Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Cecil County, Md., funds by Army, Department of

Listing $1,033,955.84 in stimulus funds from Army, Department of for Cecil

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MC QUITTY CONSTRUCTION, INC. $422,697 Demo of all non-load bearing walls to make way for larger office space and new bathrooms. New doors will be installed in all existing frames. Bathrooms will be supplied with new parttitions and bathroom accessories. Providing and installing a new HVAC
This spending item is part of a $1,829,468 allocation. See details
Army, Department of 7/30/2009
KINGFISHER ENVIRONMENTAL SERVICES INC $360,844 Repair of Town Point Wharf Bulkhead Army, Department of 8/18/2009
MC QUITTY CONSTRUCTION, INC. $86,403 Provide labor and materials to complete mold remediation at building 4307.
This spending item is part of a $188,903 allocation. See details
Army, Department of 6/30/2009
MC QUITTY CONSTRUCTION, INC. $82,655 Design Build project - work to consist of architectural, mechanical and electrical: demolish and remove existing offices and reconfigure area adjacent to existing communication room. Install new kitchenette. New drywall, paint, doors and hardware, ceili
This spending item is part of a $350,429 allocation. See details
Army, Department of 6/05/2009
Hadry & Son Masonry $64,800 Provide all labor and materials to upgrade building 394. Upgrade to consist of phasing, painting, replacing carpet, lease of modular trailers, and all mechancal and electrical to upgrade HVAC system. A modification was awarded against this project to le
This spending item is part of a $4,172,229 allocation. See details
Army, Department of 12/21/2009
MC QUITTY CONSTRUCTION, INC. $13,157 Removal of two 280 gallon (single wall) fuel storage tanks and replace with one double wall 500 gallon tank at building 1043
This spending item is part of a $29,494 allocation. See details
Army, Department of 7/01/2009
MC QUITTY CONSTRUCTION, INC. $2,300 Replace boilers in building 1064. Work to include demo of one steam sectional boiler, including all piping, piping insulation, and piper supports. Provide and install two seam Cleaver Brooks boilers. A modification was entered given to remove 2 existin
This spending item is part of a $241,076 allocation. See details
Army, Department of 9/02/2009
MC QUITTY CONSTRUCTION, INC. $1,100 Boiler Replacement Building 740C; work to consist of demo of one existing boiler in bldg, 740C and installation one low pressure, wet base cast iron sectional boiler
This spending item is part of a $61,696 allocation. See details
Army, Department of 9/23/2009