Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Graham County, Ariz., funds by Interior, Department of

Listing $988,116.37 in stimulus funds from Interior, Department of for Graham

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CKC CONSTRUCTION & MATERIALS, LLC $216,477 The purpose of the work under this contract is to provide a maintenance-driven approach intended to mitigate deterioration of the original concrete surface, halt erosion of the toe of the spillway and stabilize erosion of earthen slopes. Bureau of Land Management 4/16/2010
CKC CONSTRUCTION & MATERIALS, LLC $198,431 Furnish labor, equipment, supplies and materials to excavate, stockpile material, repair, backfill and compact embankment at two outlet works that are experiencing piping problems, namely, Underwood and Matthews Outlet Works. Furnish labor, equipment, sup
This spending item is part of a $206,431 allocation. See details
Bureau of Land Management 4/27/2010
PLS GROUP, INC. $124,214 Construct approximately 15.3 miles of new barbed wire fence and remove approximately 9.3 miles of deteriorated fence. Bureau of Land Management 3/30/2010
CKC CONSTRUCTION & MATERIALS, LLC $101,854 Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di
This spending item is part of a $105,210 allocation. See details
Bureau of Land Management 3/26/2010
CKC CONSTRUCTION & MATERIALS, LLC $101,854 Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di
This spending item is part of a $105,210 allocation. See details
Bureau of Land Management 3/26/2010
N & B FENCE CO LLC $49,975 ISLANDS AND DESERT SEAS RESTORATION, PHASE II, FENCE REMOVAL AND INSTALLATION - This project includes removal and replacement of 34,670 linear feet of barbed-wire, Type C, fencing with four gates and corresponding hardware. There are four fence constructi Bureau of Land Management 3/31/2010
SNOW DEVELOPMENT LLC $45,600 SKY ISLANDS, PHASEII, GILA WATERSHED VEGETATION TREATMENTS, GILA BOX SALT CEDAR REMOVAL Bureau of Land Management 3/18/2010
SNOW DEVELOPMENT LLC $45,600 gila box salt cedar removal Bureau of Land Management 3/18/2010
SNOW DEVELOPMENT LLC $45,600 gila box salt cedar removal Bureau of Land Management 3/18/2010
JACKSON, DANA W $43,800 SKY ISLAND AND DESERT SEAS RESTORATION Bureau of Land Management 3/19/2010
WESTERN TECHNOLOGIES, INC $8,000 Furnish labor, equipment, supplies and materials to excavate, stockpile material, repair, backfill and compact embankment at two outlet works that are experiencing piping problems, namely, Underwood and Matthews Outlet Works. Furnish labor, equipment, sup
This spending item is part of a $206,431 allocation. See details
Bureau of Land Management 4/27/2010
WESTERN TECHNOLOGIES, INC $3,356 Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di
This spending item is part of a $105,210 allocation. See details
Bureau of Land Management 3/26/2010
WESTERN TECHNOLOGIES, INC $3,356 Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di
This spending item is part of a $105,210 allocation. See details
Bureau of Land Management 3/26/2010