Contra Costa County, Calif., funds by U.S. Army Corps of Engineers
Listing $3,226,932.41 in stimulus funds from U.S. Army Corps of Engineers for Contra Costa
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NORTH STAR CONSTRUCTION AND ENGINEERING, INC | $2,348,529 | RECOVERY: The project consists of the placement of approximately 2.74 miles of reclaimed-water distribution pipeline that includes PVC, ML&PCS and Steel plus all incidental related work through the city of San Ramon in Contra Costa County, CA. | U.S. Army Corps of Engineers - civil program financing only | 8/23/2010 |
JONAS AND ASSOCIATES INC. | $619,848 | The project comprises of the placement of approximately 4.2 miles of reclaimed-water distribution PVC and ML&PCS pipeline and incidental related work through the city of San Ramon, the town of Danville and private streets within that area in Contra Costa | U.S. Army Corps of Engineers - civil program financing only | 3/29/2010 |
BLACK & VEATCH CORPORATION | $95,766 |
Contractor (AMEC) will perform a levee safety Periodic Inspection (PI) on the following five levee systems: i) Pajaro River RBW Santa Cruz County, CA (7.0 miles), ii) Pajaro River RBE Santa Cruz County, CA (7.4 miles), iii) San Lorenzo Creek LB Alameda Co
This spending item is part of a $433,540 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/30/2009 |
TOWILL, INC. | $78,791 |
The project is titled, Napa Dry Bypass Plans and Specifications for the Napa River Flood Protection Project located in Napa, California. The purpose is to complete design of Oxbow Bypass so construction can occur. The bypass channel is intended to divert
This spending item is part of a $1,256,415 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/17/2010 |
BLACK & VEATCH CORPORATION | $59,050 |
Contractor (AMEC) will perform a levee safety Periodic Inspection (PI) on the following seven levee systems: i) Klamath River RB, Del Norte County, CA (4.3 miles), ii) East Weaver Creek LB, Trinity County, CA (0.3 miles), iii) East Weaver Creek LB and RB
This spending item is part of a $405,380 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/18/2010 |
BARA INFOWARE, INC. | $17,210 | The scope of the project involved supply of Shade Shelter to Black But lake. The scope included a 12 steel shelter, 4 column design, 4:12 roof pitch and 7' Eave Height | U.S. Army Corps of Engineers - civil program financing only | 7/28/2009 |
OSCAR NIEMETH TOWING, INC. | $7,737 | BUOYS | U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
LOUIS BERGER GROUP, INC., THE | $0 |
The principal objective is to provide the Army with an (I) RPMP in accordance with Army Regulation (ER) 210-20 and the Military Planning technical Manual, (2) INRMP in accordance with the Sikes Act and AR 200-3, (3) ICRMP in accordance with Department of
This spending item is part of a $403,938 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/11/2009 |