Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Tulare County, Calif., funds by U.S. Army Corps of Engineers

Listing $4,436,970.34 in stimulus funds from U.S. Army Corps of Engineers for Tulare

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
ROMERO GENERAL CONSTRUCTION CORP. $1,559,240 REPAIR BADLY DETERIORATED ROADS, REDUCING FUTURE COSTLY REPLACEMENT AND IMPROVING STAFF AND VISITOR HEALTH AND SAFETY U.S. Army Corps of Engineers - civil program financing only 9/18/2009
ROMERO GENERAL CONSTRUCTION CORP. $999,089 REPAIR BADLY DETERIORATED ROADS, SUCCESS LAKE CA
This spending item is part of a $1,055,556 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/18/2009
DYNARAM CONSTRUCTION CORPORATION $825,236 As a part of the Operation and Maintenance Recovery Act, this contract provides for the new ADA waterborne restroom with showers in the Group area, Black Butte Lake and the installation of two vault and one waterborne restroom at Buchanan Dam, Eastman Lak U.S. Army Corps of Engineers - civil program financing only 8/12/2009
DYNARAM CONSTRUCTION CORPORATION $523,322 Installation of precast concrete waterborne restrooms including excavation, backfilling, site grading, installation of underground electrical supply line and power service, and live tap to potable water supply and hook-up to restrooms located at Success,
This spending item is part of a $825,236 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/12/2009
DYNARAM CONSTRUCTION CORPORATION $105,677 Cover all exterior wood portions and partitions with tan vinyl siding at Hensley Lake and Lake Kaweah; and remove and replace dam crest markers at Terminus Dam, California. Includes replacing two exterior steel doors and hinges at shop building at Lake K
This spending item is part of a $197,934 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/13/2009
SIERRA RANGE CONSTRUCTION $92,257 Cover all exterior wood portions and partitions with tan vinyl siding at Hensley Lake and Lake Kaweah; and remove and replace dam crest markers at Terminus Dam, California. Includes replacing two exterior steel doors and hinges at shop building at Lake K
This spending item is part of a $197,934 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/13/2009
SIERRA RANGE CONSTRUCTION $90,000 Design and build to construct and install electric campsite pedestals at Hensley, Eastman, Success and Pine Flat Lakes, California. Also includes removal and upgrade of electrical fixtures in restrooms at Hensley Lake and Buck Ridge Recreation Area.
This spending item is part of a $680,066 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/04/2009
ELEMENT 26 CONTRACTING $58,666 Installation of precast concrete waterborne restrooms including excavation, backfilling, site grading, installation of underground electrical supply line and power service, and live tap to potable water supply and hook-up to restrooms located at Success,
This spending item is part of a $825,236 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/12/2009
INTERMOUNTAIN SLURRY SEAL, INC. $56,467 REPAIR BADLY DETERIORATED ROADS, SUCCESS LAKE CA
This spending item is part of a $1,055,556 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/18/2009
ERICK AMMON INC $55,833 Purchase and install 30' x 150'x 14' metal building to use as an equipment shed in the Tule Recreation Area at Success Lake, Ca.
This spending item is part of a $118,846 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/06/2009
BSE PERFORMANCE LLC $29,108 As a part of the American Reinvestment and Recovery Act, this contract isfor: Cement Delivery on a will call basis to Success Lake, Porterville, CA Project #17680. This cement will be used for Picnic Shelters and Cement Curbing U.S. Army Corps of Engineers - civil program financing only 1/13/2010
SIERRA RANGE CONSTRUCTION $28,119 Installation of precast concrete waterborne restrooms including excavation, backfilling, site grading, installation of underground electrical supply line and power service, and live tap to potable water supply and hook-up to restrooms located at Success,
This spending item is part of a $825,236 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/12/2009
South Valley Electric $12,000 Design and build to construct and install electric campsite pedestals at Hensley, Eastman, Success and Pine Flat Lakes, California. Also includes removal and upgrade of electrical fixtures in restrooms at Hensley Lake and Buck Ridge Recreation Area.
This spending item is part of a $680,066 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/04/2009
KLEINFELDER WEST, INC. $1,956 Installation of precast concrete waterborne restrooms including excavation, backfilling, site grading, installation of underground electrical supply line and power service, and live tap to potable water supply and hook-up to restrooms located at Success,
This spending item is part of a $825,236 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/12/2009