Middlesex County, Mass., funds by U.S. Army Corps of Engineers
Listing $31,289,969.17 in stimulus funds from U.S. Army Corps of Engineers for Middlesex
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
J & J CONTRACTORS, INC. | $5,155,286 |
This project is for the Design and construction of a new U.S.Land Port of Entry @ Whitlash,MT. The contract includes construction of all port and support facilities, site utilities, roadways, parking areas, and the infrastructure for the buildings to be c
This spending item is part of a $6,356,492 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/21/2010 |
J & J CONTRACTORS, INC. | $4,905,697 |
This project is for the Design and construction of a new U.S.Land Port of Entry @ Sarles,ND. The contract includes construction of all port and support facilities, site utilities, roadways, parking areas, and the infrastructure for the buildings to be con
This spending item is part of a $6,199,749 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2010 |
J & J CONTRACTORS, INC. | $4,883,696 |
This project is for the Design and construction of a new U.S.Land Port of Entry @ Pinecreek, MN. The contract includes construction of all port and support facilities, site utilities, roadways, parking areas, and the infrastructure for the buildings to be
This spending item is part of a $6,037,123 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2010 |
J & J CONTRACTORS, INC. | $4,878,779 |
This project is for the Design and construction of a new U.S.Land Port of Entry @ Hannah,ND. The contract includes construction of all port and support facilities, site utilities, roadways, parking areas, and the infrastructure for the buildings to be con
This spending item is part of a $6,655,355 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2010 |
J & J CONTRACTORS, INC. | $4,360,270 |
This project is for the Design and construction of a new U.S.Land Port of Entry @ Forest City, ME. The contract includes construction of all port and support facilities, site utilities, roadways, parking areas, and the infrastructure for the buildings to
This spending item is part of a $5,736,277 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2010 |
ENDICOTT CONSTRUCTORS CORPORATION | $2,938,967 |
TAS::96 3134::TAS RECOVERYPROJECT#::099990 Renovate Wards,VA,Bedford, Massachusetts work includes demolition to the bare structure to accommodate new floor layouts, hazardous waste materials abatement and renovate in accordance to the plans and specs for
This spending item is part of a $6,067,400 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
E. AMANTI & SONS, INC. | $2,347,438 |
TAS::96 3134::TAS RECOVERYPROJECT#::099990 Renovate Wards,VA,Bedford, Massachusetts work includes demolition to the bare structure to accommodate new floor layouts, hazardous waste materials abatement and renovate in accordance to the plans and specs for
This spending item is part of a $6,067,400 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
WATERMARK ENVIRONMENTAL, INCORPORATED | $435,484 |
TAS::96 3135::TAS RECOVERYPRJECT#::324170::RP# Levee Safety Inspection at Local Protection Projects throughout New England. The levee systems to be inspected may consist of multiple segments and have multiple sponsors per system. The purpose is to verify
This spending item is part of a $766,178 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/23/2010 |
FAY SPOFFORD & THORNDIKE, INC. | $371,954 |
'TAS::96 3134::TAS RECOVERYPROJECT#::154463::RP#' - - Prepare a Program for Design for Wards 78F and 78G and a PFD for Ward 2C. Prepare conceptual plans of alternative floor plans of the Wards for presentation to and discussion with Government. Prepare
This spending item is part of a $860,875 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
GEI CONSULTANTS, INC. | $202,837 |
1. The Contractor shall supply all labor, materials, parts, oversight, and equipment to perform Periodic Inspections of the following dams: Ball Mountain Lake Dam, Black Rock Lake Dam, Colebrook Lake Dam, Franklin Falls Dam, Hop Brook Dam, North Hartland
This spending item is part of a $295,837 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
COAST AND HARBOR ASSOCIATES, INCORPORATED | $186,971 | TAS::96 3134::TAS::RECOVERYPROJECT#::099993::RP# Coast and Harbor Associates is providing Construction Manangement Support Services for the Veterans Administration, Bedford MA. | U.S. Army Corps of Engineers - civil program financing only | 9/27/2010 |
Shea's Center Inc | $152,995 |
TAS::96 3134::TAS RECOVERYPROJECT#::099990 Renovate Wards,VA,Bedford, Massachusetts work includes demolition to the bare structure to accommodate new floor layouts, hazardous waste materials abatement and renovate in accordance to the plans and specs for
This spending item is part of a $6,067,400 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
GEOCOMP CORP. | $125,030 |
Structural, mechanical, and electrical designs for new and ongoing navigation lock and dam projects at Chickamauga Lock, Kentucky Lock, and at possible other various locations.
This spending item is part of a $140,300 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
AECOM, INC. | $73,014 |
Survey Confined Aquatic Disposal cells in 4 New England Harbors under the Disposal Area Monitoring System
This spending item is part of a $195,391 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
OCEAN SURVEYS, INC. | $64,520 |
Survey Confined Aquatic Disposal cells in 4 New England Harbors under the Disposal Area Monitoring System
This spending item is part of a $195,391 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
GEI CONSULTANTS, INC. | $64,381 |
PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND OVERSIGHT TO PERFORM SUPPLEMENTAL DAM SAFETY PERIODIC INSPECTION, DAM INFORMATION DOCUMENTATION & DATA MANAGEMENT IN VARIOUS LOCATIONS OF VERMONT, CONNECTICUT, AND NEW HAMPSHIRE
This spending item is part of a $214,381 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/14/2010 |
Geosearch Inc | $34,421 |
Modification No's 15, 17, 20 and 22 for Remediation Activities associated with the Clean-up of the Elizabeth Mines Superfund Site. Mod Description: (Mod No. 15 - Options, Mod No. 17 - Sedimentation Basin Excavation and Mine Road Construction, Mod No. 20
This spending item is part of a $7,339,154 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
CR ENVIRONMENTAL, INC. | $29,730 |
Survey Confined Aquatic Disposal cells in 4 New England Harbors under the Disposal Area Monitoring System
This spending item is part of a $195,391 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
CHARTER ENVIRONMENTAL, INC. | $27,060 |
Modification No's 15, 17, 20 and 22 for Remediation Activities associated with the Clean-up of the Elizabeth Mines Superfund Site. Mod Description: (Mod No. 15 - Options, Mod No. 17 - Sedimentation Basin Excavation and Mine Road Construction, Mod No. 20
This spending item is part of a $7,339,154 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
ROBERT DIAZ | $20,127 |
Survey Confined Aquatic Disposal cells in 4 New England Harbors under the Disposal Area Monitoring System
This spending item is part of a $195,391 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
MOCA SYSTEMS, INC. | $14,241 | Lower monumental dam downstream gate construction schedule review | U.S. Army Corps of Engineers - civil program financing only | 1/12/2010 |
CR ENVIRONMENTAL, INC. | $8,000 |
Survey Confined Aquatic Disposal cells in 4 New England Harbors under the Disposal Area Monitoring System
This spending item is part of a $195,391 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
3-C Electrical Co., Inc. | $6,000 |
The work under this contract consists of the following: Removal of (8) existing GE Magneblast 4160V vacuum switchgear breakers, and installation of (8) new 'roll-in replacement' 4160V switchgear breakers and doors, (5) 31.5kA pump breakers, (1) 31.5kA tie
This spending item is part of a $908,269 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2010 |
BOSTON COMPUTER SCANNING, INC. | $1,810 |
Perform seepage and stability analyses of two existing dikes. Prepare summary report. Scan and prepare electronic archive of various construction related documents
This spending item is part of a $47,076 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/13/2009 |
GEOTESTING EXPRESS INC | $1,260 |
Perform seepage and stability analyses for Everett Dam. Install piezometers in Hopkinton Dam.
This spending item is part of a $85,532 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/04/2009 |