San Diego County, Calif., funds by U.S. Army Corps of Engineers
Listing $63,655,796.02 in stimulus funds from U.S. Army Corps of Engineers for San Diego
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
STRAUB CONSTRUCTION, INC. | $29,031,327 |
Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California
This spending item is part of a $29,629,127 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
MANSON CONSTRUCTION CO. | $5,661,673 | Project # 112818 Dredging at the San Diego Mission Bay | U.S. Army Corps of Engineers - civil program financing only | 1/27/2010 |
SANBERG GROUP, INC., THE | $3,623,712 | Project No. 330111. SD La Jolla VA Emergency Department Remodel including approximately 6600 square feet of complete area demolition and remodel - Phases 1 of 3. Total emergency department area includes 11,600 square feet. | U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
ROCK ELECTRIC, INC. | $3,131,691 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
CERTIFIED AIR CONDITIONING, INC. | $3,095,500 |
Clinical Lab Long Beach CA This contract consists of three distinct projects within the VeteranG??s Affairs Medical Center Long Beach. Project 600-08-102 Building 126 2nd Floor Clinical Lab is HVAC upgrade in Quadrants B and C Project 600-08-11 Building 1
This spending item is part of a $6,276,252 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
SANBERG GROUP, INC., THE | $2,520,738 | SD La Jolla VA Emergency Department Remodel including approximately 5000 square feet of complete area demolition and remodel - Phases 2 & 3 of total area of 11,600 square feet. | U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
HMS CONSTRUCTION INC | $2,485,384 |
The objective of this project is to repair by replacement switchgear CP-T1 located at Bldg 137, Tripler Army Medical Center. A type III work plan shall be provided. Project specifics include replacement of the existing 11.5 KV Primary Unit Substation CP
This spending item is part of a $2,736,139 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
HMS CONSTRUCTION INC | $2,129,407 |
The objective of this project is to repair by replacement switchgear CP-T1 located at Bldg 137, Tripler Army Medical Center. A type III work plan shall be provided. Project specifics include replacement of the existing 11.5 KV Primary Unit Substation CP
This spending item is part of a $2,736,139 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
CONNOLLY-PACIFIC CO. | $2,108,052 | Project Number: 112818 Recovery - San Diego River & Mission Bay Middle Jetty Repair, San Diego County, CA Derrick Barge Long Beach (DBLB) which is equipped with a 300-ton crane. On completion of rock foundation excavation to elevation (-5) MLLW from s | U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
FUGRO PELAGOS, INC. | $1,871,538 |
Recovery: National Coastal Mapping Program, Washington & Oregon Coastal Survey & Mapping
This spending item is part of a $3,547,320 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
HMS CONSTRUCTION INC | $1,740,333 |
The objective of this project is to repair by replacement switchgear CP-T1 located at Bldg 137, Tripler Army Medical Center. A type III work plan shall be provided. Project specifics include replacement of the existing 11.5 KV Primary Unit Substation CP
This spending item is part of a $2,736,139 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
FUGRO PELAGOS, INC. | $1,623,249 |
Recovery: National Coastal Mapping Program California Coastal Survey & Mapping, California Coast
This spending item is part of a $5,370,909 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
WEST CONSULTANTS, INC. | $601,894 | National Portfolio Assessment For Reallocation, Expand the Corps Water Management System (CWMS) to enable regulation of reservoir flows on a real-time basis for both authorized reservoir purposes and flood risk management. Analyze selected watersheds, and | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
WEST CONSULTANTS, INC. | $474,861 | The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army Corps of Engineers. Real-time data include river stage, reservoir elevation, gage precipitation, and quantitative p | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $466,170 | Air Force Defense Research Sciences Program Once abundant, the coho salmon population in the Russian River system north of San Francisco has declined to the point where the species has been listed as endangered by both the State and Federal governments. To reverse this decline intensive efforts to | U.S. Army Corps of Engineers - civil program financing only | 8/31/2010 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $466,170 | Once abundant, the coho salmon population in the Russian River system north of San Francisco has declined to the point where the species has been listed as endangered by both the State and Federal governments. To reverse this decline intensive efforts to | U.S. Army Corps of Engineers - civil program financing only | 4/08/2010 |
WEST CONSULTANTS, INC. | $283,414 | The Corps Water Management System (CWMS) is the automated hydrometeorologic data, modeling, and communication system used by the U.S. Army Corps of Engineers. Real-time data include river stage, reservoir elevation, gage precipitation, and quantitative p | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
WEST CONSULTANTS, INC. | $267,230 |
Lewis & Clark Lake Headwaters Aggradation Evaluation. The closure of Gavins Point Dam on the Missouri River at river mile 811 (RM 811) occurred in 1955 to form Lewis and Clark Lake. Significant delta deposits have formed in the headwaters of Lewis and Cla
This spending item is part of a $352,437 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
HAL HAYS CONSTRUCTION, INC. | $265,886 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
ONMATERIALS LLC | $237,486 |
Performing remediation and monitoring of contaminated groundwater at the Monitor Devices Inc./Intercuits Superfund site located in Wall Township, NJ.
This spending item is part of a $3,000,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/03/2009 |
HOPE ENGINEERING INC | $213,000 |
Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California
This spending item is part of a $29,629,127 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
VELTRE ENGINEERING | $176,000 |
Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California
This spending item is part of a $29,629,127 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
ANATECH CORP | $167,743 |
Part one includes the miter gate three-dimensional Finite Element analysis and design of all structural features required to transport, rotate and store miter gates. Part two include the preparation of plans and specifications for the Miter Gate Storage P
This spending item is part of a $295,769 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/29/2009 |
WEST CONSULTANTS, INC. | $163,762 | The Architect-Engineer (A-E) shall update and expand the limits of an existing HEC-1 and UNET models for the Morganza to the Gulf Hurricane Protection project area. The A-E shall calibrate and verify the model for recent storm events. The development of | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
THE MARINE GROUP LLC | $135,000 | Log Bronc - One Steel 14 ft Log Style Tug Boat, steel flat bottome and open side cabin | U.S. Army Corps of Engineers - civil program financing only | 8/15/2009 |
DS ENGINEERING, INC | $116,000 |
Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California
This spending item is part of a $29,629,127 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
WEST CONSULTANTS, INC. | $92,084 | Initial deployment site assessment for accelerated CWMS Deployment for the Districts of Los Angeles, Omaha and Mobile | U.S. Army Corps of Engineers - civil program financing only | 6/18/2009 |
HI-Q ENVIRONMENTAL PRODUCTS COMPANY, INC. | $74,138 |
American Recovery & Reinvestment Act (ARRA) funding was obligated on USACE Kansas City District Contract No. DACW41-99-D-9001 for 'Maywood Chemical Superfund Site-Specific Environmental Remediation' as bilateral Modification No. 0004 under Task Order No.
This spending item is part of a $49,138,392 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/22/2009 |
WEST CONSULTANTS, INC. | $71,936 | As a part of the U.S. Army Corps of Engineers ? Civil Program for Operation and Maintenance program for the Apalachicola, Chattahoochee and Flint Rivers, GA, PL & Fl, Mobile, GA. Award Contract to perform mandated Lake Lanier reallocation study, complete | U.S. Army Corps of Engineers - civil program financing only | 9/29/2010 |
SONTEK/YSI INC | $58,590 |
As part of TAS::96 3135:: TAS, Supply on Recovery - Project number 8990, Keystone Lake, Sand Springs, Oklahoma; project number 6000, Fort Gibson Lake, Fort Gibson, Oklahoma; and Project Number 5650, Eufaula Lake, Oklahoma for AE Contract to UPdate Forecas
This spending item is part of a $68,930 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
Studio West Interior | $52,200 |
Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California
This spending item is part of a $29,629,127 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
Casper's Concrete Cutting, Inc. | $45,640 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
WEST CONSULTANTS, INC. | $43,648 | ResSim Modeling Assistance for Mobile District Update Studies | U.S. Army Corps of Engineers - civil program financing only | 7/30/2009 |
Grani Installation Inc | $39,900 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
YSI INCORPORATED | $19,817 | Provide Hydrological Instrumentation: 2 Argonaut-SW 3.0-MHz System; 1 Full Featured Data Logger with Integrated GOES Transmitter with Internal GPS and keypad and display; with accessories. | U.S. Army Corps of Engineers - civil program financing only | 4/19/2010 |
HALCROW, INC. | $19,196 |
Project Number: 112818 Field investigation and report preparation for defined portions of the Corps of Engineers. Mission Bay Harbor Maintenance Dredging Project (Corps Project) to include: Caulepra Taxifolia surveys, eelgrass surveys and mapping, and r
This spending item is part of a $99,608 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/06/2010 |
R & R MECHANICAL CONTRACTORS, INC. | $19,000 |
Design and Construction of 600-10-202 Upgrade Research Lab Facilities, VA Long Beach Healthcare System, Long Beach, California.
This spending item is part of a $4,264,653 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2010 |
GLORY SUPPLY, INC | $17,462 | To supply materials for Restroom Rehab Project | U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
GLORY SUPPLY, INC | $15,215 | Supply and deliver restroom rehab materials | U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
CONSTRUCTION TESTING & ENGINEERING INC | $14,052 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
SAN DIEGO PRECAST CONCRETE, INC. | $7,951 |
Project #104781: began as a continuing clause contract with an allocated funding of 9.9 million dollars. The total cost of the project to date is over 32 million. Without the ARRA funding the project would not have been able to continue and probably wou
This spending item is part of a $19,387,307 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
GLORY SUPPLY, INC | $2,699 | To supply and deliver Cedar Lumber | U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
WULFF MECHANICAL, INC. | $2,280 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
CERTIFIED AIR CONDITIONING, INC. | $2,219 |
The project entails design and recommissioning of eleven (11) Patient Negative Pressure Isolation Rooms that will result in the creation of eight (8) Patient Negative Pressure Isolation Room Suites. The work will involve the installation of three (3) sep
This spending item is part of a $1,436,155 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
Alpha & Omega Group | $550 |
PROJECT NUMBER 330111 VA 664-08-101 REPLACE MAIN FEEDER BUILDING 1, SAN DIEGO HEALTHCARE SYSTEM SAN DIEGO, CALIFORNIA ELECTRICAL SWITCHBOARD UPGRADE.
This spending item is part of a $3,499,999 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |