Worcester County, Mass., funds by U.S. Army Corps of Engineers
Listing $2,481,210.29 in stimulus funds from U.S. Army Corps of Engineers for Worcester
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CLASSIC SITE SOLUTIONS, INC. | $406,706 | RECOVERYPRJECT#::107593::RP# Work includes processing and placement of stone and processing and placement of boulders to Dikes 1, 2 and 3 at Barre Falls Dam, Oakham and Rutland, Massachusetts | U.S. Army Corps of Engineers - civil program financing only | 6/30/2010 |
GEI CONSULTANTS, INC. | $364,852 | The purpose of the work is to collect supplemental geologic information at the interface of the dam embankment and foundation. The information will be used to design and implement a foundation grouting program to reduce seepage from beneath the dam. | U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
R. ZOPPO CORP. | $310,664 | TAS::96 3135::TAS RECOVERYPRJECT#::001560 Repair Service Gates and Guides, Birch Hill Dam, Royalston, Massachusetts. Remove cast iron slide gate discs from intake structure, transport gates to machine shop; sandblast, paint gates, reinstall at job site an | U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
WOODS HOLE GROUP, INC., THE | $202,005 | To perform an Archeological Survey at Buffumville Lake in Charlton, MA. All work shall be performed in accordance with the Statement of Work entitled Statement of Work, Intensive (Locational) Archeological Survey Buffumville Lake, Charlton, Massachusets | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
R. ZOPPO CORP. | $136,627 |
TAS::96 3135::TAS RECOVERYPRJECT#::018610::RP# Repair Service Gates and Guides, Tully Lake, Royalston, Massachusetts. Remove cast iron slide gate discs from intake structure, transport gates to machine shop; sandblast, paint gates, reinstall at job site a
This spending item is part of a $182,600 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
WOODS HOLE GROUP, INC., THE | $131,500 | To perform sediment sampling and laboratory analysis in connection with in the Fisherville Pond Section 206 restoration project located in Grafton, MA. The objective of this work is to acquire data to support design and permitting efforts for the propose | U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
TANTARA ASSOCIATES CORPORATION | $127,800 | Operation and Maintenance to Repair Pine Plains Bridge, Barre Falls, MA | U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
CLASSIC SITE SOLUTIONS, INC. | $116,501 | Operation and Maintenance - Spillway and Service Bridge Overlay Repairs & Maintenance Painting at Barre Falls Dam, Barre, MA. The award requires the removal and replacement of the existing spillway bridge deck epoxy overlay, approximately 1,746 square fe | U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
SECURITY CONSTRUCTION SERVICES, INC. | $55,951 |
Replace roofs at Knightville Gatehouse, Littleville Gatehouse and Intake Tower and Birch Hill Dam Gatehouse.
This spending item is part of a $231,451 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
TITAN ROOFING, INC | $47,500 |
Replace roofs at Knightville Gatehouse, Littleville Gatehouse and Intake Tower and Birch Hill Dam Gatehouse.
This spending item is part of a $231,451 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
WATERMARK ENVIRONMENTAL, INCORPORATED | $45,973 |
TAS::96 3135::TAS RECOVERYPRJECT#::018610::RP# Repair Service Gates and Guides, Tully Lake, Royalston, Massachusetts. Remove cast iron slide gate discs from intake structure, transport gates to machine shop; sandblast, paint gates, reinstall at job site a
This spending item is part of a $182,600 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
MONUMENT CONSTRUCTION, LLC | $33,030 | TAS::96 3135:: TAS RECOVERYPROJECT#::RP#, Furnish and install one 50 kilowatt diesel fuel generator at the gate house in Birch Hill Dam Royalston, MA | U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
AMORELLO, DAN | $24,800 | Operation and Maintenance -ADDITIONAL PAVING, WEST HILL DAM | U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
AMORELLO, DAN | $24,450 | Operation and Maintenance- PAVEMENT OVERLAY WEST HILL DAM | U.S. Army Corps of Engineers - civil program financing only | 11/13/2009 |
MCKINSTRY ARTESIAN WELL SERVICE INC | $24,000 | Repair drinking water well | U.S. Army Corps of Engineers - civil program financing only | 9/04/2009 |
MCKINSTRY ARTESIAN WELL SERVICE INC | $24,000 | Repair Drinking Water Wells | U.S. Army Corps of Engineers - civil program financing only | 9/04/2009 |
BASINGER PLUMBING & HEATING | $23,955 | Replaced utility building heating system in Royalston, MA. | U.S. Army Corps of Engineers - civil program financing only | 3/24/2010 |
BIGELOW ELECTRICAL CO., INC. | $23,260 | Replace 30kW Generator, Buffomville Lake, Oxford MA | U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
NEW ENGLAND TRUCK DESIGN INC | $20,120 | Fabricate and install a dump body. | U.S. Army Corps of Engineers - civil program financing only | 10/26/2009 |
PIOPPI CONSTRUCTION | $20,000 | REPAVE APPROXIMATELY 60000 SQ FEET OF ROADWAY AND PARKING AREA | U.S. Army Corps of Engineers - civil program financing only | 7/14/2009 |
XP MASONRY CONSTRUCTION | $17,500 | water proofing | U.S. Army Corps of Engineers - civil program financing only | 12/02/2009 |
VEGETATION CONTROL SERVICE, INC. | $17,500 | Herbicide applications at Buffamville and Hodges Village Dams | U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
