Listing $1,228,089.00 in stimulus funds from U.S. Army Corps of Engineers for Essex

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
GREAT LAKES DREDGE & DOCK COMPANY, LLC $1,161,300 TAS::96 3135::TAS RECOVERYPROJECT::000433 This contract involves the Hydraulic Cutter Suction Dredge Illinois performing maintenance dredging to 16 feet in the Newburyport Harbor with beach disposal of the medium to fine sand on Plum Island and/or Salisb U.S. Army Corps of Engineers - civil program financing only 7/19/2010
FIREPRO INCORPORATED $49,251 'TAS::96 3134::TAS RECOVERYPROJECT#::154463::RP#' - - Prepare a Program for Design for Wards 78F and 78G and a PFD for Ward 2C. Prepare conceptual plans of alternative floor plans of the Wards for presentation to and discussion with Government. Prepare
This spending item is part of a $860,875 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 12/10/2009
FIREPRO INCORPORATED $16,549 'TAS::96 3134::TAS RECOVERYPROJECT#::154463::RP#' - - Prepare a Program for Design for Wards 78F and 78G and a PFD for Ward 2C. Prepare conceptual plans of alternative floor plans of the Wards for presentation to and discussion with Government. Prepare
This spending item is part of a $860,875 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 12/10/2009
BIOENGINEERING GROUP, INC.,THE $989 Professional services including engineering and design to determine the most cost effective, enviornmentally sensitive routes for Reach A, the Reach A extension and the Reach L tie-in. This analysis shall be based on the cost of implementing levee section
This spending item is part of a $274,026 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 6/25/2009
FIREPRO INCORPORATED $0 'TAS::96 3134::TAS RECOVERYPROJECT#::154463::RP#' - - Prepare a Program for Design for Wards 78F and 78G and a PFD for Ward 2C. Prepare conceptual plans of alternative floor plans of the Wards for presentation to and discussion with Government. Prepare
This spending item is part of a $860,875 allocation. See details