Center in Albany, NY | Department of Veterans Affairs | 2/18/2010 |
D. E. ERHARD CONSTRUCTION INC. | $499,436 | Contract | : Renovate Building 9 & 10 to Correct Heating Deficiencies at VA Medical Center San Francisco, San Francisco, California. | Department of Veterans Affairs | 2/24/2010 |
BABCOCK CONSTRUCTION COMPANY, LLC | $429,918 | Contract | : Replace Water Cooled Condensors | Department of Veterans Affairs | 10/05/2009 |
WORCESTER EISENBRANDT, INC. | $33,962 | Contract | : Historic Preservation of the Pennsylvania Monument | Department of Veterans Affairs | 1/08/2010 |
CMEC, INCORPORATED | $717,835 | Contract | : Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work. | Department of Veterans Affairs | 1/01/2010 |
HMC GROUP | $201,368 | Contract | : Resurface roads and parking lots at the existing VA Long Beach Facility. | Department of Veterans Affairs | 1/28/2010 |
PACRUTA, INC. | $42,500 | Contract | : VAMC North Chicago Dietetic Serving Line | Department of Veterans Affairs | 3/16/2010 |
A. EPSTEIN AND SONS INTERNATIONAL, INC. | $418,551 | Contract | : Replace Lower Roof of Building #200 | Department of Veterans Affairs | 12/31/2009 |
CAPTURE CONSTRUCTION, LLC | $445,951 | Contract | : Contractor shall completely prepare site for building operations, including demolition and removal of existing work and furnish labor and materials and perform work to 'replace Roof Building 37' at the Bay Pines VA Medical Center, Bay Pines, FL | Department of Veterans Affairs | 4/08/2010 |
FLOYD CONSTRUCTION CORPORATION | $1,870,270 | Contract | : Upgrade Electrical Systems | Department of Veterans Affairs | 1/28/2010 |
HAMMER LGC, INC. | $66,875 | Contract | : Renovate showers | Department of Veterans Affairs | 9/03/2009 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $196,684 | Contract | : Environmental Management Audits | Department of Veterans Affairs | 1/27/2010 |
SOCON, LLC | $1,419,585 | Contract | : UPGRADE CABLING & TELEPHONE CLOSETS | Department of Veterans Affairs | 1/14/2010 |
ENTHALPY ENGINEERING CORP. | $1,168,203 | Contract | : Design/build HVAC Repairs, Lakemont Campus, Orlando VA Medical Center | Department of Veterans Affairs | 7/30/2009 |
REGIMENT CONSTRUCTION CORP. | $175,000 | Contract | : Replace and Upgrade Main Water Line | Department of Veterans Affairs | 2/01/2010 |
MCQUADE AND BANNIGAN, INC. | $2,580 | Contract | : COMPACTION EQUIPMENT | Department of Veterans Affairs | 8/11/2009 |
HOAG CONSTRUCTION COMPANY | $921,975 | Contract | : Modernize Main Lobby Project | Department of Veterans Affairs | 3/26/2010 |
A. EPSTEIN AND SONS INTERNATIONAL, INC. | $1,298,876 | Contract | : Building 13 Renovation | Department of Veterans Affairs | 1/28/2010 |
MIDWEST CONTRACTING, INC. | $192,722 | Contract | : Renovate Building Three Steps at the VA Central Iowa Healthcare System, Des Moines Division | Department of Veterans Affairs | 3/30/2010 |
CPMA, INC. | $4,014,689 | Contract | : Provide all labor, equipment, material and supervision to repair/replace steam lines in our steam distribution system at the V.A. Medical Center North Chicago. All work as per scope and specifications. Locations as per drawings and as shown during the wal | Department of Veterans Affairs | 1/14/2010 |
BABCOCK CONSTRUCTION COMPANY, LLC | $299,999 | Contract | : Replace Sanitary Sewer Lines | Department of Veterans Affairs | 7/30/2009 |
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. | $174,000 | Contract | : Install 10KW Wind Turbine at the VA Hudson Valley Healthcare System, Castle Point, NY. | Department of Veterans Affairs | 2/22/2010 |
EATON CORPORATION | $311,505 | Contract | : Tri-Annual Circuit Breaker Testing | Department of Veterans Affairs | 3/29/2010 |
EMTEQUE CORP | $145,700 | Contract | : Project Monitoring during asbestos abatement | Department of Veterans Affairs | 11/04/2009 |
WESCOTT ELECTRIC COMPANY | $989,800 | Contract | : Secondary Electrical Deficiencies | Department of Veterans Affairs | 2/25/2010 |
SAGE ENGINEERING ASSOCIATES LLP | $186,507 | Contract | : ARRA Energy Conservation Measure Projects | Department of Veterans Affairs | 1/26/2010 |
IMAGE GROUP INC | $48,593 | Contract | : A/E Services | Department of Veterans Affairs | 4/29/2009 |
FREEDOM CG, LLC | $92,802 | Contract | : Road Improvement Project | Department of Veterans Affairs | 2/26/2010 |
WALCO, INC. | $4,236,808 | Contract | : Fort Sam Houston National Cemetery headstone raise and realignment and turfgrass renovation | Department of Veterans Affairs | 11/30/2009 |
RJH AIR CONDITIONING AND REFRIGERATION SERVICE L.L.C. | $495,000 | Contract | : COOLING TOWER REPLACEMENT | Department of Veterans Affairs | 9/11/2009 |
L & J BUILDING COMPANY LLC | $1,168,238 | Contract | : Replace Elevator Controls B91 & B122 | Department of Veterans Affairs | 1/29/2010 |
GRAY BEAR CONSTRUCTION CO. | $201,442 | Contract | : Furnish and install all labor, material, supervision, and equipment necessary to accomplish the repair of Dietetic Freezers as specified in bid item 1 of the general requirements referenced in the statement of work and section 01 00 00. Change Order No. 1 | Department of Veterans Affairs | 1/29/2010 |
ONAN CORPORATION | $87,893 | Contract | : 350kw Generator and 1200A ByPass Transfer Switch for the VA Medical Center, Little Rock, AR | Department of Veterans Affairs | 8/20/2009 |
AEGIS RESTAURO LLC | $86,600 | Contract | : Confederate POW Dead Monument Conservation | Department of Veterans Affairs | 1/23/2010 |
HAL-PE ASSOCIATES | $163,450 | Contract | : Replace PA System and Paging System VA Medical Center Cincinnati, OH Project # 539-10-113 | Department of Veterans Affairs | 3/03/2010 |
WALCO, INC. | $155,404 | Contract | : San Antonio National Cemetery Turfgrass Renovation | Department of Veterans Affairs | 9/03/2009 |
GLEN/MAR CONSTRUCTION, INC. | $208,000 | Contract | : Scope of the work includes the upgrade to the existing storm drain line at the Roseburg VA. Also includes cleaning of the existing lines. Overall the work will help in increasing drainage to the area. | Department of Veterans Affairs | 12/08/2009 |
TUSCA II, INC. | $114,998 | Contract | : Modify HVAC system in sub basement of Building 1. Work includes general construction, demolition, removal of existing structures, alterations, balancing and installation of HVAC equipment, ductwork, hot and chilled water piping, electrical, architectural | Department of Veterans Affairs | 1/05/2010 |
IME-ACC INC. | $230,888 | Contract | : Renovation of existing hospital rooms at VA Loma Linda Hospital Riverside, CA | Department of Veterans Affairs | 3/05/2010 |
MIDWEST CONTRACTING, INC. | $53,538 | Contract | : Update/Replace Water Softeners of Boilers and Domestic Water Supply | Department of Veterans Affairs | 2/18/2010 |
BROOKS BORG SKILES ARCHITECTURE ENGINEERING LLP | $84,470 | Contract | : VA Des Moines Building 4 mremodel phase 3 | Department of Veterans Affairs | 3/31/2010 |
GAITHERSBURG FARMERS SUPPLY, INC. | $2,330 | Contract | : BUCKET FOR EXCAVATOR | Department of Veterans Affairs | 5/28/2009 |
C & S ENGINEERS, INC. | $230,214 | Contract | : Conceptual Design Services (preliminary concepts and layouts, investigative services, cost estimating, and life-cycle cost analysis). | Department of Veterans Affairs | 1/25/2010 |
REPSTIEN, ROGER | $38,847 | Contract | : Provide Professional Architectural / Engineering Services for Project 573A4-09-102, Replace ATS Switches, Ph. 2 | Department of Veterans Affairs | 1/20/2010 |
MONUMENT CONSTRUCTION, LLC | $248,000 | Contract | : Renovate Community Living Center at the Castle Point Campus | Department of Veterans Affairs | 1/15/2010 |
GRAY BEAR CONSTRUCTION CO. | $440,826 | Contract | : Furnish materials and perform the work to Replace Steam Lines Building 143 at the American Lake Division of the VA Puget Sound Health Care System. | Department of Veterans Affairs | 2/12/2010 |
NORDSTROM CONTRACTING & CONSULTING CORP. | $675,000 | Contract | : Fan coil project at Castle Point campus VA hudson valley healthcare system, Castle Point, NY. Provide all labor, tools, materials, equipment, supplies, supervision and personnel to examine the existing fan coil units system and furnish and replace 111 fa | Department of Veterans Affairs | 3/24/2010 |
STV-ELLERBE BECKET JV | $197,620 | Contract | : Prepare facility asset/fund protection at Castle Point. | Department of Veterans Affairs | 6/23/2009 |
PULLIAM CONSTRUCTION COMPANY, INC. | $1,863,777 | Contract | : Replace two (2) existing 225 Ton York Max-E Centrifugal Chillers, one (1) Baltimore Air Coil VLT-600 cooling tower, and expand one (1) plate and frame 'free cooling' heat exchanger. | Department of Veterans Affairs | 3/25/2010 |
COLUMBUS AUTOMATIC SPRINKLERS, INC. | $92,500 | Contract | : Upgrade fire alarm & fire sprinkler bldg 13 & bldg 14 | Department of Veterans Affairs | 9/02/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $23,218 | Contract | : Prepare an environmental assessment for the VA Los Angeles Ambulatory Care Clinic in support of the installation of solar photovoltaic systems; prepare Finding of No Significant Impacr (FONSI) report. | Department of Veterans Affairs | 3/26/2010 |
FEDTECH, LLC | $873,494 | Contract | : General construction | Department of Veterans Affairs | 2/26/2010 |
TL SERVICES, INC. | $505,676 | Contract | : Removal & Installation of Air Compressor | Department of Veterans Affairs | 3/30/2010 |
STOKES WEBB, LLC | $679,600 | Contract | : Correct electrical Deficiencies Phase V at the VA Central Healthcare System, Des Moines, Iowa | Department of Veterans Affairs | 1/07/2010 |
IMAGE GROUP INC | $73,124 | Contract | : A/E Services | Department of Veterans Affairs | 4/29/2009 |
CONCENTRIC GROUP, LLC | $476,654 | Contract | : Design/Build, 'ICU STEP DOWN UNIT 3rd. FLOOR' at VA Medical Center, Gainsville, FL | Department of Veterans Affairs | 2/04/2010 |
NIKA TECHNOLOGIES, INC. | $668 | Contract | : Fire Safety review of design of Renovate PACU project. | Department of Veterans Affairs | 12/23/2009 |
BALTIMORE HYDRAULICS, INC. | $14,276 | Contract | : Remove & Replace Hydraulic Dock Leveler at Perry Point Medical Center, Bldg 11 Warehouse, Perry Point, MD 21902 | Department of Veterans Affairs | 8/26/2009 |
C3T, INC. | $178,198 | Contract | : Replace Roof Bldg 123 B-Wing | Department of Veterans Affairs | 3/25/2010 |
GLEN/MAR CONSTRUCTION, INC. | $91,755 | Contract | : To improve road surfaces at the Willamette National Cemetery. | Department of Veterans Affairs | 7/07/2009 |
POTOMAC-HUDSON ENGINEERING, INC. | $16,032 | Contract | : Environmental Assessment of Salt Lake City, UT | Department of Veterans Affairs | 3/26/2010 |
MIDWEST CONTRACTING, INC. | $145,273 | Contract | : CARES Consolidation Storage Project | Department of Veterans Affairs | 2/24/2010 |
CONSTRUCTION SERVICES GROUP, INC., THE | $999,906 | Contract | : Renovate existing Kitchen as per drawings & specifications | Department of Veterans Affairs | 3/19/2010 |
BUYS & ASSOCIATES INC | $30,058 | Contract | : Environmental Assessment for Menlo Park VA Medical Center, California, Solar Photovoltaic Energy Project | Department of Veterans Affairs | 3/24/2010 |
KADENA PACIFIC, INC. | $1,857,100 | Contract | : Design-Build Replace emergency power systems, Menlo Park Division at the VA Palo Alto Health Care System, Menlo Park, CA | Department of Veterans Affairs | 3/31/2010 |
C3T, INC. | $218,700 | Contract | : Replace Nurse Call 2nd Floor B-406 | Department of Veterans Affairs | 3/18/2010 |
ACTION-A&D A JOINT VENTURE | $1,084,000 | Contract | : All management, supervision, labor, transportation, equipment and materials to perform work to include general construction, demolition, alterations, drainage, mechanical, electrical, water storage facilities, necessary removal of existing structures and | Department of Veterans Affairs | 2/10/2010 |
KADENA PACIFIC, INC. | $1,952,527 | Contract | : Design-Build Replace emergency power systems, Livermore Division at the VA Palo Alto Health Care System, Livermore, CA | Department of Veterans Affairs | 3/31/2010 |
PLATT CONSTRUCTION, INC. | $171,574 | Contract | : Remodel existing interior space for new electrical vault and segregate emergency power into three branches in B 406. | Department of Veterans Affairs | 2/11/2010 |
GRAND ENTERPRISES LLC | $569,951 | Contract | : Install new 12 ductile water line for domestic water, and install two new 15,000 gal diesl fuel tanks | Department of Veterans Affairs | 2/02/2010 |
AGILE INFRASTRUCTURE SERVICES, L.L.C. | $509,255 | Contract | : Repair/Upgrade Main Fire Alarm Panel | Department of Veterans Affairs | 2/18/2010 |
SUBSTATION SOLUTIONS LLC | $8,500 | Contract | : Install automatic, electronically operated gate opener on existing gate No. 2 | Department of Veterans Affairs | 6/04/2009 |
J. W. FULLER CONSTRUCTION, L.L.C. | $539,410 | Contract | : Relocate south periphery road at VAMC Marion Illinois. | Department of Veterans Affairs | 3/12/2010 |
SEVEN HILLS CONSTRUCTION | $1,554,471 | Contract | : REPLACE HVAC BLDG 5 VA MED CTR SALISBURY, NC | Department of Veterans Affairs | 9/22/2009 |
COLAMETTE CONSTRUCTION COMPANY | $288,040 | Contract | : RENOVATE MRI BUILDING | Department of Veterans Affairs | 1/04/2010 |
KREILICK CONSERVATION LLC | $28,625 | Contract | : Conservation of the Illinois Monument, Memphis National Cemetery, Memphis, TN. | Department of Veterans Affairs | 2/25/2010 |
AVETERAN CORP. | $117,100 | Contract | : Sewer replacement | Department of Veterans Affairs | 2/17/2010 |
GLEN/MAR CONSTRUCTION, INC. | $478,344 | Contract | : This project will renovate B202 US area which includes: one large (Activity Room) and one small (Director's Conference Room) conference rooms, hallway into the conference rooms, the women's and men's restrooms | Department of Veterans Affairs | 3/30/2010 |
J. W. FULLER CONSTRUCTION, L.L.C. | $590,911 | Contract | : Emergency Power for Bldg 60 Main Kitchen at VAMC Jefferson Barracks Missouri. | Department of Veterans Affairs | 11/20/2009 |
INNOVA GROUP, L.L.C., THE | $114,181 | Contract | : Systems Controls Master Plan | Department of Veterans Affairs | 2/18/2010 |
CANNON MANAGEMENT GROUP, LLC | $484,097 | Contract | : Milling and placing new HMA on approx 140,000 sqft of roads. Removing approx 14,000 sq ft of sidewalks and replacing with new concrete to inlcude new ADA ramps and replacing approx 200 ln ft of new curb and gutter. Remove and replace concrete in loading | Department of Veterans Affairs | 3/18/2010 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $172,901 | Contract | : DESIGN/BUILD SPECT CT | Department of Veterans Affairs | 9/30/2009 |
EMTEQUE CORP | $7,350 | Contract | : Project Monitoring During Asbestos Abatement | Department of Veterans Affairs | 12/01/2009 |
GRAYBAR ELECTRIC COMPANY, INC | $76,270 | Contract | : Building Wire Conduit Electrical enclosures Strut end connectors Conduit connectors | Department of Veterans Affairs | 8/20/2009 |
PATRIOT CONSTRUCTION, INC. | $2,999 | Contract | : Install Surface Mount exit Panic Bar Hardware on Existing Chain Link Fence Gate at the VA Palo Alto Health Care System Palo Alto Division, Building 10 (Warehouse). | Department of Veterans Affairs | 3/11/2010 |
CARESTREAM HEALTH INC | $96,436 | Contract | : A Picture Archiving and Communication System (PACS) is a combination of hardware and software that allows for the storage, retrieval and management of medical images. These electronic images and reports are transmitted digitally via PACS. This transmissio | Department of Veterans Affairs | 2/09/2010 |
GREENLEAF RESOURCES, LLC | $90,051 | Contract | : Construct Pre-Engineered Metal Building at Jefferson Barracks National Cemetery | Department of Veterans Affairs | 9/29/2009 |
C3T, INC. | $80,919 | Contract | : BLDG 11 ROOF REPLACEMENT | Department of Veterans Affairs | 3/11/2010 |
VALOR CONSTRUCTION MANAGEMENT, LLC | $906,704 | Contract | : Work includes survey of floors for fire stopping requirements. Propose fixes for area noted in survey. Perform firstopping in area determined to need this work by a previous survey. Fire Caulking and replacement of missing walls around elevator shafts | Department of Veterans Affairs | 3/25/2010 |
JHJ ENTERPRISES, LLC | $1,968,000 | Contract | : Repair/Replace Sidewalks, Parking Lots and Roads | Department of Veterans Affairs | 3/10/2010 |
DAEDALUS INC | $23,750 | Contract | : Conserve Unknown Dead Monument at the Salisbury National Cemetery,Salisbury, NC | Department of Veterans Affairs | 3/04/2010 |
HERMAN CONSTRUCTION GROUP, INC. | $990,931 | Contract | : Contractor shall furnish management, supervision, labor, transportation, equipment, and materials, and perform work to include demolition, general construction, alterations, mechanical and electrical work, and certain other items as required by project dr | Department of Veterans Affairs | 11/24/2009 |
CARESTREAM HEALTH, INC. | $170,371 | Contract | : A Picture Archiving and Communication System (PACS) is a combination of hardware and software that allows for the storage, retrieval and management of medical images. These electronic images and reports are transmitted digitally via PACS. This transmissio | Department of Veterans Affairs | 2/09/2010 |
MONUMENT CONSTRUCTION, LLC | $857,472 | Contract | : Water Tower Repair | Department of Veterans Affairs | 9/29/2009 |
WORCESTER EISENBRANDT, INC. | $102,975 | Contract | : Historic Preservation of the Soldiers & Sailors Monument | Department of Veterans Affairs | 1/19/2010 |
VETERANS DEVELOPMENT CORPORATION, INC. | $394,000 | Contract | : Provide all labor, tools, material, equipment and supervision to replace existing air handler units 64-AHU-8, 64-AHU-9, and 64-AHU-10 and replace the existing relief fan 64-RF-10. | Department of Veterans Affairs | 1/20/2010 |
KYLEE CONSTRUCTION INC. | $24,147 | Contract | : PAINT THE ADMINISTRATION BUILDING AT THE MOUNTAIN HOME NATIONAL CEMETERY. | Department of Veterans Affairs | 3/08/2010 |
WILLIAMS BUILDING COMPANY, INC. | $553,823 | Contract | : Wind Turbine Electric Generating System Bourne National Cemetery | Department of Veterans Affairs | 1/14/2010 |
SOUTHSIDE PLUMBING & HEATING, INC. | $500,000 | Contract | : EYEWASH UPGRADES - REPLACE EXISTING DRENCH SHOWER & EYEWASH STATIONS IN BLUIDING 70, 49, 69, 72 AND 222 | Department of Veterans Affairs | 9/18/2009 |
TL SERVICES, INC. | $239,804 | Contract | : Construct Security Control Center | Department of Veterans Affairs | 3/31/2010 |
GENERAL ELECTRIC COMPANY | $138,903 | Contract | : Centricity PACS-IW Core System Lic Pkg | Department of Veterans Affairs | 1/07/2010 |
TENG & ASSOCIATES, INC. | $77,088 | Contract | : Feasibility Study for VAMC in Boise, to determine the viability of alternate uses for their existing geothermal energy system. Desired outcome was a study showing the feasibility of producing electric power from the available geothermal energy. | Department of Veterans Affairs | 1/11/2010 |
ALARES LLC | $127,854 | Contract | : Geothermal Feasibility Study | Department of Veterans Affairs | 12/16/2009 |
GAUTIER & DE TORRES | $35,343 | Contract | : Install Oxygen System at NHCU 2nd Floor Ward B at the VA Caribbean Healthcare System, San Juan, PR. Provide A/E Services to develop detailed drawings, design, bidding documents, construction cost estimates, construction phases schedule, and construction p | Department of Veterans Affairs | 5/18/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $24,046 | Contract | : Prepare an environmental assessment for the Martinez, CA VA Outpatient Clinic in support of the installation of solar photovoltaic systems; submit a Finding of No Significant Impact (FONSI) report. | Department of Veterans Affairs | 3/25/2010 |
WEB CONTRACTING, INC. | $1,994,279 | Contract | : Demolition and removal of existing structures, and furnish labor and materials and perform work for elevator replacement-renovations | Department of Veterans Affairs | 3/31/2010 |
SIEMENS MEDICAL SOLUTIONS USA, INC. | $1,376,500 | Contract | : Scope of Work The following Scope of Work defines the construction necessary to facilitate the installation of a Siemens Medical Solutions Magnetom Verio 3.0T MRI. WorkEfforts requried include Architectural and Engineering Design and Division 1, 2, 3, 5, | Department of Veterans Affairs | 9/25/2009 |
MSC DESIGN BUILD LLC | $350,798 | Contract | : MS Construction has been contracted to complete all earthwork including installing new chilled water lines, backfill and landscape repairs. | Department of Veterans Affairs | 2/02/2010 |
KADENA PACIFIC, INC. | $1,818,100 | Contract | : Design-Build Replace emergency power systems, Palo Alto Division at the VA Palo Alto Health Care System, Palo Alto, CA | Department of Veterans Affairs | 3/31/2010 |
MIDWESTERN ELECTRIC LLC | $875,200 | Contract | : Construction Project | Department of Veterans Affairs | 3/12/2010 |
C3T, INC. | $213,052 | Contract | : CORRECT EMERGENCY PREPAREDNESS DEFICIENCIES. | Department of Veterans Affairs | 1/19/2010 |
REGIMENT CONSTRUCTION CORP. | $1,084,000 | Contract | : Renovate and Moderenize for Geriatrics Research, Education and Clinic Center (GRECC), and Geriatrics Primary Care at the James J. Peters Bronx VA Medical Center | Department of Veterans Affairs | 3/26/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $24,772 | Contract | : Environmental Assessment of Bay Pines, FL | Department of Veterans Affairs | 3/19/2010 |
ARGO BUILDING INTERNATIONAL, LLC | $2,270,312 | Contract | : Complete renovation of Surgical Intensive Care Unit at the Birmingham VA Medical Center. | Department of Veterans Affairs | 2/08/2010 |
GENERAL ELECTRIC COMPANY | $38,428 | Contract | : LOGIQ P5 Ultrasound System with associated Components | Department of Veterans Affairs | 3/08/2010 |
U.S. VETERANS CONSTRUCTION & MANAGEMENT CORP. | $342,780 | Contract | : OPC Medical Gas/Panel Upgrade | Department of Veterans Affairs | 3/16/2010 |
ADVANCED TECHNOLOGY CONSTRUCTION CORPORATION | $189,054 | Contract | : Provide all tools, labor, materials, and supervision to upgrade the dumbwaiter in the surgical department of Bldg 100. | Department of Veterans Affairs | 2/01/2010 |
POINTER CONSTRUCTION GROUP, LLC | $113,143 | Contract | : Removal of Inoperative Fire Smoke Dampers | Department of Veterans Affairs | 2/18/2010 |
CNH AMERICA LLC | $74,551 | Contract | : (1)Loader, Backhoe, 4WD, Diesel Engine, 82 wide 1 yd front bucket, cab, HVAC, with drive-in forks, 36 cemetery bucket, bucket hooks, Case Model No. 580 Super M Series 3 | Department of Veterans Affairs | 9/30/2009 |
CANNON CORPORATION, THE | $285,278 | Contract | : This PO shall fund contract VA776-RA-00500, A/E services for project R101-09-053, Implementation of ECMs at the Buffalo, NY VAMC | Department of Veterans Affairs | 1/26/2010 |
BELKRO GENERAL CONTRACTORS, INC. | $367,372 | Contract | : REPLACE COOLING TOWERS | Department of Veterans Affairs | 3/31/2010 |
SMITH BUILDING GROUP, INC. | $589,077 | Contract | : Provide materials, equipment, labor and supervision for construction to upgrade the HVAC serving the laboratory in Hospital Building 7 at the VA Medical Center, Alexandria, LA.This project will improve the air conditioning capabilities in the 4,500 square | Department of Veterans Affairs | 2/16/2010 |
AFFILIATED WESTERN, INC. | $491,560 | Contract | : Fayetteville-Upgrade A wing elevator | Department of Veterans Affairs | 1/25/2010 |
AFFILIATED WESTERN, INC. | $440,950 | Contract | : Replace elevator controls phase I. | Department of Veterans Affairs | 3/31/2010 |
CARESTREAM HEALTH, INC. | $183,528 | Contract | : A Picture Archiving and Communication System (PACS) is a combination of hardware and software that allows for the storage, retrieval and management of medical images. These electronic images and reports are transmitted digitally via PACS. This transmissio | Department of Veterans Affairs | 2/09/2010 |
CHICORA FOUNDATION INC | $8,678 | Contract | : cleaning and repointing of the Potter Monument box tomb in the Beaufort, SC National Cemetery | Department of Veterans Affairs | 3/31/2010 |
CS MONICAL CONTRACTOR | $84,359 | Contract | : Repair and replace stean condensate piping. | Department of Veterans Affairs | 10/15/2009 |
ENGINUITY SYSTEMS, LLC | $217,230 | Contract | : Design services for the remodel of the existing Emergency Room Check-In/Registration Lobby of Building 100 to create a new Registration Lobby and enclose an existing interior courtyard to create a new corridor to connect the existing Medical Mall to the E | Department of Veterans Affairs | 1/12/2010 |
229 CONSTRUCTORS, LLC | $185,833 | Contract | : The overall purpose of this contract is to complete phase II of the Halls & Walls Corridor Renovations at the Donald J. Mitchell Rome CBOC in Rome NY. The primary objective is aesthetic upgrades to the facility which will include removal of existing floo | Department of Veterans Affairs | 12/24/2009 |
MDM CONSTRUCTION SUPPLY, LLC | $360,096 | Contract | : UPGRADE INTERIOR FINISHES, BLDG. 1, 3RD FLOOR | Department of Veterans Affairs | 3/17/2010 |
CONSTRUCTION SERVICES GROUP, INC., THE | $450,315 | Contract | : Women's Health Services in Wing 'A' , Interior renovation | Department of Veterans Affairs | 1/25/2010 |
E & B CONTRACTING, LLC | $843,277 | Contract | : E&B Contracting will renovate the interior of Building 17. This work includes interior mill work, ceramic tile installation, plumbing and electrical modifications, window replacements, and resilient flooring installation. | Department of Veterans Affairs | 7/07/2009 |
CRESPO ELECTRICAL CONTRACTORS & ASSOCIATES, INC. | $749,765 | Contract | : Installation of New Emergency Generator. | Department of Veterans Affairs | 4/01/2010 |
CONTI ELECTRIC, INC. | $174,700 | Contract | : Power Monitoring System | Department of Veterans Affairs | 3/31/2010 |
AEGIS RESTAURO LLC | $29,000 | Contract | : Soldier's Monument Conservation | Department of Veterans Affairs | 1/25/2010 |
AFFILIATED WESTERN, INC. | $959,660 | Contract | : Replace Bldg 5 roof and update exterior finish for Gulf Coast VHCS, Biloxi, MS | Department of Veterans Affairs | 6/17/2009 |
INDUSTRIA, INC. | $585,000 | Contract | : Install Hot Water Converters in Basement, Bldg 1, Jesse Brown VAMC, Chicago, IL. We are required to furnish all labor, materials, equipment, and qualified supervision to perform work as described in the solicitation and as set forth in the specifications | Department of Veterans Affairs | 3/12/2010 |
MCCALL & ASSOCIATES - AIA - ARCHITECTS | $15,041 | Contract | : The overall purpose of the Award is to complete Phase II of replacing the aging and deteriorated Air Handling Units in the Interstitial Spaces at the Audie L. Murphy Veterans Memorial Hospital with energy efficient Air Handling Units of capacities that wi | Department of Veterans Affairs | 2/22/2010 |
ENVIRONMENTAL DESIGN & CONSTRUCTION, L.L.C. | $1,349,833 | Contract | : Renovate Pharmacy Area Space at Veterans Affairs Medical Center , 50 Irving Street NW Washingon, DC 20422. | Department of Veterans Affairs | 1/19/2010 |
CLARK SECURITY PRODUCTS, INC. | $195,810 | Contract | : Award to provide all labor, materials, supervision, equipment and services required to design and rekey the entire Seattle Hospital Campus with a new mechanical keying system. | Department of Veterans Affairs | 3/22/2010 |
GENERAL ELECTRIC COMPANY | $507,083 | Contract | : GE CT System | Department of Veterans Affairs | 4/05/2010 |
KEVCON, INC. | $1,410,391 | Contract | : Renovate Bldg 249 at VA HealthCare Center, White City, OR | Department of Veterans Affairs | 3/24/2010 |
C3T, INC. | $236,877 | Contract | : Replace Conference Room and Replace AHU | Department of Veterans Affairs | 3/16/2010 |
SEA KNIGHT ASSOCIATES, LLC | $888,327 | Contract | : Upgrade boiler plant instrumentation at the VA Medical Center in Coatesville,PA | Department of Veterans Affairs | 1/26/2010 |
HAMLINE CONSTRUCTION, INC. | $177,479 | Contract | : Replace carpet in domicilary building 2 at VA Medical Center in St. Cloud, MN | Department of Veterans Affairs | 12/24/2009 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $16,827 | Contract | : GDIT to provide Environmental Assessment (EA) of Ft. Rosecrans National Cemetery, Solar PV Project | Department of Veterans Affairs | 3/25/2010 |
AIRBORNE CONSTRUCTION SERVICES, LLC | $9,144,216 | Contract | : Airborne Construction Services will furnish all labor, materials, tools and equipment necessary to accomplish the work indicated on the contract drawings and as stated in the specifications or resonably implied, for the Recovery Act Projet 'Surgery Renova | Department of Veterans Affairs | 2/26/2010 |
NOBLE SALES CO., INC. | $16,259 | Contract | : life vests and ring buoys for Cartersville, GA | Department of Veterans Affairs | 10/20/2009 |
K.F. DAVIS ENGINEERING, INC. | $20,494 | Contract | : 35% design documents for energy conservation measures, VA Big Spring | Department of Veterans Affairs | 1/06/2010 |
ANDERSON ENGINEERING OF MINNESOTA, LLC | $218,032 | Contract | : Environmental Compliance and Environmental Management Audits for MSN II. | Department of Veterans Affairs | 1/07/2010 |
BUYS & ASSOCIATES INC | $30,058 | Contract | : Environmental Assessment for Monterey Out Patient Clinic, California, Solar Photovoltaic Energy Project | Department of Veterans Affairs | 3/24/2010 |
MIDWEST CONTRACTING, INC. | $117,799 | Contract | : Special Procedures Project at the VA Central Iowa Health Care System, Des Moines division | Department of Veterans Affairs | 3/10/2010 |
WOOD CONCEPT SPECIALTY INC. | $437,000 | Contract | : Roof Replacement, Building 91 at the St Albans, NY Campus of the VA Health-care system. | Department of Veterans Affairs | 2/03/2010 |
JHJ ENTERPRISES, LLC | $353,695 | Contract | : Upgrade HVAC for Cardiac Cath Lab | Department of Veterans Affairs | 1/27/2010 |
KAL ARCHITECTS INC | $565,862 | Contract | : AE is to provide professional design services to perform design, furnish working drawings, cost estimates, technical specifications, and related information for the project entitled 'Site Install Emergency Management Generator' for VA long Beach Healthcar | Department of Veterans Affairs | 2/02/2010 |
TENNANT COMPANY | $141,095 | Contract | : Model Sentinel Rider Sweeper with Options | Department of Veterans Affairs | 7/29/2009 |
U.S. VETERANS CONSTRUCTION & MANAGEMENT CORP. | $246,070 | Contract | : Access Points Repairs | Department of Veterans Affairs | 7/31/2009 |
GREENLAND ENTERPRISES, INC. | $709,411 | Contract | : Add A/C for Data Closets VA Medical Center - Martinsburg, WV | Department of Veterans Affairs | 3/16/2010 |
IMAGE GROUP INC | $76,605 | Contract | : A/E Services | Department of Veterans Affairs | 4/29/2009 |
C3T, INC. | $361,542 | Contract | : Hot Water Heater, Low Zone Bldg 111 | Department of Veterans Affairs | 3/11/2010 |
KNIGHTO, LLC | $336,626 | Contract | : Renovate & RE-establish turf with Sod and water newly istalled Sod, Quantico National Cemetery. Triangle, VA. | Department of Veterans Affairs | 9/04/2009 |
ARMSTRONG ELEVATOR COMPANY | $1,100,000 | Contract | : RECOVERY - REPLACE ELEVATORS 2009 | Department of Veterans Affairs | 1/04/2010 |
FHC CONTRACTING, INC. | $831,452 | Contract | : Prime contract for the installation of HVAC upgrades at Building 2, 7th floor, Patient Privacy area at North Texas VA Healthcare Center, Dallas, TX | Department of Veterans Affairs | 1/28/2010 |
CLUB CAR, INC. | $13,586 | Contract | : Club Car Utility Vehicle | Department of Veterans Affairs | 9/21/2009 |
CHEQUAMEGON BAY ENGINEERING, INC. | $47,197 | Contract | : This contract involves engineeing desing of a 27 car parking lot south of Building 401 and a 38 car parking lot west of B-402 at the VA Medical Center in Tomah, WI. Design includes surveying and engineering to accomplish the following elements of the pro | Department of Veterans Affairs | 12/29/2009 |
SKYLINE SERVICES, INC. | $16,415 | Contract | : Paint Building at Fayetteville National Cemetary, Fayetteville, Arkansas | Department of Veterans Affairs | 2/18/2010 |
C & S ENGINEERS, INC. | $286,242 | Contract | : Engineering Design Services and Certified Industrial Hygienist Services associated with design, schematic drawings, specifications, contract documents & construction period services associated with Batavia Energy Conservation Measures project. | Department of Veterans Affairs | 1/25/2010 |
C3T, INC. | $1,215,243 | Contract | : Renovate Urgent Care B-400 | Department of Veterans Affairs | 2/24/2010 |
CHICORA FOUNDATION INC | $24,117 | Contract | : Architectural conservation of the Dade Massacre Monument at the St. Augustine National Cemetery. The project includes removal of inappropriate OPC pointing and installation of new pointing using a soft lime mortar; cleaning of the monuments; cleaning and | Department of Veterans Affairs | 3/03/2010 |
WINN CONSTRUCTION COMPANY | $240,742 | Contract | : Renovate for New Coolers and Freezers | Department of Veterans Affairs | 3/15/2010 |
BABCOCK CONSTRUCTION COMPANY, LLC | $143,570 | Contract | : Construct Intensive Care Family Waiting Rooms | Department of Veterans Affairs | 10/20/2009 |
K.F. DAVIS ENGINEERING, INC. | $35,894 | Contract | : 35% Design documents for Energy Conservation projects | Department of Veterans Affairs | 1/11/2010 |
MCGOLDRICK CONSTRUCTION SERVICES CORPORATION | $1,155,260 | Contract | : Replace HVAC Units Audie Murphy VA Hospital San Antonio, Texas | Department of Veterans Affairs | 3/29/2010 |
C3T, INC. | $364,100 | Contract | : REPLACE ROOF BLDG 7 | Department of Veterans Affairs | 1/19/2010 |
HDR ARCHITECTURE INC, | $499,947 | Contract | : Provide professional Architectural and Engineering design services to perform extensive survey of existing conditions, develop schematic design based on space planning drawings. Also, prepare detailed design documents to include construction drawings and | Department of Veterans Affairs | 2/01/2010 |
SANBERG GROUP, INC., THE | $1,448,182 | Contract | : Project consists of the replacement of all domestic hot/cold water supply lines, domestic hot/cold water drain lines,hot water return lines, sewer drain lines and mains, including demolition/asbestos abatement and associated renovation. | Department of Veterans Affairs | 12/09/2009 |
JENSEN CONSERVATION SERVICE | $15,500 | Contract | : Conserve Soldiers' Monument, Leavenworth National Cemetery, Leavenworth, KS | Department of Veterans Affairs | 7/20/2010 |
FIRETECH CONSULTING, INC | $205,437 | Contract | : Firetech Consulting's Certified Fire Protection Engineers (FPE) will assess the level of life safety compliance of all patient buildings for six Department of Veterans Affairs (VA) Veterans Integrated Service Network-VA Midwest Health Care Network (VISN 2 | Department of Veterans Affairs | 1/21/2010 |
TTL ASSOCIATES, INC. | $20,399 | Contract | : NEPA Environmental Assessment | Department of Veterans Affairs | 3/24/2010 |
GREENLAND ENTERPRISES, INC. | $842,514 | Contract | : REPLACE BOILER EQUIPMENT | Department of Veterans Affairs | 3/24/2010 |
LEGION CONSTRUCTION, INC. | $4,797,700 | Contract | : TAS::360158:: TAS Upgrade Fire Protection. The purpose of the project is to repair and upgrade the existing fire protection systems to meet minimum current Life Safety Code and VA Requirements, including fire protection water system improvements, alarm an | Department of Veterans Affairs | 3/26/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $23,879 | Contract | : Environmental Assessment of Amarillo, TX | Department of Veterans Affairs | 3/24/2010 |
CONTINENTAL FLOORING COMPANY | $268,469 | Contract | : Project 568-09-113 Replace corridor floor tile | Department of Veterans Affairs | 12/23/2009 |
CANNON MANAGEMENT GROUP, LLC | $343,987 | Contract | : Correct Ductwork Deficiencies at Jesse Brown VA Medical Center | Department of Veterans Affairs | 1/27/2010 |
K.O.O. CONSTRUCTION, INC. | $508,982 | Contract | : Demolition and replacement of the existing roof system; removal of all exterior windows and replacement of these windows w/glass and louvers;several interior windows and doors;existing lath and plaster; painting of all doors, walls and ceiling. | Department of Veterans Affairs | 3/29/2010 |
GUERRERO BUILDERS, LLC | $1,555,996 | Contract | : Demolition and Renovation of Bldg 13. Consisting of select interior demolition, including 54 windows, doors, ceilings, flooring and bathrooms. The only signifigant deliverables would be windows, (54) amd plumbing and HVAC items. | Department of Veterans Affairs | 9/21/2009 |
C3T, INC. | $178,198 | Contract | : Replace Roof Bldg 123 C-Wing | Department of Veterans Affairs | 3/25/2010 |
KEVCON, INC. | $76,168 | Contract | : Canteen Dinning Area Renovation | Department of Veterans Affairs | 1/22/2010 |
KAL ARCHITECTS INC | $135,968 | Contract | : AE is to provide professional design services to furnish Design Development and Construction Document Packages including demolition, architectural, structural, drawings, phasing plan and narrative, cost estimates, technical specifications, and related inf | Department of Veterans Affairs | 1/19/2010 |
ZIESON CONSTRUCTION COMPANY, LLC | $606,955 | Contract | : The general scope of work includes, but is not limited to, general construction roofing membrane, insulation and associated sheet metal flashing on concrete sunshades | Department of Veterans Affairs | 3/11/2010 |
D. E. ERHARD CONSTRUCTION INC. | $85,150 | Contract | : Renovation of existing bathrooms at Building 100 at VA Palo Alto Health Care System, Palo Alto California | Department of Veterans Affairs | 2/03/2010 |
TORO COMPANY, THE | $22,994 | Contract | : mid-duty utility vehicle | Department of Veterans Affairs | 7/21/2009 |
PACE BUILDING CORPORATION | $69,140 | Contract | : Project calls for installation of an irrigation system at an existing VA National Cemetery in San Antonio, Texas. Work involves, trenching and backfill, installation of controllers, valves, irrigation piping and sprinkler heads, etc. | Department of Veterans Affairs | 3/18/2010 |
PRO WEST ENGINEERING | $345,454 | Contract | : Replace Irrigation System, Phase II | Department of Veterans Affairs | 2/10/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
S&M AND ASSOCIATES, INC. | $802,304 | Contract | : Upgrade light Fixtures to Energy Efficient Fixtures Order Number 528C04213 | Department of Veterans Affairs | 3/31/2010 |
JR SERVICES, LLC | $526,857 | Contract | : ARRA: CAULK & SEAL II AT VA MEDICAL CENTER, RICHMOND VA | Department of Veterans Affairs | 3/22/2010 |
AMEC EARTH & ENVIRONMENTAL, INC. | $14,071 | Contract | : Prepare an environmental assessment for the San Francisco VA medical center in support of the installation of solar photovoltaic systems. | Department of Veterans Affairs | 3/25/2010 |
LEGION CONSTRUCTION, INC. | $4,462,700 | Contract | : TAS::360158::TAS Upgrade Baths B200 Construct/Hospital & Infirmaries. Renovate 3rd Floor to accommodate new inpatient bedroom and bathrooms. | Department of Veterans Affairs | 3/26/2010 |
FLOYD CONSTRUCTION CORPORATION | $464,160 | Contract | : Replace Steam Lines | Department of Veterans Affairs | 3/16/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $24,824 | Contract | : Environmental Assessment of Miami, FL | Department of Veterans Affairs | 3/19/2010 |
TRI-TECH | $2,596,261 | Contract | : Improve/Enhance Sktorm Water Drainage & Roads located at the Waco VA | Department of Veterans Affairs | 2/12/2010 |
NOVI ENERGY LLC | $33,916 | Contract | : The Department of Veteran Affairs National Energy Business Center (VANEBC) has established a Blanket Purchase Order Agreement (BPA) VA776-BP-0016 for Solar PV Renewable Energy System Studies to support a number of renewable energy generating projects at v | Department of Veterans Affairs | 1/15/2010 |
RED WILK CONSTRUCTION INC | $46,133 | Contract | : Contractor shall furnish management, supervision, labor, transportation, equipment, and materials, and perform work to include demolition, general construction, alterations, mechanical and electrical work, and certain other items as required by project dr | Department of Veterans Affairs | 2/26/2010 |
KEVCON, INC. | $254,115 | Contract | : Renovate Alzheimer Unit at VA Medical Center, Roseburg, OR | Department of Veterans Affairs | 3/02/2010 |
INNOV8 CONTRACTING, INC. | $388,551 | Contract | : Upgrade Patient Care Area, Project #438-10-102 | Department of Veterans Affairs | 2/23/2010 |
KREILICK CONSERVATION LLC | $25,000 | Contract | : Conservation of the Zachary Taylor Monument, Zachary Taylor National Cemetery, Louisville, KY. | Department of Veterans Affairs | 3/24/2010 |
TL SERVICES, INC. | $292,674 | Contract | : Recondition of Boiler No. 1 | Department of Veterans Affairs | 3/29/2010 |
AMX VSS, L.L.C. | $1,092,753 | Contract | : Install new heating, vetilation and air conditioning system and upgrade electrical in Building 2. The contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materia | Department of Veterans Affairs | 3/25/2010 |
ACRO CONSTRUCTION, LLC | $560,634 | Contract | : Replace/Repair Steam Plant pipes and valves | Department of Veterans Affairs | 11/04/2009 |
C3T, INC. | $367,410 | Contract | : Replace Flooring and Wall Covering | Department of Veterans Affairs | 2/16/2010 |
VSGI, LLC | $449,990 | Contract | : Replace HVAC Bldg 138 | Department of Veterans Affairs | 3/04/2010 |
PLATT CONSTRUCTION, INC. | $222,407 | Contract | : Remodel existing interior space on 1st and 3rd floor B 404 to create additional office space. | Department of Veterans Affairs | 3/29/2010 |
JHJ ENTERPRISES, LLC | $3,944,601 | Contract | : Upgrade HVAC & Plumbing Systems | Department of Veterans Affairs | 3/19/2010 |
VALOR CONSTRUCTION MANAGEMENT, LLC | $324,637 | Contract | : The contract consists of Electrical and HVAC upgrade to repari the system. | Department of Veterans Affairs | 3/08/2010 |
ALLIED MACHINERY CORPORATION | $8,100 | Contract | : NEW 2009 GEARMORE MODEL 4T63X99 3-WAY DUMP TRAILER | Department of Veterans Affairs | 9/01/2009 |
AEGIS RESTAURO LLC | $118,265 | Contract | : Memorial Arch Conservation, Madison, Tennessee | Department of Veterans Affairs | 3/03/2010 |
KDV, INC | $4,449,000 | Contract | : Boiler Replacement | Department of Veterans Affairs | 1/04/2010 |
JE HURLEY CONSTRUCTION, INC. | $366,129 | Contract | : Restroom Refurbishing | Department of Veterans Affairs | 2/11/2010 |
REC SOLAR, INC. | $1,053,882 | Contract | : Turnkey Solar Photovoltaic Electric Generating System at national cemetery located in San Joaquin, CA. Original award was $796,950 in value but because of a project change order the total is now 1,053,882. Project is complete, only additional work is 1 y | Department of Veterans Affairs | 2/19/2010 |
WORCESTER EISENBRANDT, INC. | $29,000 | Contract | : Historic Preservation of the Union Soldiers Monument and Confederate Blocks | Department of Veterans Affairs | 1/06/2010 |
CLARK KJOS ARCHITECTS LLC | $44,003 | Contract | : Remodel Outpatient Pharmacy, Seattle Campus | Department of Veterans Affairs | 1/06/2010 |
HOMELAND SECURITY CONSTRUCTION CORP | $210,225 | Contract | : Upgrade the Outpatient Waiting Area @ VA Medical Center in Huntington, WV. | Department of Veterans Affairs | 3/29/2010 |
WILLIAMS BUILDING COMPANY, INC. | $742,034 | Contract | : Solar Photovoltaic Electric Generating System | Department of Veterans Affairs | 1/15/2010 |
C3T, INC. | $178,198 | Contract | : Replace Roof Bldg 123 D-Wing | Department of Veterans Affairs | 3/25/2010 |
P B S ENGINEERS, INC. | $39,401 | Contract | : A/E Services for Replace Fire Pump at the VA Long Beach Healthcare Center | Department of Veterans Affairs | 12/02/2009 |
TAYLOR TETER PARTNERSHIP | $393,800 | Contract | : Identification of asbestos piping insulation. Preparation of bid and construction documents for the removal of asbestos insulation the replacement with non-asbestos insulation. | Department of Veterans Affairs | 12/23/2009 |
KREILICK CONSERVATION LLC | $12,000 | Contract | : Conservation of the Minnesota Monument, Memphis National Cemetery, Memphis, TN. | Department of Veterans Affairs | 3/09/2010 |
VYKON INCORPORATED | $1,142,628 | Contract | : Renovate 1A for Specialty Clinic at the Ralph H. Johnson VAMC | Department of Veterans Affairs | 4/23/2010 |
VETERANS DEVELOPMENT CORPORATION, INC. | $1,299,450 | Contract | : Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA. | Department of Veterans Affairs | 6/17/2010 |
DECATUR CONSTRUCTION, INC. | $498,985 | Contract | : Repair and resurface roadways at Fort Scott National Cemetery, Fort Scott, Kansas. | Department of Veterans Affairs | 4/14/2010 |
SILVER STAR CONSTRUCTION, LLC | $359,227 | Contract | : kitchen cook chiller- Renovation | Department of Veterans Affairs | 5/27/2010 |
BRICAN, INC. | $2,293,747 | Contract | : Provide all Labor and Materials to install new steam traps, steam line and steam monitoring system. Contract also calls for 4 new sub-basement entrances as well as sub-basement floor slab. | Department of Veterans Affairs | 4/28/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $499,970 | Contract | : Hines VA JOC Repair & Expand KS Parking Lot | Department of Veterans Affairs | 3/08/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $499,961 | Contract | : Hines VA JOC Construct New Parking Lot | Department of Veterans Affairs | 3/08/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $499,130 | Contract | : Hines VA JOC Reconf. Intersection Hines Ave. & Tripp Blvd. | Department of Veterans Affairs | 3/08/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $499,944 | Contract | : Hines VA JOC Restripe & Expand MN Parking Lot | Department of Veterans Affairs | 3/08/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $466,090 | Contract | : Hines VA JOC Replace Roof Bldg. 228 | Department of Veterans Affairs | 3/08/2010 |
VSGI-ERA VALDIVIA A JOINT VENTURE | $171,184 | Contract | : Hines VA JOC Replace C Roof Bldg. 228 | Department of Veterans Affairs | 3/08/2010 |
DWG & ASSOCIATES, INC. | $1,062,345 | Contract | : Replace Underground Electrical Systems and Generators | Department of Veterans Affairs | 9/04/2009 |
CONSERVATION SOLUTIONS, INC | $64,456 | Contract | : Restoration of Pennsylvania Monument at the Salisbury National Cemetery in North Carolina | Department of Veterans Affairs | 1/28/2010 |
CONSERVATION SOLUTIONS, INC | $99,950 | Contract | : Restoration of Monumental Arch at Chattanooga National Cemetery. | Department of Veterans Affairs | 1/30/2010 |
INTERMUSEUM CONSERVATION ASSOCIATION | $29,319 | Contract | : Conserve (NHDVS) Soldiers' Monument, 1917, at the Danville National Cemetery, Danville, Illinois, for the National Cemetery Administration, under Project Number R-CSD-61 | Department of Veterans Affairs | 9/28/2009 |
INTERMUSEUM CONSERVATION ASSOCIATION | $36,221 | Contract | : Conserve the Memorial Arch & Confederate Boulder 1880 & 1902 monument at the Camp Chase Cemetery, Columbus, Ohio, for the National Cemetery Administration, under Project Number R-CSD-60 | Department of Veterans Affairs | 3/30/2010 |
PACRUTA, INC. | $368,000 | Contract | : Canteen Renovation | Department of Veterans Affairs | 3/23/2010 |
GCC ENTERPRISES INC. | $1,497,000 | Contract | : SCOPE: Contractor shall provide all labor, tools, materials, equipment, supplies and supervision necessary work necessary for Project No. 630A4-08-420, 10 West Renovation, VA NY Harbor Healthcare System, Brooklyn Campus. | Department of Veterans Affairs | 12/23/2009 |
IME-ACC INC. | $186,525 | Contract | : Replace Air Conditioning Condensing & Air handler Unit. | Department of Veterans Affairs | 2/04/2010 |
SCHNEIDER ELECTRIC USA, INC. | $6,550,502 | Contract | : Replacement and installation of emergency generators. | Department of Veterans Affairs | 6/11/2010 |
WG PITTS COMPANY | $46,665 | Contract | : Designing of new security system for the VA | Department of Veterans Affairs | 1/28/2010 |
BVB CONSTRUCTION, INC | $785,850 | Contract | : Building 500 Replace Nurse Call System, Phase 6 at VA Greater Los Angeles Health Care System. | Department of Veterans Affairs | 4/26/2010 |
IME-ACC INC. | $49,888 | Contract | : Replace Roof Bldg. 41 VA Palo Alto | Department of Veterans Affairs | 9/29/2009 |
GREENLAND ENTERPRISES, INC. | $5,489,166 | Contract | : Chiller Replacement, Martinsburg, WV VAMC | Department of Veterans Affairs | 5/27/2010 |
NORTHWEST TECHNOLOGIES, INC. | $446,808 | Contract | : Provide all supervision, labor, materials and equipment to complete project 531-08-117, Renovate Medical Media Building 110 on the Boise VA Medical Center Campus. | Department of Veterans Affairs | 4/05/2010 |
C3T, INC. | $392,456 | Contract | : Replace Water/Steam Lines Phase 3 | Department of Veterans Affairs | 5/10/2010 |
M2 FEDERAL INC. | $19,442 | Contract | : Relocate, Repair and Refinish Casket Biers at Ft. Sam Houston National Cemetery | Department of Veterans Affairs | 4/30/2010 |
WELCH CONSTRUCTION INC. | $293,068 | Contract | : UPGRADE ELECTRICAL PANEL BOARDS (CONSTRUCTION)COMPLETE | Department of Veterans Affairs | 5/13/2010 |
ROBERT F. HYLAND & SONS, LLC | $776,666 | Contract | : Furnish and install new fire alarm system | Department of Veterans Affairs | 5/25/2010 |
VETERANS NORTHWEST CONSTRUCTION LLC | $596,967 | Contract | : Furnish the necessary personnel, material and equipment, and supervision to provide and install 200 ton oil free frictionless magnetic bearing air cooled centrifugal water chiller on the VA Puget Sound Health Care System located in Seattle, WA. | Department of Veterans Affairs | 6/25/2010 |
MONUMENT CONSTRUCTION, LLC | $72,964 | Contract | : Underground Meter pit work in West Roxbury, MA | Department of Veterans Affairs | 4/22/2010 |
ENERGY ENGINEERING & CONSULTING SERVICES LLC | $303,453 | Contract | : Energy Engineering & Consulting Services, LLC will provide retro-commissioning (RetroCx) services for the purpose of establishing and altering HVAC and related energy-using systems to proper operational capabilities for fully functional health care facili | Department of Veterans Affairs | 3/15/2010 |
DEERE & COMPANY | $23,700 | Contract | : Purchase of a Utility Vehicle | Department of Veterans Affairs | 6/16/2010 |
VSGI, LLC | $64,990 | Contract | : Install Automatic Patient Doors B3-2-84 | Department of Veterans Affairs | 5/10/2010 |
DESIGN ENGINEERS, P.C. | $962,101 | Contract | : A/E to Replace Fan Coils and Convectors at the Iowa City VA Medical Center. | Department of Veterans Affairs | 4/22/2010 |
JE HURLEY CONSTRUCTION, INC. | $289,518 | Contract | : Exterior Finishes and Windows | Department of Veterans Affairs | 1/21/2010 |
ADVANCED TECHNOLOGY CONSTRUCTION CORPORATION | $217,677 | Contract | : Renovate existing classroom space and former fiscal space of Building 1, Second floor, Seattle Division, for other uses. | Department of Veterans Affairs | 7/05/2010 |
LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | $2,742,995 | Contract | : Renovation of clinics 3N, 5N, and 8S, Building 1 at 915 N. Grand Blvd., St. Louis, MO. | Department of Veterans Affairs | 6/02/2010 |
SEAWOLF CONSTRUCTION CORP | $286,169 | Contract | : OPC Emergency Electrical Service Upgrade @ VA Brooklyn Campus | Department of Veterans Affairs | 6/30/2009 |
SILVER STAR CONTRACTING, LLC | $64,850 | Contract | : Inpatient Mental Health General Construction, Demo, Electrical, HVAC, fire sprinkler work & other alterations | Department of Veterans Affairs | 5/17/2010 |
MICRON ELECTRICAL CONTRACTING, INC. | $839,981 | Contract | : Replace 4800V generator | Department of Veterans Affairs | 5/20/2010 |
VETERANS CONTRACTING GROUP, INC. | $808,200 | Contract | : Renovate Radiology Department. | Department of Veterans Affairs | 5/12/2009 |
LEGION CONSTRUCTION, INC. | $6,805,100 | Contract | : Advanced Utility Metering System - VISN 1, TAS 36 0158. Work for the project will include but is not limited to general construction, alternations, mechanical work, fire protection work, utility systems, and necessary removal of existing structures and co | Department of Veterans Affairs | 5/18/2010 |
BEXAR-ADVANCED SOLUTIONS GROUP, LLC | $288,975 | Contract | : Direct Digital Control Retrofit | Department of Veterans Affairs | 4/02/2010 |
VETERAN ENTERPRISES CO., INC. | $1,318,507 | Contract | : PROVIDE ALL LABOR AND MATERIAL TO REPLACE ROOFS OVER BOILER PLANT, LAUNDRY, 10D, 1E AND BLDG #5 @ VA MEDICAL CENTER @ BUFFALO, NY | Department of Veterans Affairs | 4/30/2010 |
UNITED BUILDERS. LLC | $700,036 | Contract | : Air Handlers Phase 4 | Department of Veterans Affairs | 6/10/2010 |
QWEST BUILDING CORPORATION | $377,047 | Contract | : Replace parking lot lighting fixtures at the Salem, VA Facility | Department of Veterans Affairs | 4/23/2010 |
DUNBAR MECHANICAL CONTRACTORS, LLC | $378,629 | Contract | : Installation of VFD's and hot water/chill water pumps, HVAC controls and insultion. | Department of Veterans Affairs | 5/18/2010 |
SBH, LLC | $277,517 | Contract | : Remodel of the Building 7 Dining Room | Department of Veterans Affairs | 6/08/2010 |
BLUE CORD DESIGN AND CONSTRUCTION, LLC | $407,880 | Contract | : Original contract was modified to add the 3 options that were proposed on during initial IFB and to add the cost of replacing the valves and providing negative air solutions for 3 AC units. Original contract price of $129,000 was increased by $278,880 br | Department of Veterans Affairs | 7/28/2010 |
INNOVATIVE VETERAN SOLUTIONS, LLC | $185,027 | Contract | : Remove and replace with LED lighting various types of exterior lighting fixtures. | Department of Veterans Affairs | 4/15/2010 |
CMEC, INCORPORATED | $5,268,215 | Contract | : Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center. | Department of Veterans Affairs | 5/04/2010 |
PATRIOT CONSTRUCTION, INC. | $537,500 | Contract | : Renovate/convert the existing Ultra Sound suite in Bldg 102 radiology department for the installation of a 64-Slice CT equipment and relocate Ultrasound Suite to a new location as shown in the drawing. The renovation works shall be in accordance with the | Department of Veterans Affairs | 6/07/2010 |
MIDWEST CONTRACTING, INC. | $1,527,379 | Contract | : Bldg Three HVAC at the VA Central Iowa Healthcare System, Des Moines Division | Department of Veterans Affairs | 5/20/2010 |
C3T, INC. | $286,908 | Contract | : Construct Parking Lot and Pave Gravel Lots | Department of Veterans Affairs | 4/15/2010 |
AGATE STEEL, INC. | $896,426 | Contract | : Furnish and install the temporary utilites and temporary kitchen trailers while main kitchen is renovated. | Department of Veterans Affairs | 5/12/2010 |
JOHN DEERE SHARED SERVICES, INC. | $70,115 | Contract | : 1-310J JOHN DEERE BACKHOE | Department of Veterans Affairs | 9/29/2009 |
SOCON, LLC | $52,500 | Contract | : CON Replace Exhaust Fans | Department of Veterans Affairs | 4/16/2010 |
CREATIVE SIGN SERVICE, INC. | $228,622 | Contract | : Manufacture/Install Two full color LED main site signs | Department of Veterans Affairs | 5/28/2010 |
TRI-SYSTEMS, INC. | $766,791 | Contract | : REPAIR/REPLACE EXISTING COLUMNS BUILDINGS 1, 2, 3, & 4. LEAD ABATEMENT, SANDING, PAINTING, ROOF REPAIR. | Department of Veterans Affairs | 5/20/2010 |
PULLIAM CONSTRUCTION COMPANY, INC. | $3,419,449 | Contract | : Provide all plant, tools, labor, materials, equipment, supervision, transportation, to complete construction of new roadways and new parking lots in accordance with drawings and technical specifications provided with solicitation VA-261-10-RA-0033. | Department of Veterans Affairs | 4/27/2010 |
ACTION-A&D A JOINT VENTURE | $1,084,000 | Contract | : All management, supervision, labor, transportation, equipment and materials and perform work to include general construction, demolition, alterations, drainage, mechanical, electrical work, water storage facilities, necessary removal of existing structure | Department of Veterans Affairs | 2/10/2010 |
ENERGY ENGINEERING & CONSULTING SERVICES LLC | $302,730 | Contract | : Energy Engineering & Consulting Services, LLC will provide retro-commissioning (RetroCx) services for the purpose of establishing and altering HVAC and related energy-using systems to proper operational capabilities for fully functional health care facili | Department of Veterans Affairs | 3/15/2010 |
AINSWORTH-BENNING OF WYOMING | $2,532,780 | Contract | : Capital Improvement & Maintenance Camp Crook-Office reconstruction,residents reconstruction and Energy Up-Grades and Siding Replacement throughout the Camp Crook Admin Site | Department of Veterans Affairs | 4/06/2010 |
PETERSON AFFILIATES INC | $311,018 | Contract | : Interior renovation of the primary care department in building 1 of the VA hospital in Batavia. 3 phase project. | Department of Veterans Affairs | 5/04/2010 |
KEVCON, INC. | $4,593,610 | Contract | : Work includes installation of 135 meters, Including water, steam and natural gas and connecting them to a wireless network for real time reporting of utility usage. Work is spread out over 18 different VA locations: 1 site in Nevada (Reno) , 2 sites in | Department of Veterans Affairs | 5/27/2010 |
IPB, LLC | $469,000 | Contract | : Provide and Connect new Automatic Transfer Switches for the back up power feeds. | Department of Veterans Affairs | 10/29/2009 |
US&S, INC. | $677,800 | Contract | : RECOVERY ACT UPGRADE DDC CONTROLS Phase IV of VA-247-RA-1276 at Carl Vinson VAMC, Dublin GA all in strict accordance with the specification, schedules, and drawings. | Department of Veterans Affairs | 4/22/2010 |
CONTRACTORS SERVICES LLC | $709,098 | Contract | : Veterans Affairs Medical Center (90C) Sheridan, Wyoming - provide all labor, material and equipment to excavate, remove and replace sections of steam and condensate line and insulation. Known as Phase 3 of Steam Main Corrections. | Department of Veterans Affairs | 7/01/2010 |
S P F WATER ENGINEERING | $664,100 | Contract | : Evaluate Feasibility of Direct Geothermal, Environmental Assessment, Test Boring, Schematic Design, and SOW Support at the Fort Harrison VA Medical Center | Department of Veterans Affairs | 12/16/2009 |
MILES ENGINEERING AND CONSTRUCTION, INC. | $88,291 | Contract | : Replace Mercury Vapor Lamps | Department of Veterans Affairs | 4/08/2010 |
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. | $259,265 | Contract | : Design, Engineering and Installation of Access Control Security System | Department of Veterans Affairs | 3/03/2010 |
AWG SERVICES, LLC | $635,000 | Contract | : Energy Upgrades to HVAC Systems-Buildings 40 & 41 | Department of Veterans Affairs | 4/29/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $298,000 | Contract | : Groundwater monitoring and sampling to locate potential subsurface contamination | Department of Veterans Affairs | 3/31/2010 |
HOMELAND SECURITY CONSTRUCTION CORP | $254,229 | Contract | : Design, Build & Installation of CAT Scan, Project #503-CSI-104, located at James E. Van Zandt VAMC, Altoona, PA | Department of Veterans Affairs | 6/21/2010 |
PACRUTA, INC. | $4,975,000 | Contract | : Hines HVAC Upgrade | Department of Veterans Affairs | 4/21/2010 |
ARG CONSERVATION SERVICES | $17,741 | Contract | : Conserve the Pacific Coast Garrison Monument at the San Francisco National Cemetery | Department of Veterans Affairs | 1/12/2010 |
DUNHAM ASSOCIATES, INC. | $21,636 | Contract | : VA Communications Closet AC Upgrade | Department of Veterans Affairs | 2/16/2010 |
IME-ACC INC. | $531,972 | Contract | : Supply & Install SPRUNG structure over Bldg. 26 Water Tank | Department of Veterans Affairs | 5/21/2010 |
ALTERNATIVE CONTRACTING, INC. | $605,380 | Contract | : Replace PozLok, Phase I | Department of Veterans Affairs | 5/27/2010 |
AAF-MCQUAY INC. | $347,893 | Contract | : Provide all supervision, labor, materials, tools, equipment, and installation services necessary for replacement of 3 reciprocating air cooled chillers at the Baltimore Medical Center. | Department of Veterans Affairs | 4/01/2010 |
GENERAL ELECTRIC COMPANY | $750,000 | Contract | : General Electric LightSpeed VCT scanner | Department of Veterans Affairs | 4/26/2010 |
DUNHAM ASSOCIATES, INC. | $176,325 | Contract | : VA Design and Study HVAC-39-AH-1 | Department of Veterans Affairs | 2/11/2010 |
LEGION CONSTRUCTION, INC. | $6,805,100 | Contract | : Advanced Utility Metering System - VISN 1, TAS 36 0158. Work for the project will include but is not limited to general construction, alternations, mechanical work, fire protection work, utility systems, and necessary removal of existing structures and co | Department of Veterans Affairs | 5/18/2010 |
ROBERT F. HYLAND & SONS, LLC | $98,009 | Contract | : Remove and Replace Water Heaters | Department of Veterans Affairs | 3/08/2010 |
J.A.M. CONSTRUCTION SERVICES, INC. | $588,000 | Contract | : DEMOLITION AND REMOVAL OF EXISTING OPERATING ROOM(or) FINISHES | Department of Veterans Affairs | 6/12/2010 |
INDUSTRIA, INC. | $532,000 | Contract | : Install Hot Water Converters in Penthouse, Jesse Brown VAMC, Chicago, IL. We are required to furnish all labor, materials, equipment, and qualified supervision to perform work as described in the solicitation and as set forth in the specifications and dr | Department of Veterans Affairs | 6/09/2010 |
SAYLOR CONSTRUCTION, LLC | $5,790,000 | Contract | : Upgrade Emergency Room and Urgent Care | Department of Veterans Affairs | 5/14/2010 |
UTILITY SYSTEMS SOLUTIONS, INC. | $573,670 | Contract | : Renovation of Building 12 at VAMC, Northport, NY as follows: The work includes general construction, alterations, grading, and electrical work to provide an emergency generator and electrical modifications, including necessary removal of existing structu | Department of Veterans Affairs | 6/24/2010 |
TL SERVICES, INC. | $280,417 | Contract | : RENOVATE SPD CARTLIFT | Department of Veterans Affairs | 4/09/2010 |
ALLSERV, INC. | $745,176 | Contract | : CAMP BUTLER NATIONAL CEMETERY - TURF RENOVATIONS AND HEADSTONE CLEANING | Department of Veterans Affairs | 5/11/2010 |
MONUMENT CONSTRUCTION, LLC | $1,557,000 | Contract | : Correct Electrical Deficiencies, Bedford, MA | Department of Veterans Affairs | 4/30/2010 |
OH PLANNING + DESIGN, ARCHITECTURE, LLC | $175,243 | Contract | : Feasibility study to excavate the basement of the existing hospital while maintaining operations. The result may result in expansion space to the hospital. | Department of Veterans Affairs | 3/31/2010 |
J H C FIRE CONTAINMENT SOLUTIONS, INC. | $301,484 | Contract | : Clean & sealing all ductwork and associated air handling units. | Department of Veterans Affairs | 2/01/2010 |
B R CONSTRUCTION LLC | $746,000 | Contract | : The project will be to provide all labor, materials, tools, equipment & supervision, including demolition and removal of existing structures to replace and install domestic booster pumps as required by project specifications at the VA Hospital at 3495 Bai | Department of Veterans Affairs | 6/30/2010 |
DIVISION21 INC | $4,967,679 | Contract | : Advanced Utility Metering-VISN 23 | Department of Veterans Affairs | 6/02/2010 |
KARGES-FAULCONBRIDGE, INC. | $131,680 | Contract | : Provide Retro Comissioning Services during the planning and audit phases for the Carl T. Hayden Medical Center in Phoenix, AZ. The intent is to identify and correct deficiencies with the HVAC systems, effectivly providing a retro-comissioning of the enti | Department of Veterans Affairs | 3/31/2010 |
PATRIOT CONSTRUCTION, LLC | $4,844,138 | Contract | : Advanced Utility metering- VISN3 | Department of Veterans Affairs | 5/26/2010 |
