St. Louis (City) County, Mo., funds by U.S. Army Corps of Engineers
Listing $14,310,606.60 in stimulus funds from U.S. Army Corps of Engineers for St. Louis (City)
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
W.J. ELECTRIC LLC | $2,914,234 | Contract: W912P-10-C-0416 - New Energy Management System, Bldg. #1 Veteran Administraion Medical Ct. John Cochran. Project No. - 149255 - Up-Grade all Air Handling Unit Controll Devices. | U.S. Army Corps of Engineers - civil program financing only | 3/26/2010 |
RIDGE HILL CONTRACTORS, INC. | $2,234,258 |
Recovery Project No. 111134 Work consists of Rehabilitation of structural sluice gates and rehabilitation of gravity drains by inserting HDPE piping at Wood River Gravity Drain Phase 2; Location: Madison County, IL
This spending item is part of a $2,371,807 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/17/2010 |
PATTON-TULLY MARINE, LLC | $1,477,242 |
DIKE REPAIR 300-195
This spending item is part of a $2,235,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/28/2009 |
ALBERICI CONSTRUCTORS, INC. | $1,358,000 | Gate Replacement and Closure Modification, St. Louis Flood Protection. RECOVERY PROJECT NUMBER 112349, Contractor will replace 4 Swing Gates which includes demolition, including lead paint, concrete, swing gate fabrication and painting, Service Base, Foo | U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $1,112,001 | This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging in side channels and chutes on the upper Mississippi River Miles 583.0 to 0.0, the Illinois River Miles | U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
TARLTON CORPORATION | $933,243 |
This project is to complete the design and construction of the second story expansion and alteration to the existing Intermediate Wall Control House at Lock 27 in Granite City, IL.
This spending item is part of a $1,514,609 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
JACOBS/SEH, A JOINT VENTURE | $706,887 | TAS::96-3134::TAS PROJECT NUMBER 76347, Services for preparation of Plans, Specifications, and Development of a Detailed Construction Cost Estimate for the Proposed Lock Rehabilitation Project for Locks No. 27 Major Rehabilitation, Lock Wall Tie-Downs, Gr | U.S. Army Corps of Engineers - civil program financing only | 1/11/2010 |
BROTCKE WELL & PUMP INC. | $506,388 |
Recovery Project Number 112349. Work consists of installing 30 Relief Wells along the Mississippi River levee and floodwall system. St.Louis Relief Well Multiple Award Task Order (MATOC)
This spending item is part of a $556,293 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/26/2010 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $421,999 | This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging in side channels and chutes on the upper Mississippi River Miles 583.0 to 0.0, the Illinois River Miles | U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
HORNER & SHIFRIN, INC. | $338,922 |
Current orders under this contract are to complete Periodic Inspections (PI) on 26 levee systems along the Mississippi, Illinois, and Kaskaskia Rivers in Missouri and Illinois. Work will include conducting engineering inspections of levees and associated
This spending item is part of a $3,911,985 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/22/2010 |
HORNER & SHIFRIN, INC. | $326,074 |
Delivery Order / Task Order 0004 - Closure Structure Reconstruction Wood River Drainage and Levee District, Madison County, Illinois - Design and replace 2 closure structures within the Wood River Levee System located in Madison County, Illinois. Reconst
This spending item is part of a $3,689,358 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/18/2010 |
RIDGE HILL CONTRACTORS, INC. | $237,636 | RECOVERY PROJECT NUMBER 111134, PERFORM FABRICATION WORK AT VARIOUS PUMP STATIONS - LOCATION OF WORK AT WOOD RIVER GRAVITY DRAIN PHASE- II INCLUDES REMOVAL OF EXISTING STEEL HANDRAIL, LADDER AND GRATINGS AND REPLACE WITH FIBERGLASS HAND RAIL, LADDER AND | U.S. Army Corps of Engineers - civil program financing only | 8/25/2010 |
Howell & Sons Excavating Inc | $232,485 |
Recovery Project Number 112349. Work consists of installing 30 Relief Wells along the Mississippi River levee and floodwall system. St.Louis Relief Well Multiple Award Task Order (MATOC)
This spending item is part of a $556,293 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/26/2010 |
JACOBS/SEH, A JOINT VENTURE | $200,000 | Contractor shall prepare narratives and identify methodologies, and summarize results, conclusions and recommendations for the various areas of work. Contractor shall furnish all personnel, management, facilities, supplies, equipment, transporations, and | U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
ABNA ENGINEERING INC | $169,266 | ENGINEER IS PROVIDING COMPLETE ENGINEERING SERVICES FOR THE DESIGN AND PREPARATION OF PLANS AND SPECIFICATIONS FOR A HIGH LIGHTING SYSTEM AT LOCK &DAM 25 IN WINFIELD, MO. | U.S. Army Corps of Engineers - civil program financing only | 7/31/2009 |
CTI AND ASSOCIATES, INC. | $166,637 |
RECOVERY PROJECT NUMBER 112349, Drill machine borings at 13 locations landside of the St. Louis Flood Protection District in Reach 3 and 20 locations landside of the St. Louis Flood Protection District in Reach 4.
This spending item is part of a $231,132 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/11/2009 |
HORNER & SHIFRIN, INC. | $121,584 |
Task Order 1 under this IDIQ contract is to complete Periodic Inspections (PI) of 4 levee systems along the Mississippi and Missouri Rivers in Missouri and Illinois. PIs were completed on the Consolidated North County, Cape Girardeau, and St. Genevieve L
This spending item is part of a $508,151 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
HORNER & SHIFRIN, INC. | $108,071 |
Project No. 324170. As part of Periodic Inspections for Federally constructed levee systems in the St. Paul District, this project is to perform levee safety inspections on 15 separable levee systems located in the State of Minnesota in the St. Paul Dist
This spending item is part of a $1,324,698 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 11/02/2009 |
LOCKHEED MARTIN INTEGRATED SYSTEMS, INC. | $89,500 | RECOVERY PROJECT NUMBER 324332, FY10 Systems Engineer - Associate Support in the Curation & Archives Analysis Branch for the St. Louis District Corps of Engineers. | U.S. Army Corps of Engineers - civil program financing only | 11/02/2009 |
HORNER & SHIFRIN, INC. | $85,000 |
Delivery Order / Task Order 0004 - Closure Structure Reconstruction Wood River Drainage and Levee District, Madison County, Illinois - Design and replace 2 closure structures within the Wood River Levee System located in Madison County, Illinois. Reconst
This spending item is part of a $3,689,358 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/18/2010 |
ABNA ENGINEERING INC | $69,424 | Engineer is providing complete engineering services for the design and preparation of Plans and Specifications for high mast lighting | U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
ROBERTS ENVIRONMENTAL DRILLING, INC. | $64,495 |
RECOVERY PROJECT NUMBER 112349, Drill machine borings at 13 locations landside of the St. Louis Flood Protection District in Reach 3 and 20 locations landside of the St. Louis Flood Protection District in Reach 4.
This spending item is part of a $231,132 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/11/2009 |
MATERIAL SALES COMPANY, INC. | $55,800 | provide helper boat service for locks | U.S. Army Corps of Engineers - civil program financing only | 6/04/2010 |
HORNER & SHIFRIN, INC. | $47,419 |
As a part of (Operation & Maintenance) on (Periodic Inspections on nineteen Federally constructed levee systems in the St. Paul District) project is to perform levee safety periodic inspections on 19 separable levee systems located within the Upper Missi
This spending item is part of a $1,173,249 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
Vernon L. Goedecke Company, Inc. | $40,210 |
Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010.
This spending item is part of a $27,941,413 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
HORNER & SHIFRIN, INC. | $40,066 |
As part of Operations and Maintenance for services to provide equipment, supplies, personnel, vehicles and adhere to right of entry permissions to conduct levee safety periodic inspections of required systems near Des Moines, Waterloo, Evansdale, Dubuque,
This spending item is part of a $1,600,090 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 2/25/2010 |
PLAZA PERSONNEL LTD | $32,183 | Recovery Project Numbers 110976, 111147, 129494, 111051, and 129494, Customer Hire MVS 09-30/Tim Conder/Senior Project Scheduler, Project Management, St. Louis District. | U.S. Army Corps of Engineers - civil program financing only | 10/08/2009 |
MATERIAL SALES COMPANY, INC. | $31,991 | Boat service through mastership agreement. | U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
JACOBS/SEH, A JOINT VENTURE | $25,200 | Main Lock Culvert Valve Machinery Study Phase I, Melvin Price Locks and Dam, Mississippi River, Preliminary Engineering report, per attached Scope of Work and proposal dated 18-Jun-09. DJ04 - MEL PRICE MAIN LOCK CULVERT DJ04 - MEL PRICE MAIN LOCK CULVERT | U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
HORNER & SHIFRIN, INC. | $24,544 |
Project No. 324170. As part of Operations and Maintenance on Periodic Inspections on 5 Federally constructed levee systems in the St. Paul District, this project is to perform levee safety inspections on 5 separable levee systems located within the State
This spending item is part of a $302,982 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
PANGEA INC | $20,183 |
Project No. 324170. As part of Periodic Inspections for Federally constructed levee systems in the St. Paul District, this project is to perform levee safety inspections on 15 separable levee systems located in the State of Minnesota in the St. Paul Dist
This spending item is part of a $1,324,698 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 11/02/2009 |
PLAZA PERSONNEL LTD | $19,103 | Recovery Project Number 324170, Levee Inspection Program for Geotechnical Design & HTRW Section, St. Louis, Missouri--Customer Hire MVS 08-10/Pam Reed/Engineering Technical VI, Option Year One Period of Performance is 13 July 2009 thru 30 March 2010 -- -- | U.S. Army Corps of Engineers - civil program financing only | 7/11/2009 |
PLAZA PERSONNEL LTD | $14,200 | Work for Senior Project Scheduler on this project. Increased CLIN 7002 by $9,200 and added CLIN 7003 for $5,000. | U.S. Army Corps of Engineers - civil program financing only | 10/21/2009 |
PLAZA PERSONNEL LTD | $11,245 | Project No. 323733 - Earthquake Study located in New Madrid Earthquake Zone to identify potential areas sensitive to earthquake impact; Rock Removal | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
HORNER & SHIFRIN, INC. | $10,444 |
As part of Operations and Maintenance for services to provide equipment, supplies, personnel, vehicles and adhere to right of entry permissions to conduct levee safety periodic inspections of required systems near Des Moines, Waterloo, Evansdale, Dubuque,
This spending item is part of a $1,600,090 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 2/25/2010 |
CEE-KAY SUPPLY, INC. | $9,682 | Welding Supplies | U.S. Army Corps of Engineers - civil program financing only | 6/23/2009 |
CONTINENTAL FABRICATORS INCORPORATED | $7,990 | split Ibeams | U.S. Army Corps of Engineers - civil program financing only | 6/24/2009 |
PLAZA PERSONNEL LTD | $7,044 | Project Number 323005, Customer Hire MVS 08-05/Eugene Degenhardt/Engineering Technician VI Keysport Levee RIP RAP at Carlyle Lake, Illinois -- Services to Structural/Architectural/Mechanical/Electrical Section of the Design Branch through performance of c | U.S. Army Corps of Engineers - civil program financing only | 6/23/2009 |
PLAZA PERSONNEL LTD | $7,000 | Earthquake study located in New Madrid earthquake zone to identify potential areas sensitive to earthquake impact | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
PLAZA PERSONNEL LTD | $7,000 | Funds for Senior Geophysist | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
PLAZA PERSONNEL LTD | $6,311 | Recovery Project Number 129494, Customer Hire MVS 08-29/Brian Kleber/Engineering Technician VI/ Lock 27 Major Rehab Study | U.S. Army Corps of Engineers - civil program financing only | 4/14/2010 |
PLAZA PERSONNEL LTD | $5,500 | Recovery Project Number 110976, South Berms Tri-City EDC--Customer Hire MVS 08-11/Ted Moore/Engineering Technician VI--Option Year One Period of Performance 27 January 2010 - 31 March 2010 -- Services to Structural/Architectural/Mechanical/Electrical Sect | U.S. Army Corps of Engineers - civil program financing only | 2/08/2010 |
PLAZA PERSONNEL LTD | $5,100 | Senior Project Scheduler services | U.S. Army Corps of Engineers - civil program financing only | 12/30/2009 |
PLAZA PERSONNEL LTD | $5,000 | This modification is issued to add CLIN 7001 in the funded amount of $5,000. Subsequently, the total amount of this Order is increased from $40,441.18 to $45,441.18. | U.S. Army Corps of Engineers - civil program financing only | 10/08/2009 |
JACOBS/SEH, A JOINT VENTURE | $4,045 |
Project Number 129494. The Corps of Engineers is planning on contracting for the supply of a replacement miter gate for Locks 27, Granite City, Illinois. The purpose of this contract is to provide Quality Assurance (QA) services to ensure the miter gate m
This spending item is part of a $59,388 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2010 |
FRONTIER-ARROWHEAD JOINT VENTURE, LLC | $0 |
Recovery Project Number 112349. Work consists of installing 30 Relief Wells along the Mississippi River levee and floodwall system. St.Louis Relief Well Multiple Award Task Order (MATOC)
This spending item is part of a $556,293 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/26/2010 |