Cedar County, Neb., funds by U.S. Army Corps of Engineers
Listing $5,633,732.46 in stimulus funds from U.S. Army Corps of Engineers for Cedar
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
DEAN KURTZ CONSTRUCTION COMPANY | $2,526,097 | TAS 96 3135, Recovery Project#::6440::RP# GP Design/Build Powerhouse Crane Rehab at the Gavins Point Project Office-ARRA Funds, P2 #323326 | U.S. Army Corps of Engineers - civil program financing only | 6/22/2010 |
WESTERN CONTRACTING CORPORATION | $1,102,013 | As part of the construction of clearing and grubbing, embankment placement and excavation per drawings and specifications at Missouri River Mile 781 Cedar County, Nebraska. | U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
WESTERN CONTRACTING CORPORATION | $870,700 | As a part of construction of clearing and grubbing, embankment placement, and excavation per drawings and specifications at Missouri River Mile 781.4, Cedar County, Nebraska. | U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
DEAN KURTZ CONSTRUCTION COMPANY | $457,972 |
As part of maintenance at Gavins Point Dam, Cedar County, NE this design build contract is for: 1. Remove old elevator components. Complete installation, commissioning, and certification of new elevator components. 2. Replace existing fire alarm notifier
This spending item is part of a $599,327 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
NDG CONSTRUCTORS | $304,700 |
As part of maintenance to rehab existing asphalt roadway and parking areas including milling all existing asphatlt and blending with existing base cours, recompact and install asphalt overlay at Gavins Point Project, Nebraska, Cedar County.
This spending item is part of a $1,300,648 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/09/2009 |
SLOWEY CONSTRUCTION, INC. | $190,741 |
As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
NDG CONSTRUCTORS | $119,559 |
As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
LEO A DALY COMPANY | $32,800 |
As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
FOURFRONT KURTZ JOINT VENTURE | $29,151 |
As part of maintenance at Gavins Point Dam, Cedar County, NE this design build contract is for: 1. Remove old elevator components. Complete installation, commissioning, and certification of new elevator components. 2. Replace existing fire alarm notifier
This spending item is part of a $599,327 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
FOURFRONT KURTZ JOINT VENTURE | $0 |
TAS 96 3135, Recovery Project#::6440::RP# GP Design/Build Powerhouse Crane Rehab at the Gavins Point Project Office-ARRA Funds, P2 #323326
This spending item is part of a $2,321,022 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/22/2010 |