Leflore County, Miss., funds by U.S. Army Corps of Engineers
Listing $4,949,483.16 in stimulus funds from U.S. Army Corps of Engineers for Leflore
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FERGUSON-WILLIAMS, LLC | $1,811,410 | Furnish all labor, equipment, fuel, supplies, transportation, supervision, and management to inspect, operate, maintain, repair, and rehabilitate flood control facilities in the Mississippi Delta, inclusive of emergency operations. | U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
GREENWOOD, CITY OF | $1,422,319 | Mississippi Environmental Infrastructure (Section 592) - ARRA As a part of a Section 592 project, the City of Greenwood will replace a 24' force main that runs beneath the Yazoo River. | U.S. Army Corps of Engineers - civil program financing only | 1/29/2010 |
FERGUSON-WILLIAMS LLC | $452,055 | Provide additional support to the Yazoo Basin - Tributaries. Reference Project Number: 107232, RECOVERY ARRA Packages 107-9. Period of Performance is 01 Oct 2009 through 30 Sep 2010. | U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $358,881 | Surveying and mapping on Ditch 27, Ditch 30, Ditch 37 and Pemiscot | U.S. Army Corps of Engineers - civil program financing only | 7/13/2009 |
FERGUSON-WILLIAMS LLC | $330,684 | PERFORM ADDITIONAL WORK AT YAZOO BASIN - GREENWOOD. | U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $187,088 | Comprehensive Evaluation of Project Datum | U.S. Army Corps of Engineers - civil program financing only | 6/04/2009 |
FERGUSON-WILLIAMS LLC | $140,766 | PERFORM ADDITIONAL WORK AT YAZOO BASIN - WEIR REHAB SUPPLY CONTRACT. | U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $78,045 | Surveying and mapping Ditch 21-B from Ditch 21 to Ditch 71 at PS DD-17 | U.S. Army Corps of Engineers - civil program financing only | 7/11/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $71,900 | Surveying and mapping in Coffeeville, MS | U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $67,470 | Surveying and mapping on Steel Bayou - Item 66-B | U.S. Army Corps of Engineers - civil program financing only | 10/07/2009 |
JOHNSON-MCADAMS SURVEYING AND MAPPING, L.L.C. | $28,866 |
recovery: topographic lidar & aerial photography, TennTom Waterway
This spending item is part of a $295,138 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/28/2010 |