Marin County, Calif., funds by U.S. Army Corps of Engineers
Listing $40,282,892.46 in stimulus funds from U.S. Army Corps of Engineers for Marin
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
RDA CONTRACTING, INC. | $13,838,460 | UPPER NEWPORT BAY RESTORATION PHASE II | U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
HAL HAYS CONSTRUCTION, INC. | $5,743,112 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
DUTRA DREDGING COMPANY | $5,192,425 | Maintenance Dredging | U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
DUTRA DREDGING COMPANY | $4,104,589 | South Coast Mechanical Dredging, various locations in Oregon | U.S. Army Corps of Engineers - civil program financing only | 7/16/2009 |
DUTRA DREDGING COMPANY | $3,000,000 |
Capital (deepening) dredging at the Port of Anchorage. As a part of TAS 96-3135 - program number Operation & Maintenance, Recovery Act, modification 02 to contract for 2009-11 Transitional and Maintenance Dredging, Port of Anchorage, is for increase the
This spending item is part of a $26,127,692 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
Cei Roofing - California, A Tecta America Company, LLC | $1,414,169 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
RAITO, INC. | $1,318,618 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
D D-M LEASING COMPANY, INC | $961,054 | CASTLE ROCK LEVEE SLURRY WALL | U.S. Army Corps of Engineers - civil program financing only | 9/14/2009 |
HIGH TECH ELECTRIC, INC | $918,461 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
McDevitt & Mcdevitt Construction Corp. | $665,724 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
MARTIN'S METAL FABRICATION & WELDING, INC. | $491,406 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Allied Environmental Inc. | $365,872 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
LEE & SAKAHARA ARCHITECTS, INC. | $360,222 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
CELL-CRETE CORPORATION | $343,333 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
ETRAC ENGINEERING, LLC | $288,086 |
Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010.
This spending item is part of a $27,941,413 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
NABIH YOUSSEF & ASSOCIATES | $224,700 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
LEIGHTON CONSULTING, INC | $173,880 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
FLEXIBLE LIFELINE SYSTEMS, INC. | $125,281 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
R M A GROUP, INC. | $98,039 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
FLUORESCO LIGHTING-SIGN MAINTENANCE CORP. | $77,950 | BAY MODELS VISITOR CENTER LIGHTING UPGRADE | U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
INDEPENDENT ENERGY SOLUTIONS, INC. | $66,567 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
SCHNEIDER, STEVEN A | $63,699 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
BAY AREA SYSTEMS AND SOLUTIONS, INC. | $55,145 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
GAHAGAN & BRYANT ASSOCIATES, INC. | $53,683 |
As part of dredging on the San Leandro Dredging project, the work to be performed consisted of the operation and maintenance dredging of the Federal channel located at San Leandro Marina (Jack Maltester), southeast shore of San Francisco Bay in Alameda Co
This spending item is part of a $999,974 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
Larry Boeck | $50,400 |
Painting at Bay Model Visitor Center
This spending item is part of a $73,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
WRIGHT ENGINEERS, INC. | $47,950 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
R E D Consulting | $30,600 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
NZILANI GLASS CONSERVATION LLC | $24,385 | Survey approximately 192 objects and their cases in the Marinship 1942*1945 Exhibit. The objects are made of, but are not limited to, paper, textiles, leather, clothing, watercolors, metals, plastic, wood, painted surfaces, and photographs. Provide an est | U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
TANNER ENGINEERING | $23,800 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
EAST BAY FLOORCOVERING, INC. | $17,415 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Robert Gerhold | $17,316 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Z F A STRUCTURAL ENGINEERS | $16,000 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
ATLANTIS AQUATIC MAINTENANCE | $14,459 | replace and install new display aquariums at the san francisc corps of engineers sausalito bay model | U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
KARN, ROBERT A & ASSOCIATES | $12,949 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Burkell Plumbing, Inc | $11,300 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Mark Jacobsen Construction | $10,976 |
Painting at Bay Model Visitor Center
This spending item is part of a $73,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
RBF CONSULTING | $10,800 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
FIRE STOP SPRINKLER COMPANY | $9,685 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TRI-CITY FENCE CO., INC. | $6,218 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Dotto Glass Inc | $4,918 |
Painting at Bay Model Visitor Center
This spending item is part of a $73,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
DIAMOND NICHOLS TOOL INC | $4,735 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
MTNT PROPERTIES, INC. | $4,556 |
Painting at Bay Model Visitor Center
This spending item is part of a $73,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
NORTH COAST CARPET CARE INC | $4,200 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TREE REPORT | $3,600 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Patriot Mechanical, Inc | $3,050 |
Painting at Bay Model Visitor Center
This spending item is part of a $73,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
BRUMBAUGH ENTERPRISES INC | $2,496 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
GEOTEK, INC. | $1,503 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Performance Safety, LLC | $1,411 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
BRUMBAUGH ENTERPRISES INC | $1,374 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TRI-SIGNAL INTEGRATION INC. | $1,073 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TRI-SIGNAL INTEGRATION INC. | $676 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
BRUMBAUGH ENTERPRISES INC | $216 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TRI-SIGNAL INTEGRATION INC. | $188 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
TOTAL MEDIA CONCEPTS,INC | $170 |
TAS::96 3135::TAS - BAY MODEL BUILDING REPAIRS, SAUSALITO, CA PROJECT CONSIST OF DESIGN BUILD OF ROOF EQUIPMENT INVENTORY, DEMOLITION, ASBESTOS ABATEMENT,AND DISPOSAL OF EXISITING ROOF COVERING, DRAINAGE AND NEW ROOF COVERING.
This spending item is part of a $12,653,900 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
JF JONES COMPANY | $0 |
Installation of precast concrete waterborne restrooms including excavation, backfilling, site grading, installation of underground electrical supply line and power service, and live tap to potable water supply and hook-up to restrooms located at Success,
This spending item is part of a $825,236 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |