Ada County, Idaho, funds by U.S. Army Corps of Engineers
Listing $1,904,590.63 in stimulus funds from U.S. Army Corps of Engineers for Ada
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CH2M HILL, INC. | $885,808 | Engineering design effort on the Dworshak Fish Hatchery to reduce effluent discharge during hatchery operations. P2# 324433; ARRA Project #5090 | U.S. Army Corps of Engineers - civil program financing only | 7/13/2010 |
CH2M HILL, INC. | $714,033 | The purpose of this Task Order is for the Architect-Engineer to prepare a Predesign and Feasibility Study that will ultimately lead to the Dworshak Fish Hatchery achieving compliance with its National Pollutant Discharge Elimination System (NPDES) permit. | U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
MCMILLEN, LLC | $138,640 | Develop a new one-dimensional river channel hydraulic model of the Lower Boise River from Diversion Dam (New York Canal) downstream to the head of Eagle Island. The COE will use these results to establish existing conditions for the Boise River GI study | U.S. Army Corps of Engineers - civil program financing only | 7/21/2009 |
CH2M HILL, INC. | $75,051 | Value Engineering report for the feasibility design effort at Dworshak Fish Hatchery to reduce effluent discharge during hatchery operations. P2# 324433; ARRA Project # 5090. | U.S. Army Corps of Engineers - civil program financing only | 5/28/2010 |
PACIFIC TECHNOLOGIES, INC. | $36,750 |
RECOVERY PROJECT #::6400::RP#-GARRISON STATION SERVICE REHAB & INSTALL- P2#105566-CIVIL TEAM
This spending item is part of a $3,886,688 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/24/2010 |
C X T INCORPORATED | $34,225 | Storage building for Lucky Peak. | U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
CH2M HILL, INC. | $20,084 | The purpose of this Task Order is for the Architect-Engineer (AE) to conduct an initial site investigation of Dworshak Fish Hatchery to enable the accurate scoping of a separate Task Order for the Predesigned and Feasibility Study. The ultimately goal of | U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |