St. Charles County, Mo., funds by U.S. Army Corps of Engineers
Listing $22,737,542.75 in stimulus funds from U.S. Army Corps of Engineers for St. Charles
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SAK CONSTRUCTION, LLC | $7,382,802 | Project Number 324332. The project is the Rehabilitation of the Old Mill Creek Sewer. Work consists of rehabilitating St. Louis Metropolitan Sewer District (MSD) sewers by doing various repairs including void repairs, external chemical grouting, cement g | U.S. Army Corps of Engineers - civil program financing only | 12/18/2009 |
Cissell-Mueller Construction, Inc. | $3,210,967 |
Mark Twain Lake - Boudreaux Visitor Center Complex: To remove the existing building and replace that structure with a new building, complete with interpretive exhibits. Both the original structure and its replacement will have their location with the M.W.
This spending item is part of a $4,743,526 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
VOLK CONSTRUCTION COMPANY | $2,507,990 |
The proposed new design for the Riverlands Sanctuary Orientation Center tells an important story of water resource management, wetland preservation, and its relationship to migrate birds. The building will serve as an educational tool to promote good stew
This spending item is part of a $3,091,090 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
A & H CONTRACTORS, INC. | $2,104,919 | RECOVERY PROJECT NUMBER 111134 -- Wood River Relief Wells-Construction including well screen, riser pipe, well drilling, installation, developing and testing, and D type outlet works. | U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
GPM INC | $1,353,315 | REHABILITATE LD24 SPILLWAY | U.S. Army Corps of Engineers - civil program financing only | 6/08/2009 |
GEORGEWITZ CONTRACTING CO | $1,016,029 | 0039 - Lock and Dam #25 Walkway Repairs, Chip and Seal, Lock #27 Concrete Sealer. RECOVERY PROJECT NUMBER 322852, FURNISH ALL LABOR, EQUIPMENT, MATERIALS OPERATORS, FLOATING PLANT AND SUPPLIES NECESSARY TO REPAIR WALKWAYS AT LD25, LAND REPAIR, RIVERS PROJ | U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
CHEROKEE GENERAL CORPORATION | $981,202 |
To design, fabricate and install twenty-one (21) trilateration survey stations. Melvin Price Locks and Dam (MPLD) (5), Lock and Dam (LD) 24 (5), LD24 (5) and Locks (6) compenents and associated concrete installations. Function: The trilateration stations
This spending item is part of a $1,377,722 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
GPM INC | $681,500 | CLEARING VEGETATION | U.S. Army Corps of Engineers - civil program financing only | 6/08/2009 |
CLEMENT GROUP, L.L.C., THE | $583,100 |
The proposed new design for the Riverlands Sanctuary Orientation Center tells an important story of water resource management, wetland preservation, and its relationship to migrate birds. The building will serve as an educational tool to promote good stew
This spending item is part of a $3,091,090 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
GEORGEWITZ CONTRACTING CO | $507,438 | 0038 - Calumet Creek Silo Access, LD #25 Saddle Dam, Spur Dike. | U.S. Army Corps of Engineers - civil program financing only | 5/28/2009 |
QUALITY FOREST MANAGEMENT LLC | $500,172 | Tree Planting and Forest Management Activities on lands operated by the USACE - St. Louis District | U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
QUALITY FOREST MANAGEMENT LLC | $500,172 | RECOVERY PROJECT NUMBER 322828, Tree Planting and Forest Management Activities on lands operated by the USACE - St. Louis District at Rivers Project Office, West Alton, MO. | U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
GPM INC | $465,185 | CLEAR VEGETATION | U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
GEORGEWITZ CONTRACTING CO | $199,997 | 0040 - Cabin Removal. | U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
QUALITY FOREST MANAGEMENT LLC | $119,668 | Tree Planting and Forest Management Activities on lands operated by the USACE - St. Louis District | U.S. Army Corps of Engineers - civil program financing only | 6/21/2010 |
MATTHEWS MANUFACTURING INC. | $109,929 | Lincoln Shields Handrail-CLIN 7001, RECOVERY PROJECT NUMBER 322852, Handrail Removal / Fabrication / Installation Lincoln Shields Handrail, West Alton, MO. | U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
QUALITY FOREST MANAGEMENT LLC | $84,368 | RECOVERY PROJECT NUMBER 110976; Tree Planting and Forest Management Activities on lands operated by the USACE - St. Louis District --Supply all necessary plant, equipment, materials, operators and labor to complete tree planting and maintenance at the Epp | U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
LAMAR CONSTRUCTION, INC. | $76,800 | Construct Restroom | U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
GPM INC | $75,000 | REMOVE VEGETATION | U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
GPM INC | $71,893 | REMOVE VEGETATION AND RESEED | U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
GEORGEWITZ CONTRACTING CO | $35,863 | 0043 - Demo Existing Restroom, Construct Levee Ramp | U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
GPM INC | $33,981 | CLEAR MISC. BRUSH AND TREES AMERICAN BOTTOMS AREA | U.S. Army Corps of Engineers - civil program financing only | 7/30/2010 |
ECOLOGICAL SPECIALISTS INC | $33,502 |
Project Number 110976 - Monitoring of Pallid Strugeon during a dredging operation near the Chain of Rocks on the Mississippi River.
This spending item is part of a $39,603 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/21/2010 |
QUALITY FOREST MANAGEMENT LLC | $32,917 | Tree Planting and Forest Management Activities on lands operated by the USACE - St. Louis District | U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
PATRICK ENGINEERING INC. | $30,970 |
To design, fabricate and install twenty-one (21) trilateration survey stations. Melvin Price Locks and Dam (MPLD) (5), Lock and Dam (LD) 24 (5), LD24 (5) and Locks (6) compenents and associated concrete installations. Function: The trilateration stations
This spending item is part of a $1,377,722 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
BLACK RHINO RECYCLING, INC. | $20,233 | structural grade recycled plastic lumber | U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
LANDESIGN, L.L.C. | $17,630 |
Mark Twain Lake - Boudreaux Visitor Center Complex: To remove the existing building and replace that structure with a new building, complete with interpretive exhibits. Both the original structure and its replacement will have their location with the M.W.
This spending item is part of a $4,743,526 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
SUPERIOR/LAKESHORE JV, LLC. | $0 |
RECOVERY PROJECT NUMBER 111134, PERFORM FABRICATION WORK AT VARIOUS PUMP STATIONS - LOCATION OF WORK AT WOOD RIVER GRAVITY DRAIN PHASE- II INCLUDES REMOVAL OF EXISTING STEEL HANDRAIL, LADDER AND GRATINGS AND REPLACE WITH FIBERGLASS HAND RAIL, LADDER AND
This spending item is part of a $181,011 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/25/2010 |