EJS CONTRACTING, INC.
|
$837,261 |
Contract |
Air Training Command |
6/06/2010 |
: built up roof building 266
|
BARLOVENTO, L.L.C.
|
$736,218 |
Contract |
Air Training Command |
4/19/2009 |
: Repair NCOA Drill Pad
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$713,500 |
Contract |
Air Training Command |
4/17/2009 |
: REPAIR OVERRUNS, DRONE RUNWAY, MOBILIZE AND PROVIDE 2 ASPHALT LAYER ON EACH OVERRUN AT THE DRONE RUNWAY AS PER DRAWINGS
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$713,500 |
Contract |
Air Training Command |
4/17/2009 |
: REPAIR OVERRUN DRONE RUNWAY
|
MTNT PROPERTIES, INC,
|
$637,406 |
Contract |
Air Training Command |
7/19/2010 |
: Repair HVAC, remediate mold bldg 1380
|
B. W. STRAYHORN COMPANY, INC.
|
$635,894 |
Contract |
Air Training Command |
6/03/2009 |
: The contractor will provide all plant, labor, planning, transportation, and supervision required to perform replacement of existing concrete pavement joint sealants on the airfield at Altus AFB OK.
|
1CI, INC.
|
$629,118 |
Contract |
Air Training Command |
4/24/2009 |
: PROVIDE PORTABLE WATER, AMMO AREA
|
BARLOVENTO, L.L.C.
|
$573,340 |
Contract |
Air Training Command |
4/16/2009 |
: Repair Beacon Beach Jogging Path
|
EJS CONTRACTING, INC.
|
$562,093 |
Contract |
Air Training Command |
4/17/2009 |
: REPLACE ROOF CHILD DEVELOPMENT CENTER, BLDG 1410 TYNDALL AFB REPLACE ROOF OF FACILITY
|
MTNT PROPERTIES, INC,
|
$484,973 |
Contract |
Air Training Command |
4/16/2010 |
: Replace Boiler/HVAC Equip- Dining Hall Bldg 1690
|
EJS CONTRACTING, INC.
|
$476,898 |
Contract |
Air Training Command |
7/14/2010 |
: replace roof on builidng 1060
|
B. W. STRAYHORN COMPANY, INC.
|
$381,017 |
Contract |
Air Training Command |
4/20/2009 |
: Addition and Alterations to Building 2204. Sitework, Concrete cast in place, thermal and moisture protection of building insulation, building wrap. Installation of doors and windows, finishes.
|
EJS CONTRACTING, INC.
|
$368,968 |
Contract |
Air Training Command |
4/21/2009 |
: Replace all lighting and occupancy sensors at the following facilities: 274,290,311,315,375,501,7052,9401
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$318,052 |
Contract |
Air Training Command |
4/15/2009 |
: Maintain Paint Airfield. Paint approximately 501,505 SF of airfield marking and remove approximately 47,369 SF in preparation of new painted surfaces in accordance with drawings.
|
EJS CONTRACTING, INC.
|
$305,423 |
Contract |
Air Training Command |
4/16/2009 |
: REPAIR ROOFS, QUAD DORMS, BLDG 1150-1156 TYNDALL AFB REPLACE ROOF OF FACILITY
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$304,078 |
Contract |
Air Training Command |
4/17/2009 |
: EXTEND OVERRUN RUNWAY - MOBILIZE AND PROVIDE 2 ASPHALT LAYER ON 18 END OVERRUN AT THE DRONE RUNWAY AS PER DRAWINGS
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$304,078 |
Contract |
Air Training Command |
4/17/2009 |
: EXTEND OVERRUN RUNWAY
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$291,476 |
Contract |
Air Training Command |
4/15/2009 |
: Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as per drawings.
|
BARLOVENTO, L.L.C.
|
$261,840 |
Contract |
Air Training Command |
4/19/2009 |
: Maintain Florida Ave
|
MTNT PROPERTIES, INC,
|
$259,925 |
Contract |
Air Training Command |
7/15/2010 |
: Install AC Unit BLDG 182
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$234,010 |
Contract |
Air Training Command |
4/16/2009 |
: Repair Storm Drain Near Building 335. Mobilize and remove soil to replace storm drain pipe as indicated on drawings. All pipe replaced shall be HDPE as per drawings. All pipes crossing concrete pavement shall have pavement cut a minimum of 10 feet wide
|
EJS CONTRACTING, INC.
|
$223,558 |
Contract |
Air Training Command |
5/02/2011 |
: Replace roof on building 214
|
EJS CONTRACTING, INC.
|
$204,197 |
Contract |
Air Training Command |
5/10/2009 |
: repair roof on building 3223
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$199,995 |
Contract |
Air Training Command |
9/21/2009 |
: REPAIR JOINTS PHASE III
|
MTNT PROPERTIES, INC,
|
$199,707 |
Contract |
Air Training Command |
10/28/2009 |
: HANGAR #1 DOOR RENOVATION
|
MTNT PROPERTIES, INC,
|
$190,336 |
Contract |
Air Training Command |
10/10/2009 |
: REPAIR FIRE SAFETY DEFICIENCIES BASE WIDE
|
BARLOVENTO, L.L.C.
|
$189,904 |
Contract |
Air Training Command |
4/19/2009 |
: Repair Fuel Ave
|
BARLOVENTO, L.L.C.
|
$168,783 |
Contract |
Air Training Command |
9/23/2009 |
: Repair Parking Lot 546
|
MTNT PROPERTIES, INC,
|
$153,088 |
Contract |
Air Training Command |
4/16/2010 |
: Replace Gas Release Valves and Install Gate Valves Sewer
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$138,138 |
Contract |
Air Training Command |
4/15/2009 |
: Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings.
|
DIVERSIFIED TECHNOLOGY SOLUTIONS, INC.
|
$119,149 |
Contract |
Air Training Command |
4/21/2009 |
: DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484, and 9486. Work includes providing building envelope improvem
|
MTNT PROPERTIES, INC,
|
$119,088 |
Contract |
Air Training Command |
7/16/2010 |
: Install lighting, add occupancy sensors
|
MTNT PROPERTIES, INC,
|
$110,345 |
Contract |
Air Training Command |
9/29/2009 |
: INTALL CEILING IN HANGAR 4
|
BARLOVENTO, L.L.C.
|
$106,195 |
Contract |
Air Training Command |
9/21/2009 |
: Repair Parking Lot Between Bldg 208/205
|
MTNT PROPERTIES, INC,
|
$89,098 |
Contract |
Air Training Command |
10/26/2009 |
: convert lab to classroom
|
MTNT PROPERTIES, INC,
|
$74,509 |
Contract |
Air Training Command |
7/16/2010 |
: Repair igloo vents
|
EJS CONTRACTING, INC.
|
$65,477 |
Contract |
Air Training Command |
8/31/2010 |
: Replace roof on building 427
|
PETTIBONE CONCRETE CONSTRUCTION, INC.
|
$54,159 |
Contract |
Air Training Command |
9/21/2009 |
: EXTEND FLIGHT LINE ROAD
|
EJS CONTRACTING, INC.
|
$24,326 |
Contract |
Air Training Command |
8/30/2010 |
: Replace roof on building 1277
|
BARLOVENTO, L.L.C.
|
$23,511 |
Contract |
Air Training Command |
6/02/2009 |
: Construct Exercise Pads
|
EJS CONTRACTING, INC.
|
$12,481 |
Contract |
Air Training Command |
11/10/2009 |
: Repalce roof on building 150
|
MTNT PROPERTIES, INC,
|
$10,184 |
Contract |
Air Training Command |
4/16/2010 |
: Install VAV Boxes
|