Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Sonoma County, Calif., funds by U.S. Army Corps of Engineers

Listing $6,747,586.34 in stimulus funds from U.S. Army Corps of Engineers for Sonoma

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HNTB-GERWICK JV $2,015,241 Engineering and Design for Alternative X-Option C Tunnel and 72 Pipeline and Alternative 3A Pump Station and 36 Pipeline U.S. Army Corps of Engineers - civil program financing only 7/28/2010
ALLRIGHT CONSTRUCTION, INC. $1,602,873 MODIFICATIONS TO THE MILT BRANDT VISITOR CENTER (MBVC) LAKE SONOMA, HEALDSBURG, CA & THE DON CLAUSEN FISH HATCHERY (DCFH) GEYSERVILLE, CA. Architectural, mechanical and electrical modifications to the Milt Brandt Visitor Center, Lake Sonoma, Healdsburg, U.S. Army Corps of Engineers - civil program financing only 8/04/2010
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. $623,735 RECOVERYPROJECT#::4990::RP#PRE-ENGINEERED STEEL BUILDING FOR COHO SALMON REARING FACILITY,WARM SPRINGS DAM, LAKE SONOMA PROJECT, GEYSERVILLE, SONOMA COUNTY, CA
This spending item is part of a $1,234,512 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/23/2010
B.C. SCHMIDT CONSTRUCTION, INC. $430,481 Design Build construction services to replace the 20-gallon per minute surface water treatment plant for Liberty Glen Campground at Warm Springs Dam/Lake Sonoma. Design build constrction utilizing the membrane technology for filtration of raw lake water U.S. Army Corps of Engineers - civil program financing only 12/28/2009
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. $360,438 WSD Fish Hatchery Generator Replacement
This spending item is part of a $524,790 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 2/24/2010
B.D. Compton Construction, Inc. $335,400 RECOVERYPROJECT#::4990::RP#PRE-ENGINEERED STEEL BUILDING FOR COHO SALMON REARING FACILITY,WARM SPRINGS DAM, LAKE SONOMA PROJECT, GEYSERVILLE, SONOMA COUNTY, CA
This spending item is part of a $1,234,512 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/23/2010
NORTH STAR CONSTRUCTION AND ENGINEERING, INC. $278,000 RECOVERY: Outlet Channel Erosion Repair at Lake Sonoma, CA U.S. Army Corps of Engineers - civil program financing only 6/30/2010
GOLDEN, ROGER K $169,804 The existing Emergency Water Supply Line was constructed in 1992 and has become outdated and too inefficient to comply with the newly established, Endangered Species Act mandates. The purpose of this Task Order is to compare two major rehabilitation and U.S. Army Corps of Engineers - civil program financing only 4/02/2010
PEORIA FIBERGLASS, INC. $130,000 20 Dry Creek ARRA - Restrooms, Furnish all appropriate labor, materials, equipment, supplies and transportation necessary to perform the work as outlined in the scope of work, entitled Lake Sonoma Restroom Building Replacements. U.S. Army Corps of Engineers - civil program financing only 8/24/2009
CSRW, INC. $122,223 waterproofing elevator hoistway, warm Springs Dam U.S. Army Corps of Engineers - civil program financing only 6/03/2010
Knight's Electric, Incorporated $118,400 RECOVERYPROJECT#::4990::RP#PRE-ENGINEERED STEEL BUILDING FOR COHO SALMON REARING FACILITY,WARM SPRINGS DAM, LAKE SONOMA PROJECT, GEYSERVILLE, SONOMA COUNTY, CA
This spending item is part of a $1,234,512 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/23/2010
MCMILLEN, LLC $113,253 HYDRAULIC MODELING OF WARM SPRINGS DAM FOR WITH AND WITHOUT FAILURE OF THE DAM AND INUNDATION MAPPING; PROJECT NUMBER 4990.
This spending item is part of a $132,753 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/23/2010
B & B CONSTRUCTION, INC. $73,400 RECOVERY; glu lam beam replacement, WSD FISH HATCHERY AT LAKE SONOMA PROJECT NUMBER 4990 U.S. Army Corps of Engineers - civil program financing only 2/26/2010
John Carlisle Construction Inc $68,718 RECOVERYPROJECT#::4990::RP#PRE-ENGINEERED STEEL BUILDING FOR COHO SALMON REARING FACILITY,WARM SPRINGS DAM, LAKE SONOMA PROJECT, GEYSERVILLE, SONOMA COUNTY, CA
This spending item is part of a $1,234,512 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/23/2010
STANLEY SECURITY SOLUTIONS, INC. $53,166 Recovery: Upgrade of Locks System at Dry Creek (Warm Springs) Lake & Channel, Ca U.S. Army Corps of Engineers - civil program financing only 8/05/2009
ROMTEC, INC. $48,628 ASPEN CONCRETE BUILDING KIT PACKAGE AND INSTALLATION SERVICES U.S. Army Corps of Engineers - civil program financing only 7/27/2009
MIKSIS SERVICES INC $44,840 Rehabilitation, pumping tests, and video inspection of pressure relief wells or piezometers at Martis Creek Dam (Truckee, CA), Terminus Dam (Visalia, CA), and Farmington Dam (Stockton, CA).
This spending item is part of a $291,980 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/26/2009
KINGSBOROUGH ATLAS TREE SURGERY, INC $35,626 tree work U.S. Army Corps of Engineers - civil program financing only 7/07/2009
MIRACLE PLAYSYSTEMS INCORPORATED $34,970 FURNISH AND INSTALL RECREATIONAL PLAY EQUIPMENT U.S. Army Corps of Engineers - civil program financing only 6/10/2009
Domenichelli Masonry Inc $34,184 WSD Fish Hatchery Generator Replacement
This spending item is part of a $524,790 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 2/24/2010
INFO STOR, INFORMATION STORAGE CENTERS, INC. $17,085 RECOVERY: Onsite Scanning of AS-Builts, Maps & Plans into Adobe Acrobat PDF Files U.S. Army Corps of Engineers - civil program financing only 7/01/2009
MILLER, BRIAN $16,675 Interior carpeting of Headquarters Building and Maintenance Shop Office, Lake Sonoma, Warm Springs Dam Project U.S. Army Corps of Engineers - civil program financing only 7/07/2009
MCMILLEN, LLC $12,447 HYDROLOGIC MODELING OF WARM SPRINGS DAM FOR WITH AND WITHOUT FAILURE OF THE DAM AND INUNDATION MAPPING. PRoject Number 4990
This spending item is part of a $92,674 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/23/2010
Brokaw Consulting Electrical Engineers $8,000 Design and build to construct and install electric campsite pedestals at Hensley, Eastman, Success and Pine Flat Lakes, California. Also includes removal and upgrade of electrical fixtures in restrooms at Hensley Lake and Buck Ridge Recreation Area.
This spending item is part of a $680,066 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/04/2009
HDR ENGINEERING, INC. $0 The existing Emergency Water Supply Line was constructed in 1992 and has become outdated and too inefficient to comply with the newly established, Endangered Species Act mandates. The purpose of this Task Order is to compare two major rehabilitation and
This spending item is part of a $61,394 allocation. See details