Contract: S & B INFRASTRUCTURE, LTD
Primary Recipient
S & B INFRASTRUCTURE, LTD
Amount
$33,158.00
Award Date
4/17/2009
Administering Agency
State, Department of / U.S. and Mexico International Boundary and Water Commission
CDFA Number
CDFA Program Title
Description
The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project
Recipients Connected to Award
Recipient | Role | Amount |
---|---|---|
S & B INFRASTRUCTURE, LTD | Primary recipient | $30,311.00 |
RODS SURVEYING INC | Sub-recipient | $2,847.00 |