Honolulu County, Hawaii, funds by Navy, Department of
Listing $196,534,744.50 in stimulus funds from Navy, Department of for Honolulu
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
WALSH CONSTRUCTION COMPANY | $131,103,000 | TAS:: 13 1454::TAS ARRA::YES::ARRA RECOVERYPROJECT#::5014: :RP# Construction of the NOAA PRC at Ford Island, Pearl Harbor, HI. The work to be performed provides for and involves adaptive reuse of historic hangars and new construction on an historic landma | Navy, Department of | 8/31/2010 |
HAWAIIAN DREDGING CONSTRUCTION COMPANY, INC. | $11,390,160 | Repair and Restoration of Pier B4 and Wharf B5 Pearl Harbor, Hawaii. | Naval Facilities Engineering Command | 4/27/2009 |
DRI ENERGY CORPORATION | $10,916,583 |
As a part of TAS program construction on design-build of grid-tied photovoltaic power sytems on the roof of various buildings at Pearl Harbor, Oahu, HI project
This spending item is part of a $15,237,555 allocation.
See details
|
Navy, Department of | 12/30/2009 |
NAN, INC. | $8,903,424 |
TAS:: 17 1206::TAS Child Development Center, Marine Corp Base Hawaii (MCBH), Kaneohe, Hawaii. All labor, materials, services, equipment and travel necessary to design-build a Child Development Center located at Marine Corp Base Hawaii (MCBH), Kaneohe, H
This spending item is part of a $9,763,104 allocation.
See details
|
Navy, Department of | 7/31/2009 |
HEALY TIBBITTS BUILDERS, INC. | $4,763,614 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
NIKING CORPORATION | $4,320,972 |
As a part of TAS program construction on design-build of grid-tied photovoltaic power sytems on the roof of various buildings at Pearl Harbor, Oahu, HI project
This spending item is part of a $15,237,555 allocation.
See details
|
Navy, Department of | 12/30/2009 |
FCS INC. | $3,851,190 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
NAN, INC. | $2,765,061 |
ARRA--REPAIR WINDOWS HEADQUARTERS AREA/MAJOR REPAIRS TO 3RD MARINE HEADQUARTER BATTALION, BUILDING 1087, AND INSTALL AC SYSTEM AT 3RD MARINE BATTALION HEADQUARTER, BUILDING 1087, AT MARINE CORPS BASE HAWAII, KANEOHE BAY, HAWAII
This spending item is part of a $2,835,960 allocation.
See details
|
Navy, Department of | 9/28/2009 |
GRACE PACIFIC CORPORATION | $1,918,050 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
PAUL'S ELECTRICAL CONTRACTING LLC | $1,880,999 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
NAN, INC. | $1,842,491 |
PACIFIC REGION CENTER (PRC) BLDG 130 & SEA ANIMAL RESEARCH CENTER, NOAA AT FORD ISLAND
This spending item is part of a $2,005,487 allocation.
See details
|
Navy, Department of | 9/16/2010 |
HELLMUTH, OBATA & KASSABAUM, INC. | $1,796,112 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
MAKAI OCEAN ENGINEERING, INC. | $1,699,600 |
OTEC Project
This spending item is part of a $8,119,625 allocation.
See details
|
Navy, Department of | 8/21/2009 |
HAL HAYS CONSTRUCTION, INC. | $1,038,219 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $859,680 |
TAS:: 17 1206::TAS Child Development Center, Marine Corp Base Hawaii (MCBH), Kaneohe, Hawaii. All labor, materials, services, equipment and travel necessary to design-build a Child Development Center located at Marine Corp Base Hawaii (MCBH), Kaneohe, H
This spending item is part of a $9,763,104 allocation.
See details
|
Navy, Department of | 7/31/2009 |
HELLMUTH, OBATA & KASSABAUM, INC. | $671,201 |
Recovery Project #5014#RP:Provide services as awarded on an indefinite quantity basis as awarded. NOTE: Modification no. P00067 was issued to increase the award amount by $418,950.
This spending item is part of a $872,950 allocation.
See details
|
Navy, Department of | 12/16/2011 |
WATTS CONSTRUCTORS, LLC | $576,817 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
NAVATEK, LTD | $468,726 |
OTEC Project
This spending item is part of a $8,119,625 allocation.
See details
|
Navy, Department of | 8/21/2009 |
AKAHI SERVICES, INC | $419,716 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
SEA ENGINEERING, INC. | $365,148 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
AMSEC LLC | $340,908 |
This task is to install an access control system at Tripler Army Medical Center. AMSEC is providing labor to install card readers.
This spending item is part of a $371,131 allocation.
See details
|
Navy, Department of | 3/26/2010 |
AMSEC LLC | $340,908 |
This task is to install an access control system at Tripler Army Medical Center. AMSEC is providing labor to install card readers.
This spending item is part of a $371,131 allocation.
See details
|
Navy, Department of | 3/26/2010 |
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. | $304,985 | ERRG has been contracted to perform remediation activities on Ford Island, Oahu, Hawaii. The scope of work is to excavate and dispose of suspected pesticide contaminated soil; perform confirmation soil sampling; backfill the excavation with clean fill; a | Navy, Department of | 9/20/2010 |
SSFM INTERNATIONAL, INC | $298,565 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
AMSEC LLC | $271,386 | This task is to install an Access Control System at Tripler Army Medical Center. AMSEC is providing labor to install card readers, intercoms, ACS keypads, database servers, peripheral equipment, and all necessary conduit, cabling and power (low voltage). | Navy, Department of | 3/26/2010 |
HELLMUTH, OBATA & KASSABAUM, INC. | $237,336 |
Recovery Project #5014: Perform exterior and interior signage design and study on effects to lighting and HVAC performance by increasing cubicle height for facilities comprising of Buildings 175, 176, A, and all associated facilities.
This spending item is part of a $316,175 allocation.
See details
|
Navy, Department of | 9/17/2010 |
ASSOCIATED STEEL WORKERS, LIMITED | $234,520 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
DAVID'S FENCING, INC. | $217,490 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
OCEES INTERNATIONAL, INC. | $200,000 |
OTEC Project
This spending item is part of a $8,119,625 allocation.
See details
|
Navy, Department of | 8/21/2009 |
HELLMUTH, OBATA & KASSABAUM, INC. | $179,991 |
Recovery Project #5014: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $299,146 allocation.
See details
|
Navy, Department of | 9/21/2010 |
LEWIS ELECTRIC LLC | $172,552 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
UNITEK INSULATION, LLC | $162,575 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
Hawaiian Cement | $151,049 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
J & M Blasting & Painting Inc | $148,700 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
GEOLABS, INC. | $142,680 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
ELECTECH HAWAII, INC. | $142,110 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
SOUTHEASTERN ARCHAEOLOGICAL RESEARCH INC | $104,357 | Project is to supply archaeological monitoring services during the construction of a Child Development Center at Marine Corps Base Hawaii, Kaneohe Bay, Oahu, Hawaii. The purpose of monitoring is to document the presence or absence of any cultural deposit | Naval Facilities Engineering Command | 3/26/2010 |
HARRY ASATO PAINTING INC | $91,220 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
FERRARO, CHOI AND ASSOCIATES LTD | $89,151 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
SU-MO BUILDERS, INC. | $70,899 |
ARRA--REPAIR WINDOWS HEADQUARTERS AREA/MAJOR REPAIRS TO 3RD MARINE HEADQUARTER BATTALION, BUILDING 1087, AND INSTALL AC SYSTEM AT 3RD MARINE BATTALION HEADQUARTER, BUILDING 1087, AT MARINE CORPS BASE HAWAII, KANEOHE BAY, HAWAII
This spending item is part of a $2,835,960 allocation.
See details
|
Navy, Department of | 9/28/2009 |
COMMERCIAL ELECTRIC, INC. | $63,554 |
PACIFIC REGION CENTER (PRC) BLDG 130 & SEA ANIMAL RESEARCH CENTER, NOAA AT FORD ISLAND
This spending item is part of a $2,005,487 allocation.
See details
|
Navy, Department of | 9/16/2010 |
COMMERCIAL SHEETMETAL CO., INC. | $58,643 |
PACIFIC REGION CENTER (PRC) BLDG 130 & SEA ANIMAL RESEARCH CENTER, NOAA AT FORD ISLAND
This spending item is part of a $2,005,487 allocation.
See details
|
Navy, Department of | 9/16/2010 |
DANILO D. LOPEZ ASSOCIATES, INC | $57,924 | P-835 CDC MCBH PCAS | Navy, Department of | 10/16/2009 |
National Concrete Sawing Inc | $56,461 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
MECHANICAL ENGINEERS OF HAWAII CORP | $54,314 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
ROAD BUILDERS CORP | $52,355 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
PLANNING SOLUTIONS INC | $50,000 |
OTEC Project
This spending item is part of a $8,119,625 allocation.
See details
|
Navy, Department of | 8/21/2009 |
INK ARCH LLC | $49,116 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
HELLMUTH, OBATA & KASSABAUM, INC. | $43,939 |
Architect-Engineer Services for Pacific Region Center and Wet Laboratory, NOAA, Naval Station Pearl Habor, Hawaii.
This spending item is part of a $45,156 allocation.
See details
|
Navy, Department of | 4/30/2012 |
FERRARO, CHOI AND ASSOCIATES LTD | $43,142 |
Recovery Project #5014#RP:Provide services as awarded on an indefinite quantity basis as awarded. NOTE: Modification no. P00067 was issued to increase the award amount by $418,950.
This spending item is part of a $872,950 allocation.
See details
|
Navy, Department of | 12/16/2011 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $43,000 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
PINERIDGE FARMS, INC. | $42,000 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
ECONOMY PLUMBING & SHEET METAL INC | $40,799 |
PACIFIC REGION CENTER (PRC) BLDG 130 & SEA ANIMAL RESEARCH CENTER, NOAA AT FORD ISLAND
This spending item is part of a $2,005,487 allocation.
See details
|
Navy, Department of | 9/16/2010 |
HELLMUTH, OBATA & KASSABAUM, INC. | $35,249 |
Recovery Project #5014 #RP: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $100,000 allocation.
See details
|
Navy, Department of | 8/24/2011 |
GEOTEK, INC. | $34,567 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
HONOLULU PAINTING CO LIMITED | $30,707 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
GLOBAL PROFESSIONAL SERVICES, LLC | $30,018 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
OHANA CONCRETE PUMPING CO, INC | $30,000 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
NAGAMINE OKAWA ENGINEERS INC. | $26,112 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
ARCHITECTS HAWAII LTD. | $24,921 | Replace window Headquarters area, major repairs and install AC, Building 1087, Marine Corps Base, Hawaii, Post Construction Award Services | Navy, Department of | 5/14/2010 |
THERMAL ENGINEERING CORPORATION | $24,890 |
Repair Wharf S1 (RM5-07), Pearl Harbor, Hawaii This design-build project provides repairs to Wharf S1, Subase, Pearl Harbor, Hawaii. The repairs indicated in the RFP drawings are based on previous inspections of the wharf, which are included in Part 6 o
This spending item is part of a $10,862,232 allocation.
See details
|
Navy, Department of | 4/24/2009 |
OSHCON, INCORPORATED | $19,106 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
COST ENGINEERING OF HAWAII INC | $16,619 |
Install Photovoltaic Systems (RM09-1363), Navy Installations, Islands of Oahu and Kauai, Hawaii. Replacement of roofing and installation of Photovoltaic Systems on 10 buildings at PMRF and 5 buildings at NAVSTA PH. Provide Post Construction Award Serv
This spending item is part of a $607,529 allocation.
See details
|
Navy, Department of | 6/16/2009 |
FERRARO, CHOI AND ASSOCIATES LTD | $16,608 |
Recovery Project #5014 #RP: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $100,000 allocation.
See details
|
Navy, Department of | 8/24/2011 |
KI CONCEPTS LLC | $15,820 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
PACIFIC GEOTECHNICAL ENGINEERS, INC. | $14,405 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
NAGAMINE OKAWA ENGINEERS INC. | $14,153 |
Repair Wharf S1, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $24,296 allocation.
See details
|
Navy, Department of | 8/05/2009 |
LVI ENVIRONMENTAL SERVICES INC. | $9,921 |
ARIZONA MEMORIAL VISITOR PARKING, PEARL HARBOR, HI PHASE 1- CONSTRUCT FORD ISLAND SHUTTLE ROAD AND LOADING AREA PHASE 2- DEMOLISH EXISTING FORD ISLAND SHUTTLE ROAD AND LOADING AREA AND CONSTRUCT PARKING AND IMPROVEMENTS PHASE 3- DEMOLISH TEMPORARY PARKING
This spending item is part of a $7,495,103 allocation.
See details
|
Navy, Department of | 3/02/2010 |
MK ENGINEERS, LTD. | $9,892 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
KENNEDY/JENKS CONSULTANTS, INC. | $9,567 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
THERMAL ENGINEERING CORPORATION | $8,667 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $8,559 |
Level of effort task to provide one Project Analyst to provide financial tracking and project support for the Tripler Army Medical Center (TAMC) of the Anti-Terrorism/ Force Protection (AT/FP) Integrated Physical Security Systems (IPSS) installation in Ha
This spending item is part of a $53,529 allocation.
See details
|
Navy, Department of | 3/18/2010 |
FERRARO, CHOI AND ASSOCIATES LTD | $7,897 |
Recovery Project #5014: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $299,146 allocation.
See details
|
Navy, Department of | 9/21/2010 |
MASON ARCHITECTS, INC. | $6,013 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $4,916 |
Level of effort task to provide one senior CAD technician to provide drafting support one engineering technician to provide project engineering support and one project analyst to provide financial tracking support for the Tripler Army Medical Center (TAMC
This spending item is part of a $33,551 allocation.
See details
|
Navy, Department of | 12/09/2009 |
CONTROLPOINT SURVEYING, INC. | $4,657 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
PACIFIC GEOTECHNICAL ENGINEERS, INC. | $4,264 |
Repair Wharf S1, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $24,296 allocation.
See details
|
Navy, Department of | 8/05/2009 |
KI CONCEPTS LLC | $4,032 |
Additional submittal review services in support of the Pacific Region Center and WET Laboratory, NOAA, Naval Station, Hawaii.
This spending item is part of a $645,258 allocation.
See details
|
Navy, Department of | 12/15/2011 |
GEORGE M MATSUMOTO & ASSOCIATES INC | $2,644 |
Recovery Project #5014: Perform Post Construction Award Services (PCAS) to include LEED and Commissioning in support of NOAA Pacific Regional Center (PRC). NOTE: Modification no. P00067 was issued to decrease the award amount by $418,950 from previously
This spending item is part of a $3,520,228 allocation.
See details
|
Navy, Department of | 9/16/2010 |
FERRARO, CHOI AND ASSOCIATES LTD | $2,507 |
Additional submittal review services in support of the Pacific Region Center and WET Laboratory, NOAA, Naval Station, Hawaii.
This spending item is part of a $645,258 allocation.
See details
|
Navy, Department of | 12/15/2011 |
COST ENGINEERING OF HAWAII INC | $2,462 |
Repair Wharf S1, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $24,296 allocation.
See details
|
Navy, Department of | 8/05/2009 |
ECS, INC. | $1,772 |
Repair Wharf S1, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $24,296 allocation.
See details
|
Navy, Department of | 8/05/2009 |
Miyashiro & Associates Inc | $1,645 |
Repair Wharf S1, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $24,296 allocation.
See details
|
Navy, Department of | 8/05/2009 |
MASON ARCHITECTS, INC. | $1,217 |
Architect-Engineer Services for Pacific Region Center and Wet Laboratory, NOAA, Naval Station Pearl Habor, Hawaii.
This spending item is part of a $45,156 allocation.
See details
|
Navy, Department of | 4/30/2012 |
GEORGE M MATSUMOTO & ASSOCIATES INC | $891 |
Recovery Project #5014#RP:Provide services as awarded on an indefinite quantity basis as awarded. NOTE: Modification no. P00067 was issued to increase the award amount by $418,950.
This spending item is part of a $872,950 allocation.
See details
|
Navy, Department of | 12/16/2011 |
Scott Lincolne Inc | $885 |
Recovery Project #5014 #RP: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $100,000 allocation.
See details
|
Navy, Department of | 8/24/2011 |
MASON ARCHITECTS, INC. | $830 |
Recovery Project #5014: Provide services as awarded on an indefinite quantity basis as awarded.
This spending item is part of a $299,146 allocation.
See details
|
Navy, Department of | 9/21/2010 |
COST ENGINEERING OF HAWAII INC | $820 |
Repair Pier B4 and Wharf B5, Pearl Harbor, Hawaii, Post Construction Award Services
This spending item is part of a $67,892 allocation.
See details
|
Navy, Department of | 7/31/2009 |
MASON ARCHITECTS, INC. | $119 |
Recovery Project #5014: Perform exterior and interior signage design and study on effects to lighting and HVAC performance by increasing cubicle height for facilities comprising of Buildings 175, 176, A, and all associated facilities.
This spending item is part of a $316,175 allocation.
See details
|
Navy, Department of | 9/17/2010 |
SU-MO / NAN JV | $0 |
ARRA--REPAIR WINDOWS HEADQUARTERS AREA/MAJOR REPAIRS TO 3RD MARINE HEADQUARTER BATTALION, BUILDING 1087, AND INSTALL AC SYSTEM AT 3RD MARINE BATTALION HEADQUARTER, BUILDING 1087, AT MARINE CORPS BASE HAWAII, KANEOHE BAY, HAWAII
This spending item is part of a $2,835,960 allocation.
See details
|
Navy, Department of | 9/28/2009 |
AMEC - NAN JOINT VENTURE | $0 |
TAS:: 17 1206::TAS Child Development Center, Marine Corp Base Hawaii (MCBH), Kaneohe, Hawaii. All labor, materials, services, equipment and travel necessary to design-build a Child Development Center located at Marine Corp Base Hawaii (MCBH), Kaneohe, H
This spending item is part of a $9,763,104 allocation.
See details
|
Navy, Department of | 7/31/2009 |