SUPERIOR STEEL, WELDING & REPAIR, INC. | $17,000 | Gate house doors Birch Hill Dam | U.S. Army Corps of Engineers - civil program financing only | 12/02/2009 |
SMOLEN ROOFING CO | $16,000 | Replace roofs on three buildingsEast Brimfield Lake Fiskdale , Ma. | U.S. Army Corps of Engineers - civil program financing only | 3/05/2010 |
EXPERT BUILDERS CONSTRUCTION CO | $15,400 | Residing/Reroofing, 4 Buildings, Thames River Basin Office and Hodges Village Dam Oxford, MA | U.S. Army Corps of Engineers - civil program financing only | 3/30/2010 |
PIOPPI CONSTRUCTION | $15,350 | LOG BOOM INSTALLATION | U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
JOLIN PAVING AND EXCAVATING, INC | $14,850 | Paving of Boat Ramp Area, Buffumville Lake | U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
POTTER VILLAGE LANDSCAPING | $14,800 | operation and maintenance - recreational areas cleaning services buffumville lake | U.S. Army Corps of Engineers - civil program financing only | 5/22/2009 |
COOK'S FARM ORCHARD | $13,910 | Grounds maintenance at West Hill Dam Uxbridge MA | U.S. Army Corps of Engineers - civil program financing only | 5/12/2009 |
WHITE, R. H. CONSTRUCTION CO, INC. | $13,768 | Upgrade Septic System, Buffumville Lake, Oxford, MA | U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MARCOTTE, RENE E CUSTOM WELDING | $13,000 | Miscellaneous welding services, West Hill Dam, Uxbridge, MA | U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
ED WARREN MOBILE WELDING & REPAIR SVCS | $12,687 | Rehabilitation and refurbishment of safety railings at Westville Dam flood control project. Includes removal, hot-dip galvanization and replacement of 45 year old steel railings. | U.S. Army Corps of Engineers - civil program financing only | 12/28/2009 |
ADVANCED ENERGY CONCEPTS OF WORCESTER INC | $12,115 | INSTALL CENTRAL AIR CONDITIONING AT THAMES RIVER BASIN | U.S. Army Corps of Engineers - civil program financing only | 4/27/2010 |
COOK'S FARM ORCHARD | $12,050 | Grounds Maintenance Westville Lake Park and Dam. Southbridge MA | U.S. Army Corps of Engineers - civil program financing only | 5/20/2009 |
VEGETATION CONTROL SERVICE, INC. | $12,000 | Vegetation Management work at Fiskdale Ma. projects | U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
ATLANTIC POWER CLEANING CORP | $11,855 | Operation and Maintenance - Pigeon Dropping Abatement, West Hill Dam, Uxbridge, MA 01569-1269 | U.S. Army Corps of Engineers - civil program financing only | 10/21/2009 |
SMOLEN ROOFING CO | $11,000 | Roof Replacement, Westville Lake | U.S. Army Corps of Engineers - civil program financing only | 4/30/2010 |
TASSE FUEL CORPORATION | $10,813 | Operation and Maintenance-Replace Two Oil fired boilers | U.S. Army Corps of Engineers - civil program financing only | 7/21/2009 |
MONARCH VALVE CORP. | $10,221 | oPERATION AND MAINTENANCE- LIMITORQUE REHABILITATION, FISKDALE, MA 01518-0055 | U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
PIOPPI CONSTRUCTION | $9,000 | OPERATION AND MAINTENANCE REPAIRS TO POND BRIDGE ROAD FISKDALE MA | U.S. Army Corps of Engineers - civil program financing only | 7/06/2009 |
ALPHA ANALYTICAL, INC | $8,294 | Laboratory Analysis of Environmental Samples | U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
ROBERT EMOND | $7,800 | Installation of Membrane Roof on Gatehouse Building, Uxbridge, MA 01569-0001 | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
COOK'S FARM ORCHARD | $5,160 | Gronds Maintenance Contract-East Brimfield Lake | U.S. Army Corps of Engineers - civil program financing only | 5/20/2009 |
J. D. LEBLANC ELECTRIC, INC. | $4,550 | REPLACE DEFECTIVE VENTILATION FAN,WESTVILLE LAKE,SOUTHBRIDGE,MA | U.S. Army Corps of Engineers - civil program financing only | 6/24/2009 |
SEALCOATING, INC. | $4,185 | Cracksealing, West Hill Dam | U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
ED WARREN MOBILE WELDING & REPAIR SVCS | $4,000 | Reapirs to locking mechanisms, installation of safety chains, and repainting of 14 road closure security gates at the Westville flood control reservoir. | U.S. Army Corps of Engineers - civil program financing only | 6/17/2009 |
EVERETT J. PRESCOTT, INC. | $2,810 | Drainge Pipe, 20' 15 Diameter, Fiskdale, MA 01518-0001 | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
COOK'S FARM ORCHARD | $2,500 | Fine Lawn Maint. Westville Lake, Southbridge MA | U.S. Army Corps of Engineers - civil program financing only | 10/19/2009 |
AMERICAN ALARM & COMMUNICATIONS, INC. | $2,500 | Operation and Maintenance - Alarm System Upgrade Westville Dam, Southbridge, MA 01550-0178 | U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
COOK'S FARM ORCHARD | $2,500 | Operation and maintenance-Boundary Maintenance Westville Dam | U.S. Army Corps of Engineers - civil program financing only | 10/05/2009 |
PAUL JOHNSON ELECTRIC, INC. | $2,400 | Electrical Upgrades at Hodges Village Dam | U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
WATERMARK ENVIRONMENTAL, INCORPORATED | $0 |
TAS::96 3135::TAS RECOVERYPRJECT#::001560 Repair Service Gates and Guides, Birch Hill Dam, Royalston, Massachusetts. Remove cast iron slide gate discs from intake structure, transport gates to machine shop; sandblast, paint gates, reinstall at job site an
This spending item is part of a $210,799 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |