Clinton County, Ill., funds by U.S. Army Corps of Engineers
Listing $24,613,188.79 in stimulus funds from U.S. Army Corps of Engineers for Clinton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BAXMEYER CONSTRUCTION, INC. | $11,325,258 |
PROJECT NUMBER 323005; CONTRACT NO. W912P9-09-C-0431 FOR CONSTRUCTION OF MAIN DAM AND SADDLE DAM NO. 2, RIPRAP REPAIRS, CARLYLE LAKE
This spending item is part of a $12,257,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
SUPERIOR/LAKESHORE JV, LLC. | $3,550,223 |
The work consists of removals and debris cleanup, clearing and stripping, instrumentation modification and protection, 1000 lb. riprap, bituminous concrete paving, traffic control barriers, signing and guardrail, establishment of turf and concrete.
This spending item is part of a $4,299,196 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 10/15/2009 |
CHEROKEE GENERAL CORPORATION | $2,108,497 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
ROMTEC, INC. | $1,101,306 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $768,775 | Furnish all labor, equipment, and materials necessary for road maintenance at Carlyle Lake. parking Lot & Road rehabilitation at the Kaskaskia Navigation Project. | U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
SCHAEFER CONTRACTING | $687,599 |
The work consists of removals and debris cleanup, clearing and stripping, instrumentation modification and protection, 1000 lb. riprap, bituminous concrete paving, traffic control barriers, signing and guardrail, establishment of turf and concrete.
This spending item is part of a $4,299,196 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 10/15/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $611,945 | ROAD MAINTENANCE AT CARLYLE LAKE | U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
ROOTER'S AMERICAN MAINTENANCE INC | $604,908 |
PROJECT NUMBER 323005; CONTRACT NO. W912P9-09-C-0431 FOR CONSTRUCTION OF MAIN DAM AND SADDLE DAM NO. 2, RIPRAP REPAIRS, CARLYLE LAKE
This spending item is part of a $12,257,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
FARROW CONSTRUCTION SPECIALTIES, INC. | $439,429 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
DOYON PROJECT SERVICES LLC | $400,000 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
SCHAEFER CONTRACTING | $346,578 | Furnished all labor, equipment & materials to deliver 1468 Ton 400# RipRap to Boulder Breakwater, 12440 Ton 400# RipRap to CSA Breakwater & 401.40545 Ton 3 Stone to CSA Breakwater | U.S. Army Corps of Engineers - civil program financing only | 6/08/2009 |
Clevenger Contractors Inc | $327,739 |
PROJECT NUMBER 323005; CONTRACT NO. W912P9-09-C-0431 FOR CONSTRUCTION OF MAIN DAM AND SADDLE DAM NO. 2, RIPRAP REPAIRS, CARLYLE LAKE
This spending item is part of a $12,257,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
Mideastern Plumbing Heating Air Conditioning Inc | $256,787 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
SCHAEFER CONTRACTING | $199,185 | Furnish all labor, equipment, & materials necessary to supply, transport & deliver rock. | U.S. Army Corps of Engineers - civil program financing only | 6/17/2009 |
JACKSON D SUMMERS | $180,000 | Environmental Dredging at Carlyle Lake | U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
JACKSON D SUMMERS | $180,000 | Environmental Dredging | U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
CHEROKEE GENERAL CORPORATION | $143,557 |
Provide work Plan/Design required to execute the repair/renewal/construction effort of the installation of a Prefabricated Bicycle Bridge at Lake Carlyle, Illinois.Currently in design phase.
This spending item is part of a $400,373 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $137,017 | ROAD MAINTENANCE AT CARLYLE LAKE | U.S. Army Corps of Engineers - civil program financing only | 7/28/2010 |
SCHAEFER CONTRACTING | $132,153 | Furnish all labor, equipment & material to dfeliver 4060 Ton 400# RipRap & 145 Ton 3 stone to Boulder Breakwater. | U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |
KOHRMANN ELECTRIC CO INC | $129,819 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $124,991 | CARLYLE LAKE/KASKASKIA NAV PROJ ROAD REHABILITATION | U.S. Army Corps of Engineers - civil program financing only | 10/29/2009 |
TETRA TECH, INC. | $100,531 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
MIDWEST MOWING, INC. | $95,684 | Recovery-Replace Trees in Recreational and Wildlife Areas of Carlyle Lake, Illinois | U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
SONNENBERG ASPHALT COMPANY INC | $72,195 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
ROOTER'S AMERICAN MAINTENANCE INC | $61,373 |
The work consists of removals and debris cleanup, clearing and stripping, instrumentation modification and protection, 1000 lb. riprap, bituminous concrete paving, traffic control barriers, signing and guardrail, establishment of turf and concrete.
This spending item is part of a $4,299,196 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 10/15/2009 |
JACKSON D SUMMERS | $59,050 | Environmental Dredging CSA | U.S. Army Corps of Engineers - civil program financing only | 7/06/2009 |
Williams,Keith | $58,110 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
AULD BACKHOE SERVICE | $57,225 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
SCHAEFER CONTRACTING | $56,600 | Furnished all labor, equipment & material to deliver 1741.5384 Ton 400# RipRap to Area 3 at Coles Creek Revetment as directed by government personnel. | U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
SUBSURFACE CONSTRUCTORS INCORPORATED | $46,450 |
Provide work Plan/Design required to execute the repair/renewal/construction effort of the installation of a Prefabricated Bicycle Bridge at Lake Carlyle, Illinois.Currently in design phase.
This spending item is part of a $400,373 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
BROMLEY EXCAVATING | $43,436 | Furnish all labor, equipment, and materials necessary for rental equipment with operators at the Carlyle Lake Project and the Kaskaskia River Nav Project. | U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
Budrovich Excavating, Inc. | $39,566 |
Provide work Plan/Design required to execute the repair/renewal/construction effort of the installation of a Prefabricated Bicycle Bridge at Lake Carlyle, Illinois.Currently in design phase.
This spending item is part of a $400,373 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
BROMLEY EXCAVATING | $39,154 | Rental of equipment to be used at the Carlyle Lake/Kaskaskia Nav Project IAW the contract specs, clauses,and provisions. | U.S. Army Corps of Engineers - civil program financing only | 6/16/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $37,753 | PROJECT #323006 PARKING LOT AND ROAD REHAB CARLYLE LAKE Furnish all labor, equipment and materials necessary for road maintenance ar Kaskaskia River Project. | U.S. Army Corps of Engineers - civil program financing only | 9/22/2010 |
QUALITY TESTING AND ENGINEERING INC | $30,230 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
SCHAEFER CONTRACTING | $29,299 | Furnish all labor, equipment & material to deliver 1179 Ton Topsoil to Dam East Boat ramp. | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
BROMLEY EXCAVATING | $22,940 | Furnish all labor, equipment and materials necessary for rental of equipment with operators at the Carlyle Lake/Kaskaskia River Navigation Project. | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
BROMLEY EXCAVATING | $7,828 | Furnish all labor, equipment, and materials necessary for rental of equipment with operators at the Carlyle Lake/Kaskaskia Nav Project. | U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |