Recovery Tracker

How Much Stimulus Funding is Going to Your County?

San Joaquin County, Calif., funds by Interior, Department of

Listing $15,038,674.51 in stimulus funds from Interior, Department of for San Joaquin

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SHIMMICK CONSTRUCTION COMPANY, INC. $12,537,411 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
WESTERN OILFIELDS SUPPLY COMPANY $1,651,023 DROUGHT RELIEF TEMPORARY PUMPS AND PIPING PROJECT SUPPLIES Bureau of Reclamation 11/13/2009
A. M. Stephens Construction Co., Inc. $450,000 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
Wagner Mechanical, Inc. $333,426 Project Description: The project will remove two 4,000 gallon heating oil tanks and replace them with a propane fuel system to convert the HVAC system to propane.
This spending item is part of a $915,021 allocation. See details
National Park Service 4/07/2010
ALL STEEL FENCE INC. $43,650 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
Popuch Concrete Contracting, Inc. $23,165 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010