Sacramento County, Calif., funds by U.S. Army Corps of Engineers

Listing $21,402,255.29 in stimulus funds from U.S. Army Corps of Engineers for Sacramento

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MAGNUS PACIFIC CORPORATION $2,599,074 As part of the Construction Recovery Act, this contract provides for construction under the levee reconstruction project at site L8/R8. Project #75522, Location: American River, CA. Final contract value does not reflect final underrun of quantity adjust
This spending item is part of a $3,323,249 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/02/2010
SMP SERVICES, INC. $2,506,590 A contract to provide environmental mitigation for Folsom Bridge that would restore 55 acres of oak and riparian habitat along the American River Parkway. This action provided labor and material for this project U.S. Army Corps of Engineers - civil program financing only 9/29/2009
MAGNUS PACIFIC CORPORATION $2,223,102 Q1/2011 - Award Summary: As a part of the Construction Recovery Act,this contract provides for Phase I,Contract A,Site R1, levee reconstruction project. All underground utilities and structures will be protected in place. Project #75522, Location: Amer
This spending item is part of a $2,820,814 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
RDA CONTRACTING, INC. $1,892,902 RAISE AND WIDEN LEVEE NEAR SACRAMENTO, CA ALONG AMERICAN RIVER U.S. Army Corps of Engineers - civil program financing only 9/16/2009
HDR FUGRO WLA $1,169,374 AMERICAN RIVER COMMON FEATURES: WRDA96 PHASE 2, REMAINING SITES: SACRAMENTO COUNTY, CALIFORNIA. THIS WORK INCLUDES FINAL REMEDIATION METHODS REPORT (RMR) FOR SITES R3A, L7, R7, L10, L13; 30% AND 60% DESIGN PLANS -5 SITES; DRAFT DESIGN DOCUMENTATION REPOR
This spending item is part of a $1,236,709 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/03/2010
URS GROUP, INC. $1,081,218 AS A PART OF PROJECT #30745, USACE LEVEE SAFETY PROGRAM PERIODIC INSPECTION (PI) ON SACRAMENTO RIVER WEST BANK LEVEE SYSTEM ALONG BUTTE, COLUSA, GLENN, SUTTER AND YOLO COUNTIES, CA. Contractor shall perform levee safety periodic inspections (PI) for the S U.S. Army Corps of Engineers - civil program financing only 6/01/2010
GENTERRA / HULTGREN-TILLIS / TABER, LLC $974,791 Periodic Inspection of Priority One Levees U.S. Army Corps of Engineers - civil program financing only 9/29/2009
GENTERRA / HULTGREN-TILLIS / TABER, LLC $829,992 Periodic Inspection of Priority Three Levees U.S. Army Corps of Engineers - civil program financing only 9/30/2009
HDR FUGRO WLA $818,692 American River Common Features (ARCF) - Reach I, Natomas Basin, Sacramento, CA: Perform geotechnical investigations and develop final plans and specs for construction. Recovery Project #75522
This spending item is part of a $926,574 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/30/2010
TETRA TECH, INC. $809,765 As part of the US Army Corps of Engineers-Civil Program for Operations and Maintenance program for Regulatory-Studies, Six Counties Aquatic Resources Inventory, Sacramento, Placer, Yolo, El Dorado, Yuba and Sutter Counties, California, Program Code: 08889 U.S. Army Corps of Engineers - civil program financing only 9/28/2009
JAG CONSTRUCTION, INC. $739,629 As a part of the Construction Recovery Act, this contract provides for ARCF Site R5 Levee improvements. Project #: 75522 Location: California Complete the construction of 8800 SF of Slag Cement Bentonite cutoff wall and associated earthwork to close the
This spending item is part of a $2,198,391 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/31/2010
CONTRACTOR SERVICES GROUP, INC. $724,176 As part of the Construction Recovery Act, this contract provides for construction under the levee reconstruction project at site L8/R8. Project #75522, Location: American River, CA. Final contract value does not reflect final underrun of quantity adjust
This spending item is part of a $3,323,249 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/02/2010
DAVID FORD CONSULTING ENGINEERS INC $595,718 The objectives for the accelerated CWMS deployment campaign are as follows: 1. To enhance the capability of the Corps of Engineers offices nationwide to make well-informed decisions for managing reservoirs and water control systems. This will be achieved U.S. Army Corps of Engineers - civil program financing only 9/24/2009
CONTRACTOR SERVICES GROUP, INC. $561,489 Q1/2011 - Award Summary: As a part of the Construction Recovery Act,this contract provides for Phase I,Contract A,Site R1, levee reconstruction project. All underground utilities and structures will be protected in place. Project #75522, Location: Amer
This spending item is part of a $2,820,814 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
ALLIED INDUSTRIES INC. $555,920 Replacement of Housing Units #3 and #4 at Warm Spings Dam - Dan Clausen Fish Hatchery U.S. Army Corps of Engineers - civil program financing only 9/17/2009
GENTERRA / HULTGREN-TILLIS / TABER, LLC $522,591 Periodic Inspection of Priority Five Levees U.S. Army Corps of Engineers - civil program financing only 9/30/2009
WEST CONSULTANTS, INC. $425,954 In order to assist the American public to better understand how the particular contract fits into a larger context the award description shall begin with these words ?As a part of Construction Recovery Act, NAPA RIVER, CA, DESIGN FOR THE OXBOW PUMP STATIO U.S. Army Corps of Engineers - civil program financing only 9/29/2009
INTERMOUNTAIN SLURRY SEAL, INC. $358,917 Hidden Dam and Hensley Lake: Repair badly deteriorated roads, reducing future costly replacements and improving staff and visitor health and safety; New Melones, Downstream Channel, Ca: Repair flood damaged access roads at Oakdale and Horseshoe.
This spending item is part of a $2,684,139 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/28/2009
KLEINFELDER-GEOMATRIX $307,578 Project Title: As a part of Project No. 75522, American River Watershed (Common Features), CA Geotechnical services and related documentatio U.S. Army Corps of Engineers - civil program financing only 7/09/2010
YERBA BUENA ENGINEERING & CONSTRUCTION INC $291,723 YOLO LEVEE REPAIR
This spending item is part of a $1,798,613 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/10/2009
DAVID FORD CONSULTING ENGINEERS INC $273,869 As part of the U.S. Army Corps of Engineer-Mississippi River and Tributaries program for the Red River of the North Basin, MN, ND, SD, & Manitoba Canada. Funds will be used for a contract to collect airborne laser mapping light detection and ranging dat U.S. Army Corps of Engineers - civil program financing only 9/24/2009
DAVID FORD CONSULTING ENGINEERS INC $254,360 The objectives for the accelerated CWMS deployment campaign are as follows: 1. To enhance the capability of the Corps of Engineers offices nationwide to make well-informed decisions for managing reservoirs and water control systems. This will be achieved U.S. Army Corps of Engineers - civil program financing only 9/24/2009
R & M ENVIRONMENTAL AND INFRASTRUCTURE ENGINEERING, INC. $119,713 Rehabilitation, pumping tests, and video inspection of pressure relief wells or piezometers at Martis Creek Dam (Truckee, CA), Terminus Dam (Visalia, CA), and Farmington Dam (Stockton, CA).
This spending item is part of a $291,980 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/26/2009
GREGG DRILLING & TESTING, INC. $107,882 American River Common Features (ARCF) - Reach I, Natomas Basin, Sacramento, CA: Perform geotechnical investigations and develop final plans and specs for construction. Recovery Project #75522
This spending item is part of a $926,574 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/30/2010
Camblin Steel Service, Inc. $88,259 RECOVERYPROJECT#::4990::RP#PRE-ENGINEERED STEEL BUILDING FOR COHO SALMON REARING FACILITY,WARM SPRINGS DAM, LAKE SONOMA PROJECT, GEYSERVILLE, SONOMA COUNTY, CA
This spending item is part of a $1,234,512 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/23/2010
TETRA TECH, INC. $80,227 HYDROLOGIC MODELING OF WARM SPRINGS DAM FOR WITH AND WITHOUT FAILURE OF THE DAM AND INUNDATION MAPPING. PRoject Number 4990
This spending item is part of a $92,674 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/23/2010
MWH AMERICAS, INC. $68,209 As part of the U.S. Army Corps of Engineers - Civil Program for Operation and Maintenance program for Farmington Recharge (Sec 502), contract to a firm that will secure environmental clearances for future ground water recharge sites. Construct ground wat U.S. Army Corps of Engineers - civil program financing only 7/29/2010
GREGG DRILLING & TESTING, INC. $67,335 AMERICAN RIVER COMMON FEATURES: WRDA96 PHASE 2, REMAINING SITES: SACRAMENTO COUNTY, CALIFORNIA. THIS WORK INCLUDES FINAL REMEDIATION METHODS REPORT (RMR) FOR SITES R3A, L7, R7, L10, L13; 30% AND 60% DESIGN PLANS -5 SITES; DRAFT DESIGN DOCUMENTATION REPOR
This spending item is part of a $1,236,709 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/03/2010
DAVID FORD CONSULTING ENGINEERS INC $47,656 As part of TAS: 96-3135, the requirement involves developing input data files which will facilitate the daily real time water management of Dierks Lake. The combined product of the input files, developed via this scope of work, and the HEC programs is her
This spending item is part of a $162,514 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/30/2009
Camblin Steel Service, Inc. $47,000 Coyote Fish Facility Settling Pond Upgrade, Lake Mendocino,CA Project Number 4230.COYOTE FISH FACILITY SETTLING POND UPGRADE, COYOTE VALLEY DAM LAKE MENDOCINO, CA. Expand existing steel head settling pond of the imprinting facility to improve water qualit
This spending item is part of a $871,162 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/29/2010
HALLSTEN CORPORATION $46,876 FURNISH THE U.S. ARMY CORPS OF ENGINEERS (COE), SAN FRANCISCO DISTRICT WITH LABOR, PERSONNEL, MATERIALS, EQUIPMENT AND SUPPLIES NECESSARY TO PERFORM THE WORK AS OUTLINED IN THE SCOPE OF WORK, ENTITLED LAKE SONOMA, WSD GANGWAY FOR GOVERNMENT COVE. U.S. Army Corps of Engineers - civil program financing only 8/06/2009
DAVID FORD CONSULTING ENGINEERS INC $45,042 As part of TAS: 96-3135, the requirement involves the development of input data files which will facilitate the daily real-time water management of DeQueen Lake. The combined product of the input files, developed via this scope of work, and the HEC progr
This spending item is part of a $160,796 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/20/2009
HALLSTEN CORPORATION $38,360 One (1) 4'W x 20'L ALUMINUM BOAT DOCKS; SIX (6) 8'W X 20'L ALUMINUM BOAT DOCKS; FOUR (4) CHAIN CONNECTING BOXES BUILT INTO END MEMBERS OF FOUR (4) DOCKS. DELIVERED TO JOBSITE AT SONOMA LAKE. SHOP DRAWINGS AND INSTALLATION INSTRUCTIONS INCLUDED. U.S. Army Corps of Engineers - civil program financing only 9/24/2009
WDC EXPLORATION & WELLS $36,224 Q1/2011 - Award Summary: As a part of the Construction Recovery Act,this contract provides for Phase I,Contract A,Site R1, levee reconstruction project. All underground utilities and structures will be protected in place. Project #75522, Location: Amer
This spending item is part of a $2,820,814 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
HDR ENGINEERING, INC. $28,592 Conduct an independent external peer review (IEPR) for the Jamaica Bay, Marine Park & Plumb Beach, Kings, and Queens Counties, New York Interim Feasibility Report and review of the Evaluation of Planned Wetlands Model in accordance with procedures describ
This spending item is part of a $255,853 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/07/2010
INNOVATIVE MAINTENANCE SOLUTIONS, INC. $20,229 Deliver Materials U.S. Army Corps of Engineers - civil program financing only 7/31/2009
TETRA TECH, INC. $19,500 HYDRAULIC MODELING OF WARM SPRINGS DAM FOR WITH AND WITHOUT FAILURE OF THE DAM AND INUNDATION MAPPING; PROJECT NUMBER 4990.
This spending item is part of a $132,753 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/23/2010
Watson Roofing, Inc. $12,375 Project #104781: began as a continuing clause contract with an allocated funding of 9.9 million dollars. The total cost of the project to date is over 32 million. Without the ARRA funding the project would not have been able to continue and probably wou
This spending item is part of a $19,387,307 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/01/2010
POST BUCKLEY SCHUH & JERNIGAN INC $11,353 The initial Coyote and Berryessa Creeks, and Uvas Creek O&M Manuals were prepared in 1996 and 1989, respectively. AGS has been tasked by the USACE to prepare updated OMRR&R Manuals. Objectives of the manuals include: to maintain the components/reaches o
This spending item is part of a $185,817 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/09/2009