St. Louis County, Mo., funds by U.S. Army Corps of Engineers
Listing $27,351,509.63 in stimulus funds from U.S. Army Corps of Engineers for St. Louis
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MIDWEST LEVEE INSPECTORS, LLC | $3,164,814 | As a [art pf US Army Corps of Engineers - civil program financing only-Operation and Maintenance Recovery Act on Periodic Levee Inspections project on identified Levees | U.S. Army Corps of Engineers - civil program financing only | 3/03/2010 |
MAGRUDER CONSTRUCTION COMPANY, INC. | $2,645,926 | Recovery Project #111147; Baxter Road Phase 3, Chesterfield, MO. 69.5 foot long run of concrete-capped sheet pile I-wall, 335 foot long run of H-pile founded T-wall with a sheet pile cutoff, 157.58 foot long run of concrete capped sheet pile I-wall and a | U.S. Army Corps of Engineers - civil program financing only | 5/26/2010 |
ALBERICI CONSTRUCTORS, INC. | $2,559,186 |
Delivery Order / Task Order 0004 - Closure Structure Reconstruction Wood River Drainage and Levee District, Madison County, Illinois - Design and replace 2 closure structures within the Wood River Levee System located in Madison County, Illinois. Reconst
This spending item is part of a $3,689,358 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/18/2010 |
INSITUFORM TECHNOLOGIES, INC. | $2,242,347 | INSTALL CIPP LINERS AR RIVER LEVEE AND LA RED RIVER BACKWATER | U.S. Army Corps of Engineers - civil program financing only | 3/30/2010 |
CABRERA SERVICES INC. | $2,000,000 | St. Louis FUSRAP North St. Louis County Vicinity Properties Remedial Action. Remedial action involves the excavation of accessible soils at or above remediation goals established by USACE for specified radiological contaminants of concern. Contaminated | U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
ARTISAN CONTRACTING, INC. | $1,384,697 |
PROJECT NO. 111147. Provide Structural Gates for Rail Road Closure. Provide H pilling and Floodwall for north and south of gate Concrete Abutments for Gate closure Provide sheet pilling and excavation Provide temporary railroad track and tie structu
This spending item is part of a $2,447,873 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2010 |
MAGRUDER CONSTRUCTION COMPANY, INC. | $1,307,480 |
Recovery Project #111147. Chesterfield Levee District Baxter Road Closure Structure. Removal of existing Baxter Road pavement, curbs and electricity
This spending item is part of a $2,022,698 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |
SUPERIOR LAKESHORE JV 2 LLC | $1,202,161 |
PROJECT NO. 111147.Demolition of three (3) two story buildings. Including foundations, and 12? below Slab on grade on legally remove to landfill Demo asphalt parking lot and curbs and gutters and legally remove from site Demo underground storm and uti
This spending item is part of a $1,752,143 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/22/2010 |
SUPERIOR/LAKESHORE JV, LLC. | $1,035,012 |
PROJECT NO. 111147. Provide Structural Gates for Rail Road Closure. Provide H pilling and Floodwall for north and south of gate Concrete Abutments for Gate closure Provide sheet pilling and excavation Provide temporary railroad track and tie structu
This spending item is part of a $2,447,873 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2010 |
KEITH CONTRACTING, L.L.C. | $715,219 |
Recovery Project #111147. Chesterfield Levee District Baxter Road Closure Structure. Removal of existing Baxter Road pavement, curbs and electricity
This spending item is part of a $2,022,698 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |
KEITH CONTRACTING, L.L.C. | $611,614 |
Recovery project #111147, Centaur RR Closure, Chesterfield, MO. Pile-founded, reinforced concrete flood control structure having two steel swing gates which seal against each other, two center gate strut assemblies and a sheet pile cutoff
This spending item is part of a $1,070,036 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/02/2010 |
ROSS & BARUZZINI, INC. | $556,191 |
Replacement of Lake Shelbyville Visitor Center to provide facilities that are proactive, educational, and encourage a broader understanding and appreciation of all the resources in the region.
This spending item is part of a $6,834,551 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
COGENT, INC. | $525,193 |
The project is to repair and/or replace existing sewer lines and lift stations and to remove and replace existing comfort stations at Carlyle Lake, IL. Install accessible and flood proof vault toilets at upstream and downstream boat ramps, Kaskaskia River
This spending item is part of a $5,337,474 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
Lighthouse Architects, Inc. | $481,850 |
For Delivery Ordert / Task Order 0003 - (1) To Provide a work/plan design to execute the repair/renewal/construction effort for Dewey Short Visitor's Center, Table Rock Lake, Branson, MO. (2) Facilities Repair Renewal (FRR) of the Dewey Short Visitor's Ce
This spending item is part of a $8,083,140 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
ROSS & BARUZZINI, INC. | $464,198 |
Mark Twain Lake - Boudreaux Visitor Center Complex: To remove the existing building and replace that structure with a new building, complete with interpretive exhibits. Both the original structure and its replacement will have their location with the M.W.
This spending item is part of a $4,743,526 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
MAGRUDER CONSTRUCTION COMPANY, INC. | $458,421 |
Recovery project #111147, Centaur RR Closure, Chesterfield, MO. Pile-founded, reinforced concrete flood control structure having two steel swing gates which seal against each other, two center gate strut assemblies and a sheet pile cutoff
This spending item is part of a $1,070,036 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/02/2010 |
Innovations In Art, Inc | $400,000 |
Mark Twain Lake - Boudreaux Visitor Center Complex: To remove the existing building and replace that structure with a new building, complete with interpretive exhibits. Both the original structure and its replacement will have their location with the M.W.
This spending item is part of a $4,743,526 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
Innovations In Art, Inc | $400,000 |
Replacement of Lake Shelbyville Visitor Center to provide facilities that are proactive, educational, and encourage a broader understanding and appreciation of all the resources in the region.
This spending item is part of a $6,834,551 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
COATINGS UNLIMITED, INC. | $348,282 |
ARRA PROJECT #6440, Gavins Point Dam, Intake Gate Rehab, Yankton, SD.
This spending item is part of a $901,532 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
ROSS & BARUZZINI, INC. | $334,208 |
Replace the Cordell Hull Natural Resource Manager's Office and Display Area Facility that was destroyed by fire in 2008.
This spending item is part of a $2,923,847 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
SURDEX CORPORATION | $334,015 | 323983 The Kansas City District US Army Corps of Engineers requires a high-resolution digital elevation model developed from LiDAR (Light Detection and Ranging) data for all below, as well as hydrographic survey data integration and GIS services for two o | U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
SHANNON & WILSON, INC. | $324,686 | Jane Green Detention System | U.S. Army Corps of Engineers - civil program financing only | 12/16/2009 |
INSITUFORM TECHNOLOGIES, INC. | $281,000 | Humphries County, Installation CIPP | U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
HARTMAN-WALSH PAINTING COMPANY | $273,402 |
Rend Lake Spillway Bridge Repair; Railroad Bridge Removal; Dredge of Silted-In Boating Areas; and Kaskaskia River Navigation Excavation in Benton, Illinois.
This spending item is part of a $4,028,003 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
INSITUFORM TECHNOLOGIES, INC. | $272,253 | Northeastern Minnesota Environmental Infrastructure (Section 569) - ARRA As part of the design and construction of the rehabilitation of sanitary sewer project in various locations in the City of Duluth, MN, the ARRA Program will assist in the installation of cured-inplace-pipe (CIPP) along 2nd Strereet between 7th Avenue East a... Show more | U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
REITZ & JENS INC | $262,199 |
Current orders under this contract are to complete Periodic Inspections (PI) on 26 levee systems along the Mississippi, Illinois, and Kaskaskia Rivers in Missouri and Illinois. Work will include conducting engineering inspections of levees and associated
This spending item is part of a $3,911,985 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/22/2010 |
SUPERIOR CONTRACTING GROUP, INC. | $250,000 |
PROJECT NO. 111147.Demolition of three (3) two story buildings. Including foundations, and 12? below Slab on grade on legally remove to landfill Demo asphalt parking lot and curbs and gutters and legally remove from site Demo underground storm and uti
This spending item is part of a $1,752,143 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/22/2010 |
REITZ & JENS INC | $235,184 |
Task Order 1 under this IDIQ contract is to complete Periodic Inspections (PI) of 4 levee systems along the Mississippi and Missouri Rivers in Missouri and Illinois. PIs were completed on the Consolidated North County, Cape Girardeau, and St. Genevieve L
This spending item is part of a $508,151 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
COATINGS UNLIMITED, INC. | $228,660 |
Rehab and Painting of Tainter Gates at Kaw Lake Dam, OK
This spending item is part of a $859,982 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/25/2009 |
SURDEX CORPORATION | $225,000 | Delivery Order 0013: ARRA-LiDAR Data & Orthophotography Project Phase 2, Fayetteville, AR IAW attached Scope of Work. Delivery date - 30 September 2009; Amendment 01: Increase required area of coverage by 1,500 square miles located immediately west and ad | U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
SURDEX CORPORATION | $225,000 | Delivery Order 0013: ARRA-LiDAR Data & Orthophotography Project Phase 2, Fayetteville, AR IAW attached Scope of Work. Delivery date - 30 September 2009; Amendment 01: Increase required area of coverage by 1,500 square miles located immediately west and ad | U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
ROSS & BARUZZINI, INC. | $167,879 |
This project is to complete the design and construction of the second story expansion and alteration to the existing Intermediate Wall Control House at Lock 27 in Granite City, IL.
This spending item is part of a $1,514,609 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
SURDEX CORPORATION | $165,500 | 323893 Delivery Order 0014: ARRA-LiDAR data and Orthophotography project; Big Muddy River, IL. In accordance with attached Scope of Work: design, research, floodplain mapping, dam safety assessments, updating inundation maps, and hydrologic modeling utili | U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
TESTAMERICA LABORATORIES, INC. | $154,521 |
The Atomic Energy Commission utilized the Luckey site for beryllium processing to support the national defense program. Beryllium production activities brought different types of source media or potential contaminants to the site. Primary source media a
This spending item is part of a $1,055,610 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/15/2009 |
SHANNON & WILSON, INC. | $151,383 |
Task Order 1 under this IDIQ contract is to complete Periodic Inspections (PI) of 4 levee systems along the Mississippi and Missouri Rivers in Missouri and Illinois. PIs were completed on the Consolidated North County, Cape Girardeau, and St. Genevieve L
This spending item is part of a $508,151 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
DIAMOND H ACQUISITION CORP INC | $150,000 |
PROJECT NO. 111147.Demolition of three (3) two story buildings. Including foundations, and 12? below Slab on grade on legally remove to landfill Demo asphalt parking lot and curbs and gutters and legally remove from site Demo underground storm and uti
This spending item is part of a $1,752,143 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/22/2010 |
ARTISAN CONTRACTING, INC. | $149,982 |
PROJECT NO. 111147.Demolition of three (3) two story buildings. Including foundations, and 12? below Slab on grade on legally remove to landfill Demo asphalt parking lot and curbs and gutters and legally remove from site Demo underground storm and uti
This spending item is part of a $1,752,143 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/22/2010 |
Swt Assoc Inc | $125,409 |
For Delivery Ordert / Task Order 0003 - (1) To Provide a work/plan design to execute the repair/renewal/construction effort for Dewey Short Visitor's Center, Table Rock Lake, Branson, MO. (2) Facilities Repair Renewal (FRR) of the Dewey Short Visitor's Ce
This spending item is part of a $8,083,140 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
SURDEX CORPORATION | $116,536 | 323893 The Tulsa District US Army Corps of Engineers requires a high-resolution digital elevation model developed from LiDAR (Light Detection and Ranging) data for all below, as well as hydrographic survey data integration and GIS services for two of the | U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
SURDEX CORPORATION | $100,000 | LiDAR (Light Detection and Ranging) Mapping for 10 counties in Eastern Kansas, approximately 5300 square miles. RECOVERY PROJECT NUMBER 323133 - Sediment Survey-Lidar, Melvern Lake, RECOVERY PROJECT NUMBER 323137 - Sediment Survey-Lidar, Pomona Lake, RECO | U.S. Army Corps of Engineers - civil program financing only | 2/16/2010 |
WORLD WIDE TECHNOLOGY, INC. | $81,306 | As part of Project: Inland Waterway Navigation Charts / PN::008315 task order DF45 to contract W91QUZ-07-D-0011-DF45 is for 4 HP Blade Servers to support the Lock Operations Management Systems (LOMA) being developed to track real time traffice of commerci | U.S. Army Corps of Engineers - civil program financing only | 9/29/2010 |
Industrial Products Corp. | $51,506 |
Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010.
This spending item is part of a $27,941,413 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
GATEWAY COMPANY OF MISSOURI, LLC, THE | $50,820 |
Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010.
This spending item is part of a $27,941,413 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
SECURITY EQUIPMENT SUPPLY, INC. | $32,673 | PROJECT# 18660 TUTTLE LAKE, KS | U.S. Army Corps of Engineers - civil program financing only | 9/17/2010 |
MILLENNIUM ENGINEERING & SALES, INC. | $30,900 | Furnish and Deliver High-Performance plate & frame heat exchangers to the Harry S Truman Power Plant, Warsaw, MO. | U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
ROBERTS ENVIRONMENTAL DRILLING, INC. | $28,164 |
PROJECT NO. 111147. Provide Structural Gates for Rail Road Closure. Provide H pilling and Floodwall for north and south of gate Concrete Abutments for Gate closure Provide sheet pilling and excavation Provide temporary railroad track and tie structu
This spending item is part of a $2,447,873 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2010 |
M Brent McClane | $17,084 |
The services to be provided under this contract will be accomplished by diving surveys at various locations for the purpose of identifying freshwater mussel communities in and near an area proposed for navigation channel maintenance dredging disposal acti
This spending item is part of a $23,805 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/11/2009 |
WELLINGTON ENVIRONMENTAL CONSULTING & CONSTRUCTION, INC | $14,038 |
Replacement of Lake Shelbyville Visitor Center to provide facilities that are proactive, educational, and encourage a broader understanding and appreciation of all the resources in the region.
This spending item is part of a $6,834,551 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
HODELL-NATCO INDUSTRIES, INC. | $9,276 | NUTS AND BOLTS FOR AN ARMY CORP OF ENGINEER PROJECT UNKNOWN TO US. | U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
REIS ENVIRONMENTAL, INC. | $6,334 | SANDING BLASTING EQUIPMENT MEL PRICE DAM ALTON, IL | U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
GENERAL ELECTRIC INTERNATIONAL, INC. | $0 |
Services to repair 6 Amplidynes for the Barkley Power Plant project of the Nashville District U.S. Army Corps of Engineers.
This spending item is part of a $390,788 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
KEITH CONTRACTING, L.L.C. | $0 |
Recovery Project #111147; Baxter Road Phase 3, Chesterfield, MO. 69.5 foot long run of concrete-capped sheet pile I-wall, 335 foot long run of H-pile founded T-wall with a sheet pile cutoff, 157.58 foot long run of concrete capped sheet pile I-wall and a
This spending item is part of a $1,697,199 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/26/2010 |