San Diego County, Calif., funds by Navy, Department of
Listing $571,831,753.86 in stimulus funds from Navy, Department of for San Diego
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MONACO MECHANICAL, INC. | $95,449,839 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
CLARK/MCCARTHY, A JOINT VENTURE | $87,244,145 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
GENERAL ATOMICS | $35,268,468 |
Research and Development activities associated with the development of a proof of concept for the Arleigh Burke (DDG 51) Class Destroyer Hybrid Electric Drive (HED)
This spending item is part of a $44,208,318 allocation.
See details
|
Navy, Department of | 7/08/2009 |
BERGELECTRIC CORP. | $32,987,603 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
G & C EQUIPMENT CORPORATION | $15,518,562 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
GLASS COMPANY, INC., THE | $15,134,778 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
COMM STEEL, INC. | $13,425,945 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SYNERGY ELECTRIC COMPANY, INC. | $9,379,828 | RECOVERYPROJECT#::P856M::RP# PHOTOVOLTAIC SYSTEM, MARINE CORPS BASE CAMP PENDLETON, CALIFORNIA | Navy, Department of | 12/03/2009 |
CARRARA MARBLE COMPANY OF AMERICA | $7,939,107 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
ENERGY/MATTER CONVERSION CORPORATION | $7,855,504 | The purpose of the AGEE program is to test the properties of the Polywell Plasma Confinement Concept. We expect to determine if the plasma scaling agrees with the Theoretical models. | Navy, Department of | 9/11/2009 |
STRONGHOLD ENGINEERING INCORPORATED | $7,270,184 |
RECOVERYPROJECT#::P0875 P0876::RP# PHOTOVOLTAIC SYSTEM, SPAWAR, SAN DIEGO, CA
This spending item is part of a $7,661,049 allocation.
See details
|
Navy, Department of | 7/08/2010 |
HDR ARCHITECTURE, INC. | $6,868,038 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
HDR ARCHITECTURE INC, | $6,500,000 | Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA. | Navy, Department of | 9/18/2009 |
R.A. BURCH CONSTRUCTION CO., INC. | $6,106,582 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PENICK NORDIC JV II | $5,684,553 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PHAZER ELECTRIC, INC. | $5,591,560 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
BARNHART-BALFOUR BEATTY, INC. | $5,493,882 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
RQ-BERG JV | $5,491,613 | RECOVERYPROJECT#::P982M::RP# FACILITY ENERGY IMPROVEMENT AT MARINE CORPS AIR STATION MIRAMAR, SAN DIEGO, CA | Navy, Department of | 2/15/2011 |
RQ-BERG JV | $5,421,504 | RECOVERYPROJECT#::P982M::RP# FACILITY ENERGY IMPROVEMENT AT MARINE CORPS AIR STATION MIRAMAR, SAN DIEGO, CA | Navy, Department of | 2/15/2011 |
DAVID SHAPOSHNICK, INC. | $4,483,500 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
VALLEYCREST LANDSCAPE DEVELOPMENT, INC. | $3,985,514 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
STRONGHOLD ENGINEERING INCORPORATED | $3,753,461 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
HARPER CONSTRUCTION COMPANY, INC. | $3,650,386 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SYNERGY ELECTRIC COMPANY, INC. | $3,432,035 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAVAL BASE POINT LOMA, SAN DIEGO, CA.
This spending item is part of a $4,165,711 allocation.
See details
|
Navy, Department of | 6/29/2009 |
T. B. PENICK & SONS, INC. | $3,355,925 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PREMIER CONSULTANTS INTERNATIONAL, INC. | $3,108,530 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SYNERGY ELECTRIC COMPANY, INC. | $3,086,128 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $3,924,266 allocation.
See details
|
Navy, Department of | 7/23/2009 |
RJC ARCHITECTS INC. | $3,033,870 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
AERO AUTOMATIC SPRINKLER COMPANY | $2,643,489 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
INDEPENDENT ENERGY SOLUTIONS, INC. | $2,546,310 |
RECOVERYPROJECT#::P905M::RP# PHOTOVOLTAIC SYSTEM,MARINE CORPSRECRUIT DEPOT(MCRD),SAN DIEGO,CA.
This spending item is part of a $2,908,713 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ABC CONSTRUCTION CO., INC. | $2,542,580 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
AMERICAN SYSTEMS CORPORATION | $2,466,177 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $7,686,778 allocation.
See details
|
Navy, Department of | 8/21/2009 |
JACKSON & BLANC | $2,344,500 |
RECOVERYPROJECT#::MI09BOILM::RP# REPAIR BOILERS,VARIOUS FACILITIES, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,800,000 allocation.
See details
|
Navy, Department of | 9/04/2009 |
DYNALECTRIC COMPANY | $2,336,158 |
RecoveryProject#::P985::RP# Street and Parking Solar Lighting (P985), Marine Corps Air Station, Miramar, Calif
This spending item is part of a $2,399,908 allocation.
See details
|
Navy, Department of | 8/31/2010 |
ADVANTECH GS ENTERPRISES, INC. | $2,313,081 | RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, CAMP PENDLETON, CA. ENGINEER, SAFETY, AND QUALITY ASSURANCE SERVICES | Navy, Department of | 6/26/2012 |
F.J. WILLERT CONTRACTING CO. | $2,182,477 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SAN DIEGO GAS & ELECTRIC COMPANY | $2,120,764 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
HAL HAYS CONSTRUCTION, INC. | $2,110,222 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
WEST C P M INC | $2,046,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
BAKER ELECTRIC, INC. | $1,973,300 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
HUGO ALONSO, INC. | $1,952,155 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
WEST C P M INC | $1,916,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
ACCURATE ENGINEERING INTEGRATED CONSTRUCTION SERVICES, INC. | $1,900,043 | RECOVERYPROJECT#::P0872::RP# PHOTOVOLTAIC SYSTEM, NAVAL BASE CORONADO, CALIFORINIA. Provide design, construction, and utility interconnection for a new solar photovoltaic (PV) electrical generating system capable of providing a base goal at or near 200 KW | Navy, Department of | 9/29/2009 |
ARB INC | $1,873,310 |
RECOVERYPROJECT#::PE1068M::RP# REPAIR GAS PIPE 53 AREA, MCB CAMP PENDLETON CA.
This spending item is part of a $2,274,600 allocation.
See details
|
Navy, Department of | 7/28/2009 |
K.O.O. CONSTRUCTION, INC. | $1,861,743 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
STRONGHOLD ENGINEERING INCORPORATED | $1,829,406 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, VARIOUS BUILDINGS, NAVAL BASE SAN DIEGO, SAN DIEGO, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on three (3) buildings. Scope of work includes demolition and
This spending item is part of a $2,617,100 allocation.
See details
|
Navy, Department of | 7/20/2009 |
JACKSON & BLANC | $1,815,067 |
RECOVERYPROJECT#::MI905M MI0906M::RP# REPLACE BOILER/DHW UNITS IN THE 7000, 8000, AND 9000 AREAS,MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,498,891 allocation.
See details
|
Navy, Department of | 9/15/2009 |
RMA LAND CONSTRUCTION, INC | $1,807,573 | RECOVERYPROJECT#::PA0906M PA0906R::RP# REPAIR HVAC AND BOILERS AND RECONFIGURE WORK SPACES, AIRCRAFT RESCUE AND FIRE FIGHTING BUILDING 2370, MCAS CAMP PENDLETON, CA. | Navy, Department of | 9/17/2009 |
Select Electric, Inc. | $1,774,400 |
RECOVERYPROJECT#::PE1090M::RP# REPAIR/REPLACE COMMUNICATION CABLES BETWEEN BASILONE ROAD AND BUFFALO BUMP AT MARINE CORPS BASE (MCB) CAMP PENDLETON, CALIFORNIA
This spending item is part of a $4,581,024 allocation.
See details
|
Navy, Department of | 6/30/2009 |
INDPSOLUTIONS, INC. | $1,639,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SYNERGY ELECTRIC COMPANY, INC. | $1,612,817 |
RECOVERYPROJECT#::PE1090M::RP# REPAIR/REPLACE COMMUNICATION CABLES BETWEEN BASILONE ROAD AND BUFFALO BUMP AT MARINE CORPS BASE (MCB) CAMP PENDLETON, CALIFORNIA
This spending item is part of a $4,581,024 allocation.
See details
|
Navy, Department of | 6/30/2009 |
A & P DRYWALL, INC. | $1,587,935 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
STRONGHOLD ENGINEERING INCORPORATED | $1,531,439 |
RECOVERYPROJECT#::P196M::RP# SOLAR CARPORT PHOTOVOLTAIC SYSTEM, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA.
This spending item is part of a $1,910,197 allocation.
See details
|
Navy, Department of | 8/05/2009 |
BARNHART-BALFOUR BEATTY, INC. | $1,492,566 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
MW SERVICES INC. | $1,391,292 |
RECOVERYPROJECT#::P885M::RP# PHOTOVOLTAIC SYSTEM, MCB CAMP PENDLETON, CA. Solar Photovoltaic Rooftop Power System Installation at Bldgs 22055 adn 430713 and Interior Lighting Retrofit at Various Buildings
This spending item is part of a $2,830,236 allocation.
See details
|
Navy, Department of | 9/28/2009 |
SYNERGY ELECTRIC COMPANY, INC. | $1,381,341 | RECOVERYPROJECT#::MI09SOLIGR::RP# INSTALL SOLAR LIGHTS, 6000 AREA AND HANGARS 5 AND 6, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA | Navy, Department of | 8/21/2009 |
INDEPENDENT ENERGY SOLUTIONS, INC. | $1,375,153 |
RECOVERYPROJECT#::P885M::RP# PHOTOVOLTAIC SYSTEM, MCB CAMP PENDLETON, CA. Solar Photovoltaic Rooftop Power System Installation at Bldgs 22055 adn 430713 and Interior Lighting Retrofit at Various Buildings
This spending item is part of a $2,830,236 allocation.
See details
|
Navy, Department of | 9/28/2009 |
R. J. LANTHIER COMPANY, INC. | $1,314,911 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
HASSON PAINTING CONTRACTORS, INC. | $1,308,922 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
Asbury Steel Construction Co. | $1,244,969 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
DRI COMMERCIAL CORPORATION | $1,190,170 | RECOVERYPROJECT#::PE0469::RP# REPAIR ROOF AND HVAC, HQ AREA, MCB CAMP PENDLETON, CA. Firm Fixed Price (Lump Sum) for all labor, equipment, and materials to provide design and construction for PE0469M Repair Roof and HVAC, Bldg. 1108, including bond costs, | Navy, Department of | 9/10/2009 |
INDEPENDENT ENERGY SOLUTIONS, INC. | $1,173,909 |
RECOVERYPROJECT#::P0874::RP# PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $1,595,039 allocation.
See details
|
Navy, Department of | 9/22/2009 |
WIRTZ QUALITY INSTALLATIONS, INC. | $1,170,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
TEL TECH PLUS, INC. | $1,168,487 |
RECOVERYPROJECT#::RM09-1451::RP# ENERGY PROJECT - FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE SAN DIEGO, CA.
This spending item is part of a $2,070,559 allocation.
See details
|
Navy, Department of | 9/18/2009 |
PEREIRA, JOSE ENGINEERING AND MECHANICAL, INC. | $1,131,543 | RECOVERYPROJECT#::SD1007M::RP# REPAIR HVAC MESSHALL DINING FACILITY, MARINE CORPS RECRUIT DEPOT (MCRD), SAN DIEGO, CA. | Navy, Department of | 9/22/2009 |
CALIFORNIA SHEET METAL WORKS, INC. | $1,120,861 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SCHUFF STEEL COMPANY | $1,086,608 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
TEKWORKS INC. | $1,063,807 |
RECOVERYPROJECT#::PE1090M::RP# REPAIR/REPLACE COMMUNICATION CABLES BETWEEN BASILONE ROAD AND BUFFALO BUMP AT MARINE CORPS BASE (MCB) CAMP PENDLETON, CALIFORNIA
This spending item is part of a $4,581,024 allocation.
See details
|
Navy, Department of | 6/30/2009 |
CASMAR CONTRACTING INC | $1,040,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
ARCHITECTS / DELAWIE WILKES RODRIGUES BARKER | $1,035,645 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
PRO INSTALLATIONS INC | $1,000,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SIERRA PACIFIC WEST, INC | $992,751 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
HAL HAYS CONSTRUCTION, INC. | $983,098 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
PORGES ENTERPRISES, INC. | $965,112 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
DAVID SHAPOSHNICK, INC. | $965,000 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
NICHOLAS CONSTRUCTION SERVICES | $954,367 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
G. I. BECHTHOLD CORPORATION | $936,000 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PATRICIA I. ROMERO, INC. | $930,752 |
RECOVERY PROJECT#::RM525-08::RP# RENOVATION AND UPGRADE OF 13 LIVING UNITS AND INSTALLATION OF A NEW FIRE SPRINKLER AND FIRE ALARM SYSTEM AT BUILDING 554, (BEQ), NAVAL MINE AND ANTI-SUBMARINE WARFARE, NAVAL BASE POINT LOMA, SAN DIEGO, CA
This spending item is part of a $947,152 allocation.
See details
|
Navy, Department of | 4/29/2009 |
ELKEN CONTRACTING, INC. | $930,246 |
RECOVERYPROJECT#::YU0006-7M::RP# SANITARY SEWER REPAIRS, MARINE CORPS AIR STATION (MCAS), YUMA, AZ.Design Bid Build Sanitary Sewer Improvemnts Phase VI, MCAS, Yuma, AZ
This spending item is part of a $1,283,959 allocation.
See details
|
Navy, Department of | 6/15/2009 |
Accu Bore Directional Drilling | $922,197 |
RECOVERYPROJECT#::PE1076M::RP# REPAIR GAS PIPE 31 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,555,700 allocation.
See details
|
Navy, Department of | 7/28/2009 |
Kone Inc. | $910,841 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ARIZONA PIPE LINE COMPANY | $908,351 |
RECOVERYPROJECT#::PE1069M::RP# REPAIR GAS PIPE 62 AREA, MCB CAMP PENDLETON, CA
This spending item is part of a $1,513,770 allocation.
See details
|
Navy, Department of | 8/07/2009 |
MESA ENERGY SYSTEMS, INC. | $865,947 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PACIFIC COAST GLAZING, INC. | $861,200 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
DYNALECTRIC COMPANY | $860,645 |
RecoveryProject#::P304::RP# Photovoltaic System and Lighting Retrofit at MCAS Miramar, CA
This spending item is part of a $2,245,326 allocation.
See details
|
Navy, Department of | 9/30/2010 |
MTM BUILDERS, INC. | $859,588 | RECOVERYPROJECT#::SD1019M::RP# Repair Obstacle Course and Track and Marine Corps Recruit Depot, San Diego, CA | Navy, Department of | 9/23/2009 |
Premier Roofing Ca, Inc. | $838,138 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $3,924,266 allocation.
See details
|
Navy, Department of | 7/23/2009 |
ACCO ENGINEERED SYSTEMS, INC. | $813,365 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
MTM BUILDERS, INC. | $813,324 | Replace Roof Mounted Boilders and Improvements at Buildings 3144 and Building 3150 at Naval Base San Diego, California. | Navy, Department of | 4/07/2009 |
NEAL ELECTRIC CORP. | $787,141 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
ACCO ENGINEERED SYSTEMS, INC. | $778,639 |
RECOVERYPROJECT#::RM091452::RP# FACILITY ENERGY IMPROVEMENTS (PHASE 3-HVAC), NAVAL BASE POINT LOMA, SAN DIEGO, CA
This spending item is part of a $1,063,400 allocation.
See details
|
Navy, Department of | 9/15/2009 |
PATRICIA I. ROMERO, INC. | $763,592 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Melhorn Construction Company Inc | $740,326 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
Premier Roofing Ca, Inc. | $733,676 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAVAL BASE POINT LOMA, SAN DIEGO, CA.
This spending item is part of a $4,165,711 allocation.
See details
|
Navy, Department of | 6/29/2009 |
C & I GRADING, INC. | $715,442 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
BESTEK ENGINEERING INC | $709,514 | IDIQ HVAC MACC Contract Recovery Project Number RM09-1452 Facility Energy Improvement (Phase 3-Boilers) | Naval Facilities Engineering Command | 9/16/2009 |
BESTEK ENGINEERING INC | $709,514 | RECOVERYPROJECT#::RM09-1452::RP# FACILITY ENERGY IMPROVEMENTS (PHASE 3-BOILERS) AT NAVAL BASE POINT LOMA, SAN DIEGO, CALIFORNIA | Navy, Department of | 9/16/2009 |
CERTIFIED AIR BALANCE CO INC | $698,500 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
COMMERCIAL OPENINGS, INC. | $694,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
COUNTYWIDE MECHANICAL SYSTEMS, INC. | $692,586 |
RECOVERYPROJECT#::RM33-05::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 14 & 15, NAS LEMOORE, CA
This spending item is part of a $9,955,127 allocation.
See details
|
Navy, Department of | 8/28/2009 |
SYNERGY ELECTRIC COMPANY, INC. | $692,307 | RECOVERYPROJECT#::RM09-1454::RP# Replace Inverter for 750KW Solar Array, Naval Base Coronado, San Diego, CA. | Navy, Department of | 6/30/2009 |
ENGEL HOLDINGS, INC. | $682,773 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
ABLE HEATING & AIR CONDITIONING | $666,050 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
HAWORTH, INC. | $657,295 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Delorenzo Incorporated | $656,150 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
Kone Inc. | $649,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
Pacific Design Directions, Inc. | $645,705 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
ALPHA MECHANICAL HEATING & AIR CONDITIONING | $639,634 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
WESTON SOLUTIONS, INC. | $633,503 |
RECOVERYPROJECT#::PE1076M::RP# REPAIR GAS PIPE 31 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,555,700 allocation.
See details
|
Navy, Department of | 7/28/2009 |
Pacific Design Directions, Inc. | $632,151 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
A & P DRYWALL, INC. | $631,200 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
HUDSON P. DAVIS, INC. | $626,873 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Daniel Schaeffer | $625,000 |
RECOVERYPROJECT#::RM09-1453::RP# FACILITY ENERGY IMPROVEMENT (PHASE III), NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $1,840,605 allocation.
See details
|
Navy, Department of | 9/15/2009 |
BRADY COMPANY/SAN DIEGO, INC. | $617,198 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
HUDSON P. DAVIS, INC. | $600,000 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
SOUZA CONSTRUCTION INC | $574,862 |
RECOVERYPROJECT#::MI905M MI0906M::RP# REPLACE BOILER/DHW UNITS IN THE 7000, 8000, AND 9000 AREAS,MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,498,891 allocation.
See details
|
Navy, Department of | 9/15/2009 |
PATRICIA I. ROMERO, INC. | $571,134 |
RECOVERYPROJECT#::PE0887M::RP# INSTALL EFFICIENT BOILER MCB CAMP PENDLETON, CA
This spending item is part of a $575,934 allocation.
See details
|
Navy, Department of | 1/15/2010 |
Accu Bore Directional Drilling | $559,740 |
RECOVERYPROJECT#::PE1070M::RP# REPAIR GAS PIPE 43 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,751,900 allocation.
See details
|
Navy, Department of | 7/28/2009 |
R.L. ELECTRIC, INC. | $557,424 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Picketfence Design, Inc. | $555,924 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
JDS PLUMBING & MECHANICAL | $554,032 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
WESTON SOLUTIONS, INC. | $553,738 |
RECOVERYPROJECT#::PE1070M::RP# REPAIR GAS PIPE 43 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,751,900 allocation.
See details
|
Navy, Department of | 7/28/2009 |
A & P DRYWALL, INC. | $545,287 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
PARRON-HALL CORPORATION | $540,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
HUGO ALONSO, INC. | $539,002 |
RECOVERYPROJECT#::RM09-1453::RP# FACILITY ENERGY IMPROVEMENT (PHASE III), NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $1,840,605 allocation.
See details
|
Navy, Department of | 9/15/2009 |
K.O.O. CONSTRUCTION, INC. | $535,205 |
RECOVERYPROJECT#::71653::RP#HOSPITAL REPLACEMENT, CAMP PENDLETON, CA
This spending item is part of a $2,112,053 allocation.
See details
|
Navy, Department of | 11/03/2011 |
DOMINY+ ASSOCIATES ARCHITECTS LLP | $535,000 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
HARPER CONSTRUCTION COMPANY, INC. | $529,578 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
James G. Tate | $524,300 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
T-Mar Construction, Inc. | $520,605 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
DOMINY+ ASSOCIATES ARCHITECTS LLP | $520,000 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
TOLTEST, INC. | $514,169 |
RECOVERYPROJECT#::PE1069M::RP# REPAIR GAS PIPE 62 AREA, MCB CAMP PENDLETON, CA
This spending item is part of a $1,513,770 allocation.
See details
|
Navy, Department of | 8/07/2009 |
CLAUSS CONSTRUCTION | $510,908 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
I.E.-PACIFIC, INC. | $508,200 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
RPM MECHANICAL - A JOINT VENTURE | $500,264 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
COURSEAULT COMMERCIAL, INC. | $490,103 | RECOVERYPROJECT#::EG-233-10::RP# RETROFIT EXISTING TO CLOSELOOP WASHRACK IN SUPPORT OF LAS FLORES CO 4 LAR MCB CAMP PENDLETON, CA | Navy, Department of | 9/30/2010 |
RBF CONSULTING | $485,160 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
SOCAL CARPETS AND FLOOR COVERING, INC. | $485,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
BOWCON COMPANY INC | $474,566 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
A & D LOGISTICS, INC. | $465,218 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
COURSEAULT COMMERCIAL, INC. | $465,007 | RECOVERYPROJECT#::EG-232-10::RP# RETROFIT EXISTING TO CLOSELOOP WASHRACK IN SUPPORT OF LAS FLORES CO 4 TANKS MCRC CAMP PENDLETON, CA | Navy, Department of | 9/30/2010 |
BURCH CONSTRUCTION COMPANY INC. | $461,679 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SC ENGINEERS INC | $455,712 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
Wildman & Morris, Incorporated | $452,294 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
MINSHEW BROTHERS STEEL CONSTRUCTION, INC. | $451,991 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
PARRON-HALL CORPORATION | $445,248 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
A M Ortega Construction Inc | $440,390 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
HUGO ALONSO, INC. | $434,441 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
PRICE INDUSTRIES, INC. | $430,884 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
J P Witherow Roofing Co | $428,821 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Melrose Consulting & Management, Inc. | $427,000 |
RECOVERYPROJECT#::PA1002M PA1002R:RP# REPAIR FIRE PUMPS AND ALARMS AND IMPROVEMENTS TO FIRE PUMP UTILITY, BLDG 2390, MCB CAMP PENDLETON, CA
This spending item is part of a $604,523 allocation.
See details
|
Navy, Department of | 9/15/2009 |
ALLEN ENGINEERING CONTRACTOR, INC. | $425,613 | RECOVERYPROJECT#::RM09-1452::RP# FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE POINT LOMA, SAN DIEGO, CA. | Navy, Department of | 9/15/2009 |
HUGO ALONSO, INC. | $424,072 |
RECOVERYPROJECT#::RM09-1451::RP# ENERGY PROJECT - FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE SAN DIEGO, CA.
This spending item is part of a $2,070,559 allocation.
See details
|
Navy, Department of | 9/18/2009 |
JEAN YOUNG HANCHETT INC | $421,357 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
HUGO ALONSO, INC. | $420,828 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
MBR ASSOCIATES | $415,000 |
RECOVERYPROJECT#::RM09-1451::RP# ENERGY PROJECT - FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE SAN DIEGO, CA.
This spending item is part of a $2,070,559 allocation.
See details
|
Navy, Department of | 9/18/2009 |
ONYX BUILDING GROUP, INC. | $411,545 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
SOUTH BAY EDC, INC. | $407,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
HERMAN CONSTRUCTION GROUP, INC. | $405,300 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
WESTON SOLUTIONS, INC. | $401,290 |
RECOVERYPROJECT#::PE1068M::RP# REPAIR GAS PIPE 53 AREA, MCB CAMP PENDLETON CA.
This spending item is part of a $2,274,600 allocation.
See details
|
Navy, Department of | 7/28/2009 |
Standard Drywall, Inc. | $400,970 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
WEST TECH CONTRACTING, INC. | $392,026 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
MTM CONSTRUCTION, INC. | $389,383 |
The project is to renovate the 22 units of BEQ in Camp Pendleton. The Contractor shall remove the existing flooring, plumbing fixture, lighting fixture, door hardwires and replace them new one. Also the contractor shall provide the interior and exterior p
This spending item is part of a $579,659 allocation.
See details
|
Naval Facilities Engineering Command | 7/15/2009 |
HAL HAYS CONSTRUCTION, INC. | $385,229 |
RECOVERYPROJECT#::P0874::RP# PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $1,595,039 allocation.
See details
|
Navy, Department of | 9/22/2009 |
SOUZA CONSTRUCTION INC | $382,468 |
RECOVERYPROJECT#::MI09BOILM::RP# REPAIR BOILERS,VARIOUS FACILITIES, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,800,000 allocation.
See details
|
Navy, Department of | 9/04/2009 |
M BAR C CONSTRUCTION, INC. | $380,473 |
RecoveryProject#::P304::RP# Photovoltaic System and Lighting Retrofit at MCAS Miramar, CA
This spending item is part of a $2,245,326 allocation.
See details
|
Navy, Department of | 9/30/2010 |
DIGGIN IT CONSTRUCTION, INC. | $373,694 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
CASS SOWATSKY CHAPMAN & ASSOCIATES | $371,775 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
STRONGHOLD ENGINEERING INCORPORATED | $370,234 |
RECOVERYPROJECT#::TMA-N13::RP# REPAIR STRUCTURAL IT VULNERABILITY, NAVAL MEDICAL CENTER, SAN DIEGO, CA. Repair of Information Technologies vulnerabilities at Naval Medical Center, San Diego. Scope of work includes installing a new UPS System to assist wi
This spending item is part of a $459,100 allocation.
See details
|
Navy, Department of | 6/03/2009 |
MELCHIOR LAND SURVEYING INCORPORATED | $367,710 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
WESTON SOLUTIONS, INC. | $366,394 |
RECOVERYPROJECT#::PE1079M::RP# REPAIR GAS PIPE 52 AREA (BS20) MCB CAMP PENDLETON, CALIFORNIA.
This spending item is part of a $762,000 allocation.
See details
|
Navy, Department of | 7/29/2009 |
MBR ASSOCIATES | $365,000 |
RECOVERYPROJECT#::RM09-1453::RP# FACILITY ENERGY IMPROVEMENT (PHASE III), NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $1,840,605 allocation.
See details
|
Navy, Department of | 9/15/2009 |
SYSKA HENNESSY GROUP CONSTRUCTION INC. | $362,403 |
RECOVERYPROJECT#::P905M::RP# PHOTOVOLTAIC SYSTEM,MARINE CORPSRECRUIT DEPOT(MCRD),SAN DIEGO,CA.
This spending item is part of a $2,908,713 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SOLARCITY CORPORATION | $359,802 |
Recovery Project#::P010M::RP# Photovoltaic System MCAS,Camp Pendleton,CA Provide all services including labor materials and equipment necessary to accomplish the task required.
This spending item is part of a $655,205 allocation.
See details
|
Navy, Department of | 8/12/2009 |
BERGELECTRIC CORP. | $357,310 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ARCHITECTS / DELAWIE WILKES RODRIGUES BARKER | $352,715 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
CACY ELECTRIC | $344,572 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
HELFERS ELECTRIC COMPANY, INC. | $337,191 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
BERGELECTRIC CORP. | $337,156 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
SHELDON SITE UTILITIES, INC. | $335,226 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Mv Plumbing Inc | $328,870 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Nations Roof of California | $326,598 |
RECOVERYPROJECT#::PE0410M::RP# Repair Roof/HVAC 1100 Area, MCB Camp Pendleton, CA
This spending item is part of a $1,113,353 allocation.
See details
|
Navy, Department of | 9/15/2009 |
GEOTECHNICAL PROFESSIONALS, INC | $326,385 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
JAM FIRE PROTECTION, INC. | $317,500 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
HOWARD'S RUG COMPANY OF SAN DIEGO, INC. | $317,160 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
ENGINEERING PARTNERS, INC., THE | $313,809 | RECOVERYPROJECT#::P0875 P0876::RP# PHOTOVOLTAIC SYSTEM, SPAWAR SAN DIEGO, CA Design of roof repairs and a 1 MW Solar Power Array on two very large buildings at SPAWAR in San Diego CA | Navy, Department of | 3/04/2010 |
Mike's Metal Works, Inc. | $312,997 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
WMK OFFICE SAN DIEGO, LLC | $312,926 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
BOWCON COMPANY INC | $312,840 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
TURBO CM, INC. | $311,664 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, CAMP PENDLETON, CA
This spending item is part of a $328,159 allocation.
See details
|
Navy, Department of | 9/29/2011 |
MARK HARRIS PLUMBING CO., INC. | $311,330 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SOUTHWEST V-DITCH INC | $301,742 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
TEL TECH PLUS, INC. | $300,000 |
RECOVERYPROJECT#::RM09-1453::RP# FACILITY ENERGY IMPROVEMENT (PHASE III), NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $1,840,605 allocation.
See details
|
Navy, Department of | 9/15/2009 |
MTM BUILDERS, INC. | $288,839 |
RECOVERYPROJECT#::SD1018M::RP# REPAIR RECRUIT UNDERWATER SURVIVAL FACILITY, MARINE CORPS RECRUIT DEPOT, SAN DIEGO, CA
This spending item is part of a $1,099,119 allocation.
See details
|
Navy, Department of | 9/24/2009 |
I.E.-PACIFIC, INC. | $286,000 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
SOUZA CONSTRUCTION INC | $284,761 |
RECOVERYPROJECT#::RM091452::RP# FACILITY ENERGY IMPROVEMENTS (PHASE 3-HVAC), NAVAL BASE POINT LOMA, SAN DIEGO, CA
This spending item is part of a $1,063,400 allocation.
See details
|
Navy, Department of | 9/15/2009 |
EDAW, INC. | $284,131 | RECOVERYPROJECT#::P1167::RP# ARCHAEOLOGY MONITORING, MCB CAMP PENDLETON, CA | Navy, Department of | 8/11/2010 |
SOUZA CONSTRUCTION INC | $282,520 |
RECOVERYPROJECT#::PE0410M::RP# Repair Roof/HVAC 1100 Area, MCB Camp Pendleton, CA
This spending item is part of a $1,113,353 allocation.
See details
|
Navy, Department of | 9/15/2009 |
SO CAL GLAZING, INC. | $280,078 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
M BAR C CONSTRUCTION | $280,008 |
RECOVERYPROJECT#::P196M::RP# SOLAR CARPORT PHOTOVOLTAIC SYSTEM, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA.
This spending item is part of a $1,910,197 allocation.
See details
|
Navy, Department of | 8/05/2009 |
JOHNSON MAINTENANCE INC | $277,118 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SCHWARTZ MASONRY INC | $268,498 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Pk Excavations | $262,483 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
WAYNE PERRY, INC. | $261,300 |
RECOVERYPROJECT#::PE1070M::RP# REPAIR GAS PIPE 43 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,751,900 allocation.
See details
|
Navy, Department of | 7/28/2009 |
GROUND SERVICE TECHNOLOGY, INC. | $253,899 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
Accu Bore Directional Drilling | $252,289 |
RECOVERYPROJECT#::PE1079M::RP# REPAIR GAS PIPE 52 AREA (BS20) MCB CAMP PENDLETON, CALIFORNIA.
This spending item is part of a $762,000 allocation.
See details
|
Navy, Department of | 7/29/2009 |
PATRICIA I. ROMERO, INC. | $249,799 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
AMERICAN SYSTEMS CORPORATION | $248,033 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $2,363,580 allocation.
See details
|
Navy, Department of | 8/21/2009 |
SOCAL CARPETS AND FLOOR COVERING, INC. | $242,500 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
PIN WEST INC | $232,906 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SABER PLUMBING, INC | $232,216 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
MINSHEW BROTHERS STEEL CONSTRUCTION, INC. | $229,210 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Simmons Sheet Metal Fabricators, Inc | $228,500 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
U.S. COST INCORPORATED | $224,293 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
TOWNE CONSTRUCTION INC | $220,515 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
VANDER WERFF, PETER CONSTRUCTION, INC. | $220,500 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
SJA, INC. | $218,945 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
JACKSON & BLANC | $213,620 |
RECOVERYPROJECT#::TMA-N12::RP# RESTORE AGED AND DETERIORATED COOLING TOWERS, NAVAL MEDICAL CENTER, SAN DIEGO, CA
This spending item is part of a $339,118 allocation.
See details
|
Navy, Department of | 9/14/2009 |
UNITED SITE SERVICES OF CALIFORNIA, INC. | $212,211 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
EDJE-ENTERPRISES! | $211,022 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PROGRESSIVE INVESTMENTS, INC. | $204,335 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
FERGUSON ENTERPRISES, INC. | $203,586 |
RECOVERYPROJECT#::PE1070M::RP# REPAIR GAS PIPE 43 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,751,900 allocation.
See details
|
Navy, Department of | 7/28/2009 |
KTU&A | $203,436 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
PDI COATINGS | $200,211 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
HAL HAYS CONSTRUCTION, INC. | $195,422 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
M-Tech Glass Inc. | $194,667 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
SULLIVAN SOLAR POWER OF CALIFORNIA, INC. | $192,750 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
FLEX-SHIELD, INC. | $190,320 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
Marine Air, Inc. | $190,276 |
The project is to renovate the 22 units of BEQ in Camp Pendleton. The Contractor shall remove the existing flooring, plumbing fixture, lighting fixture, door hardwires and replace them new one. Also the contractor shall provide the interior and exterior p
This spending item is part of a $579,659 allocation.
See details
|
Naval Facilities Engineering Command | 7/15/2009 |
X Controls, Inc. | $186,250 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
KAWASAKI THEILACKER UENO AND ASSOCIATES | $185,928 | RECOVERYPROJECT#::71653::RP# PLANNING AND DESIGN FOR HSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA. A&E SERVICES | Navy, Department of | 7/27/2009 |
PAR ELECTRICAL CONTRACTORS, INC. | $185,083 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
WRC ROOFING | $182,000 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
REDHORSE CORPORATION | $181,624 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $7,686,778 allocation.
See details
|
Navy, Department of | 8/21/2009 |
HALE ENGINEERING & SURVEYING INC | $172,625 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SYSKA HENNESSY GROUP CONSTRUCTION INC. | $171,409 |
Recovery Project#::P010M::RP# Photovoltaic System MCAS,Camp Pendleton,CA Provide all services including labor materials and equipment necessary to accomplish the task required.
This spending item is part of a $655,205 allocation.
See details
|
Navy, Department of | 8/12/2009 |
CRUSBERG, G W INC | $170,000 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
MAXIM CRANE WORKS, L.P. | $169,601 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
APPLIED RESTORATION INC. | $169,505 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
South Coast Pool Plastering, Inc | $168,042 |
RECOVERYPROJECT#::SD1018M::RP# REPAIR RECRUIT UNDERWATER SURVIVAL FACILITY, MARINE CORPS RECRUIT DEPOT, SAN DIEGO, CA
This spending item is part of a $1,099,119 allocation.
See details
|
Navy, Department of | 9/24/2009 |
T. B. F. INVESTMENTS, INC. | $168,000 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
AMERICAN PRIDE GENERAL ENGINEERING INC. | $164,000 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
PRECISION CONCRETE CONSTRUCTION, INC. | $162,390 |
RECOVERYPROJECT#::71653::RP#HOSPITAL REPLACEMENT, CAMP PENDLETON, CA
This spending item is part of a $2,112,053 allocation.
See details
|
Navy, Department of | 11/03/2011 |
CHALLENGER SHEET METAL, INC. | $162,145 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
Industrial Distributors | $158,193 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
TEZA DESIGN | $155,548 | RECOVERYPROJECT#::P970M::RP# FACILITY ENERGY IMPROVEMENTS, MARINE CORPS LOGISTICS BASE (MCLB), BARSTOW, CA. A-E SERVICES | Navy, Department of | 9/01/2009 |
STANTON ENGINEERING SERVICES LLC | $152,695 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
NORTH COUNTY SCAFFOLD & PLANK, INC. | $152,440 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
PARRON-HALL CORPORATION | $152,114 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
CHRISTIAN BROTHER'S FLOORING & INTERIORS, INC. | $151,720 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
TINMEN CONTRACTING INC. | $149,000 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
PATRIOT ROOFING, INC. | $148,247 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
CHICO'S SALES CO | $148,156 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
PECORARO, INC. | $146,160 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
INDUSTRIAL COMMERCIAL SYSTEMS, INC. | $143,262 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
Coastal Flooring Inc | $142,755 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
TUCKER SADLER ARCHITECTS, INC | $140,000 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
Paramount Fire Systems, Inc. | $137,091 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
Sunrise Bobcat and Hauling Service Inc | $137,018 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
California Landscapes & Management | $136,260 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
COMMERCIAL FURNISHINGS, INC. | $134,645 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Unisource Solutions, Inc. | $134,175 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Alvarez Construction, Inc. | $130,190 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
ENGINEERING PARTNERS, INC., THE | $130,000 |
RECOVERYPROJECT#::PE1090M::RP# REPAIR/REPLACE COMMUNICATION CABLES BETWEEN BASILONE ROAD AND BUFFALO BUMP AT MARINE CORPS BASE (MCB) CAMP PENDLETON, CALIFORNIA
This spending item is part of a $4,581,024 allocation.
See details
|
Navy, Department of | 6/30/2009 |
SPOONER'S BUILDING PRODUCTS | $128,353 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
SOUZA CONSTRUCTION INC | $125,498 |
RECOVERYPROJECT#::TMA-N12::RP# RESTORE AGED AND DETERIORATED COOLING TOWERS, NAVAL MEDICAL CENTER, SAN DIEGO, CA
This spending item is part of a $339,118 allocation.
