Maricopa County, Ariz., funds by State, Department of
Listing $9,889,642.13 in stimulus funds from State, Department of for Maricopa
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FNF CONSTRUCTION, INC. | $8,510,462 |
Complete the construction for Upper Rio Grande Flood Control Project (URGFCP), rehabilitation for the Rio Grande Canalization Protective Levee System-Mesilla Levee Segment-Phase II, Mesilla, Dona Ana county, NM.
This spending item is part of a $13,744,568 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/03/2010 |
AVNET, INC. | $842,626 |
ADP SUPPORT EQUIPMENT
This spending item is part of a $1,032,186 allocation.
See details
|
State, Department of | 6/29/2010 |
AVNET, INC. | $474,246 |
ADP SUPPORT EQUIPMENT
This spending item is part of a $627,864 allocation.
See details
|
State, Department of | 7/07/2010 |
CAMP DRESSER & MC KEE INTERNATIONAL INC | $34,100 |
The Rio Grande Canalization Project (RGCP) consists of a narrow river corridor that extends 105.4 miles along the Rio Grande, from below Percha Dam in Sierra County, New Mexico to American Dam in El Paso, Texas. The RGCP, operated and maintained by the US
This spending item is part of a $214,996 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 3/31/2009 |
AVNET, INC. | $28,208 |
ADPE SYSTEM CONFIGURATION
This spending item is part of a $98,579 allocation.
See details
|
State, Department of | 7/21/2010 |