Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Prince George's County, Md., funds by Agriculture, Department of

Listing $33,476,250.30 in stimulus funds from Agriculture, Department of for Prince George's

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
POOLE AND KENT CORPORATION, THE $5,625,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
MULTIPLE RECIPIENTS $5,516,885 Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA Rural Housing Service 8/31/2009
J. & L. MAVILIA INCORPORATED $2,926,176 Replacement of Boiler System in Boiler Plant #014.
This spending item is part of a $3,138,143 allocation. See details
Agricultural Research Service 9/10/2010
VIGIL CONTRACTING, INC. $2,391,284 Replacement of all boiler systems and components (removal of three boilers and replacement with three 350 HP firetube boilers) at BARC Building 309 Agricultural Research Service 9/27/2010
TRADEMASTERS SERVICE, INC. $2,313,426 Decentralization of the 100 Series Area Steam Stystems of the Betlsville Agricultural Research Center in Beltsville, MD Agricultural Research Service 9/14/2010
VIGIL CONTRACTING, INC. $1,955,261 Provide all labor, material and equipment necessary to demolish and renovate designated restrooms including tile, fixtures, toilet partitions, plumbing and mechanical piping at the National Agricultural Library (NAL), Beltsville, Maryland.
This spending item is part of a $2,193,985 allocation. See details
Agricultural Research Service 2/02/2010
F. B. HARDING, INC. $1,846,574 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
VIGIL CONTRACTING, INC. $1,436,705 Tower window replacement, NAL Building, Beltsville, MD to include removal of all existing finishes at punch window openings; remove and replace existing punch windows and window walls; mock-up and testing of each type of window. MOD #1 dated 09/28/2010 i
This spending item is part of a $2,663,096 allocation. See details
Agricultural Research Service 1/29/2010
ADVANCED WINDOW, INC. $1,172,703 Tower window replacement, NAL Building, Beltsville, MD to include removal of all existing finishes at punch window openings; remove and replace existing punch windows and window walls; mock-up and testing of each type of window. MOD #1 dated 09/28/2010 i
This spending item is part of a $2,663,096 allocation. See details
Agricultural Research Service 1/29/2010
EV-AIR-TIGHT, SHOEMAKER, INC. $815,000 Brick Repair Phase 4 and 5 (South Face of the Tower and North, East, South and West elevations of the Admin Bldg. includes 300 SF of unsatisfactory brick replacement;
This spending item is part of a $1,357,177 allocation. See details
Agricultural Research Service 10/06/2009
WHITING-TURNER CONTRACTING COMPANY, THE $701,645 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
NYCOM, INC. $665,021 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Winshire Interior Construction Inc $581,866 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
GAUDREAU INC $565,257 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
YOUR RECRUITING COMPANY, INC. $554,500 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection,
This spending item is part of a $651,274 allocation. See details
Natural Resources Conservation Service 8/03/2009
VIGIL CONTRACTING, INC. $542,177 Brick Repair Phase 4 and 5 (South Face of the Tower and North, East, South and West elevations of the Admin Bldg. includes 300 SF of unsatisfactory brick replacement;
This spending item is part of a $1,357,177 allocation. See details
Agricultural Research Service 10/06/2009
Peggy McFarland $492,921 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
ENVIRONMENTAL & DEMOLITION SERVICES, INC. $444,103 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
CAPITOL SPRINKLER CONTRACTING, INC. $194,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
AIR FLOW SERVICES, INC. $188,988 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
AMA Construction Co Inc $175,495 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Bunting's Door & Hardware Co., Inc. $169,900 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Otis Elevator Company $158,180 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
FREEDOM FLOOR COMPANY $157,509 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
INTEGRATED DEVELOPMENT & MANUFACTURING COMPANY $151,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
SYSTCOM, INC. $142,980 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
BIRCKHEAD ELECTRIC, INC $129,967 Replacement of Boiler System in Boiler Plant #014.