See details
|
Navy, Department of | 9/14/2009 |
MBR ASSOCIATES | $125,000 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SYLVANIA LIGHTING SERVICES CORP. | $123,994 |
Recovery Project#::P010M::RP# Photovoltaic System MCAS,Camp Pendleton,CA Provide all services including labor materials and equipment necessary to accomplish the task required.
This spending item is part of a $655,205 allocation.
See details
|
Navy, Department of | 8/12/2009 |
COMMUNICATION WIRING SPECIALISTS, INC. | $123,800 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Roel Construction Co., Inc. | $123,411 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
HUBZONE DOORS, INC. | $120,000 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ARROW AUTOMATIC FIRE SPRINKLER, INC | $118,000 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
VALLEYCREST LANDSCAPE DEVELOPMENT, INC. | $116,726 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
INLAND FLOORING CONTRACTORS INC | $116,287 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PRECISION CONCRETE CONSTRUCTION, INC. | $115,805 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
POWER TESTING AND ENERGIZATION, INC | $114,950 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
PNR MARKETING SOLUTIONS LLC | $114,747 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
HVAC ENGINEERING INC | $114,685 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SATURN LANDSCAPE PLUS INC | $114,173 | RECOVERYPROJECT#::71653::RP# VEGETATION REMOVAL AND CLEARING OF CONSTRUCTION SITE, HOSPITAL REPLACEMENT, CAMP PENDLETON, CA. | Navy, Department of | 1/28/2010 |
Payco Specialties Inc | $109,895 |
RECOVERYPROJECT#::ST09-1934::RP# REPAIR MAIN RUNWAY 8/26, NAF EL CENTRO, CA
This spending item is part of a $13,968,450 allocation.
See details
|
Navy, Department of | 7/09/2010 |
REDHORSE CORPORATION | $109,425 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $3,194,541 allocation.
See details
|
Navy, Department of | 8/21/2009 |
LASER ELECTRIC, INC. | $108,962 |
RECOVERYPROJECT#::MI905M MI0906M::RP# REPLACE BOILER/DHW UNITS IN THE 7000, 8000, AND 9000 AREAS,MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,498,891 allocation.
See details
|
Navy, Department of | 9/15/2009 |
GENERAL UNDERGROUND FIRE PROTECTION, INC. | $108,505 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Mbn Group Inc | $108,000 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
AMBIENT AIR CONTROL SYSTEMS | $106,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
CHALLENGER SHEET METAL, INC. | $103,022 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
SPRING VALLEY INSULATION CONTRACTORS | $102,180 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
KONE INC. | $100,367 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
COMMERCIAL OPENINGS, INC. | $99,775 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
PRO-TECH FIRE PROTECTION SYSTEMS CORP. | $99,250 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ECOLOGY AND ENVIRONMENT, INC. | $98,827 | RecoveryProject#::1653::RP# Post NEPA bio monitoring support for the naval hospital replacement at Marine Corps Base (MCB) Camp Pendleton, CA PLEASE NOTE: The Department of the Navy, Quick Reference Matrix for Contractor Reporting contains a typographi | Navy, Department of | 12/06/2010 |
S C Coating | $98,706 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
E. N. DELL COMPANY, INC. | $98,300 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
K Killman Inc | $98,290 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PRIME TILE INC | $97,000 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
I.E.-PACIFIC, INC. | $96,808 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ABLE HEATING & AIR CONDITIONING , INC. | $96,793 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
Play Foundations | $96,449 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SPEEDWAY CONSTRUCTORS, INC. | $94,347 |
RecoveryProject#::P304::RP# Photovoltaic System and Lighting Retrofit at MCAS Miramar, CA
This spending item is part of a $2,245,326 allocation.
See details
|
Navy, Department of | 9/30/2010 |
REDHORSE CORPORATION | $93,431 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $5,181,612 allocation.
See details
|
Navy, Department of | 8/21/2009 |
VALLEY CASEWORK, INC. | $91,539 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
REDHORSE CORPORATION | $91,428 |
RECOVERYPROJECT#::RM09-1439::RP# TAS::17 1805::TAS RECOVERY ACT PROJECT - ADVANCED METER INSTALLIONS LOCATED AT SITE 7 EL CENTRO NAVAL AIR FACILITY, EL CENTRO CA.
This spending item is part of a $1,467,697 allocation.
See details
|
Navy, Department of | 8/21/2009 |
QUALITY REBAR, INC. | $91,175 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
B&B Acoustics, Inc. | $90,338 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Cats Excavating Inc | $89,946 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
COUNTYWIDE MECHANICAL SYSTEMS, INC. | $88,866 |
RECOVERYPROJECT#::TMA-N13::RP# REPAIR STRUCTURAL IT VULNERABILITY, NAVAL MEDICAL CENTER, SAN DIEGO, CA. Repair of Information Technologies vulnerabilities at Naval Medical Center, San Diego. Scope of work includes installing a new UPS System to assist wi
This spending item is part of a $459,100 allocation.
See details
|
Navy, Department of | 6/03/2009 |
INSTITUTIONAL CABINET & MILLWORK, INCORPORATED | $88,551 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
URS GROUP, INC. | $87,909 | Delivery order to provide architecture and engineering services for the renovation of Angelley Hall at Naval base San Diego. | Naval Facilities Engineering Command | 5/19/2009 |
SO CAL SANITATION LLC | $87,733 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
PERFORMANCE AUTOMATION SOLUTIONS, INC. | $87,000 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
A & A Flooring, Inc | $86,098 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
Ila Zammit Engineering, Inc. | $85,500 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Institutional Cabinet & Millwork, Incorporated | $84,625 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
A&D FIRE SPRINKLERS, INC. | $81,852 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
AMERICAN PRIDE GENERAL ENGINEERING INC. | $80,541 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Site Consulting Services Inc | $80,000 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
Gamboa, Incorporated | $79,750 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
WILLIAM ROGERS DRYWALL | $79,645 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
NATON ENGINEERING INC | $79,287 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
Windco Painting Inc | $79,096 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
Jds Plumbing & Mechanical | $78,127 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, VARIOUS BUILDINGS, NAVAL BASE SAN DIEGO, SAN DIEGO, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on three (3) buildings. Scope of work includes demolition and
This spending item is part of a $2,617,100 allocation.
See details
|
Navy, Department of | 7/20/2009 |
RBE, INCORPORATED | $77,540 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
RBF CONSULTING | $77,000 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
Superior Ready Mix Concrete L.P. | $76,290 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
CHALLENGER SHEET METAL, INC. | $75,900 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Scs Flooring Systems | $75,281 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
DIVERSIFIED WINDOW COVERINGS, INC. | $73,709 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
LASER ELECTRIC, INC. | $73,032 |
RECOVERYPROJECT#::MI09BOILM::RP# REPAIR BOILERS,VARIOUS FACILITIES, MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
This spending item is part of a $2,800,000 allocation.
See details
|
Navy, Department of | 9/04/2009 |
APPLIED RESTORATION INC. | $72,794 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
H & D Construction | $71,683 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
AUDIO VIDEO SOLUTIONS, INC. | $71,655 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
ACOUSTICWORKS INC | $71,289 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
HALBERT CONSTRUCTION COMPANY, INC. | $64,500 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
Western Foundations & Shoring, Inc. | $63,750 |
RecoveryProject#::P985::RP# Street and Parking Solar Lighting (P985), Marine Corps Air Station, Miramar, Calif
This spending item is part of a $2,399,908 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Real Escape Inc | $61,185 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
ELDA ENTERPRISES INC | $60,591 |
RECOVERYPROJECT#::SD1018M::RP# REPAIR RECRUIT UNDERWATER SURVIVAL FACILITY, MARINE CORPS RECRUIT DEPOT, SAN DIEGO, CA
This spending item is part of a $1,099,119 allocation.
See details
|
Navy, Department of | 9/24/2009 |
WINZLER & KELLY, CONSULTING ENGINEERS | $60,442 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
TUCKER SADLER ARCHITECTS, INC | $60,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
COMMERCIAL OPENINGS, INC. | $59,871 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
WAYNE PERRY, INC. | $59,744 |
RECOVERYPROJECT#::PE1079M::RP# REPAIR GAS PIPE 52 AREA (BS20) MCB CAMP PENDLETON, CALIFORNIA.
This spending item is part of a $762,000 allocation.
See details
|
Navy, Department of | 7/29/2009 |
SMR-ISD CONSULTING STRUCTURAL ENGINEERS, INC. | $58,000 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
Maximum Demolition, Inc | $56,334 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ONE SOURCE DISTRIBUTORS, LLC | $55,471 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
TSC, RESTORATION, INC. | $55,305 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
MARK BEAMISH WATERPROOFING, INC. | $55,000 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
SAN DIEGO PRECAST CONCRETE, INC. | $54,553 |
RecoveryProject#::01653::RP# Relocate 69KV Electrical Service at Camp Pendleton Hospital, MCB Camp Pendleton, CA Includes Mod 02 Study, design, cost extimates for 8.4 MW backup service
This spending item is part of a $3,431,053 allocation.
See details
|
Navy, Department of | 12/06/2010 |
URS GROUP, INC. | $54,437 | Delivery order for engineering studies in support of building renovation/modernization. | Naval Facilities Engineering Command | 6/04/2009 |
Southland Fire Protection Inc | $53,722 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
BURKETT & WONG ENGINEERS, INC. | $53,665 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Executive Landscape, Inc. | $53,629 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
Executive Landscape, Inc. | $53,629 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
Empire 3 Consulting Engineers | $53,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
AEROTEK, INC. | $52,974 |
RECOVERYPROJECT#::PE1070M::RP# REPAIR GAS PIPE 43 AREA, MCB CAMP PENDLETON, CA.
This spending item is part of a $1,751,900 allocation.
See details
|
Navy, Department of | 7/28/2009 |
RBF CONSULTING | $52,900 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
M TRUSS & COMPONENTS LLC | $50,022 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
GEE RAY GEE, INC. | $50,000 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
ALLIED INDUSTRIES INC. | $50,000 |
RECOVERYPROJECT#::TP1022M::RP# REPAIR 20 INCH WATER MAIN, MCAGCC TWENTY-NINE PALMS, CA.Repair 20 water transmission main at MCASCC, Twentynine Palms, CA
This spending item is part of a $3,716,142 allocation.
See details
|
Navy, Department of | 6/02/2009 |
Daniel Schaeffer | $50,000 |
RECOVERYPROJECT#::RM09-1451::RP# ENERGY PROJECT - FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE SAN DIEGO, CA.
This spending item is part of a $2,070,559 allocation.
See details
|
Navy, Department of | 9/18/2009 |
MULTIVISTA, LLC | $50,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
ARTLINE WHOLESALERS INC | $49,603 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
CLEVENGER GEOCONSULTING, INC. | $49,485 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
MILLENNIUM FIRE PROTECTION CORPORATION | $48,750 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
COMMERCIAL OPENINGS, INC. | $47,598 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
ELEN CONSULTING INC. | $47,500 |
RecoveryProject#::P304::RP# Photovoltaic System and Lighting Retrofit at MCAS Miramar, CA
This spending item is part of a $2,245,326 allocation.
See details
|
Navy, Department of | 9/30/2010 |
NABIH YOUSSEF & ASSOCIATES | $47,300 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
SC ENGINEERS INC | $47,000 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
LEIGHTON CONSULTING, INC | $45,500 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Courtesy Refrigeration, Inc. | $45,095 |
RECOVERYPROJECT#::RM09-0493::RP# REPAIR/MODERNIZE MERCER HALL GALLEY,BUILDING 3202,NAVAL BASE SAN DIEGO,CA
This spending item is part of a $5,024,749 allocation.
See details
|
Navy, Department of | 9/27/2010 |
SMR-ISD CONSULTING STRUCTURAL ENGINEERS, INC. | $45,000 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $44,970 |
Level of effort task to provide one Project Analyst to provide financial tracking and project support for the Tripler Army Medical Center (TAMC) of the Anti-Terrorism/ Force Protection (AT/FP) Integrated Physical Security Systems (IPSS) installation in Ha
This spending item is part of a $53,529 allocation.
See details
|
Navy, Department of | 3/18/2010 |
J.D.PAVING, INC | $43,742 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
PACIFIC COAST GLAZING, INC. | $43,200 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
ELECTRONIC CONTROL SYSTEMS, INC. | $43,120 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
PRO INSTALLATIONS INC | $43,000 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
LERCH BATES INC. | $42,610 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $42,575 | RECOVERYPROJECT#::P1653::RP# NAVY HOSPITAL CAMP PENDLETON REPLACEMENT, CAPITAL IMPROVMENTS-PROGRAM AND ENGINEERING SUPPORT | Navy, Department of | 8/29/2011 |
REDHORSE CORPORATION | $42,553 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $1,629,308 allocation.
See details
|
Navy, Department of | 8/21/2009 |
HASENBECK INTERIOR DESIGN, INC. | $42,000 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
MILLENNIUM FIRE PROTECTION CORPORATION | $41,950 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
CONSTRUCTION TESTING & ENGINEERING INC | $41,908 |
RECOVERYPROJECT#::854933::RP# REPLACE 5KV POWER LINES, SUB A, TRAVIS AIR FORCE BASE, FAIRFIELD, CALIFORNIA
This spending item is part of a $3,357,097 allocation.
See details
|
Navy, Department of | 6/22/2009 |
REDHORSE CORPORATION | $40,940 |
RECOVERYPROJECT#::RM09-1439::RP# TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1439::RP# ADVANCE METER INSTALLATION, NAS LEMOORE, CA
This spending item is part of a $2,648,409 allocation.
See details
|
Navy, Department of | 8/21/2009 |
SUSTINEO CORPORATION | $40,723 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAWS CHINA LAKE, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on three (3) buildings. Scope of work includes demolition and replacement of the roofs on the thr
This spending item is part of a $4,147,127 allocation.
See details
|
Navy, Department of | 7/23/2009 |
MAGNESITE SPECIALTIES INC | $40,450 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
SUPERIOR DOOR SYSTEMS INC | $40,150 |
RECOVERYPROJECT#::RM-118-09::RP# REPAIR AND MODERNIZE ADMIN AND WAREHOUSE, NWS SEAL BEACH, CA. The scope of work is to replace gun shed carport with a pre-fabricated steel building, construct an armory in Room 144, convert classroom in Bldg 14 to an elec
This spending item is part of a $968,148 allocation.
See details
|
Navy, Department of | 9/15/2009 |
COR-O-VAN MOVING & STORAGE CO. | $40,000 |
RECOVERYPROJECT#::RM33-05::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 14 & 15, NAS LEMOORE, CA
This spending item is part of a $9,955,127 allocation.
See details
|
Navy, Department of | 8/28/2009 |
DS ENGINEERING, INC | $40,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PNR MARKETING SOLUTIONS LLC | $38,065 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
DELORENZO INCORPORATED | $37,500 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
Geotechnics, Incorporated | $36,769 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
J M R Environmental Services Inc | $35,920 |
RECOVERYPROJECT#::P0875 P0876::RP# PHOTOVOLTAIC SYSTEM, SPAWAR, SAN DIEGO, CA
This spending item is part of a $7,661,049 allocation.
See details
|
Navy, Department of | 7/08/2010 |
A GLASCO | $35,832 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Woodcrafters | $35,830 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SPRING VALLEY INSULATION CONTRACTORS | $35,650 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
Kitchen Professionals | $34,676 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA Design Build request for proposal document A&E services for hospital replacement at Camp Pendleton, CA.
This spending item is part of a $8,469,034 allocation.
See details
|
Navy, Department of | 9/18/2009 |
PEREIRA, JOSE ENGINEERING AND MECHANICAL, INC. | $34,564 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
Hlc Drywall Inc | $34,476 |
RECOVERYPROJECT#::P885M::RP# PHOTOVOLTAIC SYSTEM, MCB CAMP PENDLETON, CA. Solar Photovoltaic Rooftop Power System Installation at Bldgs 22055 adn 430713 and Interior Lighting Retrofit at Various Buildings
This spending item is part of a $2,830,236 allocation.
See details
|
Navy, Department of | 9/28/2009 |
Semper Verus Inc. | $33,755 |
RECOVERYPROJECT#::SD1018M::RP# REPAIR RECRUIT UNDERWATER SURVIVAL FACILITY, MARINE CORPS RECRUIT DEPOT, SAN DIEGO, CA
This spending item is part of a $1,099,119 allocation.
See details
|
Navy, Department of | 9/24/2009 |
SPRING VALLEY INSULATION CONTRACTORS | $33,700 |
RECOVERYPROJECT#::RM33-05::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 14 & 15, NAS LEMOORE, CA
This spending item is part of a $9,955,127 allocation.
See details
|
Navy, Department of | 8/28/2009 |
DIAMOND ENVIRONMENTAL SERVICES, LLC | $33,100 |
RECOVERYPROJECT#::P-742::RP# CONSTRUCT BACHELOR ENLISTED QUARTERS, NAVAL BASE CORONADO, SAN DIEGO, CA. The purpose of this project is to design and construct an 18,480 sqaure meter multi-story concrete bachelor enlisted quarters (BEQ) with 264 1 + 1E modu
This spending item is part of a $64,735,873 allocation.
See details
|
Navy, Department of | 9/30/2009 |
TEAM C CONSTRUCTION | $33,000 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
A Good Roofer, Inc. | $32,960 |
RECOVERYPROJECT#::RM128-08::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, ANGELLEY HALL, BUILDING 3204, NAVAL BASE, SAN DIEGO, CA.
This spending item is part of a $10,600,127 allocation.
See details
|
Navy, Department of | 8/31/2009 |
Quality Assurance International Inc A | $32,460 |
RECOVERYPROJECT#::PE1069M::RP# REPAIR GAS PIPE 62 AREA, MCB CAMP PENDLETON, CA
This spending item is part of a $1,513,770 allocation.
See details
|
Navy, Department of | 8/07/2009 |
GOLDEN ARROW ENGINEERING, INC. | $31,901 |
RECOVERYPROJECT#::P0874::RP# PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $1,595,039 allocation.
See details
|
Navy, Department of | 9/22/2009 |
GEOVISION, INC. | $31,800 |
RECOVERYPROJECT#::PE1069M::RP# REPAIR GAS PIPE 62 AREA, MCB CAMP PENDLETON, CA
This spending item is part of a $1,513,770 allocation.
See details
|
Navy, Department of | 8/07/2009 |
WIMMER YAMADA AND CAUGHEY | $31,500 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
PAINTERS UNLIMITED CA INC | $31,271 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
REDHORSE CORPORATION | $30,972 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $2,363,580 allocation.
See details
|
Navy, Department of | 8/21/2009 |
CHRISTIAN WHEELER ENGINEERING | $30,601 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ROLF JENSEN & ASSOCIATES, INC. | $30,200 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ALLIED INDUSTRIES INC. | $29,933 |
RECOVERYPROJECT#::P970M::RP# FACILITY ENERGY IMPROVEMENTS, MCLB BARSTOW, CALIFORNIA
This spending item is part of a $10,221,050 allocation.