PULLIAM CONSTRUCTION COMPANY, INC. | $236,777 | Contract | : Furnish the necessary personnel, material, equpment, materials and supervision for the re-roofing of Buildings 4,5 & 6 inlcuding roofs at building main entry(s); reuse of existing copper flashing, gutters and downspouts; repair and refinishing of associat | Department of Veterans Affairs | 4/01/2010 |
CARRIGG COMMERCIAL BUILDERS, LLC | $348,119 | Contract | : Project #608-07-120; Renovate for Mental Health and Primary Care Work includes furnish all labor, materials, tools, equipment, supervision, and travel required to demo existing area, install HVAC pad footings and fit up space. Concrete, non-structural met | Department of Veterans Affairs | 3/25/2010 |
WELCH CONSTRUCTION INC. | $278,526 | Contract | : RENOVATE FOR OUTPATIENT EXAM ROOMS | Department of Veterans Affairs | 6/04/2010 |
INNOVATIVE MANAGEMENT CONCEPTS, INC. | $3,998,741 | Contract | : The goal of this award is to provide software Independent Verification and Validation (IV&V) Services for Department of Veterans AffairsG?? Benefits Services system development projects named Chapter 33, VONAPP, VBMS (ARRA funded subprojects are VBMS VRO | Department of Veterans Affairs | 4/15/2010 |
IXL/WORLD CLASS BUILDERS | $920,507 | Contract | : Building 3 new electrical towers for electrical upgrade on Bldg. 14 | Department of Veterans Affairs | 1/22/2010 |
GREENLAND ENTERPRISES, INC. | $1,733,620 | Contract | : Mechanical Installation of Utility Meters for Veterans Integrated Service Network 5 | Department of Veterans Affairs | 5/26/2010 |
K.O.O. CONSTRUCTION, INC. | $1,152,006 | Contract | : Renovate Approx. 1,052S.F., of (2) Operating rooms and Corridor #2 | Department of Veterans Affairs | 5/20/2010 |
GREENLAND ENTERPRISES, INC. | $4,682,196 | Contract | : Design-Build Advanced Utility Metering of Veterans Integrated Service Network 6 | Department of Veterans Affairs | 5/20/2010 |
VETERANS DEVELOPMENT CORPORATION, INC. | $889,500 | Contract | : Provide all labor, materials, equipment, transportation, supervision and disposal necessary for the Chiller Upgrade at Jamaica Plain VAMC, MA. | Department of Veterans Affairs | 6/30/2010 |
LEEBCOR SERVICES, LLC | $617,000 | Contract | : renovate public bathrooms | Department of Veterans Affairs | 5/19/2010 |
GRANT SOLUTIONS | $273,000 | Contract | : Demo Bldgs 32,76,77,116,68,69,78 | Department of Veterans Affairs | 6/11/2010 |
INNOV8 CONTRACTING, INC. | $288,000 | Contract | : Roadway Repairs at Black Hills National Cemetery | Department of Veterans Affairs | 6/09/2010 |
PATRIOT CONSTRUCTION, LLC | $457,827 | Contract | : CNRC Hot Water System Upgrade | Department of Veterans Affairs | 4/23/2010 |
KMK CONSTRUCTION, INC. | $997,626 | Contract | : Water Tower Corrosion Control, VAMC Manchester, NH | Department of Veterans Affairs | 6/16/2010 |
PATRIOT CONSTRUCTION, INC. | $204,106 | Contract | : Building 1 Sprinkler System Design-Build Reno VAMC. | Department of Veterans Affairs | 5/18/2010 |
HOMELAND SECURITY CONSTRUCTION CORP | $1,923,731 | Contract | : Altoona, PA, VAMC Window Replacement. Design Build & replace windows and screens in buildings #1 through bldg#11. | Department of Veterans Affairs | 4/15/2010 |
SECURITY SIGNAL DEVICES, INC. | $5,413,266 | Contract | : Contractor is to provide all labor, materials, tools, equipment, supervision, to design, for removal or existing Siemens Fire Alarm System and replacement with new Fire Alarm/Mass Notification System at the Dallas VA Campus of the VA North Texas Health Ca | Department of Veterans Affairs | 3/26/2010 |
NEAT CONTRACTING, INC. | $413,409 | Contract | : New elevator on existing building. | Department of Veterans Affairs | 3/29/2010 |
COLAMETTE CONSTRUCTION COMPANY | $141,713 | Contract | : RENOVATE THEATRE RESTROOMS | Department of Veterans Affairs | 9/14/2009 |
AGILE INFRASTRUCTURE SERVICES, L.L.C. | $542,581 | Contract | : GROUND SAFETY AND ACCESSIBILITY IMPROVEMENTS | Department of Veterans Affairs | 6/16/2010 |
SAYLOR CONSTRUCTION, LLC | $5,790,000 | Contract | : Upgrade Emergency Room and Urgent Care | Department of Veterans Affairs | 5/14/2010 |
JR SERVICES, LLC | $799,000 | Contract | : Renovate and upgrade HVAC for SPD and Pharmacy Storage in BLDG 200 | Department of Veterans Affairs | 6/29/2010 |
TRADESMEN GROUP INC, THE | $490,980 | Contract | : Develop and provide a complete design for the deconstruction, reconstruction, and restoration of 495 LF of existing historical brick wall, including sub-surface drainage and furnish and provide necessary labor, equipment and material for all wall deconstr | Department of Veterans Affairs | 6/09/2010 |
TRI-TECH | $888,913 | Contract | : Restore Bldg. 1 Waco VA Hospital. | Department of Veterans Affairs | 6/25/2010 |
CARRIGG COMMERCIAL BUILDERS, LLC | $1,493,448 | Contract | : Project # 405-09-101 Upgrade Building 1 HVAC Provide all labor, materials, equipment, transportation, supervision and disposal necessary to Upgrade B1 HVAC Work includes general construction, alterations, and mechanical, electrical, fire protection, plum | Department of Veterans Affairs | 3/16/2010 |
LEGION CONSTRUCTION, INC. | $779,700 | Contract | : Contractor shall provide all labor, materials, equipment and supervision and perform all necessary work including general construction, alterations, asbestos abatement, HVAC, plumbing and electrical work, necessary removal of existing structures, construc | Department of Veterans Affairs | 6/21/2010 |
SIEMENS INDUSTRY INC. | $1,546,978 | Contract | : Provide design services, installation services, operator training, and warranty for replacing building automation system (BAS) at the Washington, DC Veterans Affairs Medical Center. | Department of Veterans Affairs | 4/28/2010 |
JE HURLEY CONSTRUCTION, INC. | $50,229 | Contract | : Dental Suite Remodel | Department of Veterans Affairs | 5/12/2010 |
AGILE INFRASTRUCTURE SERVICES, L.L.C. | $921,199 | Contract | : CANTEEN IMPROVEMENT AND RENOVATION | Department of Veterans Affairs | 6/30/2010 |
DEWBERRY-GOODKIND, INC. | $249,850 | Contract | : Planning,design, bidding and construction services for fire alarm replacement for the Brockton, MA, VA, Campus | Department of Veterans Affairs | 8/06/2009 |
US BUILDERS GROUP INC. | $6,728,000 | Contract | : VISN 4 DESIGN/BUILD ADVANCED UTILITY METERING | Department of Veterans Affairs | 5/18/2010 |
RIGHT ELECTRIC INC. | $261,922 | Contract | : Recovery Alarm Integration | Department of Veterans Affairs | 5/17/2010 |
TOTAL TEAM CONSTRUCTION SERVICES, INC. | $1,130,228 | Contract | : Provide a perimeter Fence at Audie L Murphy VA Hospital. | Department of Veterans Affairs | 3/26/2010 |
TL SERVICES, INC. | $3,870,845 | Contract | : VISN 8 Utility Metering System | Department of Veterans Affairs | 5/20/2010 |
TREVINO GROUP, INC., THE | $112,292 | Contract | : provide all labor and materials necessary to Replace Flat Roof areas at Bldg 1, Waco VA Medical Center. | Department of Veterans Affairs | 4/09/2010 |
HOSTETTER, KEACH & CASSADA CONSTRUCTION, LLC | $2,476,589 | Contract | : Construction upfit of Primary Care patient/office area in basement of facility and a new entrance with small office /patient addition. | Department of Veterans Affairs | 6/14/2010 |
MONUMENT CONSTRUCTION, LLC | $576,302 | Contract | : Training, Punch list and close out. | Department of Veterans Affairs | 3/24/2010 |
MIDWEST CONTRACTING, INC. | $179,394 | Contract | : Renovate Loading Dock at the VA Central Iowa Healthcare System, Des Moines Division | Department of Veterans Affairs | 5/25/2010 |
ANDROS CONTRACTING INC. | $1,700,000 | Contract | : Replace Elevator Cabs & Controls, Bldgs 58, 98, 14 & 19 | Department of Veterans Affairs | 3/12/2010 |
FIDELIS DESIGN AND CONSTRUCTION LLC | $3,353,000 | Contract | : Correct Architectural Barriers Phase II | Department of Veterans Affairs | 5/24/2010 |
SOMAR GENERAL CONTRACTOR INC. | $549,800 | Contract | : Replace Roofing and Fall Protection Buildings 8, 9 & 35 at Castle Point VA. | Department of Veterans Affairs | 3/31/2010 |
TEAMUS CONSTRUCTION CO., INC. | $3,350,000 | Contract | : General Contracting | Department of Veterans Affairs | 6/30/2010 |
C3T, INC. | $487,129 | Contract | : Replace Water/Steam Lines Phase 4 | Department of Veterans Affairs | 5/13/2010 |
FRONTLINE CONSTRUCTION GROUP, INC. | $215,100 | Contract | : Design Build Replacement of 43 each Steam Traps at Orlando VA Medical Center. | Department of Veterans Affairs | 3/31/2010 |
REPSTIEN, ROGER | $38,847 | Contract | : A/E Services Project 573A-09-102 Replace ATS Switched Lake City Florida VAMC | Department of Veterans Affairs | 1/20/2010 |
P B S ENGINEERS, INC. | $39,405 | Contract | : replace fire pump bldg 139 | Department of Veterans Affairs | 12/02/2009 |
POLU KAI SERVICES, LLC | $923,610 | Contract | : Replace existing mechanical AHUs, Chillers and add one additional chiller and all associated duct work, elcetrical and piping. | Department of Veterans Affairs | 4/06/2010 |
VSGI, LLC | $3,397,073 | Contract | : Advanced Utility Metering VISN 11 | Department of Veterans Affairs | 5/29/2010 |
STOVER & ASSOCIATES INC | $90,000 | Contract | : This Architect-Engineer contract contemplates the needs of the VA Medical Center, Fayetteville, AR in the major disciple of General Engineering. | Department of Veterans Affairs | 3/11/2010 |
C&C CONTRACTORS, LLC | $954,000 | Contract | : Replace Windows Building 1 at Tuscaloosa Alabama VA Hospital | Department of Veterans Affairs | 5/12/2010 |
SOMAR GENERAL CONTRACTOR INC. | $411,050 | Contract | : Renovate Research at Northport VA. | Department of Veterans Affairs | 9/14/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $90,613 | Contract | : Replace Damaged HVAC Drive Controls | Department of Veterans Affairs | 4/05/2010 |
ELLERY GROUP & RATTO CONSTRUCTION COMPANY, INC., THE | $1,115,202 | Contract | : All labor and materials for the Design and Construction of an existing area in Building 1D to complete an Urgent Care Area and new Police Service. | Department of Veterans Affairs | 6/03/2010 |
IXL/WORLD CLASS BUILDERS | $373,680 | Contract | : replacement of EPDM roof with alterations for Building 45 at the Omaha Division of the Nebraska-Western Iowa Health Care System and repair of slate roof of buildings 12 & 24 | Department of Veterans Affairs | 4/27/2010 |
MECHANICAL CONCEPTS, LLC | $944,423 | Contract | : Mechanical Concepts LLC is providing Retro Commissioning services to the Carl Hayden VA Medical Center in Phoenix, AZ. We are assessing all mechanical equipment and providing a detailed report to the owner for energy savings. We have also subcontraced imp | Department of Veterans Affairs | 3/31/2010 |
VETERANS CONTRACTING GROUP, INC. | $430,550 | Contract | : Renovate Retherm Unit. | Department of Veterans Affairs | 11/23/2009 |
SAYLOR CONSTRUCTION, LLC | $5,790,000 | Contract | : Emergency Room and Urgent Care | Department of Veterans Affairs | 5/18/2010 |
SIEMENS MEDICAL SOLUTIONS USA, INC. | $621,433 | Contract | : The SOMATOM Definition AS is founded on Siemens' proprietary UFC detector system and the revolutionary STRATON X-ray source. In combination with Siemens' CARE solutions as well as Siemens exclusive CT Clinical Engines options, SOMATOM Definition AS offers | Department of Veterans Affairs | 6/30/2010 |
JOHNSON CONTROLS, INC. | $2,841,209 | Contract | : Building automation system upgrade - VAMC Baltimore | Department of Veterans Affairs | 3/26/2010 |
ACRO CONSTRUCTION, LLC | $609,714 | Contract | : Replace Chiller BRC | Department of Veterans Affairs | 4/16/2010 |
TRI-TECH | $220,084 | Contract | : Removal & Preparation for installation of New CT Scanner, Bldg. 163, for CTVHCS,Temple TX. | Department of Veterans Affairs | 6/08/2010 |
IRONCLAD SERVICES, INC. | $179,769 | Contract | : Fisher House Additional Parking | Department of Veterans Affairs | 3/30/2010 |
JOHNSON CONTROLS, INC. | $2,756,236 | Contract | : Provide turnkey services to include materials, equipment, and labor for HVAC upgrades throughout floors 1, 2, 3, and 6 in building 100. | Department of Veterans Affairs | 4/06/2010 |
VETERANS DEVELOPMENT CORPORATION, INC. | $556,527 | Contract | : Provide all necessary supervision, labor, materials, transportation, disposal to replace the steam piping (Phase II) at the Jamaica Plain VAMC, MA. | Department of Veterans Affairs | 7/14/2010 |
PLATT CONSTRUCTION, INC. | $3,121,642 | Contract | : Install HVAC in B 401 | Department of Veterans Affairs | 5/28/2010 |
KWV INCORPORATED | $1,680,620 | Contract | : Replace two roofs | Department of Veterans Affairs | 7/06/2010 |
HICAPS, INC. | $3,827,435 | Contract | : This contract will provide for the design and installation of advanced utility meters for VA facilities in Veteran's Integraded Service Network 17 | Department of Veterans Affairs | 5/28/2010 |
HICAPS, INC. | $6,706,286 | Contract | : This contract will provide for the design and installation of advanced utility meters for VA facilities in Veteran's Integraded Service Network 9 | Department of Veterans Affairs | 5/27/2010 |
PAULI ENGINEERING INC | $48,313 | Contract | : CLC Medical Gas Expansion. Redesign oxygen and vacuum hook-ups for patient rooms. | Department of Veterans Affairs | 4/16/2010 |
ERICKSON BUILDERS & CO INC. | $581,771 | Contract | : Upgrade the existing pneumatic tube system. | Department of Veterans Affairs | 2/18/2010 |
JHJ ENTERPRISES, LLC | $1,948,000 | Contract | : AC System Upgrade | Department of Veterans Affairs | 6/30/2010 |
US&S, INC. | $575,865 | Contract | : Upgrade Mechanical Controls Phase V, Carl Vinson VAMC | Department of Veterans Affairs | 6/08/2010 |
AVETERAN CORP. | $518,500 | Contract | : Renovate Ward E at the Batavia VA | Department of Veterans Affairs | 6/30/2010 |
DAL CONSTRUCTION LLC | $1,386,254 | Contract | : This scope of work includes the demolition and installation of two new air handler units for the H.H. McGuire VAMC, located in Richmond, Virginia. | Department of Veterans Affairs | 3/01/2010 |
AINSWORTH-BENNING OF WYOMING | $133,850 | Contract | : Repair Historic Buildings on Campus | Department of Veterans Affairs | 12/22/2009 |
DIVISION21 INC | $3,923,987 | Contract | : Elevator Upgrade Phase III | Department of Veterans Affairs | 4/03/2010 |
SEAWOLF CONSTRUCTION CORP | $3,819,987 | Contract | : VA Lyons Replace Steam / Condensate Lines | Department of Veterans Affairs | 4/20/2010 |
QWEST BUILDING CORPORATION | $377,047 | Contract | : Replace parking lot lighting fixtures at the Salem, VA Facility | Department of Veterans Affairs | 4/23/2010 |
GRAY BEAR CONSTRUCTION CO. | $2,579,202 | Contract | : Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'. | Department of Veterans Affairs | 4/23/2010 |
COLUMBUS AUTOMATIC SPRINKLERS, INC. | $97,250 | Contract | : Upgrade Sprinkler and Fire Alarm Systems | Department of Veterans Affairs | 9/02/2009 |
US BUILDERS GROUP INC. | $509,000 | Contract | : Replace Roofs Building 22 | Department of Veterans Affairs | 5/06/2010 |
AMERICAN BUILD & DESIGN, INC | $245,041 | Contract | : PROVIDE & INSTALL SALT SHED 30 X 50 X 20 | Department of Veterans Affairs | 5/21/2010 |
ENERGY ENGINEERING & CONSULTING SERVICES LLC | $325,783 | Contract | : Energy Engineering & Consulting Services, LLC will provide retro-commissioning (RetroCx) services for the purpose of establishing and altering HVAC and related energy-using systems to proper operational capabilities for fully functional health care facili | Department of Veterans Affairs | 3/15/2010 |
V3 COMPANIES OF ILLINOIS LTD. | $183,086 | Contract | : Watermain Replacement at Edward Hines Jr. VA Hospital in Hines, IL | Department of Veterans Affairs | 8/14/2009 |
VETERAN ENTERPRISES CO., INC. | $233,473 | Contract | : PROVIDE ALL LABOR/MATERIAL/SUPERVISION NECESSARY TO FURNISH AND INSTALL AN EMERGENCY NOTIFICATION SYSTEM @ VA MEDICAL CENTER IN CANANDAIGUA, NY MOD 0001 EFFECTIVE 6/28/11 ACCEPTED FOR $34036.43 ORIGINAL CONTRACT AMOUNT: $199,437.00 | Department of Veterans Affairs | 5/07/2010 |
JOHN DEERE SHARED SERVICES, INC. | $44,431 | Contract | : JOHN DEERE EXCAVATOR | Department of Veterans Affairs | 8/26/2009 |
SYGNOS, INC. | $3,228,000 | Contract | : The contractor shall furnish all labor, materials, tools, design-build services, and equipment necessary to accomplish the work indicated in solicitation or reasonably implied, for G?Advanced Utility MeteringG?, located at VISN 20. Work will include but | Department of Veterans Affairs | 5/20/2010 |
GENERAL ELECTRIC COMPANY | $740,000 | Contract | : GE CT System LightSpeed VCT | Department of Veterans Affairs | 6/29/2010 |
MTM CONTRACTORS, INC. | $1,079,200 | Contract | : Install New Heating, Ventilation and Air Conditioning | Department of Veterans Affairs | 4/21/2010 |
EATON CORPORATION | $19,401,536 | Contract | : Turn-Key Solar Photovoltaic (PV) System at the New Mexico VA Health Care System located in Albuquerque, NM (NOTE: Original contract award $14,979,935.00 plus $5,316,891.76 Mod 0001 less removal of New Mexico Gross Receipts Tax $1,256,401.76 plus repair of | Department of Veterans Affairs | 5/05/2010 |
ATLANTIC DESIGN & CONSTRUCTION GOVERNMENTAL DIVISION LLC | $1,429,904 | Contract | : Plumbing Deficiencies builing C | Department of Veterans Affairs | 9/29/2010 |
A.A.M.C. INC. | $261,891 | Contract | : Weatherize 300 Row Buildings VAMC | Department of Veterans Affairs | 5/13/2010 |
FRENCH CONSTRUCTION LLC | $264,206 | Contract | : Storm Drainage Improvements at Fort Bliss National Cemetery, Fort Bliss, Texas. Contractor shall completely prepare site for construction operations, including demoltion and removal of existing structures, and furnish labor and materials and perform work | Department of Veterans Affairs | 5/27/2010 |
J.A.M. CONSTRUCTION SERVICES, INC. | $278,992 | Contract | : DEMO AND REMOVAL OF EXISTING OR UTILITY SYSTEM | Department of Veterans Affairs | 6/09/2010 |
CANNON MANAGEMENT GROUP, LLC | $343,987 | Contract | : Remove and re-install new duct working in the lobby of the DDTC area level 2 of the Taylor building. Work shall include removal of insulation, re-routing of cables, power, and fire sprinklers heads to accommendate new duct work. | Department of Veterans Affairs | 1/27/2010 |
SYGNOS, INC. | $2,687,000 | Contract | : Contractor shall provide all necessary materials, labor, tools, equipment and supervision to provide humidification and dehumidification for Operating Rooms 1 through 7, located at the Carl T. Hayden VA Medical Center, in Phoenix, Arizona. Scope of work | Department of Veterans Affairs | 6/28/2010 |
FARLEY ASSOCIATES, INC. | $272,653 | Contract | : Repairs to Pedestrian Walkway Bridge | Department of Veterans Affairs | 3/23/2010 |
AGILE INFRASTRUCTURE SERVICES, L.L.C. | $507,843 | Contract | : DEMO BLDGS 3 & 28 | Department of Veterans Affairs | 5/21/2010 |
JOHNSON CONTROLS, INC. | $10,495,690 | Contract | : THE CONTRACTOR IS TO COMPLETE THE DESIGN AND CONSTRUCTION OF A RENEWABLY FUELED COGENERATION SYSTEM AT THE LOMA LINDA VA MEDICAL CENTER, LOMA LINDA, CA. THE CONTRACTOR SHALL FURNISH ALL LABOR, DESIGN, MATERIALS, SUPPLIES, AND TRAVEL NECESSARY TO ACCOMPLIS | Department of Veterans Affairs | 6/14/2010 |
BRICAN, INC. | $1,533,000 | Contract | : Provide all Materials and Labor to update/renovate HVAC System for Wards 6A and 6B, VAMC Providence, RI. | Department of Veterans Affairs | 4/06/2010 |
VETERANS CONTRACTING GROUP, INC. | $688,400 | Contract | : Renovate and Upgrade Elevators. | Department of Veterans Affairs | 3/08/2010 |
ASD CONSULTANTS-HOUSTON, INC. AND ASD CONSULTANTS, INC. JOINT VENTURE | $477,000 | Contract | : Recovery Act-Interior Renovations, Building #1 at WTXVAHCS, Big Spring, TX | Department of Veterans Affairs | 6/28/2010 |
DEERE & COMPANY | $23,700 | Contract | : Purchase of a Utility Vehicle | Department of Veterans Affairs | 6/16/2010 |
L & D JOHNSON PLUMBING & HEATING, INC. | $1,184,338 | Contract | : Renovate and Expand Prosthetics ( Construction) at the Stratton VA Medical Center, Albany, NY | Department of Veterans Affairs | 4/19/2010 |
PLATT CONSTRUCTION, INC. | $195,450 | Contract | : Replace Medical Gas Systems B 402, B403 & B 406 | Department of Veterans Affairs | 5/20/2010 |
FACILITY DEFENSE CONSULTANTS, INC. | $5,113,192 | Contract | : Advanced Metering | Department of Veterans Affairs | 6/07/2010 |
LEGION CONSTRUCTION, INC. | $4,797,700 | Contract | : TAS::360158:: TAS Upgrade Fire Protection. The purpose of the project is to repair and upgrade the existing fire protection systems to meet minimum current Life Safety Code and VA Requirements, including fire protection water system improvements, alarm an | Department of Veterans Affairs | 3/26/2010 |
CHOCTAW CONTRACTORS INC | $508,189 | Contract | : Asbestos Abatement B1 & 3 | Department of Veterans Affairs | 6/16/2010 |
ASTOR CONSTRUCTION SERVICES INC | $38,500 | Contract | : Paint Building project at Bushnell National Cemetery | Department of Veterans Affairs | 6/14/2010 |
TL SERVICES, INC. | $6,139,793 | Contract | : VISN 16 UTILITY METERING SYSTEMS | Department of Veterans Affairs | 5/28/2010 |
KAR CONTRACTING, LLC | $4,387,359 | Contract | : Replacement of various Air Handling Units serving the Medical Center | Department of Veterans Affairs | 4/30/2010 |