Cedar County, Mo., funds by U.S. Army Corps of Engineers
Listing $7,968,455.17 in stimulus funds from U.S. Army Corps of Engineers for Cedar
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SWIFT CONSTRUCTION COMPANY, INC. | $2,337,297 | Road Work for missouri lakes | U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
PEAK HYDRO SERVICES, INC | $1,352,250 | In Place Blade Repair | U.S. Army Corps of Engineers - civil program financing only | 5/15/2010 |
OCCI, INC. | $1,156,834 | Furnish manpower and equipment to conduct investigation and repairs of intake and draft bulkheads at Stockton Hydroelectric Dam. | U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
NATIONAL ELECTRICAL SYSTEMS INC. | $1,134,650 | 17560 STOCKTON LAKE, MO. Design, Manufacture, and Delivery of 1 Transformer for Stockton Lake in Stockton, MO to replace existing Transformer to ensure compatibility with the restored turbine . Work include offloading transformer and accessories at the St | U.S. Army Corps of Engineers - civil program financing only | 3/08/2010 |
KONZA CONSTR. CO., INC. | $899,158 | Asphalt overlay of existing roads at Milford Lake, Kansas. We have received one change order increasing the contract from $840,334.50 to $907,849.50. Of this amount, $899,157.92 was ARRA funded. | U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
OCCI, INC. | $550,262 | The Contractor shall furnish all manpower and equipment necessary to conduct investigation and reparis of the intake and draft tube bulkheads and intake gates at the Stockton Dam Hydroelectric Power Plant. | U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
CAMAN CONSTRUCTION COMPANY INC 8 (A)/ STRICKLAND CONSTRUCTION CO INC A MISSOURI JV | $175,064 |
Tranformer Pad Installation Including the following: Geotechnical sampling/analysis for development of grading and slope foundation/stability information; Re-establish drainage in the area of the pad and stabilized surface; Design/Expansion of the ground
This spending item is part of a $527,554 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/02/2010 |
FEDERAL CONTRACTS CORP | $87,533 | Bucket Truck (aerial device) delivered to Stockton, MO Power Plant | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
MAINSTREAM COMMERCIAL DIVERS, INC. | $65,786 |
underwater recovery of turbine blade section and draft tube inspection
This spending item is part of a $69,487 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
CHARGER, INC. | $62,216 | Boat, Motor, Trailer & Miscellaneous accessories | U.S. Army Corps of Engineers - civil program financing only | 9/14/2010 |
DRILL IT WELL, INC | $45,090 | As a part of the ARRA on RECOVERY--NEW WELL AT RUARK BLUFF WEST- construction project to provide a water well water supply system to the Ruark Bluff West Group Campground for the USACE, KANSAS CITY, Stockton Lake Project. Project NumberL 17560, STOCKTON L | U.S. Army Corps of Engineers - civil program financing only | 3/22/2010 |
KENNEY CONSTRUCTION | $24,995 | As a part of the construction at US Army Corps of Engineers, Stockton Lake Project, we have been awarded $24,995.00 as a labor contract to place and finish exterior concrete around 21 restroom sites surrounding the Stockton Lake. Pricing varied per unit d | U.S. Army Corps of Engineers - civil program financing only | 6/25/2010 |
EWING READY MIX LLC | $20,418 | As a part of the construction on Project number 17560, Stockton Lake, MO | U.S. Army Corps of Engineers - civil program financing only | 6/21/2010 |
MARINE SOLUTIONS, INC. | $18,800 | As part of the 96-135 construction project on Stockton Lake Project for the Underwater Placement of Turbine Blade Section and Inspection of Draft Seal Plates. The project is located at the Stockton Power Plant in Stockton, Missouri. The P2# is, the OSD# | U.S. Army Corps of Engineers - civil program financing only | 6/04/2010 |
SPECIALTY SEALING TECHNOLOGIES, INC. | $14,480 | DElivery of hydraulic seals and present for installation. | U.S. Army Corps of Engineers - civil program financing only | 3/15/2010 |
DOALL COMPANY | $11,428 | Delivery of a 2013 Doall Saw to Stockton MO Power Plant. | U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
FASTENAL COMPANY | $5,943 | The purchase of a Conduit Bendor to maintain the facitliy at the Stockton Power Plant | U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
INTERNATIONAL SUPPLIERS, INC. | $4,348 | Purchase and Delivery of Horizontal Band Saw | U.S. Army Corps of Engineers - civil program financing only | 10/13/2009 |
W. W. GRAINGER, INC. | $1,904 | Electrical Hardware and Supplies - Electrical hardware (recepticals, plugs, boxes) for Stockton Missouri Power Plant - Micropurchase | U.S. Army Corps of Engineers - civil program financing only | 7/06/2009 |