See details
|
Navy, Department of | 4/05/2010 |
RBF CONSULTING | $29,720 |
RECOVERYPROJECT#::PA1002M PA1002R:RP# REPAIR FIRE PUMPS AND ALARMS AND IMPROVEMENTS TO FIRE PUMP UTILITY, BLDG 2390, MCB CAMP PENDLETON, CA
This spending item is part of a $604,523 allocation.
See details
|
Navy, Department of | 9/15/2009 |
Price Industries, Inc. | $29,634 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
SPOONERS WOODWORKS, INC. | $29,535 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
PASCAL STEEL CORPORATION | $29,315 |
RECOVERYPROJECT#::P885M::RP# PHOTOVOLTAIC SYSTEM, MCB CAMP PENDLETON, CA. Solar Photovoltaic Rooftop Power System Installation at Bldgs 22055 adn 430713 and Interior Lighting Retrofit at Various Buildings
This spending item is part of a $2,830,236 allocation.
See details
|
Navy, Department of | 9/28/2009 |
Stueven Engineering Consultants | $29,200 |
RECOVERYPROJECT#::TMA-N16::RP# RESTORE INTERIOR SPACES FOR MENTAL HEALTH CLINIC AND DEPLOYMENT HEALTH CENTER, NAVAL MEDICAL CENTER, SAN DIEGO, CA.
This spending item is part of a $1,008,678 allocation.
See details
|
Navy, Department of | 9/30/2009 |
PACIFIC DESIGN SOLUTIONS, LLC | $28,878 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
ACOUSTICWORKS INC | $28,744 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $28,635 |
Level of effort task to provide one senior CAD technician to provide drafting support one engineering technician to provide project engineering support and one project analyst to provide financial tracking support for the Tripler Army Medical Center (TAMC
This spending item is part of a $33,551 allocation.
See details
|
Navy, Department of | 12/09/2009 |
SUSTINEO CORPORATION | $28,500 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEM, NAVAL POSTGRADUATE SCHOOL (NPS), MONTEREY, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on three (3) buildings. Scope of work includes demolition and replacemen
This spending item is part of a $2,617,100 allocation.
See details
|
Navy, Department of | 7/20/2009 |
SUSTINEO CORPORATION | $28,500 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, NAVAL BASE VENTURA COUNTY, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on two (2) buildings. Scope of work includes demolition and replacement of the roofs on
This spending item is part of a $4,877,000 allocation.
See details
|
Navy, Department of | 7/20/2009 |
SUSTINEO CORPORATION | $28,500 |
RECOVERY PROJECT#::RM09-1440::RP# SOLAR PHOTOVOLTAIC ROOFTOP POWER SYSTEM INSTALLATION AT BUILDINGS 4001, 4002, 201, 202, AND 214, AT THE NAVAL AIR FACILITY, EL CENTRO, CALIFORNIA
This spending item is part of a $2,971,027 allocation.
See details
|
Navy, Department of | 7/20/2009 |
SUSTINEO CORPORATION | $28,500 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, B-78 AND B-110, NAVAL WEAPONS STATION (NWS), SEAL BEACH, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on two (2) buildings. Scope of work includes demolition a
This spending item is part of a $2,359,127 allocation.
See details
|
Navy, Department of | 7/20/2009 |
SUSTINEO CORPORATION | $28,500 |
RECOVERYPROJECT#::RM09-1440::RP# INSTALL PHOTOVOLTAIC SYSTEMS, VARIOUS BUILDINGS, NAVAL BASE SAN DIEGO, SAN DIEGO, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on three (3) buildings. Scope of work includes demolition and
This spending item is part of a $2,617,100 allocation.
See details
|
Navy, Department of | 7/20/2009 |
SPRING VALLEY INSULATION CONTRACTORS | $27,650 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SIMMONS & WOOD INC | $27,631 |
RECOVERYPROJECT#::P0868::RP# PHOTOVOLTAIC SYSTEM, NWS SEAL BEACH, CA. Project involves installation of Solar Photovoltaic Power systems (SPVPS) on the vehicle canopy structure and shall be sized to utilitize maximum amount of space available on vehicle ca
This spending item is part of a $1,951,000 allocation.
See details
|
Navy, Department of | 9/25/2009 |
ECKERT AND ASSOCIATES | $27,600 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MARINE CORPS BASE CAMP PENDLETON, CA
This spending item is part of a $401,438,378 allocation.
See details
|
Navy, Department of | 9/01/2010 |
MERKEL & ASSOCIATES, INC. | $27,040 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Calvada Surveying, Inc. | $26,990 |
RECOVERYPROJECT#::PE1069M::RP# REPAIR GAS PIPE 62 AREA, MCB CAMP PENDLETON, CA
This spending item is part of a $1,513,770 allocation.
See details
|
Navy, Department of | 8/07/2009 |
REDHORSE CORPORATION | $26,987 |
RECOVERYPROJECT#::RM09-3265::RP# ADVANCED METERING INSTALLATION AT NAVAL AIR STATION FALLON, NEVADA.
This spending item is part of a $1,673,047 allocation.
See details
|
Navy, Department of | 9/30/2010 |
MBO INC., A CALIFORNIA CORPORATION | $25,900 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
LARRY BRADFORD & ASSOCIATES | $25,797 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
DIVERSIFIED WINDOW COVERINGS, INC. | $25,716 |
RECOVERYPROJECT#::ST155-08::RP# REPAIR AND MODERNIZE LITTORAL COMBAT SHIP SQUADRON, BUILDING 55, NAVAL BASE SAN DIEGO, SAN DIEGO, CA.
This spending item is part of a $13,154,571 allocation.
See details
|
Navy, Department of | 9/30/2009 |
AMBIENT AIR CONTROL SYSTEMS | $25,660 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
JOHNSON MAINTENANCE INC | $24,900 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
Anderson Audio Visual - San Francisco, Inc. | $24,217 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
IN-LINE FENCE & RAILING COMPANY, INC. | $23,764 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
HARPER CONSTRUCTION COMPANY, INC. | $23,105 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
HAXTON MASONRY, INC. | $23,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
JEKO INSTALLATIONS | $22,800 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Casper's Concrete Cutting, Inc. | $21,987 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
S C Coating | $21,050 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
Davidson Reinforcing Company, Inc. | $20,805 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC. | $20,150 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $1,629,308 allocation.
See details
|
Navy, Department of | 8/21/2009 |
PRO INSTALLATIONS INC | $19,544 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
GEE RAY GEE, INC. | $18,943 |
RECOVERYPROJECT#::P601::RP# CHILD DEVELOPMENT CENTER, MCB CAMP PENDLETON CA
This spending item is part of a $11,165,832 allocation.
See details
|
Navy, Department of | 9/29/2009 |
SATURN LANDSCAPE PLUS INC | $18,009 | RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, MCB CAMP PENDLETON, CA; VEGETATION REMOVAL AND CLEARING ON CONSTRUCTION SITE | Navy, Department of | 6/23/2010 |
ELECTRICAL RELIABILITY SERVICES, INC. | $17,990 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
SASS ELECTRIC, INC. | $17,923 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
REDHORSE CORPORATION | $17,569 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $870,246 allocation.
See details
|
Navy, Department of | 8/21/2009 |
QUALITY REBAR, INC. | $16,770 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
COMMUNICATION WIRING SPECIALISTS, INC. | $16,400 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
Guardian Waterproofing & Caulking | $16,245 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
COMMERCIAL OPENINGS, INC. | $16,024 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Ion Mechanical Services, Inc. | $16,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
INLAND FLOORING CONTRACTORS INC | $15,510 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
LYLE FABER MASONRY INC | $15,430 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
ANNING-JOHNSON COMPANY | $15,150 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
ELECTRONIC CONTROL SYSTEMS, INC. | $15,000 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
FENCECORP, INC. | $14,689 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
UNITED SITE SERVICES OF CALIFORNIA, INC. | $14,470 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
Mtgl, Inc. | $14,462 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
AON FIRE PROTECTION ENGINEERING CORPORATION | $14,060 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
Williams Steel Construction LLC | $13,568 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Slayton Mechanical Contractors, Inc. | $13,500 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
Cmt Alpine Electric, Inc | $13,500 |
RECOVERY PROJECT#::RM525-08::RP# RENOVATION AND UPGRADE OF 13 LIVING UNITS AND INSTALLATION OF A NEW FIRE SPRINKLER AND FIRE ALARM SYSTEM AT BUILDING 554, (BEQ), NAVAL MINE AND ANTI-SUBMARINE WARFARE, NAVAL BASE POINT LOMA, SAN DIEGO, CA
This spending item is part of a $947,152 allocation.
See details
|
Navy, Department of | 4/29/2009 |
GENERAL UNDERGROUND FIRE PROTECTION, INC. | $13,500 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
FERRELL CONSTRUCTION, INC. | $13,335 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
ALL STAR SIGNS INC | $13,151 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
SABER PLUMBING, INC | $13,112 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
MBO INC., A CALIFORNIA CORPORATION | $13,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
TUCKER SADLER ARCHITECTS, INC | $13,000 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
MBN GROUP INC | $13,000 |
RECOVERYPROJECT#::RM09-1451::RP# ENERGY PROJECT - FACILITY ENERGY IMPROVEMENTS (PHASE 3), NAVAL BASE SAN DIEGO, CA.
This spending item is part of a $2,070,559 allocation.
See details
|
Navy, Department of | 9/18/2009 |
COMMERCIAL OPENINGS, INC. | $12,341 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
K & S ENGINEERING, INC. | $11,910 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
DIVERSIFIED WINDOW COVERINGS, INC. | $11,785 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
MBN GROUP INC | $11,603 |
RECOVERYPROJECT#::RM09-1453::RP# FACILITY ENERGY IMPROVEMENT (PHASE III), NAVAL BASE CORONADO, SAN DIEGO, CA.
This spending item is part of a $1,840,605 allocation.
See details
|
Navy, Department of | 9/15/2009 |
PACIFIC COAST CLEANING, INC. | $11,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
REDHORSE CORPORATION | $10,867 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $631,060 allocation.
See details
|
Navy, Department of | 8/21/2009 |
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC. | $10,607 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $5,181,612 allocation.
See details
|
Navy, Department of | 8/21/2009 |
IRISH SETTER INC, THE | $10,080 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
S C Coating | $10,019 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
GREEN FIELDS CONSULTING, LLC | $10,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
New Image Painting | $9,850 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |
MY OFFICE, INC | $9,780 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
RUSCO, INC. | $9,530 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Guy Evans Contracting Services | $9,514 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
SPRING VALLEY INSULATION CONTRACTORS | $9,410 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
AON FIRE PROTECTION ENGINEERING CORPORATION | $9,100 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
J. P. WITHEROW ROOFING COMPANY | $8,330 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
G. SCOTT ASPHALT, INC. | $8,203 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
CONSTRUCTION TESTING & ENGINEERING INC | $8,000 |
RECOVERYPROJECT#::P901::RP# CHILD CARE CENTER 24/7 NAVAL BASE CORONADO, CA
This spending item is part of a $1,925,000 allocation.
See details
|
Navy, Department of | 9/29/2009 |
AVOT CLEANING SOLUTIONS | $7,950 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
Marcor Remediation, Inc | $7,943 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
NINYO & MOORE GEOTECHNICAL & ENVIRONMENTAL SCIENCES CONSULTA | $7,500 |
RECOVERYPROJECT#::71653::RP# HOSPITAL REPLACEMENT, CAMP PENDLETON, CA
This spending item is part of a $328,159 allocation.
See details
|
Navy, Department of | 9/29/2011 |
SAN DIEGO AIR BALANCE CO., INC. | $7,158 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
ALL STAR SIGNS INC | $6,775 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Pacific Design Directions, Inc. | $6,772 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
SAFWAY SERVICES, LLC | $6,755 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
CA SIGNS | $6,495 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
DESIGN FABRICATION, INC. CALL MONDAY | $6,423 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
GEOCON INCORPORATED | $6,400 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PRICE INDUSTRIES, INC. | $5,700 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC. | $5,497 |
RECOVERYPROJECT#::RM09-1439::RP# TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1439::RP# ADVANCE METER INSTALLATION, NAS LEMOORE, CA
This spending item is part of a $2,648,409 allocation.
See details
|
Navy, Department of | 8/21/2009 |
H. M. PITT LABS, INC. | $5,455 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
COLLINGS & ASSOCIATES, LLC | $5,080 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
AVOT CLEANING SOLUTIONS | $5,000 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Cmt Alpine Electric, Inc | $4,800 |
RECOVERYPROJECT#::PE0887M::RP# INSTALL EFFICIENT BOILER MCB CAMP PENDLETON, CA
This spending item is part of a $575,934 allocation.
See details
|
Navy, Department of | 1/15/2010 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $4,680 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $5,181,612 allocation.
See details
|
Navy, Department of | 8/21/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $4,680 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $7,686,778 allocation.
See details
|
Navy, Department of | 8/21/2009 |
FULLER PAVING & DEVELOPMENT, INC. | $4,562 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
G. SCOTT ASPHALT, INC. | $4,000 |
RECOVERYPROJECT#::P0874::RP# PHOTOVOLTAIC SYSTEM, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $1,595,039 allocation.
See details
|
Navy, Department of | 9/22/2009 |
PSOMAS | $3,906 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
ALLENS PAVEMENT MARKINGS | $3,820 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
SUPERIOR DOOR SYSTEMS INC | $3,299 |
RECOVERYPROJECT#::P-329::RP# EXPAND CHILD DEVELOPMENT CENTER, NAS LEMOORE, CA New 16,800 square foot single story Child Development Center and site improvements on 2 acre site at Naval Air Station, Lemoore CA
This spending item is part of a $7,475,529 allocation.
See details
|
Navy, Department of | 6/15/2009 |
Syska Hennessy Group Construction Inc. | $3,200 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $3,120 |
RECOVERYPROJECT#::RM09-1439::RP# TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1439::RP# ADVANCE METER INSTALLATION, NAS LEMOORE, CA
This spending item is part of a $2,648,409 allocation.
See details
|
Navy, Department of | 8/21/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $3,120 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $2,363,580 allocation.
See details
|
Navy, Department of | 8/21/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $3,120 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $3,194,541 allocation.
See details
|
Navy, Department of | 8/21/2009 |
Acculine Survey Inc | $3,100 |
RECOVERYPROJECT#::P438M::RP# REPAIR/RENOVATE BEQ 52609, MCB CAMP PENDLETON, CA
This spending item is part of a $7,407,463 allocation.
See details
|
Navy, Department of | 6/18/2009 |
CERTIFIED AIR CONDITIONING, INC. | $3,100 |
RECOVERYPROJECT#::P518::RP# CHILD DEVELOPMENT CENTER, NAVAL BASE POINT LOMA, SAN DIEGO, CA New 25k square foot single story Child Development Center and site improvements on 3 acre site at Naval Base Pt. Loma, San Diego, CA
This spending item is part of a $9,401,430 allocation.
See details
|
Navy, Department of | 9/30/2009 |
CEMENT CUTTING, INC. | $2,900 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
CASPER'S CONCRETE CUTTING, INC. | $2,900 |
RECOVERY PROJECT#::RM525-08::RP# RENOVATION AND UPGRADE OF 13 LIVING UNITS AND INSTALLATION OF A NEW FIRE SPRINKLER AND FIRE ALARM SYSTEM AT BUILDING 554, (BEQ), NAVAL MINE AND ANTI-SUBMARINE WARFARE, NAVAL BASE POINT LOMA, SAN DIEGO, CA
This spending item is part of a $947,152 allocation.
See details
|
Navy, Department of | 4/29/2009 |
INTERSTATE STRIPING OF CALIFORNIA INC | $2,900 |
RECOVERYPROJECT#::RM09-1392 RM09-1393::RP# WHOLE BACHELOR QUARTERS MODERNIZATION, BUILDINGS 783 AND 787, NAVAL BASE CORONADO, SAN DIEGO, CA. The work includes provisions for the repair and renovation of existing solid grouted masonry constructed 114,106
This spending item is part of a $22,663,074 allocation.
See details
|
Navy, Department of | 12/18/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $2,760 |
RECOVERYPROJECT#::RM09-1439::RP# TAS::17 1805::TAS RECOVERY ACT PROJECT - ADVANCED METER INSTALLIONS LOCATED AT SITE 7 EL CENTRO NAVAL AIR FACILITY, EL CENTRO CA.
This spending item is part of a $1,467,697 allocation.
See details
|
Navy, Department of | 8/21/2009 |
LEWIS ALAN,INCORPORATED | $2,700 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
Best Maintenance Inc | $2,690 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
Air Lab Inc | $2,500 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
DOWNSTREAM SERVICES, INC. | $2,134 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $1,560 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $1,629,308 allocation.
See details
|
Navy, Department of | 8/21/2009 |
DEL REY SYSTEMS AND TECHNOLOGY, INC. | $1,560 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $631,060 allocation.
See details
|
Navy, Department of | 8/21/2009 |
STEVEN FIELD PLUMBING CORP | $1,500 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
KONECRANES INC | $1,300 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
Air Lab Inc | $1,206 |
RECOVERYPROJECT#::RM985-08::RP# REPAIR AND MODERNIZE DDG 1000 TRAINING FACILITY, BUILDING 3292, NAVAL BASE SAN DIEGO, SAN DIEGO, CA
This spending item is part of a $3,890,076 allocation.
See details
|
Navy, Department of | 9/01/2009 |
Air Lab Inc | $871 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
Pdi Coatings | $700 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
PENHALL COMPANY | $644 |
RECOVERYPROJECT#::PA0905M PA0905R::RP# REPAIR CNATT, BUILDINGS 2369, 2368, 2314 AND 2360, MCAS CAMP PENDLETON, CA.
This spending item is part of a $1,364,656 allocation.
See details
|
Navy, Department of | 6/19/2009 |
H. M. PITT LABS, INC. | $425 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
COSCO FIRE PROTECTION, INC. | $416 |
RECOVERYPROJECT#::TMA-N14::RP# RESTORE MYCOLOGY CLINICAL SPACES, NMCSD, SAN DIEGO, CA.
This spending item is part of a $216,000 allocation.
See details
|
Navy, Department of | 5/21/2009 |
Casper's Concrete Cutting, Inc. | $390 |
RECOVERYPROJECT#::PE0713M PE0713R::RP# D/B PE0713M REPAIR AND PE0713R MAINTAIN AND CONSTRUCT A FORMER ASSAULT AMPHIBIAN SCHOOL, BUILDING 210567, MCB CAMP PENDLETON, CALIFORNIA
This spending item is part of a $5,107,743 allocation.
See details
|
Navy, Department of | 8/07/2009 |
AMERICAN SYSTEMS CORPORATION | $0 | RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training | Navy, Department of | 8/21/2009 |
AMERICAN SYSTEMS CORPORATION | $0 |
RECOVERYPROJECT#::RM09-1439::RP# Advanced Metering installation and training
This spending item is part of a $3,194,541 allocation.
See details
|
Navy, Department of | 8/21/2009 |
T. B. PENICK & SONS, INC. | $0 |
RECOVERYPROJECT#::P-741::PR# BACHELOR QUARTERS AT SAN CLEMENTE ISLAND, CA
This spending item is part of a $17,124,105 allocation.
See details
|
Navy, Department of | 8/31/2010 |