Santa Barbara County, Calif., funds by U.S. Army Corps of Engineers
Listing $17,067,396.53 in stimulus funds from U.S. Army Corps of Engineers for Santa Barbara
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
AIS CONSTRUCTION COMPANY | $7,961,550 | The awarded money will be used to remove the built up ocean sediment that has accumulated on the bottom of Morro Bay Harbor. The buildup of material is essential to remove in order to eliminate sand bars that form regularly at the harbor mouth and prevent | U.S. Army Corps of Engineers - civil program financing only | 8/07/2009 |
RODNEY WILLIAMS CONSTRUCTION, INC. | $7,851,622 | PROJECT NUMBER 138751, THE SOUTH LEVEE IMPROVEMENT PROJECT INCLUDES TWO REACHES. IMPROVEMENTS CONSIST OF CONSTRUCTION OF AN 8 FT WIDE AND ABOUT 30 FT DEEP COMPACTED SOIL CEMENT SECTION, WHICH REQUIRES EXCAVATION OF THE EXISTING GROUND, REMOVAL AND REINST | U.S. Army Corps of Engineers - civil program financing only | 10/08/2009 |
TETRA TECH, INC. | $374,590 |
Project Number 104780-As part of TAS 96-3133-DESIGN MATERIAL AND FINAL PLANS AND SPECIFICATIONS FOR PHASE 2 OF LOWER MISSION CREEK. The Architect-Engineer (A-E) shall prepare a Design Report (DR), a geotechnical report, and detailed construction drawings
This spending item is part of a $600,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
ASPEN ENVIRONMENTAL GROUP | $358,949 | Project Number 138751 As part of Construction Monitoring on the Santa Maria River, Santa Barbara County, California; Aspen Environmental Group will conduct construction monitoring; including input on pre-construction environmental briefing summary and pr | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
HDR/CDM, A JOINT VENTURE | $299,533 | Project Number 104763; Prepare construction drawings and specifications for Phase 2 of the Santa Paula Creek project. Final Design materials will consist of contract drawings, specifications, design backup/calculations, cost estimates ad quantity estimat | U.S. Army Corps of Engineers - civil program financing only | 4/16/2010 |
BENGAL ENGINEERING, INC | $129,400 |
Project Number 104780-As part of TAS 96-3133-DESIGN MATERIAL AND FINAL PLANS AND SPECIFICATIONS FOR PHASE 2 OF LOWER MISSION CREEK. The Architect-Engineer (A-E) shall prepare a Design Report (DR), a geotechnical report, and detailed construction drawings
This spending item is part of a $600,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $32,784 | Project #: 138751 As part of the U.S. Army Corps of Engineers - Construction, Recovery Act on the Santa Maria River Levees project, provide quality assurance support during the construction of modifications to the Santa Maria levees, Reachs 1 and 2, Santa | U.S. Army Corps of Engineers - civil program financing only | 1/12/2010 |
JOHNSON-FRANK & ASSOCIATES, INC. | $32,580 | Aerial Mapping at a scale of one inch equals one hundred feet (1=100') with a two foot (2') contour interval and color orthophotography, for the Santa Maria River Project. | U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
ECO & ASSOCIATES INC | $26,389 | Provide Quality Assurance Services at Santa Maria, CA Period of performance 120 Calendar days. This Quality Assurance personal is responsible to make sure that the contractor that is performing work at Santa Maria Levee Project, CA is doing their work in | U.S. Army Corps of Engineers - civil program financing only | 8/24/2010 |