Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Missoula County, Mont., funds by U.S. Army Corps of Engineers

Listing $230,699.00 in stimulus funds from U.S. Army Corps of Engineers for Missoula

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HRA GRAY & PAPE LLC $139,310 Project 324332: Section 110 cultural resources investigations (survey) of Mill Creek, Lower Monumental, Lower Granite, Little Goose, Ice Harbor, Washington; McNary Washington adn Oregon; and Dworshak, Idaho
This spending item is part of a $501,000 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 3/24/2010
Roscoe Steel and Culvert Co. $59,789 Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 12/07/2009
ROSCOE STEEL AND CULVERT CO. $25,780 FABRICATION OF ONE (1) 4'X 62' FREE-SPAN PEDESTRIAN BRIDGE, CONSTUCTED OF HIGH STRENGTH, WEATHERING TUBE STEEL IN COMPLIENCE WITH AASHTO SPECIFICATIONS. BRIDGE DELIVERED IN TWO (2) SECTIONS WITH FULLY BOLTED SPLICE CONNNECTIONS, DEKCING SHALL BE DOUGLAS
This spending item is part of a $31,600 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
PACIFIC HIDE & FUR DEPOT $3,320 FABRICATION OF ONE (1) 4'X 62' FREE-SPAN PEDESTRIAN BRIDGE, CONSTUCTED OF HIGH STRENGTH, WEATHERING TUBE STEEL IN COMPLIENCE WITH AASHTO SPECIFICATIONS. BRIDGE DELIVERED IN TWO (2) SECTIONS WITH FULLY BOLTED SPLICE CONNNECTIONS, DEKCING SHALL BE DOUGLAS
This spending item is part of a $31,600 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
APEX ENGINEERING SERVICES, INC. $2,500 FABRICATION OF ONE (1) 4'X 62' FREE-SPAN PEDESTRIAN BRIDGE, CONSTUCTED OF HIGH STRENGTH, WEATHERING TUBE STEEL IN COMPLIENCE WITH AASHTO SPECIFICATIONS. BRIDGE DELIVERED IN TWO (2) SECTIONS WITH FULLY BOLTED SPLICE CONNNECTIONS, DEKCING SHALL BE DOUGLAS
This spending item is part of a $31,600 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009