Napa County, Calif., funds by U.S. Army Corps of Engineers
Listing $80,233,985.67 in stimulus funds from U.S. Army Corps of Engineers for Napa
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
KIEWIT INFRASTRUCTURE WEST CO | $33,393,649 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
SUULUTAAQ, INC. | $17,521,614 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
PROVEN MANAGEMENT INC. | $14,330,564 | The primary goal of the Napa Creek Project is to provide the City of Napa with 100yr flood protection along the Napa Creek. The project consists of two reinforced bypass culverts, terrace grading, channel smoothing and stabilization treatments, removal a | U.S. Army Corps of Engineers - civil program financing only | 7/14/2010 |
HAROLD E. NUTTER, INC. | $2,519,643 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
West Concrete, Inc. | $2,208,017 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
INDUSTRIAL RAILWAYS CO. | $2,155,528 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
SIERRA TESTING LABORATORIES INC | $900,795 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
MCMILLEN, LLC | $727,584 |
The project is titled, Napa Dry Bypass Plans and Specifications for the Napa River Flood Protection Project located in Napa, California. The purpose is to complete design of Oxbow Bypass so construction can occur. The bypass channel is intended to divert
This spending item is part of a $1,256,415 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/17/2010 |
M C B Framers | $616,310 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
LYON ENGINEERING & SURVEYING, INC. | $585,096 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
TRANSYSTEMS CORPORATION | $549,413 | Napa River Flood Protection Project, Napa Valley Wine Train Phase 2 Relocation, Napa, California, Construction Phase Services, Construction Support Services | U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
Railway Signal Construction, Inc. | $522,731 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
TRANSYSTEMS CORPORATION | $513,774 | Project Title: Napa Valley Flood Control Project Engineering Services during Construction, Napa, CA This contract provides for the continuation of engineering support services required during and to completion of the construction phase in support to the C | U.S. Army Corps of Engineers - civil program financing only | 8/03/2010 |
PACIFIC CIVIL & STRUCTURAL CONSULTANTS, LLC. | $466,001 | Engineering Services by the Design Team during Construction of Project #105469, Napa Creek Flood Protection Project, a $15 million construction project designed to control flood waters between Jefferson Street and the Napa River in the City of Napa. | U.S. Army Corps of Engineers - civil program financing only | 8/10/2010 |
CH2M HILL, INC. | $450,039 |
The project is titled, Napa Dry Bypass Plans and Specifications for the Napa River Flood Protection Project located in Napa, California. The purpose is to complete design of Oxbow Bypass so construction can occur. The bypass channel is intended to divert
This spending item is part of a $1,256,415 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/17/2010 |
AHLBORN FENCE & STEEL, INC. | $379,714 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Querqus Inc | $320,551 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
WEST CONSULTANTS, INC. | $304,799 | A conceptual desgin for the Dry Bypass Pump Station was provided in the Final Supplemental General Design Memorandum (GDM) with the recommendations for the capacity to pump the peak 100-year interior flow (about 930 cubic feet per second) drainage to the | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
W. Bradley Electric, Inc. | $187,072 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Denbeste Transportation, Inc | $182,666 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
NORTH STAR CONSTRUCTION AND ENGINEERING, INC | $164,000 | As part of the construction project for Project Number 12130 Napa, CA this project will consist of Levee repairs include filling rodent holes, repair erosion gully, installation of ground survey markers, and erosion control seeding. | U.S. Army Corps of Engineers - civil program financing only | 7/28/2010 |
WEST CONSULTANTS, INC. | $161,889 | In order to assist the American public to better understand how the particular contract fits into a larger context the award description shall begin with these words ?As a part of Construction Recovery Act? American River Watershed (Common Features), CA; | U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
WESTERN OILFIELDS SUPPLY COMPANY | $160,562 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
O. C. JONES & SONS, INC. | $142,076 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
KLEINFELDER WEST, INC. | $130,367 |
Provide geotechnical engineering construction phase services to support the Corps on the Napa River Flood Control Protection project.
This spending item is part of a $148,762 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/13/2010 |
TRANSYSTEMS CORPORATION | $113,428 | Construction Support | U.S. Army Corps of Engineers - civil program financing only | 6/01/2009 |
North Bay Construction, Inc | $102,504 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
UNITED STRIPING 101 , INC. | $89,724 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Commercial Power Sweep, Inc | $68,834 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Pipenology, Inc. | $61,150 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Traffic Management, Inc. | $47,154 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Pacific Coast Cutters Inc | $45,000 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Sonco Concrete Construction | $35,589 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
Delta Grinding Inc | $32,250 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
NAPA Electric Shop | $25,503 |
The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up
This spending item is part of a $62,303,732 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
MCMILLEN, LLC | $18,395 |
Provide geotechnical engineering construction phase services to support the Corps on the Napa River Flood Control Protection project.
This spending item is part of a $148,762 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/13/2010 |