This spending item is part of a $3,138,143 allocation. See details
Agricultural Research Service 9/10/2010
NLP ENTERPRISES, INC. $126,723 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Baltimore Steel Erectors, LLC $119,822 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
BANNER MASONRY CORPORATION $112,035 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
VETERANS MANAGEMENT SERVICES, INC. $96,774 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection,
This spending item is part of a $651,274 allocation. See details
Natural Resources Conservation Service 8/03/2009
K.C. Company, Inc. $91,139 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
BOARD OF EDUCATION OF PRINCE GEORGE COUNTY, MD, INC $89,764 Child Nutrition Discretionary Grants Limited Availability The Maryland State Department of Education received funds through the American Recovery and Reinvestment Act of 2009 (ARRA) to assist in the purchase of equipment for School Food Authorities (SFAs) participating in the National School Lunch Pr... Show more
This spending item is part of a $1,231,398 allocation. See details
Food and Nutrition Service 3/19/2009
SOUTHERN INSULATION, INC. $89,236 Provide all labor, material and equipment necessary to demolish and renovate designated restrooms including tile, fixtures, toilet partitions, plumbing and mechanical piping at the National Agricultural Library (NAL), Beltsville, Maryland.
This spending item is part of a $2,193,985 allocation. See details
Agricultural Research Service 2/02/2010
Business Flooring, Inc. $84,438 Provide all labor, material and equipment necessary to demolish and renovate designated restrooms including tile, fixtures, toilet partitions, plumbing and mechanical piping at the National Agricultural Library (NAL), Beltsville, Maryland.
This spending item is part of a $2,193,985 allocation. See details
Agricultural Research Service 2/02/2010
SOUTHERN INSULATION, INC. $82,000 Replacement of Boiler System in Boiler Plant #014.
This spending item is part of a $3,138,143 allocation. See details
Agricultural Research Service 9/10/2010
YOUR RECRUITING COMPANY, INC. $81,510 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection, Natural Resources Conservation Service 2/24/2010
SIEMENS INDUSTRY, INC. $65,050 Provide all labor, material and equipment necessary to demolish and renovate designated restrooms including tile, fixtures, toilet partitions, plumbing and mechanical piping at the National Agricultural Library (NAL), Beltsville, Maryland.
This spending item is part of a $2,193,985 allocation. See details
Agricultural Research Service 2/02/2010
SOUTHERN INSULATION, INC. $53,688 Tower window replacement, NAL Building, Beltsville, MD to include removal of all existing finishes at punch window openings; remove and replace existing punch windows and window walls; mock-up and testing of each type of window. MOD #1 dated 09/28/2010 i
This spending item is part of a $2,663,096 allocation. See details
Agricultural Research Service 1/29/2010
YOUR RECRUITING COMPANY, INC. $50,000 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection, Natural Resources Conservation Service 9/29/2009
GETINGE USA, INC. $31,930 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Sun Control Systems, Inc. $24,844 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
ATLANTIC SCAFFOLDING COMPANY, LLC $24,757 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
EASTERN WATERPROOFING & RESTORATION CO., INC. $22,300 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Ronkin Construction, Inc. $22,040 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
PARTITION PLUS, INC. $20,266 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
YOUR RECRUITING COMPANY, INC. $20,000 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection, Natural Resources Conservation Service 2/24/2010
YOUR RECRUITING COMPANY, INC. $20,000 This requirement is to provide nationwide acquisition and contract administration support to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) in the areas of pre-award acquisition planning, source selection, Natural Resources Conservation Service 2/04/2010
METAL SALES & SERVICE, INC. $20,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Jk Tile Co Inc $19,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
JPK & Associates Inc $18,000 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
RUPPERT LANDSCAPE, INC. $15,975 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
Hallmark Building Service $13,176 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
ECS - MID-ATLANTIC, LLC $12,150 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
KENNEDY MATERIAL HANDLING CO. $11,729 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
DIAMOND ENGINEERING CORPORATION $7,243 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
AC SIGNS ACQUISITION CORP. $6,381 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
INTERNATIONAL MASONRY INSTITUTE $4,500 Grey Towers Masonry Project Forest Service 5/25/2010
GENERAL SOLAR CORPORATION $2,940 Design-Build Services necessary for the Building 306 Renovations at the Beltsville Agricultural Research Center, Beltsville, MD.
This spending item is part of a $12,982,889 allocation. See details
Agricultural Research Service 8/10/2010
MULTIPLE RECIPIENTS $771 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 10/31/2010
MULTIPLE RECIPIENTS $734 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 8/31/2010
MULTIPLE RECIPIENTS $466 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 5/31/2010
MULTIPLE RECIPIENTS $346 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 4/30/2010