Kauai County, Hawaii, funds by Navy, Department of
Listing $31,603,147.00 in stimulus funds from Navy, Department of for Kauai
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
GRACE PACIFIC CORPORATION | $19,373,416 |
Repave Runway 16-34, Taxiway 1-19 and Aprons at Pacific Missile Range, Barking Sands, Kauai, Hawaii. The work includes, but is not limited to, sawcutting and cold mill planing up to 4' of the existing asphalt concrete pavement of the runway, taxiway, and
This spending item is part of a $24,786,569 allocation.
See details
|
Navy, Department of | 4/28/2009 |
BULLTRACK-WATTS, A JOINT VENTURE | $5,111,074 |
Repave Runway 16-34, Taxiway 1-19 and Aprons at Pacific Missile Range, Barking Sands, Kauai, Hawaii. The work includes, but is not limited to, sawcutting and cold mill planing up to 4' of the existing asphalt concrete pavement of the runway, taxiway, and
This spending item is part of a $24,786,569 allocation.
See details
|
Navy, Department of | 4/28/2009 |
MAUI BUILDERS, INC. | $3,772,524 |
PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI
This spending item is part of a $6,791,916 allocation.
See details
|
Navy, Department of | 12/10/2009 |
SU-MO / NAN JV | $2,704,769 |
PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI
This spending item is part of a $6,791,916 allocation.
See details
|
Navy, Department of | 12/10/2009 |
HARRY ASATO PAINTING INC | $302,079 |
Repave Runway 16-34, Taxiway 1-19 and Aprons at Pacific Missile Range, Barking Sands, Kauai, Hawaii. The work includes, but is not limited to, sawcutting and cold mill planing up to 4' of the existing asphalt concrete pavement of the runway, taxiway, and
This spending item is part of a $24,786,569 allocation.
See details
|
Navy, Department of | 4/28/2009 |
COMMERCIAL ROOFING & WATERPROOFING HAWAII, INC. | $158,687 |
PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI
This spending item is part of a $6,791,916 allocation.
See details
|
Navy, Department of | 12/10/2009 |
AES DESIGN GROUP, INC, THE | $103,936 |
PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI
This spending item is part of a $6,791,916 allocation.
See details
|
Navy, Department of | 12/10/2009 |
Iniki Enterprises, Limited | $52,000 |
PROJECT RM09-1363, INSTALL PHOTOVOLTAIC SYSTEMS, KAUAI, HI
This spending item is part of a $6,791,916 allocation.
See details
|
Navy, Department of | 12/10/2009 |
ENGINEERING SOLUTIONS, INC. | $24,662 | Repave Runway 16-34, Taxiway I-19 and Aprons, Pacific Missle Range Facility, Kauai, Hawaii, Post Construction Award Services | Navy, Department of | 5/28/2009 |