Warren County, Miss., funds by U.S. Army Corps of Engineers
Listing $16,115,128.20 in stimulus funds from U.S. Army Corps of Engineers for Warren
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SUNSET MARINE, LLC (OF DE) | $3,242,330 | Lease of Truckable Dredge not less than 8 inch Diameter for Dredging Oxbow Lakes on the Red River and MS Lakes (Arkabutla, Enid, Grenada, Sardis) Award $1,560,400.00 P00003 - Substitution Dredge used; therefore, decreasing value by $0.71 P00004 - Additi | U.S. Army Corps of Engineers - civil program financing only | 8/04/2009 |
G M R AERIAL SURVEYS, INC. | $1,838,052 |
A-E is processing Airborne LiDAR survey data for the National Levee Data Base. Award: $1,094,834.00; Modification P000001: 902,166.00; Total: $1,997,000.00. This project consists of post processing of the LiDAR data previously collected under Phase 1 of
This spending item is part of a $1,997,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/28/2009 |
AEROQUEST OPTIMAL INC | $1,548,683 |
USACE Vicksburg District requires the acquisition of LiDAR data in the Vicksburg District. The project shall include capturing LiDAR data and digital aerial photogarphy that will be used to create ortho-rectified mosaics and digital elevation models deri
This spending item is part of a $1,825,993 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/28/2009 |
INLAND DREDGING COMPANY, L.L.C. | $1,456,958 | Construction and Maintenance Dredging Within Vicksburg and Adjacent Districts | U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $1,084,089 | Lease of cutterhead hyrdraulic pipeline dredge for construction and maintenance dredging within the Vicksburg and adjacent districts. | U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |
L. W. MATTESON, INC | $1,084,089 | LEASE OF CUTTERHEAD HYDRAULIC PIPELINE DREDGE FOR CONSTRUCTION AND MAINTENANCE DREDGING WITHIN THE VICKSBURG AND ADJACENT DISTRICTS. P00001 - ADDITIONAL DREDGING UNDER BID ITEMS 0003AC AND 0003AD, THEREFORE, INCREASING VALUE BY $147,008.70 | U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |
3001, INC. | $1,041,369 | Surverys and Mapping Services for Lock Operations Management Application Nationwide | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
APRO TECHNOLOGY, LLC | $791,316 | D6N Dozer, 1 ea. D6T Dozer, and 1 ea. 324 DL Excavator Trackhow for U.S. Army Corps of Engineers Vicksburg District Grenada Lake Field Office | U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
DIRTWORKS, INC. OF VICKSBURG | $489,000 |
Flood Control, Mississippi River and Tributaries Steele Bayou Basin, Big Sunflower River, Issaquena County, Mississippi, Steele Bayou Sediment Reduction Structures, Phase III. The work consists of furnishing all plant, labor, materials, and equipment, an
This spending item is part of a $570,268 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
TROPICAL WORLD LANDSCAPE AND IRRIGATION LLC | $459,000 | YAZOO BACKWATER MISSISSIPPI CRUSHED STONE A2270-114 STIMULUS GRAVEL TO LEVEES - YAZOO BACKWATER MISSISSIPPI | U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
APRO TECHNOLOGY, LLC | $376,404 | Dump Truck and 1 ea. Front End Loader for U.S. Army Corps of Engineers Vicksburg District Enid Lake Field Office | U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
3001, INC. | $333,108 | Coastal Mapping NCMP-2010 Gulf Coast Topographic Coastal Mapping TOTAL NUMBER OF Sub Awards to Individuals is supposed to be one but your help deks could not help me input that since I received an error message @ time I put 1 | U.S. Army Corps of Engineers - civil program financing only | 4/05/2010 |
APRO TECHNOLOGY, LLC | $264,414 | 0001 ARRA Front End Loader Lake Chicot | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
APRO TECHNOLOGY, LLC | $264,414 | Front End Loader for U.S. Army Corps of Engineers Vicksburg District Lake Chicot Pumping Plant | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
APRO TECHNOLOGY, LLC | $264,414 | Front End Loader for U.S. Army Corps of Engineers Vicksburg District Sardis Lake Field Office | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
APRO TECHNOLOGY, LLC | $264,414 | 0001 ARRA Sardis Front End Loader | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
DEMOLITION AND CONSTRUCTION MANAGEMENT SERVICES, INC. | $160,061 | 0001 Furnish and deliver Rip Rap R650 0002 Furnish and Deliver Graded 'C Stone 0003 Furnish and Deliver 9 Flter Stone | U.S. Army Corps of Engineers - civil program financing only | 12/01/2009 |
APRO TECHNOLOGY, LLC | $154,719 | AS PART OF THE MISSISSIPPI LAKES PROGRAM, SARDIS LAKE FIELD OFFICE, (1) MACK DIESEL FIRE FIGHTING EQUIPMENT TRANSPORT TRUCK | U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
MENDROP & WAGES LLC | $148,201 | Provide Additional Dam Break Inundation Mapping Support for U.S. Army Corps of Engineers (USACE), Modeling, Mapping and Consequences (MMC) Team, Associated with Kerr Scott Dam and Documentation Review for 5 Other Projects | U.S. Army Corps of Engineers - civil program financing only | 6/29/2010 |
INSTRUMENTAL SOLUTIONS | $121,518 |
As part of project: Inland Waterway Navigation Charts::008315::contract W912HZ-05-D-0008 Delivery Order 0048 is for contract support for Assembly of Automatic Identification System (AIS) Units for Collection of Data to Support the Lock Operations Manageme
This spending item is part of a $193,719 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2010 |
BIEDENHARN GROUP, LLC | $92,919 |
TAS::96 3155:: TAS RECOVERY PROJECT # 018070:: ARCHITECT AND ENGINEER SERVICES FOR DEVELOPMENT OF ALTERNATIVES TO REDUCE SEDIMENT DEPOSITION AND MAINTENANCE DREDGING, ABERDEEN DEPOSITION PROBLEM, TENNESSEE-TOMBIGBEE WATERWAY, AL & MS.
This spending item is part of a $242,409 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/08/2009 |
CHUSTZ SURVEYING, INC. | $81,417 | Survey and Monument the tract referred to as the Island Lake & Alligator Mitigation Lands | U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |
CHUSTZ SURVEYING, INC. | $81,417 | Survey & Monument the tract referred to as the Island Lake & Alligator Mitigation Lands MOD 01 To Survey and Monument Additional Tracts 800 and 801 in the amount of $19,887.85 | U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |
EVANS - HAMILTON, INC. | $72,201 |
As part of project: Inland Waterway Navigation Charts::008315::contract W912HZ-05-D-0008 Delivery Order 0048 is for contract support for Assembly of Automatic Identification System (AIS) Units for Collection of Data to Support the Lock Operations Manageme
This spending item is part of a $193,719 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2010 |
MENDROP & WAGES LLC | $65,583 | The Architect-Engineer shall perform the various professional services required to prepare plans and specifications for the reconstruction of approximately 5,650 linear feet of concrete paved ditch along the upper toe drain for the Grenada Dam in accordan | U.S. Army Corps of Engineers - civil program financing only | 6/10/2009 |
MENDROP & WAGES LLC | $65,064 | The Architect-Engineer shall furnish all services to prepare specifications for removal and reconstruction of the upper toe ditch for Sardis Lake. Award: $65,064.33 | U.S. Army Corps of Engineers - civil program financing only | 3/18/2010 |
APRO TECHNOLOGY, LLC | $53,886 | One Caterpillar 257B2 Track Loader for U.S. Army Cops of Engineers Vicksburg District Sardis Lake Field Office Sardis, Mississippi | U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
APRO TECHNOLOGY, LLC | $53,886 | 0001 ARRA Sardis Caterpillar 257N2 Multi-Terrain Loader | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
APRO TECHNOLOGY, LLC | $50,887 | 0001 Caterpillar Mini Excavator Model 303.5C | U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
APPLIED RESEARCH ASSOCIATES, INC. | $48,701 | CUSTOMIZED INSTALLATION OF THE REGIONAL INTERNET BANK INFORMATION TRACKING SYSTEM (RIBITS) | U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
TETRA TECH, INC. | $38,439 | As part of TAS 96-3133, Program#76344, CCS#772, Ship Simulation Coordination/Review Trip to CHL-Engineer shall travel to CHL and take part in the ship simulator modeling runs for the Port of Anchorage Deepening Study. Engineer shall review draft calibrat | U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
WORLD WIDE TECHNOLOGY, INC. | $20,045 | As a part of Operation and Maintenance of Inland Waterway Navigation Charts this purchase of (2) HP Servers is to support the Lock Operations Management System (LOMA) which is being developed to track real time traffic of commercial vessels on U.S. rivers | U.S. Army Corps of Engineers - civil program financing only | 3/30/2010 |
APRO TECHNOLOGY, LLC | $4,131 | supply and deliver Farley's Challenger IV steam pressure washer | U.S. Army Corps of Engineers - civil program financing only | 8/24/2010 |